  • Date 17-10-16

    KILANG KELAPA SAWIT BATU LINTANG

    Progress Report

    For the month ofSEPTEMBER 2016

    (YEO BOON KEAT)Manager

    KUALA LUMPUR KEPONG BERHAD(No. Syarikat: 15043-V)

    KILANG KELAPA SAWIT BATU LINTANG

    .

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    STERILIZATION

    STERILIZER NO.2

    REPLACE PCINLET VALVE SEATPN:N2B080S-39

    1 MAINTENANCE OF STERILISER NO.2

    Printed On: 15/10/2016 2:41:03 PM Page: 1 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    CLARIFICATION/FILTRATION

    SEPARATOR C7A

    PURCHASE PCLIFTING TOOL FORDISTRIBUTOR

    1 SEPARATECH REPLACED OLD SEPERATOR TOOLS

    REWIND UT3PHASE25HP MOTOR STATORCOIL

    1 KANDAN ELECTRICAL SERVICE SEPARATOR MOTOR BURNED OUT

    REWIND UT3PHASE18.5KW MOTOR STATORCOIL

    1 KANDAN ELECTRICAL SERVICE

    SEPARATOR C7B

    REPLACE STEROSION GUARD (LOWER) 1 MAINTENANCE OF SLUDGE SEPERATORREPLACE PCBUSHING 8

    SEPARATOR C7C

    REPLACE PCPARING DISC 528534-80 1 MAINTENANCE OF SLUDGE SEPERATORREPLACE PCINLET PIPE 517670-02 1REPLACE STEROSION GAURD

    (LOWER)5358921

    SLUDGE PIT PUMP

    PURCHASE UT2 1/2" MTP MSSC CAST IRONCASING

    1 CONSOLIDATED ENG SDN BHD MANITENANCE OF MTP PUMP

    PURCHASE PC2 1/2" MTP MSSC S/STEEL LINER 1 CONSOLIDATED ENG SDN BHD

    SLUDGE TANKS

    PURCHASE LH6"X20(SCH40) STEAM PIPE 1 OIL ROOM PIPING

    VIBRATING SCREEN

    REPLACE RL40GX3'X28' S/STEEL WIRE MESH 1 MAINTENANCE OF VIBRATING SCREENREPLACE UT6" S/STEEL ANGLE BAFFLE

    PLATE10

    Printed On: 15/10/2016 2:41:03 PM Page: 2 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    WATER SUPPLY

    WATER TREATMENT PLANT PIPINGS

    REPLACE PC1/4" S/STEEL DISCHARGE CHECKVALVE

    1 MAINTENANCE OF WATER TREATMENT PLANT

    REPLACE PC1/4" S/STEEL SUCTION CHECKVALVE

    1

    Printed On: 15/10/2016 2:41:03 PM Page: 3 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    DIGESTION/PRESSING

    DCO PUMP NO.1

    REPLACE PC4"C.I. BODY S/STEEL BALLVALVE

    1 MAINTENANCE OF CRUDE OIL PIPING

    REPAIR UTSERVICE 2 1/2" MTP PUMP 1 VISIBLE ENGINEERING SERVICES MAINTENANCE OF DCO PUMP

    DIGESTER NO.2

    REPLACE STP15 DIGESTER EXPELLER ARM 1 MAINTENANCE OF DIGESTERREPLACE PCC.STEEL SHORT ARM 4REPLACE PCC.STEEL LONG ARM 4REWIND UT3PHASE40HP MOTOR STATOR

