senior manager cidb sijil reka bentuk (sementara) sijil reka bentuk & pembinaan (50%- 50%) sijil o&m

Download Senior Manager CIDB Sijil Reka Bentuk (Sementara) Sijil Reka Bentuk & Pembinaan (50%- 50%) Sijil O&M

Post on 11-Feb-2020

8 views

Category:

Documents

0 download

Embed Size (px)

TRANSCRIPT

  • Zuraihi Abdul Ghani Senior Manager

    CIDB Malaysia

  • Administrator of MyCREST

  • Floods in East Coast Peninsular

    Malaysia – Dec 2014

  • Quality, Safety &

    Professionalism

    Quality, safety and

    professionalism ingrained in

    industry culture

    More than 50%

    public projects

    exceed acceptable

    QLASSIC score

    More than 50%

    reduction in

    worksite fatalities

    and injuries

    Ease of Doing Business

    indicator in dealing with

    construction permits

    improved bt 5% points

    Expected Outcomes from 4 Strategic Thrusts of the CITP

    Environmental

    Sustainability

    Malaysian sustainable

    infrastructure: a model for the

    emerging world

    100% of large infrastructure

    projects exceed

    sustainability requirements

    4 Mt CO2 equivalent reduction per

    year

    Productivity

    More than doubling productivity,

    matched by higher wages

    2.5x increase in productivity to

    US$16,500 per worker

    Internationalisation

    Malaysian Champions:

    Leading the charge locally and

    globally

    10 companies

    achieve 5 STAR

    SCORE rating

    50 Malaysian

    companies earn

    G8 Status

    10 more

    constructions-related

    companies export

    construction services

    in the global market

  • Sustainability Rating Tool

    Building Township Infrastructure

    Malaysian Sustainability Rating Tools

    SUSTAINABLE

    INFRASTRUCTURE

    RATING TOOL

    http://www.utm.my/construction/files/2014/03/myghi-logo.jpg http://www.utm.my/construction/files/2014/03/myghi-logo.jpg

  • What is MyCREST?

    MyCREST

    RATING TOOL

    AIMS

    Quantifying, and

    reducing built

    environment’s impact

    in terms of carbon

    emissions and

    environmental

    implication That

    guides construction industry players and stakeholders to

    design, construct and operate buildings that integrate low carbon and sustainable

    practices

    Malaysian Carbon Reduction and

    Environmental

    Sustainability Tool

    GOVERN BY

    1. Ministry of Works

    Malaysia

    2. CIDB Malaysia

    3. Public Work

    Department

  • RATING STAGES MyCREST

  • MyCREST Certification

    RATING

  • PEMBINAAN OPERASI

    & PENYELENGGARAAN REKA BENTUK

    Sijil Reka Bentuk (Sementara) Sijil Reka Bentuk &

    Pembinaan

    (50%- 50%)

    Sijil O&M

    Sijil Keseluruhan LABEL PENGURANGAN KARBON

    /REDUCED CARBON LABEL

    Jenis-Jenis Pensijilan MyCREST

    Kondisi:

    Bangunan Baru:

    Jika projek memperolehi Sijil di peringkat Reka Bentuk & Pembinaan serta Sijil O&M

    Bangunan Sedia Ada

    Jika bangunan sedia ada memperolehi Sijil di peringkat Sijil O&M dengan sekurang-kurangya 3 Bintang.

  • Jenis-Jenis Pensijilan MyCREST

    Design

    (50%)

    Construction(50

    %) +

    Sijil MyCREST

    Reka Bentuk & Pembinaan

    Sijil MyCREST

    Operasi & Penyelenggaraan

    Sijil MyCREST

    Reka Bentuk, Pembinaan, O&M

    Operation & Maintenance

    (100%) Design

    (50%)

    Construction(50

    %)+ O & M+

  • IMPLEMENTATION

    REQUIREMENT

    1

    23 Reference

    Guide Carbon

    Calculator

    Scorecard

  • Criteria Name

    Identification Code

    Sub-Criteria Name Assessment Stage

    No. of points

    Carbon calculator codeCriteria Aims

    Requirements to score the points

    Justification

    Approach & Strategy

    Submittals

    Standards & Codes to be referred

    Sample of Reference Guides

  • a. Project Details

    b. Design Tool scoring

    c. Construction Tool scoring

    d. O&M Tool scoring

    e. Final Rating Star Award

    f. Carbon Summary for Design Tool

    g. Carbon Summary for

    Construction Tool

    h. Carbon Summary for O&M Tool

    i. Total Carbon Emission

    Sample of Scorecard

    ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf ../../ppt1/MyCREST Part 1/MyCREST Part 1/MyCREST/MYCREST RG_Introduction ver3.2_03102014.pdf

  • Sample of Scorecard – EC (Lowering the Embodied Carbon)

  • REGISTRATION FEE MyCREST

    Gross Floor Area Registration fee Renewal

    < 2000 m² RM 2,000 -

    2001 – 4000 m² RM 4,000 RM 1,200

    4001 – 10,000 m² RM 5,000 RM 1,500

    10,001 – 30,000 m² RM 10,000 RM 3,000

    30,001 – 50,000 m² RM 15,000 RM 4,500

    50,001 – 100,000 m² RM 20,000 RM 6,000

    >100,000 m² Determine based on project