NO SEBUTHARGA : JPS(SH)/PLSK/13/2020 TAJUK SEBUT HARGA : KERJA-KERJA MEMBAIKPULIH SISTEM ELEKTRIK DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI KLANG UNTUK PEJABAT LEMBANGAN SUNGAI KLANG TAKLIMAT SEBUT HARGA JABATAN PENGAIRAN DAN SALIRAN WILAYAH PERSEKUTUAN KUALA LUMPUR 1

Upload: others

Post on 26-Oct-2020

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

NO SEBUTHARGA : JPS(SH)/PLSK/13/2020

TAJUK SEBUT HARGA :

KERJA-KERJA MEMBAIKPULIH SISTEM ELEKTRIK DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI KLANG UNTUK PEJABAT LEMBANGAN SUNGAI KLANG

TAKLIMAT SEBUT HARGAJABATAN PENGAIRAN DAN SALIRAN

WILAYAH PERSEKUTUAN KUALA LUMPUR

1

Page 2: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

1. PENGKHUSUSAN/KELAS KONTRAKTOR

2. TARIKH TUTUP SEBUT HARGA DAN TARIKH MUAT TURUN SEBUT HARGA

3. LOKASI DAN KOORDINAT KAWASAN NAIKTARAF

4. SKOP KERJA

5. GAMBAR/VIDEO KEADAAN DI TAPAK

6. TEMPOH SIAP KERJA

7. PEGAWAI JPS YANG BERTANGGUNGJAWAB

2

Page 3: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Kontraktor yang ingin menyertai sebut harga ini perlumemenuhi syarat-syarat berikut :

a. Berdaftar dengan CIDB di WPKL.

b. Mempunyai Perakuan Pendaftaran Kontraktor (PPK).

c. Sijil Taraf Bumiputera (STB) jika ada.

d. Sijil Perolehan Kerja Kerajaan (SPKK) di bawah bidangberikut :

GREDG1/G2/G3

KATEGORIME

PENGKHUSUSANE04-Pemasangan Voltan RendahDANM15 – Kelengkapan Mekanikal Pelbagai

3

Page 4: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Tarikh Tutup Sebut Harga : 24 Jun 2020 (Rabu)(Dokumen sebut harga perlu dikembalikan dalam bentuk hard

copy dan dimasukkan ke dalam Peti Sebut Harga secarapandu lalu di Kawasan Tempat Letak Kereta, Jabatan

Pengairan dan Saliran Wilayah Persekutuan Kuala Lumpurbermula 10.30 pagi sehingga jam 12.00 tengahari pada hari

tersebut)

Tarikh Muat Turun Sebut Harga :

11 Jun 2020 (Khamis) sehingga 24 Jun 2020 (Rabu)

4

Page 5: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Lokasi adalah di JPS RWTP SUNGAI KLANG, AU3KERAMAT, HULU KLANG.

Koordinat adalah:

3.180958, 101.758849

Kontraktor boleh melawat tapak dengan inisiatifsendiri dengan sentiasa mengambil perhatian danmematuhi langkah-langkah pencegahan COVID-19dan penjarakkan sosial oleh KKM dan MKN.

5

Page 6: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop kerja adalah seperti berikut :1. Membaikpulih Papan Suis Utama (MSB RWTP Sg Klang) yang

berkadaran 400A , 415V , 50Hz termasuk membawa keluarMSB untuk dibaiki di kilang, pengujian di kilang dan pemasangan semula di RWTP Sg Klang.

2. Kerja-kerja mengenalpasti power cable dan control cable, membekal dan memasang kabel termasuk kerjapenyambungan semula , penamatan dengan menggunakanaksesori yang berkaitan seperti jointing kit, trunking , konduit dan lain-lain.

3. Membaikpulih Obemeyer Crest Gate System di RWTP Sg Klang dengan membekal dan memasang power & control cable , kerja intergrasi antara Obemeyer Crest Gate System dengan sistem pengoperasian loji rawatan air sungai(RWTP).

6

Page 7: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

4. Menggantikan Ultrasonic water level sensor dan dipasang di tapak inlet RWTP Sg. Kerayong Klang berserta membaiki tiang(pole) yang rosak. Termasuk juga kerja membekal dan memasang sensor cable.

5. Kerja-kerja membaikpulih komponen SCADA panel , CCTV system dan telekomunikasi. Penyambungan semula kabeltermasuk mengenalpasti punca masalah dan penyelarasansemula (synchronize) bagi memastikan sistem dapat berfungsisemula.

