MAJLIS PERBANDARAN KLANG NO. SEBUTHARGA: MPK 400-10/2/25 KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG. DOKUMEN TAWARAN TEKNIKAL BIL ISI KANDUNGAN M/S 1. REKOD PENGALAMAN PENYEBUT HARGA D/1 (BORANG D) 2. MAKLUMAT KAKITANGAN TEKNIKAL/ E/1 PEKERJA (BORANG E) 3. SENARAI ALAT KELENGKAPAN/ F/1 JENTERA (BORANG F) 4. SENARAI KERJA KONTRAKTOR SEMASA (BORANG G) G/1 5. BAHAGIAN A (BORANG SPESIFIKASI KERJA DAN PEMATUHAN SPESIFIKASI) Peringatan: 1. Kesemua jadual yang disenaraikan ini Wajib dikemukakan. Penyebut Harga yang gagal mengemukakan Borang D, E, F, G dan BAHAGIAN B akan menyebabkan tawarannya ditolak.

Upload: others

Post on 09-Feb-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

  • MAJLIS PERBANDARAN KLANG

    NO. SEBUTHARGA: MPK 400-10/2/25

    KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN

    HAMZAH UNTUK MAJLIS PERBANDARAN KLANG.

    DOKUMEN TAWARAN TEKNIKAL

    BIL ISI KANDUNGAN M/S

    1. REKOD PENGALAMAN PENYEBUT HARGA D/1

    (BORANG D)

    2. MAKLUMAT KAKITANGAN TEKNIKAL/ E/1

    PEKERJA (BORANG E)

    3. SENARAI ALAT KELENGKAPAN/ F/1

    JENTERA (BORANG F)

    4. SENARAI KERJA KONTRAKTOR SEMASA (BORANG G) G/1

    5. BAHAGIAN A (BORANG SPESIFIKASI KERJA DAN PEMATUHAN SPESIFIKASI)

    Peringatan:

    1. Kesemua jadual yang disenaraikan ini Wajib dikemukakan. Penyebut Harga yang gagal

    mengemukakan Borang D, E, F, G dan BAHAGIAN B akan menyebabkan tawarannya ditolak.

  • BORANG D –REKOD PENGALAMAN KERJA (SENARAI SEMUA KERJA YANG DISIAPKAN DALAM 5 TAHUN LEPAS)

    Bil.

    NAMA KONTRAK/PROJEK DAN SKOP KERJA

    NILAI KONTRAK

    (RM)

    NILAI

    PENYEBUT HARGA BERTANGGUNGJA

    WAB

    TEMPOH KONTRAK

    **

    TARIKH MILIK TAPAK

    TARIKH

    SIAP

    NAMA DAN ALAMAT PEGAWAI PENGUASA / JURUTERA PERUNDING

    NAMA DAN ALAMAT MAJIKAN

    KONTRAK

    SEBENAR

    + Salinan Perakuan / Pengesahan Siap Kerja bagi setiap kerja yang disenaraikan hendaklah disertakan. * Hanya perlu diisi sekiranya Penyebut harga melaksanakan kerja sebagai Ahli Syarikat Gabungan. ** Tempoh Kontrak hendaklah termasuk Lanjutan Masa yang diluluskan.

    D/1

  • BORANG E – MAKLUMAT KAKITANGAN TEKNIKAL (BUTIR-BUTIR KAKITANGAN YANG ADA DALAM PENGGAJIAN PENYEBUTHARGA MASA KINI)

    *NAMA DAN NO. K/P

    UMUR

    KELULUSAN

    PROFESSIONAL/ PENDIDIKAN **

    TAHUN KELULUSAN

    TARIKH

    DIAMBIL BEKERJA

    JAWATAN YG

    DISANDANG/ TUGAS-TUGAS

    SEMASA

    PENGALAMAN LEPAS

    (JAWATAN DISANDANG,

    NAMA PROJEK & MAJIKAN & TEMPOH BEKERJA &

    SEBAGAINYA

    1. 2.

    3.

    4.

    5.

    6. 7.

    8.

    9.

    10.

    * Salinan Sah borang KWSP ̀ A’ setiap pekerja bagi bulan caruman terakhir dan Salinan Perjanjian Perkhidmatan Ahli Professional yang diambil khidmat secara kontrak hendaklah ditawarkan.

    ** Sila sertakan Salinan Sijil Kelulusan atau Sijil Keahlian Badan-badan Professional.

    E/1

  • BORANG F – SENARAI JENTERA-JENTERA, PERALATAN DAN PERKAKASAN (Senarai loji & peralatan pembinaan utama kepunyaan Penyebut Harga yang sesuai yang boleh digunakan untuk projek)

    BIL.

    BUTIRAN

    (JENIS, MODEL, BUATAN DAN

    KEUPAYAAN / SAIZ)

    DIMILIKI, DISEWA-

    BELI ATAU

    DISEWAPAJAK*

    BIL.