    COIL1 KANDAN ELECTRICAL SERVICE DIGESTER MOTOR BURNED OUT

    DIGESTER/PRESS PIPING/FITTINGS/INSTRUMENTATION

    REPLACE PCS/STEEL BOTTOM PLATE NO 1 1 MAINTENANCE OF DIGESTERREPLACE PCS/STEEL BOTTOM PLATE NO 2 1

    PRESS NO.1

    REPLACE PCP15 PRESSURE CONE 2 MAINTENANCE OF SCREW PRESSREPLACE STP15 CB/MSB LENGTHENING

    SHAFT1

    REPLACE STP15 CB/MSB WORM SCREW 1

    PRESS NO.3

    REPLACE STCB/MSB WORM SCREW 1 MAINTENANCE OF SCREW PRESSREPLACE UTP15 PRESS CAGE 1REPLACE STP15 CB/MSB LENGTHENING

    SHAFT1

    Printed On: 15/10/2016 2:41:03 PM Page: 4 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    INCINERATOR

    INCLINED EFB CONVEYOR

    REPAIR PC6" RENOLD CONN LINK 10 MAINTENANCE OF INCLINE EFB CONVEYOR

    RECEPTION

    BOGIES & CAGES

    - PCRECOND BEARING BLOK C/WHITEC BUSH

    26 BOGIE/CAGE MAINTENANCE

    - SHNEW CAGE BTTOM MS PLATE5MMX5'X10'

    2

    - UT5' X8.5' FFB CAGE BASE PLATE 2- UT4" PERFORATED CAGE STEAM

    PIPE2

    - UT4 1/2' CURVE X 8 1/2' CAGE CURSIDE PLT

    4

    - ST12 1/2" CAST STEEL BOGIEWHEEL

    4

    - UTBOGIE FRAME HOOK BUMPER 2- UTBOGIE FRAME TOWING BUMPER 2

    LOADING RAMP

    RECONDITION STHUDRAULIC CYLINDER 1 WELL ON ENGINEERING & TRADING MAINTENANCE OF LOADING RAMP

    LOADING RAMP CAPSTAN

    REPLACE RL16MMX150" WIRE ROPE 1 MAINTENANCE OF WIRE ROPE CAPSTANREPLACE RL16MMX250" WIRE ROPE 1

    RAIL TRACK/SWITCHES

    REPAIR SH3/8"X4'X8' M.S. PLATE 1 REPAIR RAILTRACK

    Printed On: 15/10/2016 2:41:03 PM Page: 5 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    EFFLUENT DISPOSAL

    BELT PRESS STATION

    REPLACE LH5"X20'(SCH40) STEAM PIPE 1 REPLACE BELT PRESS SLUDGE INLET PIPE

    POWER GENERATION

    CHEMICAL DOSING PUMP

    REPAIR MPE TUBING 30 MAINTENANCE OF BOLER CHEMICAL TANK

    VEHICLES

    CAT 950 (SHOVEL)

    PURCHASE UTN150YOKOHAMA BATTERY 1 KEAT HENG KEDAI TYRE & BATTERY MAINTENANCE OF CATERPILLAR

    KERNEL RECOVERY PLANT

    KERNEL SILO NO 1 & 2

    REPLACE PC2" 10K GLOBE VALVE SE 1 REPLACE STEAM VALVE KERNEL HEATER SILO

    RIPPLE MILL MSB K23

    PURCHASE STMSB 6TON SQUARE RODHOLDER

    1 MSHK ENGINEERING SDN BHD MAINTENANCE OF ROTOR RIPPLE MILL

    Printed On: 15/10/2016 2:41:03 PM Page: 6 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    HOISTING & THRESHING

