taklimat kepada ahli –ahli parlimen lynas advanced material plant (lamp)

22
TAKLIMAT KEPADA AHLI –AHLI PARLIMEN LYNAS ADVANCED MATERIAL PLANT (LAMP)

Upload: nani

Post on 13-Jan-2016

56 views

Category:

Documents


0 download

DESCRIPTION

TAKLIMAT KEPADA AHLI –AHLI PARLIMEN LYNAS ADVANCED MATERIAL PLANT (LAMP). LYNAS Advanced Material Plant. 25 KMs North East of Kuantan. 600,000 Population Beautiful Beaches, Tourist Town One of the biggest Fishing port Seafood Industry - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

TAKLIMAT KEPADA AHLI –AHLI PARLIMEN

LYNAS ADVANCED MATERIAL PLANT (LAMP)

Page 2: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

25 KMs North East of Kuantan

LYNAS Advanced Material Plant

• 600,000 Population• Beautiful Beaches,• Tourist Town• One of the biggest Fishing port• Seafood Industry• Monsoon season and high rainfall Nov-Jan

Page 3: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Lynas Malaysia Sdn Bhd100% Milik Australia

Page 4: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

LAMP

• Di JADUAL KAN SIAP SEPT 2011

• MENERIMA LESEN UNTUK MEMBINA 2008

Page 5: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

• LAMP built over 100 hectare of land – With no inner buffer zone.

Page 6: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)
Page 7: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)
Page 8: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Lynas’s Mount Weld mine Lynas’s Mount Weld mine

Page 9: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

LYNAS Corporation

• Satu Syarikat milik Australia • Di kecualikan dari membayar cukai selama 12

tahun – status “Strategik Pioneer Status” oleh MITI

• Logi Lynas di Gebeng ini hanya akan mengambil 350 pekerja

Page 10: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Lynas Malaysia Sdn Bhd

• Di miliki sebenuhnya oleh Lynas Corp (Tiada shareholder tempatan)

• Authorised Capital RM500,000• Issued Capital RM250,000 (semuanya di bayar

oleh Lynas Corp)• Director Lynas Malaysia Sdn Bhd merupakan

Nominee Director

Page 11: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

LAMP – Lynas Advanced Material Plant

• Apabila Logi Lynas (LAMP) beroperasi sepenuhnya akan mengeluarkan tanah nadir bernilai jumlah Export sebanyak RM8 bil setahun

• Lynas Corp akan menguasai 30% pasaran dunia

• LAMP akan menjadi logi pemrosesan Tanah Nadir yang terbesar didunia

Page 12: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Deportment of Radioactivity(Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri

Trengganu)

The Mt Weld Rare Earths ore contains a naturally low level of radioactive thorium, which is concentrated with the Rare Earths in the flotation process.

The ore typically contains 23 ppm U3O8 and 750 ppm ThO2 which equates to a total radioactivity of 31 Bq/g for the two decay chains.

The concentrate typically contains 29 ppm U3O8 and 1600 ppm ThO2 which equates to a total radioactivity of

61 Bq/g for the two decay chain

Page 13: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

PIAWAIAN NEGERI CINA (Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri Trengganu)

• For Chinese industry the classification of radioactive wastes is defined in the Chinese Standard GB9133-S3, which specifies that a solid waste with a specific activity of less than 74Bq/g is classified as non radioactive solid waste and can therefore be stored in a standard waste solids facility with impermeable lining

Page 14: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Lynas Malaysia Sdn Bhd

• Insists that their Mt Weld ore is lathanide contrary to various other reports which states that Mt Weld ore are monazites in nature

• Proposes to bring the Rare Earth concentrate into Malaysia NOT as radioactive material.

• Declares that the residues (tailings) from processing in LAMP are not radioactive and not hazardous in nature. Thus can be disposed as municipal waste

• Western Australian Minister has asserted in WA Parliament that the radioactive waste belongs to Malaysia and will not be accepted back into Australia

Hon Norman Moore- Menteri WA

Page 15: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Menurut kertas kajian yang di keluarkan oleh Parlimen Australia No: 11 2007-08

Sumber utama Thorium di Australia ialah mineral Monazite yang merupakan tanah nadir kemerah merahan / coklat mineral phosphate yang mengandungi 8 - 10 % Thorium.

Berdasarkan sasaran, LYNAS akan memproses 22,000 -32,000 (fully operational) metric tan tanah nadir setahun

Page 16: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Lynas Corp• Lynas mengambil alih Ashton Rare Earth Ltd dan mendapat

lesen melombong di Mt Weld (1992)• Ashton telah mendapat kelulusan membina logi

pemprosesan di Australian di bawah kawal seliaan EPA Australia dan mempunyai ‘Waste Management Plans’ untuk Concentration Plant di Mt Weld dan ‘Secondary Processing Plant’ di Meenaar dimana melibatkan menghantar balik sisa buangan radioaktif ke Mt Weld

• Ashton menegaskan bahawa bahan rare earth ore dan sisa buangan haruslah di kendali sebagai hazardous material dan oleh itu telah pun berikan proposal yang menyeluruh berkenaan pengendalian, melibatkan pengangkutan sehinggalah pengendalian sisa buangan radioaktif

Page 17: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Radioactive Composition of Rare Earth Ore

Mt Pass OreBastnaesite• Uranium 0.002 %• Thorium 0.02 %

Mt Weld OreMonazite• Uranium 0.0028 %• Thorium 0.075 %

Mt Weld Concentrate• Uranium 0.0029 %• Thorium 0.16 %

Page 18: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Proposed Processing and Waste Management Plans

Molycorp Minerals - Refinery Due to operate 2012-2024

• The plant operation is expected to run on an environmentally advanced standard due to extensive public approval procedure (EU Parliament Paper)

Lynas – LAMP due to operate Sept 2011

• No Concrete Waste Management Plans yet

• Menggunakan Piawaian Negeri Cina

• No Public Consultation prior to construction

• EIA –full report is not made available to the public

Page 19: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

‘Public Consultation’ oleh PKNP

• Lulus lesen untuk membina 2008• 18 Nov 2008 di bawa ke Palimen

buat pertama kali• AELB datang ke Kuantan 2009• Tidak melibatkan rakyat. –hanya

memanggil Ketua-Ketua Jabatan dan MP serta ADUN

• 8 sesi penerangan yang di anjurkan PKNP bulan April 2011 di hentikan selepas 2 sesi.

5 April 2011

Page 20: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

Status LAMP

• Belum menerima Lesen Operasi / Lesen Operasi Sementara dari AELB

• Panel Pakar akan diberi masa 1 bulan untuk memberi maklumbalas. Laporan panel IAEA di jangka siap pada 30 June 2011

Page 21: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

CONCERNS – APA YANG MEMBIMBANGKAN • Malaysia tiada undang-undang ketat di dalam

memelihara Alam Sekitar• Kerajaan Malaysia tidak menjadikan Public

Consultation sebagai satu prosedur wajib didalam proses membuat keputusan.

• Malaysia tiada ‘Freedom of Information Act’• Sehingga kini Laporan EIA yang lengkap keatas Lynas

tidak boleh didapat oleh orang awam• Banyak isu berkenaan penguatkuasaan undang-

undang• Rasuah

Page 22: TAKLIMAT KEPADA AHLI –AHLI PARLIMEN  LYNAS ADVANCED MATERIAL PLANT (LAMP)

STOP LYNAS!!! PROTECT KUANTAN

ByConcerned Citizens of Kuantan

Thank You