    SETIAP

    SATU

    NILAI SEMASA

    UMUR

    (DARI TARIKH BELIAN ASAL

    TEMPAT SIMPANAN/

    DIGUNAKAN SEKARANG

    CATATAN

    * Salinan kad pendaftaran dan / atau dokumen-dokumen lain bukti keempunyaan hakmilik Penyebut Harga atau perjanjian sewa-beli dan peralatan yang disenaraikan hendaklah disertakan.

    ** Pegawai yang menyediakan Dokumen Sebut harga hendaklah menyenaraikan butiran-butiran peralatan asas bagi projek berkenaan

    F/1

  • BORANG G - SENARAI KERJA KONTRAK SEMASA (Senarai semua kerja di dalam tangan / sedang berjalan dan belum siap termasuk kontrak yang baru diaward)

    KEMAJUAN

    KERJA

    BIL.

    NAMA

    KONTRAK/PROJEK+

    NILAI

    KONTRAK (RM)

    NILAI

    PENYEBUTHARGA BERTANGGUNGJA

    WAB

    TEMPOH KONTRAK

    (**)

    TARIKH MILIK TAPAK

    TARIKH

    SIAP PROJEK

    IKUT JADUAL

    (%)

    SEBENAR DICAPAI

    (%)

    NAMA DAN

    ALAMAT JURUTERA

    PROJEK

    NAMA DAN

    ALAMAT MAJIKAN

    * Hanya perlu diisi sekiranya Penyebut Harga melaksanakan kerja sebagai Ahli Syarikat Gabungan. ** Tempoh Kontrak hendaklah termasuk Lanjutan Masa yang diluluskan.

    G/1

  • PENYEBUTHARGA WAJIB MENGISI SEMUA MEDAN PEMATUHAN DAN TAWARAN SEBUTHARGA DENGAN

    MENANDAKAN (/) ATAU (X) DI RUANG PEMATUHAN DAN MENGISI DENGAN JELAS, LENGKAP DAN

    SEMPURNA BUTIRAN SPESIFIKASI YANG DITAWARKAN DI RUANG TAWARAN SEBUTHARGA.

    SEKIRANYA TIADA, ISIKAN TIADA.

    TAWARAN AKAN DITOLAK SEKIRANYA GAGAL MEMENUHI MANA-MANA SYARAT TEKNIKAL YANG

    DITETAPKAN.

    Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    1.0

    KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN

    DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU

    PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS

    PERBANDARAN KLANG

    1.1 Penyebutharga dikehendaki melaksanakan kerja-kerja penaiktarafan Sistem Rangkaian setempat mengikut ketetapan

    berikut :

    1.1.1 Membekal dan memasang Infrastruktur termasuk peralatan,perisian dan sistem hendaklah dipasang di lokasi yang telah ditetapkan oleh Majlis Perbandaran

    Klang (MPK);

    1.1.2 Infrastruktur hendaklah dipasang dengan lengkap,

    sempurna dan beroperasi dengan baik sebelum ditauliahkan kepada MPK;

    1.1.3 Pemasangan hendaklah melibatkan konfigurasi dan penyesuaian dengan persekitaran rangkaian sedia ada;

    1.1.4 Semua peralatan/perisian/sistem yang telah dipasang hendaklah diuji dan disahkan oleh pihak MPK;

    1.1.5 Memberikan perkhidmatan latihan;

    1.1.6 Memberi sokongan teknikal dan penyelenggaraan;

    1.1.7 Menyediakan dokumentasi berkaitan projek.

    MAJLIS PERBANDARAN KLANG

    BANGUNAN SULTAN ALAM SHAH, JALAN PERBANDARAN,

    41675 KLANG, SELANGOR DARUL EHSAN.

    TEL: 33755555 FAX: 33731909 Laman Web Rasmi : www.mpklang.gov.my

    KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER

    OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG

    BAHAGIAN A : BORANG SPESIFIKASI KERJA DAN

    PEMATUHAN SPESIFIKASI

    PENGELUAR KERJA:

    JABATAN TEKNOLOGI MAKLUMAT

    Email: [email protected]

    Tel: 33755555 sambungan 1251

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    1.2 Penyebutharga hendaklah memastikan infrastruktur yang dibekalkan dan dipasang menyokong teknologi IPV4 dan IPV6

    (dual stack) dan menyokong penuh teknologi IPV6 semasa dan akan datang tanpa ada kos tambahan. Jika didapati terdapat kos tambahan semasa memerlukan penggunaan IPV6 di masa akan datang, maka kos tersebut di bawah tanggungjawab

    penyebutharga. MPK tidak akan menanggung sebarang kos tambahan yang dikenakan.

    1.3 Infrastruktur yang ditawarkan hendaklah dalam kategori jimat elektrik dan mendapat “Energy Star Certified”

    1.4 Penyebutharga hendaklah memastikan infrastruktur boleh

    disesuaikan dengan sebarang persekitaran pejabat dan

    mempunyai keupayaan tinggi dengan teknologi paling terkini dan

    berkeupayaan menampung bebanan dan keperluan pengguna

    sedia ada dan akan datang.