    HOIST

    PURCHASE STCONTACT POINT3TB46 3 MAINTENANCE OF HOISTREPAIR & RENEW UTMAIN MOTOR COIL 1 LIFTECH ENGINEERING MAINTENANCE OF HOIST MAIN MOTORREPAIR & RENEW PCSKF BEARING NU307 2 LIFTECH ENGINEERINGREPAIR & RENEW PCTHRUST BEARING 51113 1 LIFTECH ENGINEERINGREPAIR & RENEW PCPINION SHAFT 2 LIFTECH ENGINEERINGREPAIR & RENEW PCPROTECTIVE CAP 4 LIFTECH ENGINEERINGREPAIR & RENEW PCWHEEL LEG 4 LIFTECH ENGINEERINGREPAIR & RENEW PCWHEEL LEG SHAFT 4 LIFTECH ENGINEERINGREPAIR & RENEW PCCOUPLING HALF P600 1 LIFTECH ENGINEERINGREPAIR & RENEW PCCYL ROLLER BEARING 2 LIFTECH ENGINEERINGREPAIR & RENEW PCDISHED WASHER PACK 1 LIFTECH ENGINEERINGREPAIR & RENEW UTREWIND MAIN MOTOR 1 LIFTECH ENGINEERING MAINTENANCE OF CROSS TRAVELLING MOTORREPAIR & RENEW UTREPAIR ROTOR SHAFT 2 LIFTECH ENGINEERINGREPAIR & RENEW PCTHRUST RING 2 LIFTECH ENGINEERINGREPAIR & RENEW PCOIL SEAL 6 LIFTECH ENGINEERINGREPAIR & RENEW PCTHRUST BEARING 2 LIFTECH ENGINEERING

    THRESHING STATION

    PURCHASE ST3" CAST IRON BODY HANGERBEARING

    4 WELL ON ENGINEERING & TRADING MAINTENANCE OF THRESHER CONVEYOR

    FABRICATE JOCLAMP BUNCH INLET RINGPLATE NO1

    1 WELL ON ENGINEERING & TRADING MAINTENANCE OF THRESHER

    FABRICATE JOCLAMP BUNCH INLET RINGPLATE NO2

    1 WELL ON ENGINEERING & TRADING

    DEPERICARPER

    CAKE BREAKER CONVEYOR

    PURCHASE ST4" CAST IRON BODY HANGERBEARING

    4 WELL ON ENGINEERING & TRADING MAINTENANCE OF CBC CONVEYOR

    Printed On: 15/10/2016 2:41:03 PM Page: 7 of 8

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    Work Done By Outsider Problem Description

    CONFINED SPACE

    ALTAIR 5X MULTIGAS DETECTOR

    CALIBRATE UTALTAIR MULTIGAS TESTER 1 DYNAMIC SAFETY SDN BHD CALIBRATION GAS TESTER

    Printed On: 15/10/2016 2:41:03 PM Page: 8 of 8

    Chan Kok Leong ([email protected])File AttachmentMaintenanceRpt Sep2016.pdf

  • PAGE 1

    HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading

    PRODUCTION

    RAINFALL RECORD (mm) Year 2016

    Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FY 365.00 428.00 415.00 144.00 178.00 145.00 328.00 252.00 176.00 202.00 153.00 321.00This FY 312.00 520.00 364.00 133.00 58.00 42.00 60.00 319.00 141.00 212.00 246.00 342.00

    OTHER HIGHLIGHTS

    DESCRIPTION OF PROBLEMS / ACHIEVEMENTS

    Comments :

    than the estimate of 5.00%.The month rainfall recorded at 342mm.

    TodateThis Month

    21.38

    Last Month

    21.39

    The month OER decreased by 1.08% as compared to last month and KER increase by 1.05%Todate OER for FY 2015/16 is 0.06% higher than the estimate of 22.00 and todate KER is 0.48% lower

    23.2622.18 O.E.R %

    4.585.24 4.19 K.E.R %

    PROGRESS REPORT ON

    (12TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF SEPTEMBER 2016

    KILANG KELAPA SAWIT BATU LINTANG

    Same Period Last YearTodate

    22.06

    ITEM

    4.77

    Current Financial Year This Month

    5.34

  • PAGE 2

    1 PRODUCTION REPORT

    1.1. FFB STATEMENT

    1.1.1. FFB CONTRIBUTION

    Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate

    KLK Estates MT MT MT MT MT MT2,220.030 25,797.090 4,081.000 43,078.000 -45.60% -40.12%

    445.340 6,431.850 - -595.970 7,049.310 2,064.000 20,885.000 -71.13% -66.25%544.980 5,864.470 - -531.880 5,851.000 - -374.190 3,801.490 2,837.000 26,563.000 -86.81% -85.69%873.210 8,748.630 - -356.580 4,231.720 - -

