palm oil biomass industry - palmex thailand 2018thaipalmoil.com/paper2011/mr. douglas...
TRANSCRIPT
Palm Oil Biomass IndustryPalm Oil Biomass Industry
EFB: Waste to Wealth?EFB: Waste to Wealth?
Wisma Zelan, Suite 01.12B, 1st Floor, No. 1, Jalan Tasik Permaisuri 2, Bandar Tun Razak, Cheras 56000, Kuala Lumpur, Malaysia.
EFB: Waste to Wealth?EFB: Waste to Wealth?
Global Green Synergy Global Green Synergy SdnSdn BhdBhd
1
Introduction of GGS
Introduction of Palm Biomass Industry
Application of Palm Biomass
2
Content
Application of Palm Biomass
Optimizing the Biomass Product Portfolio
GGS Dried Long Fiber (DLF) Treatment
Plant
Introduction of
� GGS was founded in 2007 in Malaysia
� Good track record in:
- dried long fiber and other value-
added palm biomass trading
business
- providing solutions for palm
3
- providing solutions for palm
biomass treatment and
manufacturing
- collaboration in R&D with both
academics and industry
specialists to provide state-of-
the-art solutions for your palm
biomass
� Company philosophy – to promote
‘Technology and Business Synergy’
Palm Biomass
4
Mesocarp FiberPalm Trunk
EFB
(Largely
unutilized)
Mesocarp Fiber
(Heat & Power generation)
Palm Frond
(Largely unutilized)POME
(Biogas
production)
Palm Kernel Shell
(Heat & Power
generation)
Palm Trunk
(Largely unutilized)
Fresh Fruit Bunch
(FFB)
Palm Biomass
5
Thailand
FFB ≈ 9,000,000 t/year
EFB ≈ 2,000,000 t/year
Empty Fruit Bunch (EFB)
After Process
• Extraction rate of EFB from FFB @23%of FFB
Conventional Practice in Palm
Oil Mills
6
Empty Fruit Bunch (EFB)Empty Fruit Bunch (EFB)
Normal ways
Burning for heatOrganic Fertilizer Left as waste
Most of the times
Conventional Practice in Palm
Oil Mills
Empty Fruit Bunch (EFB)Empty Fruit Bunch (EFB)
Normal ways
Burning for heatOrganic Fertilizer Left as waste
Most of the times
7
Empty Fruit Bunch (EFB)Empty Fruit Bunch (EFB)
Organic Fertilizer
What are the alternatives?
Bio-Pellet
8
Burning for heat
Organic Fertilizer
Dried Long Fiber (DLF)
Bio-Pellet
Bio-Briquette
How do we decide?
Empty Fruit Bunch
(EFB)
Empty Fruit Bunch
(EFB)
Organic Fertilizer Bio-Pellet
� Process Optimization
- making the best decision to
meet your investment
objective
� What insights and solutions
can Process Optimisation
9
Burning for heatDried Long Fiber (DLF) Bio-Briquette
can Process Optimisation
provide?
- to identify biomass value loss
- to identify maximum economic
gain with optimal products
allocation
- strategy for a one-go or
modular investment in
stages
Empty Fruit Bunch (EFB)Empty Fruit Bunch (EFB)
Dried Long Fiber (DLF)Dried Long Fiber (DLF)
10
DLF Treatment Plant
Converting into
All you need to do is just to set up a EFB fiber
production line in your mill.
11
DLF Treatment Plant
Patented and Proven Technology
Specification of EFB
Dried Long Fiber:
�Moisture Content: 12-15%
12
DLF Treatment Plant
�Moisture Content: 12-15%
�Oil Content: < 1%
� Length: 5 – 15cm
� Impurities: < 5%
�Weight: 150-180kg / bale
�Container: 19 – 20MT/40’HQ
Major Commercial Usage:
Mattresses Manufacturing
~ Alternative to Coconut
13
DLF Treatment Plant
~ Alternative to Coconut
Fiber
Eco-Mat Manufacturing
~ ensure slow release of
moisture and nutrients
~ prevent soil erosion
A EFB fiber production line consists of the followings:
14
DLF Treatment Plant
Fiber
Separating
Equipments
Fiber Drying
Equipments
Fiber Baling
Equipments
Capacity :500 MT/mth
Thru 20hrs operation and 25 Thru 20hrs operation and 25 Thru 20hrs operation and 25 Thru 20hrs operation and 25 working days per month.working days per month.working days per month.working days per month.
15
DLF Treatment Plant
Patented and Proven Transfer of Technology
What You Need Is:
1. EFB Input :
- Oil Content Less Than 1%
16
DLF Treatment Plant
- Oil Content Less Than 1%
- Moisture Level Less Than 45%
- EFB in Non-Shredded condition
- 2,000 MTs of EFB per Month
- Process within 24 hours for Freshness
based on 3 to 1 ratio plus 1 Mts extra for Boiler
What You Need Is:
2. Operating cost
17
DLF Treatment Plant
• - Power Consumption 210 kWh/t DLF
• - 14 General Workers, 2 Supervisor [ 2 shifts ]
• - Hot Air 600,000 kcal/ 5 MTs of Steam
• - The ratio 3-4 MTs EFB : 1 MTs DLF
What You Need Is:
3. Land Requirement
18
DLF Treatment Plant
3. Land Requirement
• - 20 m (W) x 100 m (L) x 10 m (H)
• - The Closer to Port, then better
• - Surrounded by Palm Oil Mill for input
supply
What You Need Is:
4. Maintenances cost / Wear & Tear
• - RM 20.00 / (MT/Hrs)
19
DLF Treatment Plant
• - RM 20.00 / (MT/Hrs)
• - Operating Schedule suggesting at
20 hours x 25 days = 6,000 hours/annum
•Buy Back Guarantee
20
DLF Treatment Plant
•Buy Back GuaranteeAbsorb All Produced DFL
* This optional Offer Subject to term and conditions
Buy Back Guarantee *
21
DLF Treatment Plant
Offer buy back price: Minimum RM480/MTsBased on certain factor including location & logistic
* This optional Offer Subject to term and conditions
• Machine, Technology & Know How Investment :
22
DLF Treatment Plant
Investment at RM1,800,000 (≈≈≈≈THB 18,000,000)Building & Land Area not included
ROI : 51 mths
• Machine, Technology & Know How Investment :
23
DLF Treatment Plant
Investment at NOW RM1,600,000 (≈≈≈≈THB 16,000,000)Building & Land Area not included
ROI : 43 mths
• Machine, Technology & Know How Investment :
24
DLF Treatment Plant
If EFB is FREE
ROI : 15 mths
• Machine, Technology & Know How Investment :
25
DLF Treatment Plant
If EFB is FREE
If Power is Self Generated
ROI : Less than 12 mths !
26
GGS Provide:
• 1. Machinery Advice
• 2. Technologies Advice
Summary
GGS DLF/Biomass Treatment Plant
27
• 3. Optimization on Biomass Usage
• 4. Complete Know How Manual
• 5. Staff Training
• 6. Buy Back Guaranteed Option
• 7. Market Insight and Import Export KnowHow
Kindly contact us for detail of
Investment Plan:
28
Albert Law / Steven Ng/ Douglas Tay
Business Development Department
Mobile : +6012-228 6410 / +6012-632
5763/+60168757097
Email : [email protected] / [email protected] /