    2.0 SPESIFIKASI MINIMUM INFRASTRUKTUR SISTEM

    RANGKAIAN KOMPUTER

    2.1 Penyebutharga dikehendaki mematuhi spesifikasi teknikal minimum bagi pembekalan dan pemasangan infrastruktur Sistem

    Rangkaian Komputer perkakasan, perisian dan sistem yang dibekalkan seperti yang dinyatakan di dalam jadual spesifikasi.

    2.2 Penyebutharga MESTI menyertakan pernyataan surat sokongan

    (authorization letter) daripada prinsipal bagi bukti kelayakan

    sebagai pembekal.

    2.3 Penyebutharga dikehendaki mengisi dengan terang, jelas,

    lengkap dan padat butiran spesifikasi yang ditawarkan di dalam

    borang ini yang ditetapkan beserta katalog dan brosur bagi

    memberi maklumat yang jelas mengenai produk yang ditawarkan.

    2.4 Kerja-kerja pengkabelan semula talian rangkaian dalaman dan

    pengkabelan fiber optik dari ibu pejabat ke dewan hamzah adalah

    seperti berikut:

    1) Membekal, menghantar, memasang dan menguji

    pengkabelan UTP Cat 6 daripada Distribution Switch ke Node Pengguna.

    Untuk menggantikan Node yang rosak dan penambahan Node sedia ada di setiap aras.

    Pemasangan Node seperti di lokasi berikut :

    a. Server Farm 5 b. Ground Floor (G) 103

    c. Mezanin Floor (M) 98 d. 1st Floor (R1) 53 e. 2nd Floor (R2) 43

    f. 3rd Floor (R3) 37 g. 4th Floor (R4) 17 h. 5th Floor (R5) 33

    i. 6th Floor (R6) 16

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    Spesifikasi minimum adalah seperti berikut:

    PENGKABELAN SISTEM RANGKAIAN SETEMPAT(LAN)

    KETERANGAN SPESIFIKASI KTT

    i) Membekal dan memasang pengkabelan UTP

    Genuine Cat 6 daripada patch panel setiap aras ke lokasi node dinding pengguna (termasuk outlet/faceplate with shutter,

    Modular jack Type RJ45, metal trunking, PVC casing and flexible conduit).

    ii) Kerja-kerja hacking dan kemasan.

    iii) Kerja-kerja-kerja Termination, Labelling, Fluke Testing Report & Commissioning

    405

    unit

    2) Membekal, Menghantar, Memasang Dan Menguji Network

    Equipment (Mengikut Aras).

    a) Distribution Switch

    Membekal, menghantar, memasang dan membuat

    konfigurasi stacking Distribution Switch 48-port (4 unit),

    Distribution Switch 24-port (4 unit) dan Distribution

    Switch 12-port (2 unit) dengan switch sedia ada

    mengikut lokasi seperti berikut:

    Ibu Pejabat (5 lokasi): i) Aras 5

    ii) Aras 2 iii) Aras 1 iv) Aras Mezanin (M)

    v) Aras Bawah (G)

    Dewan Hamzah (3 lokasi): i) Bilik CCTV Server

    ii) Bilik Multimedia iii) Bilik Pengurusan

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    Spesifikasi minimum adalah seperti berikut:

    DISTRIBUTION SWITCH

    KETERANGAN SPESIFIKASI KTT

    i) Distribution Switch 48-port 10/100/1000T

    Stackable switch with 2 combo ports (10/100/1000T or 100/1000X SFP) and 2 SFP+ stacking/user ports.

    Manage layer 2 switch. Support Link Aggregate Control protocol

    (LACP).

    1 meter cable for stacking – SFP+ “Twinax” direct attach cable.

    ii) Distribution Switch 24-port 10/100/1000T

    Stackable switch with 2 combo ports (10/100/1000T or 100/1000X SFP) and 2 SFP+ stacking/user ports.

    Manage layer 2 switch. Support Link Aggregate Control protocol

    (LACP).

    1 meter cable for stacking – SFP+ “Twinax” direct attach cable.

    iii) Distribution Switch 12-port 10/100/1000T

    Stackable switch with 2 combo ports (10/100/1000T or 100/1000X SFP) and 2 SFP+ stacking/user ports.

    Manage layer 2 switch. Support Link Aggregate Control protocol

    (LACP).

    1 meter cable for stacking – SFP+ “Twinax” direct attach cable.