    2,536.220 26,521.540 5,176.000 59,438.000 -51.00% -55.38%- - - -- - - -

    - -- -- -- -- -- -

    Sub Total 8,478.400 94,297.100 14,158.000 149,964.000 -40.12% -37.12%

    Non-KLK Estates- -

    - - 0.000 0.000 - -655.270 776.490 - -135.000 773.170 - -

    - -- -- -- -- -- -- -

    Sub Total 790.270 1,549.660 - - - -

    Outsiders- -- -- -- -- -- -- -- -- -- -- -- -

    Sub Total - - - - - -

    Grand Total 9,268.670 95,846.760 14,158.000 149,964.000 -34.53% -36.09%

    Comment :

    Norseman

    Senggang

    Genting SelamaGenting Chong Meng

    Bukit Tebuan

    Sungai PulauPelam

    Serapoh

    Batu LintangKedah BuntarGhim KhoonNagalelaiSubur

    Total FFB received for the month of September 16 is 9268.670mt which is 34.53% lower than the estimate.

  • PAGE 31.1.2. FFB COMPOSITION

    Composition of crop from various years of planting are :-

    MT % MT %1980 - - - - 1981 - - - - 1982 - - - - 1983 - - - - 1984 - - - - 1985 - - - - 1986 - - - - 1987 - - - - 1988 - - 2.11 0.00 1989 - - - - 1990 81.75 0.88 1,575.14 1.64 1991 89.39 0.96 1,802.40 1.88 1992 27.33 0.29 488.24 0.51 1993 34.13 0.37 69.17 0.07 1994 163.82 1.77 2,047.66 2.14 1995 324.98 3.51 4,571.07 4.77 1996 190.94 2.06 2,596.50 2.71 1997 567.34 6.12 6,401.88 6.68 1998 886.28 9.56 9,753.69 10.18 1999 729.21 7.87 8,664.91 9.04 2000 679.26 7.33 7,068.68 7.37 2001 425.51 4.59 4,719.12 4.92 2002 429.22 4.63 3,777.77 3.94 2003 556.43 6.00 5,561.85 5.80 2004 837.38 9.03 7,553.58 7.88 2005 230.43 2.49 1,655.77 1.73 2006 290.75 3.14 1,363.15 1.42 2007 501.55 5.41 4,068.31 4.24 2008 443.01 4.78 3,659.04 3.82 2009 510.50 5.51 5,353.54 5.59 2010 665.26 7.18 6,674.84 6.96 2011 395.15 4.26 3,995.69 4.17 2012/13 209.05 2.26 2,422.65 2.53

    - - - - - - - - - - - - - -

    Total 9,268.670 100.00 95,846.76 100.00

    Append below the classification of Palms According to Age :-Category Palm Age (years) TM % TD %

    Immature 1st - 3rd 0% 0%Young 4th - 9th 27% 25%Prime 10th - 18th 55% 52%Old 19th and above 18% 23%Comments :

    Year of Planting

    Remarks

    FFB composition vary from the year 1990 to 2012 with most of the crop

    This Month Todate

    coming from the year of 1998 & 1999.

  • 1.1.3. FFB QUALITY

    CONTRIBUTING This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month

    Total/Average 0 0

    1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

    FFB INTAKE (MT) % %- -

    Comments :

    % Empty Bunch% Overnight % Rotten

    No grading is carried out by the mill.

    - WEIGHT (MT)

    LOADING RAMPWEIGHT (MT)

    FFB GRADING

    9,268.670

    PAGE 4

    No. of Grading % Black % Underripe % Long Stalk % Pest Damaged

  • 1.1.5. LOOSE FRUIT & TRASH CONTENT

    This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month

    123456789

    101112

    Average 0 0

    NO Outsider Estate123

    Average 0 0

    1.1.6. LOOSE FRUITS TO FFB RATIO

    NO ESTATES1 Batu Lintang2 Pelam3 Kedah45678

    1.1.7. STONES & TRASH IN FFB

    NO ESTATES12345678

    Comments :

    No Grading is carried out by the mill.

