AKTA KUALITI ALAM SEKELILING 1974PERATURAN-PERATURAN KUALITI ALAMSEKELILING (BUANGAN TERJADUAL)2005ENVIRONMENTAL QUALITYSCHEDULED WASTES ) 2005

JABATAN ALAM SEKITARMALAYSIA

PERATURAN-PERATURAN KUALITI ALAM SEKELILING (BUANGANTERJADUAL) 2005

MULA BERKUATKUASA PADA 15 OGOS 2005

WHAT IS SCHEDULED WASTE?

Is your premise HAS THE POTENTIAL toproduce scheduled waste?

WHAT ARE THE LEGISLATIONS ON SW?

What shall you do to ensure that your factoryhandle SW properly according to the legalrequirement?

SCHEDULED WASTE MANAGEMENTOBJECTIVES

• Protect public health and the environment ;• Conservation of natural resources;• Reduce waste;• Environmental friendly management ;and• Profitable in the long run

Vital components

)

ENFORCEMENT

LEGISLATION

SUPPORTSERVICES

FACILITIES

Institutionalarrangements

Stakeholders

Source: David C Wilson 1993

Hazardous waste management system

ENFORCEMENT

LEGISLATION

ENVIRONMENTAL CONTROLS

SUPPORT SERVICES

FACILITIES

Hazardouswaste

managementsystem

INFRASTRUCTURE

ANCILLARY SERVICESSERVICE SECTOR

Why definition is difficult

HAZARDOUS WASTE

PHYSICAL FORM

PHYSICAL PROPERTIESCHEMICAL PROPERTIES

COMPOSITION

The hazard associated with a waste depends on:

BIOLOGICAL PROPERTIES

Some types of waste associated with differentindustries

ChemicalmanufacturersChemical processwastesAcids and alkalisSpent solventsReactive wastesDiscarded commercialchemical products

Construction industryPaint wastesSpent solventsStrong acids and bases

Vehicle maintenance shopsPaint wastesUsed oilsSpent solventsAcids and alkalis

Furniture and woodmanufacturing andrefinishingSpent solventsPaint wastes

JADUAL PERTAMAPBT 2005

FIRST SCHEDULE(Regulation 2)

REDUCTIONReassessment of process, raw materials, Technology

RECYCLEReuse/raw materials

WASTE TREATMENTPCT/ Solidification/incinerator

DISPOSALSecure Landfill

HIRACHYOF WASTE MANAGEMENT

• Peraturan 2, PBT 2005Regulation 2, SWR 2005

– Kontraktor = mana-mana orang yang dilesen dibawahSubseksyen 18 (1A) Akta

– Contractor = any person licenced under subsection18 (1A) of the Act

RESPONSIBILITY OF WASTE GENERATOR

Regulation 3 - Notification( Second Schedule) –within 30 daysfrom generation.Submit once only unless there is achange in the category of wasteproduced

IMPORTANT REGULATIONS

ooo Pelupusan Buangan Terjadual (P4)Pelupusan Buangan Terjadual (P4)

Disposal of Scheduled WastesDisposal of Scheduled Wastes

Di premis Yang DitetapkanDi premis Yang Ditetapkan(PYDT)(PYDT)

At prescribed premises onlyAt prescribed premises only

o Pengolahan Buangan Terjadual (P5)Treatment of Scheduled Wastes

> Dalam tapak atau di PYDTsahaja

On-site or at prescribed premisesonly