    4

    4

    2

    Jumlah 10

    b) Patch Panel (UTP Cat 6)

    Membekal, menghantar dan memasang Patch Panel

    (UTP Cat 6) 24 Port (14 unit) di dalam Rak Rangkaian

    sedia ada di lokasi seperti berikut:

    Ibu Pejabat : i) Aras 6 ii) Aras 5 iii) Aras 4

    iv) Aras 3 v) Aras 2 vi) Aras 1

    vii) Aras Mezanin(M) viii) Aras G

    Dewan Hamzah : iv) Bilik CCTV Server v) Bilik Multimedia vi) Bilik Pengurusan

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    Spesifikasi minimum adalah seperti berikut:

    UTP CAT6 PATCH PANEL

    KETERANGAN SPESIFIKASI KTT

    i) UTP Cat6 Patch Panel (24 Ports) Menyokong penggunaan UTP cable Cat5e dan

    Cat6.

    Fit all standard 19” racks. Pemasangan termasuk: 2 meter Cat 6 Patch Cord (Factory

    terminated) – Patch Panel ke Switch. 3 meter Cat 6 Patch Cord (Factory

    terminated) – Faceplate to workstation/PC.

    14

    unit

    c) High End Network Workstation

    Membekal, membuat konfigurasi dan menguji High End

    Network workstation (2 unit).

    Spesifikasi minimum adalah seperti berikut :

    HIGH END NETWORK WORKSTATION

    KETERANGAN SPESIFIKASI KTT

    High End Network workstation : 2

    a. Kategori : High End

    b. Model : Model terkini – (Sila

    nyatakan)

    c. Tahun Dikeluarkan : 2017 dan ke atas

    (Mesti sertakan surat

    dari principle)

    d. Processor : Intel Core i7 6700HQ

    Processor (minimum)

    e. Hard Drive : 1TB HDD

    upgradeable(min)

    f. Memory : 8GB (Min)

    g. Grafic Card : NVIDIA GeForce 4G

    VRAM

    h. Screen Display : Video Intelligent

    Technology -15.6”

    i. Card Reader : 2-in-1 card reader

    j. Web Camera : HD Web Camera

    k. Network Port : 10/100/1000 Base T

    l. USB Port : 3 (minimum)

    m. HDMI Port : 1 (minimum)

    n. Wireless : Integrated 802.11

    o. Bluetooth : Built in Bluetooth

    p. Software Included : Adobe Acrobat Reader,

    DVD player (Burner)

    q. Operating System : Windows terkini –

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    with CD &

    Registration

    professional edition

    come with license key

    r. Waranti : 3 Tahun

    d) Patch Cord ke PC termasuk Half Moon Casing

    Membekal dan memasang 1 lot Patch Cord UTP cable

    (termasuk pemasangan Half Moon Casing) ke setiap Pc

    bagi tujuan kekemasan laluan kabel dan mengelakkan

    kabel dilantai rosak dan digigit haiwan perosak.

    e) Rack Switch 42U (termasuk KVM switch beserta

    monitor)

    Membekal, menghantar dan memasang 1 unit Rack

    Switch 42U dan 1 unit KVM Switch (termasuk Monitor).

    Spesifikasi minimum adalah seperti berikut :

    RACK SYSTEM

    KETERANGAN SPESIFIKASI KTT

    i) 1-Rack 42U (for mounting server)

    Width: EIA Standard 19″ Rack Rails External Width: 23.6″ – 600mm Height: 2,000mm | Units: 42U Depths: 39.37″ & 41.34″ Sidewalls, Split rear doors Baying Kits, toolless Shelves, casters,

    Bolt Down Kits, Cable Management

    Power Strips – vertical or Rackmount, Enclosure Monitoring System

    Toolless Blanking Panels, Fans Warranty: 3 years

    1

    ii) KVM Switch

    Come with KVM switch and 18.5 inch rack monitor

    Include KVM console and accessories Minimum: support eight (8) servers Support Gen5 to Gen9 server Warranty: 3 years

    1

    f) Rack Switch 12U

    Membekal, menghantar dan memasang 2 unit Rack

    Switch 12U di lokasi seperti berikut:

    i) Bilik Multimedia Dewan Hamzah – 1 unit ii) Bilik Pengurusan Dewan Hamzah – 1 unit

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    Spesifikasi minimum adalah seperti berikut :

    RACK SYSTEM

    KETERANGAN SPESIFIKASI KTT

    i) Rack 12U Wall mount rack 12U c/w accessories

    12U - 600 X 700mm 19" Wall Mount Equipment Rack Front Perspex Lockable Door Side Panels 1 Low Noise Ventilation Fan 13A

    Power Point with 3 Sockets

    1 Set of Cage Nuts Cable Management Warranty: 3 years

    2

    g) AP Wireless (Included Configuration & Mounting)

    Membekal, menghantar, memasang dan menguji 3 unit

    AP Wireless (802.1 n/1ac Wi-Fi AP for business) di

    Dewan Hamzah MPKlang.