    Stones (kgs) per 100 tn FFBTrash

    Tonnage (mt) % to FFB

    Last Month% to FFB

    This Month Last MonthTotal Tonnage

    This Month

    Fruit in Load Loose Fruit (%) FFB %

    PAGE 4.1

    No. of Grading % Loose Trash Content in Trash Content in

  • PAGE 5

    1.2. PRODUCTION QUALITY

    1.2.1. PRODUCTION OIL / DESPATCH OIL

    X S.D. X S.D. X S.D. X S.D.

    FFA %

    Moisture (VM) %

    Dirt %

    Peroxide Value %

    DOBI

    ANALYSIS RESULT BY (KDC/TQCC)

    TaikoSAMPLE Average StandardFFA 4.12 4.79 4.10 3.0 MaxVM 0.13 0.22 0.18 0.13 MaxDIRT 0.037 0.028 0.04 0.03 MaxPEROXIDE VALUE 0.80 0.70 0.75 0.60 MaxIODINE VALUE 51.90 52.10 51.95 50 - 54DOBI VALUE 2.67 2.66 2.66 3.0 MinCAROTENE 565.75 600 MinE233 (1% CORR.) 1.16 1.25 1.20 1.20 MaxE269 (1% CORR.) 0.27 0.31 0.29 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 15.61 15.45 15.45 20.0 MinQUALITY RATING NIL

    Comments :

    610.00

    16.40

    The quality of despatched Oil within the Marketing specifications.

    0.13

    0.020

    2.66 0.03

    0.020

    0.12

    2.67 0.042.65 0.05

    0.29

    2.59

    The quality of production oil was satisfactory.

    540.00

    0.36

    0.03

    0.021

    0.223.56

    2nd Week

    573.00

    0.80

    14.33

    540.00

    51.90

    1st Week

    0.210.0600.70

    Marketing

    1.210.28

    < 0.25

    3.57 3.90

    51.902.73

    PRODUCTIONThis Month Last Month

    2.67 0.04

    This Month DESPATCH

    Last Month

    0.018

    0.15

    3.91

    0.009

    0.02

    3.710.28

    0.01

    0.013

    Specification

    < 5.0

    3rd Week 4th Week

    > 2.31

    0.018

    0.12

    4.11 0.30

    1.18

    0.03

    0.018

    0.150.038

  • PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL

    MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION

    5.42 0.27 5.22 0.42 4.33 0.35 5.48 0.08 6%4.38 0.30 5.08 0.54 5.51 0.12 4.58 0.26 7%0.21 0.03 0.22 0.23

    12.20 0.03 12.20 2.680.25 0.07 0.31 0.07 0.22 0.05 0.23 0.08

    1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -

    NET NET ON MILLWEIGHT WEIGHT NET WEIGHT

    tn tn tn1- 0.000 0.000 0.0002- 0.000 0.000 0.0003- 0.000 0.000 0.0004- 0.000 0.000 0.0005- 0.000 0.000 0.0006- 493.920 494.160 0.2407- 917.120 918.890 1.7708- 283.780 284.070 0.2909- 499.890 500.230 0.340

    10- 0.000 2194.710 2197.350 2.640

    1.2.4. PK DESPATCHBUYER MILL

    NETWEIGHT

    tn1- 0.0002- 0.000 3- 4- 0.0005- 466.1906-7-

    Total : 466.190

    1.2.5. CXC REPORT

    Comments :

    THIS MONTH

    MEWAH OIL - (SG)

    WILMAR (KLKC/00351-S)MEWAH OIL(ISCC)

    DESPATCHTHIS MONTH LAST MONTH

    PRODUCTIONLAST MONTH

    MOISTURE %DIRT %FFA %TOTAL BROKEN KERNEL %STONE CONTENT %

    TAIKO BLEACHING

    KL-KEPONG OLEOMAS (ISCC)

