CADANGAN MEMBINA SATU UNIT
RUMAH BERKEMBAR 2 TINGKAT
LOT RB2-01,
MUKIM SRI GADING,
DAERAH BATU PAHAT,JOHOR DARUK TAKZIM.
SITE PHOTOS AND DRAWINGS
SITE PHOTOS AND DRAWINGS
SITE PHOTOS AND DRAWINGS
SITE PHOTOS AND DRAWINGS
SITE PHOTOS AND DRAWINGS
PILING WORKS AND PILECAPS
Trapezium sized pilecap
TENDER DOCUMENT
CONTENT1. DECLARATION OF NON-COLUSION
2. FORM OF CONTRACT
3. PART A FORM OF TENDER
4. PART B INSTRUCTIONS TO TENDERERS
5. PART C CONDITIONS OF TENDERING
6. PART D FINAL SUMMARY OF TENDER
7. PART E PREAMBLES
8. PART F SPECIFICATION / MATERIALS &WORKMANSHIP
9. PART G BILLS OF QUANTITIES
10.PART H APPENDICES
Form for tenderer to fill in &
signTo declare that they are not under
any agreement with any
tenderer/parties (to submit pre
determined tender amount)
DECLARATION OF NON-COLUSION
FORM OF CONTRACT
a) Articles of
agreementb) Conditions of
contract
Employer & contractor
signing upon tender award
Contractual duty of parties
involved
Form of Contract-PAM Contract 2006
PART A-FORM OF TENDER
Signed by tenderer
Tenderer fill in “tender amount” & proposed
“completion time”(if not fixed by consultant)
PART B-INSTRUCTIONS TO TENDERER
To inform tenderer on rules &
procedure they need to follow
throughout tender processEg: the completed Tender
Documents shall be submitted in a
sealed envelope
PART C-CONDITIONS OF TENDERING
Conditions that need to be complied by
tender during submission
Eg: tender must be submitted together with
earnest money in terms of bank guarantee/
bankers cheque
PART D-FINAL SUMMARY OF TENDERING
Collection of all priced bills for
all sections of project
Tenderer can insert sectional
summary (total amount= Tender
amount)
PART E-PREAMBLES
Contain Clauses To Introduce & Explain Provision in “SPECIFICATION” and “BOQ” Sections and Scope Of Coverage of Rate in BQ.
PART F-SPECIFICATION
Contain extensive clauses on detail
procedures to be followed in
executing the works
Requirements and description of
works to be performed relating to:
-material and workmanship
PART G-BILLS OF QUANTITIES
BILL NO.1 –
Preliminaries
BILL NO.2 –
Main
Building
Works
BILL NO.3 –
External
Works
BILL NO.4 –
PC &
Provisional
Sums
BILL NO.1-
Preliminaries
Allows contractor assess costs which is required by work circumstances
•Site office
•Storage area
Facilities to be provided by contractor
BILL NO.2-
Main Building
Works
BILL NO.3-
External
works
BILL NO.4-
PC and Provisional
Sum
•Electrical Installation
•Cold water and sanitary plumbing
Inserted in tender for specific element or works that is not get defined in enough detail
To cover additional cost for unforeseen cases
PART H -APPENDICE
S
LIST OF DRAWINGS
All drawings used in preparation of contract bills for tenderer’s inspection
SCHEDULE OF FINISHES
• - Set out the detail finishes for the whole building
SCHEDULE OF DAYWORK RATES
For the tenderer to fill in
daywork rates for ‘labour’ &
machineries - shall form the basis of payment for daywork ordered by architecture
Avoid protracted argument on
reasonable rates to be used
PRICES OF BASIC MATERIALS
Tenderer required to fill up this
form to be used for deriving new
rates for variation ordered by
architecture
Avoid protracted argument on reasonable rates to be used
FORM OF BANK GUARANTEE FOR EARNEST MONEY
Refundable amount paid
while quoting for a tender
FORM OF BANK GUARANTEE FOR PERFORMANCE BOND
PERFORMANCE BOND
A bond issued by a bank or other
financial institution, to guarantee the
contractor to complete his work.