    Lokasi pemasangan AP wireless adalah seperti berikut::

    i) Bilik Mesyuarat Dewan Hamzah – 1 unit ii) Bilik Pengurusan Dewan Hamzah – 1 unit iii) Ruang Dewan Hamzah – 1 unit

    Spesifikasi minimum AP wireless adalah seperti berikut:

    AP WIRELESS

    KETERANGAN SPESIFIKASI KTT

    a. Standards IEEE 802.11a/b/g/n/ac 2.4GHz and 5GHz

    3

    b. Supported

    Data Rates

    802.11n/ac: 6.5Mbps – 173.4Mbps (20MHz)

    13.5Mbps – 400Mbps (40MHz) 29.3Mbps – 867Mbps (80MHz) 802.11a: 54, 48, 36, 24, 18, 12, 9

    and 6Mbps 802.11b: 11, 5.5, 2 and 1 Mbps 802.11g: 54, 48, 36, 24, 18, 12, 9

    and 6 Mbps

    c. Radio Chains 2 x 2

    d. Spatial Streams

    SU-MIMO : Up to 2 streams MU-MIMO : Up to 2 streams

    e. Channel 20MHz, 40MHz, 80MHz

    f. RF POWER OUTPUT

    (Aggregate)

    26 dBm for 2.4GHz† 25 dBm for 5GHz†

    g. Channels

    2.4GHz channels* : 1-13 5 GHz channels* : 36-64, 100-

    140, 149-165

    h. Frequency Band

    IEEE 802.11 b/g/n: 2.4 – 2.484 GHz

    IEEE 802.11a/n/ac: 5.15 – 5.25 GHz; 5.25 – 5.35 GHz; 5.47 –

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    5.725 GHz; 5.725 – 5.85 GHz

    i. Power Save Supported

    j. Wireless

    Security

    WPA-PSK, WPA-TKIP, WPA2 AES, 802.11i

    Authentication via 802.1X with the ZoneDirector, SmartZone, local authentication database, support for RADIUS, LDAP, and Active

    Directory

    h) Multifunction Device Network (MFD)

    Membekal, menghantar, memasang dan menguji 3 unit

    MFD.

    Spesifikasi minimum adalah seperti berikut :

    MULTIFUNCTION DEVICE (MFD) NETWORK

    KETERANGAN SPESIFIKASI KTT

    a. Functions Print, copy, scan, fax, email

    3

    b. Resolution (black)

    600 x 600 dpi, Up to 38,400

    x 600 enhanced dpi

    c. Resolution (color)

    600 x 600 dpi, Up to 38,400

    x 600 enhanced dpi

    d. Resolution

    technology

    HP ImageREt 3600,

    PANTONE® calibrated

    e. Print

    Technology

    Laser

    f. Display

    4.3" intuitive touchscreen

    Color Graphic Display (CGD)

    g. Number of print cartridges

    (1 each black, cyan,

    magenta, yellow)

    h. Replacement cartridges

    410A Black LaserJet Toner

    Cartridge

    410A Cyan LaserJet Toner

    Cartridge

    410A Yellow LaserJet Toner

    Cartridge

    410X Magenta LaserJet

    Toner Cartridge

    i. Duplex printing

    Automatic (standard)

    j. Print languages

    PCL 6, PCL 5c, postscript

    level 3 emulation, PCLm,

    PDF, URF, Native Office

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    k. Paper handling input,

    Standard 50-sheet

    multipurpose tray, 250-sheet

    input tray, 50-sheet

    Automatic Document Feeder

    (ADF)

    l. Mobile Printing Capability

    ePrint; Apple AirPrint™;

    Mopria™-certified; NFC

    Touch-to-print; Wireless

    Direct Printing; Google Cloud

    Print 2.0; Mobile Apps

    m. Connectivity

    , standard

    Hi-Speed USB 2.0 port; built-

    in Gigabit Ethernet

    10/100/1000 Base-TX

    network port; Easy-access

    USB

    n. Ports

    1 Hi-Speed USB 2.0; 1

    Gigabit Ethernet

    10/100/1000 Base-TX; 1

    Easy-access USB

    o. Network ready

    Standard (built-in Gigabit

    Ethernet, Wi-Fi)

    p. Security management

    Embedded Web Server:

    password-protection, secure

    browsing via SSL/TLS;

    Network: enable/disable

    network ports and features,

    SNMPv1 & SNMPv2

    community password

    q. Compatible operating systems

    Windows OS compatible with

    In-Box Driver;

    Windows XP SP3 all 32-bit

    editions; Windows Vista all

    32-bit editions ; Windows 7

    all 32- & 64-bit editions;

    Windows 8/8.1 all 32- & 64-

    bit editions (excluding RT OS

    for Tablets);

    Windows 10 all 32- & 64-bit

    editions (excluding RT OS

    for Tablets);

    Windows OS compatible with

    Universal Print Driver (From

    http://www.HP.com);

    Windows XP SP3 32- & 64-

    bit editions (XP Home, XP

    Pro, etc.); Windows Vista all

    32- & 64-bit editions (

    Windows 7 all 32- & 64-bit)