    KL-KEPONG OLEOMAS (MB)UNITATA (SG)

    SINN HWAT HENG

    FELDA IFFCO SDN BHD (SG)

    LAST MONTH

    SANG KEE

    KL-KEPONG OLEOMAS

    CARGILL PALM (SG)

    UNITATA (SG)

    ISI SAWITFLEET PALM

    Total CPO tankers dispatched with active GPS (A) 58

    2

    Total CPO tankers dispatched with non-active GPS (B)

    No. of loads with the weight shortage of 80kg and above

    THIS MONTH

    1

    Month of Sept 2016 - 100% of CPO-SG despatched from total despatch of 2194.710mt - 100% of PK SG despatched from total despatch of 466.190 mt

    The difference in weight for CPO despatch between the mill and the buyers was 2.640 mt

    Total number of CPO tankers dispatched (A+B+C)

    The kernel quality is within the Marketing Specification.

    77

    7758Total CPO tankers dispatched with no GPS installed (C)

  • PAGE 6.1

    LOADS FROM MONTH: September 2016

    Ticket No Driver Vehicle Date Mill Buyer Loss (A) Buyer

    A094607 A.THANASEGARAN AJG1139 27-09-16 40.570 40.480 0.090 CARGILL 20.000

    Total 0.090 20.000 0.000* Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.

    Comments

    CPO Despatch Loads With Weight Shortage of 80kg and Above

    Charges to the

    transporters (MT) *

    The shortage is charged to the transporters.

    EXTRACTED FROM CXC REPORT

    Actual oil recovered (MT) at Mill

    (B)

    Tanker with GPS

    Weight Details (MT)

  • PAGE 6.2

    No. Tanker number Date Time Action Taken / RemarksNett Weight diff. with buyers (+/-) (MT)

    None of the tankers that doesn't follow the authorisedroute during delivery.

    Total 0.000

    GPS VIOLATION REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON September 2016On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only

  • PAGE 71.3. COST OF PRODUCTION

    (Basis : Cost per tonne CPO)

    ThisMonth Todate Year ' s

    September 2016 12 mths EstimateRM / tn RM / tn RM / tn

    Indirect Cost 69.34 83.16 61.53

    Depreciation 15.69 18.30 11.73

    Manufacturing Cost 179.42 219.73 177.98

    Ex-Mill Cost 264.45 321.19 251.24

    Cooking Oil Cess 0.00 0.00 0.00

    Palm Oil Stabilisation Cess 2.00 2.00 2.00

    CPO (Sabah) Sales Tax

    Despatch & Selling 49.54 48.44 38.34

    TOTAL EXPENDITURE 315.99 371.63 291.58

    A/c This Month Estimate

    Code RM/ton CPO RM/ton CPO Diff. (%)1 0.97 0.73 32.9%2 20.27 11.23 80.5%3 8.41 5.48 53.5%

    11 1.87 1.15 62.6%

    12 1.35 1.07 26.2%19 6.10 4.20 45.2%41 3.83 2.87 33.4%43 21.41 11.89 80.1%

    48 7.52 6.66 12.9%

    50 28.46 19.73 44.2%

    52 14.16 8.64 63.9%

    55 15.74 11.01 43.0%

    71 49.54 38.34 29.2%

    Comments :

    Comments

    Replaced 2 unit digester bottom plate (RM5700) and repair CO pump (RM2500)Under estimate cpo transport to Port Klang area.

    Under estimate the new OT rate due to minimun wages.

    Higher lab operator overtime due to grader worker resign

    Higher cost due to expenses for Family Day(RM1500)Higher AP wages and OT levied by BLEHigher due to low crop processed(34%)

    Replaced crane travelling wheel,motor & shaft(RM18,000)

    Purchased 1 unit new FFB cages (RM5500) & 4 pcs cages side plate (RM5120.00)

    Higher cost due to low crop processed(34%)Under estimate the additional executive salary.Higher cost due to renewal work permit for 3 Indonesia Foreign Workers (RM2520)& public holiday paid

    Higher cost due to purchase clinical charges by BLE(RM1819)

    Manufacturing cost was at RM 179.42/tonne oil against estimate of RM 177.98/tonne oil.