6. Kerja-kerja membaikpulih lampu Kawasan

7. Kerja-kerja membaikpulih struktur inlet penstock gate

7

Page 8: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Lokasi RWTP SG KLANG

3.180958, 101.758849

8

Page 9: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Laluan masuk ke RWTP Sg Klang. Berada di bawah laluan MRR2 yang sedang dalam pembinaan.

Laluan masuk ke

RWTP SG KLANG

9

Page 10: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Papan Suis Utama

MSB-SK-RWTP berkadaran 400A , 415V , 50Hz telah mengalamikerosakan akibat pencerobohan dan kecurian

10

Page 11: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Papan Suis Utama

Menanggalkan MSB sedia ada dan dibaiki di kilang serta pengujian di kilang (FAT)

11

Page 12: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Papan Suis Utama

12

Page 13: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Papan Suis Utama

Bekalan kuasa elektrikdaripada TNB masih ada.

Membaikpulih sistempembumian MSB

Copper tape telah

hilang

13

Page 14: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membekal Dan Memasang Semula Power & Control Cable

Power & control cable sedia ada telah dipotong

14

Page 15: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membekal Dan Memasang Semula Power & Control Cable

Power & control cable sedia ada telah dipotong

15

Page 16: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membekal Dan Memasang Semula Power & Control Cable

Power cable for air blower

16

Page 17: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membekal Dan Memasang Semula Power & Control Cable

control cable and Local Control Panel (LCP) for air blower

17

Page 18: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Obermeyer Crest Gate System

Air compressor starter panel – kerja pendawaian semula dan memasang komponen yang rosak/hilang

18

Page 19: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Obermeyer Crest Gate System

PLC cabinet – kerja pendawaian semula , membekal bateri dan komponen telah rosak/hilang

19

Page 20: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Obermeyer Crest Gate System

Air Compressor unit– kerja pendawaian semula dan mengenalpastikerosakan

20

Page 21: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Obermeyer Crest Gate System

Air Control Cabinet– kerja pendawaian semula dan mengenalpastikerosakan

Air control

cabinet

21

Page 22: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Obermeyer Crest Gate System

Ultrasonic water level sensor– telah rosak dan tiang bengkok . Mengganti Ultrasonic water level sensor termasuk sensor cable dan membaiki tiang

Ultrasonic

water

level

sensor

Tiang

rosak

22

Page 23: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-OBERMEYER-SCADA panel

23

Page 24: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-OBERMEYER-SCADA panel

24

Page 25: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-SA-SCADA panel

25

Page 26: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-SA-SCADA panel

26

Page 27: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-RWTP-SCADA panel 27

Page 28: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-RWTP-SCADA panel 28

Page 29: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

SGKL-SA BATTERY panel 29

Page 30: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih SCADA panel

DB SCADA – menggantikan komponen DB dan pendawaian semula

30

Page 31: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih CCTV dan sistem telekomunikasi

CCTV rack– menggantikan NVR, network switch dan pendawaiansemula

Kamera CCTV

31

Page 32: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Lampu Kawasan

DB compound light– menggantikan komponen DB dan kabelelektrik

Kabel elektrik

telah putus

32

Page 33: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Lampu Kawasan

Lampu kawasan– menggantikan mentol 150W HPSV dan kabel elektrik

33

Page 34: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Skop Kerja Membaikpulih Struktur

34

Kerja kejuruteraan awam – membaikpulih struktur inlet penstock

Page 35: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Tempoh siap kerja bagi sebut harga ini adalah :

= 4 BULAN

35

Page 36: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

Memandangkan taklimat dan lawatan tapak tidakdiwajibkan, pihak kontraktor boleh berhubung dengan

pegawai-pegawai berikut sekiranya terdapat kemusykilantentang sebutharga ini pada waktu pejabat sahaja

(9.00 pagi - 4.00 petang)

En. Mohd. Fairuz Bin Ishak

(019-7744227)

En Amirulddin Bin Ismail @ Abdul Aziz

(011-35533515)

Kontraktor boleh melawat tapak dengan inisiatif sendiri dengan sentiasa mengambil

perhatian dan mematuhi langkah-langkah pencegahan COVID-19 dan penjarakkan

social seperti saranan KKM dan MKN.

36

Page 37: NO SEBUTHARGA : JPS(SH)/PLSK/13/2020state.water.gov.my/wpkl/images/pdffile/plsk132020slide.pdf · pemasangan semula di RWTP Sg Klang. 2. Kerja-kerja mengenalpasti power cabledan control

SEKIAN, TERIMA KASIH.