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    r. Memory, standard

    256 MB NAND Flash, 256

    MB DRAM

    s. Warranty 3 Years

    3.0 KERJA-KERJA PENGKABELAN SAMBUNGAN FIBER OPTIC

    BACKBONE 10 GB DARIPADA IBU PEJABAT MAJLIS

    PERBANDARAN KLANG KE DEWAN HAMZAH

    3.1 Membekal, Menghantar, Memasang Dan Menguji Fiber Optic Backbone 10 Gb – Outdoor

    Pengkabelan 6 Core singlemode Outdoor Fiber Optic digunakan

    bagi tujuan:

    a) Talian Rangkaian Dalaman dari Pusat Data Ibu Pejabat ke Bilik Server Dewan Hamzah (300 meter) – 2 talian

    b) Talian CCTV dari Pusat Data Ibu Pejabat ke Bilik Server Dewan Hamzah (300 meter) – 2 Talian

    Spesifikasi minimum adalah seperti berikut:

    SPESIFIKASI FIBER OPTIC 10G – OUTDOOR KE DEWAN

    HAMZAH

    KETERANGAN SPESIFIKASI KTT

    1. Memasang 4 talian fiber :

    a. 2 pair 6-Core singlemode Outdoor Fiber

    Optic termasuk aksesori lengkap (termasuk SC connector, fiber terminator, patch cord-3 meter, simplex/duplex

    connector, fiber tray dan lain-lain berkaitan)

    b. Fiber Optic hendaklah dipasang di dalam metal trunking yang dilabelkan.

    i) Infrastruktur yang dipasang

    hendaklah bersesuaian dengan infrastruktur sedia ada di tapak.

    ii) Trunking tersebut dipasang

    secara penyamaran.

    c. Pengkabelan mengambil kira anggaran jarak dari Pusat data Ibu Pejabat MPKlang ke Bilik Server CCTV Dewan Hamzah.

    d. Sekiranya tiada sambungan antara blok,

    kabel hendaklah dipasang di dalam tanah mengikut termasuk kerja-kerja pemotongan jalan, spesifikasi standard

    pemasangan fiber.

    4 Talian

    2. Membuat kerja-kerja Splicing dan Termination

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    3.2 Membekal, Menghantar, Memasang Dan Menguji Fiber Optic Backbone 10 Gb – Indoor

    Pengkabelan 6 Core multimode Indoor Fiber Optic digunakan

    bagi tujuan:

    a) Talian Rangkaian Dalaman dari Bilik Server Dewan Hamzah ke Bilik Pengurusan Dewan(135 meter) – 2 talian

    b) Talian Rangkaian Dalaman dari Bilik Server Dewan Hamzah ke Bilik Multimedia (45 meter) – 2 Talian

    Spesifikasi minimum adalah seperti berikut:

    SPESIFIKASI FIBER OPTIC 10G – OUTDOOR KE DEWAN

    HAMZAH

    KETERANGAN SPESIFIKASI KTT

    1. Memasang 4 talian fiber :

    a. 2 pair 6-Core multimode OM4

    50/125um Indoor Fiber Optic termasuk aksesori lengkap (termasuk SC connector, fiber terminator, patch cord-3 meter, simplex/duplex connector, fiber

    tray dan lain-lain berkaitan)

    b. Fiber Optic hendaklah dipasang di dalam metal trunking yang dilabelkan.

    iii) Infrastruktur yang dipasang

    hendaklah bersesuaian dengan infrastruktur sedia ada di tapak.

    iv) Trunking tersebut dipasang secara penyamaran.

    c. Pengkabelan mengambil kira anggaran

    jarak dari Bilik Server Dewan Hamzah ke Bilik Pengurusan Dewan dan Bilik Multimedia.

    d. Sekiranya tiada sambungan antara blok, kabel hendaklah dipasang di dalam

    tanah mengikut termasuk kerja-kerja pemotongan jalan, spesifikasi standard pemasangan fiber.

    4 Talian

    2. Membuat kerja-kerja Splicing dan Termination

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    4.0 KERJA-KERJA KONFIGURASI DAN PENYESUAIAN SEMULA

    SEMULA SISTEM RANGKAIAN KOMPUTER MAJLIS

    PERBANDARAN KLANG

    4.1 Konfigurasi dan penyesuaian semula melibatkan keseluruhan connectivity bagi Sistem Rangkaian Komputer Majlis Perbandaran

    Klang seperti berikut :

    a) Konfigurasi dan penyesuaian connectivity Core Switch ke setiap talian dalaman di setiap aras dan fiber Optik di Ibu Pejabat dan Dewan Hamzah.

    b) Konfigurasi dan Penstrukturan semula VLAN Sistem Rangkaian Majlis Perbandaran Klang.

    c) Konfigurasi dan penyesuaian network equipment yang

    baru dengan persekitaran Sistem Network sedia ada.

    d) Konfigurasi dan penstrukturan semula keseluruhan

    capaian rangkaian ke endpoint, server, firewall, sistem keselamatan dan perkakasan LAN dan WAN sedia ada.

