sokongan pejabat pembangunan dan …reg.upm.edu.my/eiso/docs/2012102211431210.sok.pyg... · faktor...

1
Projek : ___________________________ TCL DF MD Arus 3 fasa Arus 1 fasa Saiz Kabel (Watt) (Watt) (Ampere) (Ampere) SPN TPN (mm.sq) Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti 1 gang 2 gangs 3 gangs ISO SPN 32A ISO TPN 32A 15A Pemanas Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti 18W 26W 36W 80W 250W 400W 1000W Nota: Vd = Cannot Exceed 4% (Single Phase = 9.6V, Three Phase = 16.6V) Vd = (mV x Ib x L) / 1000 where Vd = Voltage Drop mV = Cable Voltage Drop Refer Table 4D2B Ib = Loading Current L = Cable Length (m) Disediakan Oleh : ______________________ Disemak Oleh : _________________________ Tarikh : ______________________ Tarikh : _________________________ Cop Rasmi : Cop Pengesahan : : 00 NO. ISU : 02 TARIKH KUAT KUASA : 03/01/2011 NO. SEMAKAN Nama PTJ : ___________________________ Penggunaan 24jam 1.00 Jumlah Beban 0 0 0 Voltage Drop Calculation (kiraan susutan voltan akan diambil kira apabila panjang kabel melebihi 50m) Penggunaan < 12jam 0.8 0 1.5hp (Watt) = hp x 746 2.0hp (Watt) = hp x 746 2.5hp (Watt) = hp x 746 3.0hp (Watt) = hp x 746 (Watt) = hp x 746 Lengkapan lampu Beban Beban 0 0 Penghawa Dingin 0 Bil Beban 1.0hp (Watt) = hp x 746 0 0 0 0 0.00 0 0 0.00 1.5mm Soket Alur Keluar Beban Beban Beban Beban Beban 0 2.5mm 0 0.00 0.00 Faktor Kepelbagaian (DF) 0 0 Pemutus Litar Utama 0.00 0.00 0 0.00 0 0 0.00 1.5mm Beban Kipas Siling Beban Lain-lain Beban Kipas Pelawas Beban Kipas Industri 0 Beban Beban 5.0hp 1 2 0 Kipas 0 Beban Beban Beban 0 Beban BORANG PENGIRAAN BEBAN ELEKTRIK PEJABAT PEMBANGUNAN DAN PENGURUSAN ASET SOKONGAN KOD DOKUMEN : SOK/PYG/BR11 3 4

Upload: vuongkhanh

Post on 03-Mar-2018

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: SOKONGAN PEJABAT PEMBANGUNAN DAN …reg.upm.edu.my/eISO/docs/2012102211431210.SOK.PYG... · Faktor Kepelbagaian (DF) 0 0 Pemutus Litar Utama 0.00 0.00 0 0.00 0 0 ... BORANG PENGIRAAN

Projek : ___________________________

TCL DF MD Arus 3 fasa Arus 1 fasa Saiz Kabel

(Watt) (Watt) (Ampere) (Ampere) SPN TPN (mm.sq)

Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti

1 gang 2 gangs 3 gangs ISO SPN 32A ISO TPN 32A 15A Pemanas

Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti Kuantiti

18W 26W 36W 80W 250W 400W 1000W

Nota:

Vd = Cannot Exceed 4% (Single Phase = 9.6V, Three Phase = 16.6V)

Vd = (mV x Ib x L) / 1000

where Vd = Voltage Drop mV = Cable Voltage Drop Refer Table 4D2B Ib = Loading Current L = Cable Length (m)

Disediakan Oleh : ______________________ Disemak Oleh : _________________________

Tarikh : ______________________ Tarikh : _________________________

Cop Rasmi : Cop Pengesahan :

: 00

NO. ISU : 02

TARIKH KUAT KUASA : 03/01/2011

NO. SEMAKAN

Nama PTJ : ___________________________

Penggunaan 24jam 1.00

Jumlah

Beban

0 0 0

Voltage Drop Calculation (kiraan susutan voltan akan diambil kira apabila panjang kabel melebihi 50m)

Penggunaan < 12jam 0.8

0

1.5hp(Watt) =

hp x 7462.0hp

(Watt) =

hp x 7462.5hp

(Watt) =

hp x 7463.0hp

(Watt) =

hp x 746

(Watt) =

hp x 746

Lengkapan lampu

Beban Beban

0 0

Penghawa Dingin 0

Bil Beban 1.0hp(Watt) =

hp x 746

0 00 0 0.000 0 0.00 1.5mm

Soket Alur Keluar

Beban Beban Beban Beban Beban

0 2.5mm0 0.00 0.00

Faktor Kepelbagaian (DF)

0 0

Pemutus Litar Utama

0.00 0.00

0 0.00

0

0

0.00 1.5mm

Beban Kipas Siling Beban Lain-lain BebanKipas

PelawasBeban

Kipas

Industri

0

Beban Beban

5.0hp

1

2

0

Kipas

0

Beban Beban

Beban

0

Beban

BORANG PENGIRAAN BEBAN ELEKTRIK

PEJABAT PEMBANGUNAN DAN PENGURUSAN ASET

SOKONGAN

KOD DOKUMEN : SOK/PYG/BR11

3

4