    5.0 KERJA-KERJA PENGUJIAN DAN PENTAULIAHAN

    INFRASTRUKTUR SISTEM RANGKAIAN KOMPUTER MAJLIS

    PERBANDARAN KLANG

    5.1 Pengujian dan pentauliahan termasuk kerja-kerja berikut :

    a) Pengujian dan pentauliahan Konfigurasi dan penstrukturan semula Sistem Rangkaian Dalaman (LAN).

    b) Pengujian dan pentauliahan infrastruktur bagi keseluruhan Sistem Rangkaian Komputer (Capaian LAN & WAN).

    c) Kerja-kerja pelabelan infrastruktur Sistem rangkaian

    Komputer.

    d) Kerja-kerja housekeeping Sistem Rangkaian Komputer

    yang lama/sedia ada.

    5.2 Penyebutharga dikehendaki menjalankan pengujian mengikut

    peringkat pengujian yang ditetapkan seperti berikut :

    a) Penyebutharga mesti menjalankan ujian peringkat awal

    iaitu UAT (User Acceptance Test) dan ujian keseluruhan iaitu FAT (Final Acceptance Test) bagi memastikan keseluruhan infrastruktur Sistem Rangkaian Komputer

    Majlis Perbandaran Klang dapat berfungsi dengan sempurna. Jika didapati infrastruktur tersebut gagal berfungsi dan memerlukan tambahan

    peralatan/perisian/sistem yang lain, maka kos untuk perolehan tersebut di bawah tanggungjawab Penyebutharga. MPK tidak akan menanggung sebarang kos tambahan untuk perolehan tersebut.

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    b) Penyebutharga hendaklah memastikan setiap peringkat

    pengujian (UAT & FAT) diterima dan disahkan oleh pegawai MPK yang dipertanggungjawabkan ke atas projek ini.

    c) Penyebutharga MESTI menyediakan dokumen pentauliahan ke atas penyelesaian menyeluruh projek

    yang telah telah sempurna dan disahkan.

    6.0 LATIHAN DAN PEMINDAHAN PENGETAHUAN/TEKNOLOGI

    (TOT)

    6.1 Penyebutharga WAJIB menyediakan latihan dan pemindahan

    teknologi kepada personel ICT bagi tujuan pengoperasian peralatan, perisian dan sistem yang dipasang.

    6.2 Penyebutharga dikehendaki menyediakan 2 kategori latihan

    seperti berikut :

    a) Administrative dan teknikal – 10 orang (Minimum) b) Latihan Bertauliah – 6 orang

    6.3 Latihan hendaklah diberikan oleh tenaga pengajar yang bertauliah

    (mempunyai certificate yang diiktiraf)

    6.4 Penyebutharga WAJIB menyediakan dokumen manual dalam

    bentuk hardcopy dan softcopy seperti berikut :

    a) Nota rujukan/manual latihan

    b) Manual pengendalian operasi dan penyelenggaraan

    7.0 JAMINAN DAN KHIDMAT SOKONGAN

    7.1 Jaminan dan khidmat sokongan yang ditawarkan hendaklah

    sekurang-kurangnya 3 tahun seperti berikut :

    a) Jaminan peralatan, perisian dan sistem (Part & Labor &

    On Site).

    b) Back to back Agreement antara syarikat dengan principal.

    c) Dalam tempoh jaminan ini semua khidmat baik pulih, penyelenggaraan, penggantian infrastruktur termasuk peralatan, perisian dan sistem yang rosak dan kos buruh hendaklah diberikan secara percuma.

    d) Menyediakan Talian dan Maklumbalas khidmat

    Sokongan.

    7.2 Penyebutharga hendaklah memberikan khidmat sokongan termasuk penyelenggaraan merangkumi peralatan, perisian dan sistem termasuk tenaga kerja bagi lokasi di MPK sepanjang tempoh jaminan.

    7.3 Penyebutharga dikehendaki menyediakan mekanisme sokongan teknikal yang melibatkan kakitangan sokongan teknikal syarikat

    penyebutharga dan syarikat prinsipal berkaitan bagi menjamin sokongan berterusan terhadap operasi infrastruktur yang dipasang.

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    7.4 Penyebutharga hendaklah menyediakan kakitangan khidmat sokongan teknikal yang cekap, berdikari, berkelayakan serta

    terlatih dalam memberikan khidmat sokongan terhadap semua perkakasan, perisian dan sistem yang dibekalkan. Mereka juga hendaklah mempunyai komunikasi yang baik dengan kakitangan Kerajaan bagi memastikan tugasan berjalan dengan lancar dan

    melaporkan kepada pegawai yang bertanggungjawab sekiranya ada masalah dalam tempoh jaminan.

    7.5 Penyebutharga WAJIB menyediakan khidmat sokongan peringkat pertama (1st level support) melalui emel/telefon helpdesk di sepanjang tempoh kontrak dan MPK boleh mendapatkan khidmat nasihat daripada Penyebutharga.

    7.6 Penyebutharga dikehendaki menyatakan dengan lengkap maklumat khidmat sokongan yang disediakan seperti penyediaan

    perkhidmatan helpdesk, telephone and online support dan tempoh maklum balas (response time) serta tindakan.

    7.7 Penyebutharga MESTI melaksanakan penyelenggaraan pencegahan (preventive maintenance) sekurang-kurangnya tiga

    (3) kali setahun dalam tempoh kontrak sebutharga yang ditawarkan seperti berikut :

    a) Menyediakan jadual dan perincian perkhidmatan bagi lawatan penyelenggaraan berkala.

    b) Melaksanakan penyelenggaraan dan pengemaskinian peralatan, perisian dan sistem.

    c) Menyediakan laporan bulanan yang komprehensif dalam bentuk softcopy dan hardcopy termasuk laporan prestasi

    (performance report) rangkaian bagi menilai keberkesanan penggunaan sistem rangkaian yang baru.

    7.8 Sebarang permasalahan/kerosakan kepada perkakasan, perisian dan sistem semasa tempoh jaminan hendaklah ditanggung oleh pihak pembekal dari segi peralatan, perkhidmatan, penukaran, kewangan dan lain-lain berkaitan.

    Alat ganti sementara (on-loan item) perkakakasan yang rosak hendaklah disediakan sehinggalah perkakasan dibaiki atau diganti.

    7.9 Penyebutharga WAJIB mencadangkan kaedah penyelesaian

    dan membaikpulih sekiranya berlaku sebarang permasalahan / kerosakan berkaitan infrastruktur sistem rangkaian komputer.

    7.10 Penyebutharga dikehendaki memberi maklumbalas dalam

    tempoh tidak melebihi 4 jam dari masa menerima laporan dari MPK jika berlaku permasalahan/kerosakan perkakasan, perisian atau sistem yang dibekalkan. Jika kerosakan tidak dapat dibaiki

    dalam tempoh berkenaan, penggantian peralatan hendaklah dilaksanakan atau menyediakan alat ganti sementara (on-loan item) bagi mengelakkan operasi terjejas.

    7.11 Penyebutharga hendaklah bersedia memberikan khidmat penyelenggaraan dan sokongan selepas tempoh jaminan tamat berasaskan suatu perjanjian penyelenggaraan yang akan

    ditentukan kemudian. Walaubagaimanapun MPK mempunyai hak untuk memilih sebarang pembekal lain untuk memberikan khidmat penyelenggaraan.

  • Bil KEPERLUAN SPESIFIKASI MINIMA PEMATUHAN TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN)

    Ya (/)

    TIDAK (X)

    8.0 PELAKSANAAN DAN PASUKAN PROJEK

    8.1 Penyebutharga dikehendaki mematuhi garis panduan dan dasar

    keselamatan ICT yang telah ditetapkan dalam tempoh pelaksanaan projek dan melaksanakan langkah-langkah keselamatan bagi menjamin keselamatan maklumat, aset fizikal dan lain-lain berkaitan.

    8.2 Penyebutharga dikehendaki menyediakan dalam bentuk dokumen

    cadangan projek/pelan pelaksanaan dan pasukan projek yang komprehensif bagi melaksanakan projek ini.

    8.3 Penyebutharga hendaklah memastikan bahawa tempoh

    pelaksanaan projek ini adalah selama 16 minggu dari tarikh surat setuju terima dikeluarkan oleh MPK.

    8.4 Penyebutharga dikehendaki mengemukakan Jadual Pelaksanaan Projek dan aktiviti-aktiviti lain yang terlibat dalam bentuk Gant-Chart.

    9.0 PENYEDIAAN DOKUMEN PELAKSANAAN PROJEK

    9.1 Penyebutharga yang telah dilantik dikehendaki menyediakan dan melengkapkan dokumen-dokumen seperti berikut :

    a) Jadual Pelaksanaan Kerja;

    b) Senarai infrastruktur yang dibekalkan termasuk peralatan, perisian dan sistem beserta nombor siri dan nombor pendaftaran lesen perisian;

    c) Borang uji lari UAT dan FAT untuk penerimaan dan

    pengesahan;

    d) Laporan kemajuan kerja dan laporan siap kerja

    e) Dokumentasi teknikal projek:

    Dokumen konfigurasi dan perubahan; Dokumen Laporan Insiden dan kerosakan

    (breakdown); Dokumen Laporan Logical & physical Network

    Diagram ; Dokumen Lengkap manual teknikal dan maklumat

    keseluruhan Sistem Rangkaian Komputer MPK untuk rujukan.

    Syarikat dengan ini bersetuju untuk mematuhi ke semua Spesifikasi Sebutharga seperti yang dinyatakan di atas.

    Diperakukan oleh :

    Tanda tangan

    :

    ……………………………………………………

    Nama : ……………………………………………………

    Jawatan : ……………………………………………………

    Cop syarikat :