  • PAGE 82 PROCESS PERFORMANCE

    2.1. STERILIZATION

    Summary of sterilisation cycle for the month is tabulated as follows :-

    Function X (min) S.D.Deaeration 21st. Peak (1.2 Bar / 17.4 psi) 101st. Peak exhaust 22nd. Peak (1.2 Bar / 17.4 psi) 62nd. Peak exhaust 23rd. Peak (1.2 Bar / 17.4 psi) 63rd. Peak exhaust 24th. Peak (2.9 Bar / 42 psi) 11Holding Time 45Final exhaust 5Steaming cycle 91 0Door Open to Door Shut Time 15

    X S.D. X S.D.USB after 1st Threshing (%)USB after 2nd Threshing (%) 1.34 0.04 1.37 0.06Threshing Efficiency (%)

    STERILIZER CONDENSATE

    This Month Last MonthX S.D. X S.D.

    0.95 0.08 0.93 0.10

    Condensate / FFB Ratio

    Absolute oil loss (kg/tn FFB)

    Comments :

    Last MonthThis Month

    Steriliser condensate (Oil Content in Wet Basis)

    OLWB in steriliser condensate at range of 1.00%.The condensate is recycled to system as press dilution.Sterilization using four peak sterilising.

    The percentage of USB is 1.34% .

  • PAGE 9.02.2. DIGESTING & PRESSING STATION

    2.2.1. DIGESTER TEMPERATURE OC

    This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 95.00 0.44 96.00 0.45 Digester No. 2 96.00 0.45 95.00 0.44 Digester No. 3 95.00 0.46 95.00 0.50 Digester No. 4 Digester No. 5 Digester No. 6 Digester No. 7 Digester No. 8 Digester No. 9

    2.2.2. PRESSING

    Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

    X 5.12 5.18 5.16 5.15S.D. 0.18 0.29 0.29 0.25

    X 5.18 5.13 5.30 5.20S.D. 0.20 0.26 0.09 0.18

    X 7.74 7.65 7.80 7.73S.D. 0.11 0.24 0.08 0.14

    X 7.69 7.72 7.75 7.72S.D. 0.19 0.16 0.20 0.18

    X 19.66 20.39 19.75 19.93S.D. 1.25 0.79 1.03 1.02

    X 19.47 19.98 19.78 19.74S.D. 0.91 0.61 0.42 0.65

    X 73.95 279.51 271.59 208.35S.D.

    X 280.95 241.02 74.33 198.77S.D.

    Comments :

    - Nut Breakage was recorded at 19.93% and will strive to control below 15%.

    This Month

    Last Month

    This Month

    Last Month

    OIL LOSS ON DRY BASIS (OLDB)

    NUT BREAKAGE (%)

    PRESS RUNNING HOURS

    This Month

    Last Month

    This Month

    Last Month

    OIL LOSS ON WET BASIS (OLWB)

    - Digester temperature was >90 C

    - Average OLDB of Press Fibre was recorded at 7.73%

  • PAGE 9.12.2.3.

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    X 28.16 20.72 31.97 34.32 60.24 61.24 6.37 6.69 7.47 7.70 23.06 20.72 11.41 11.32S.D. 0.77 2.81 6.60 5.25 0.47 1.60 1.42 1.49 1.01 1.36 3.53 2.81 1.53 2.85N

    True Nut TrashTrue Mesocarp (ripe)

    True Mesocarp (unripe)

    Oil in Mesocarp OLWB Normal Parthenocarp

    Abnormal Partnenocarp

  • PAGE 9.2

    2.2.4. EFB PRESSING

    Press Press Press Press Super SuperNo. 1 No. 2 No. 3 No. 4 Press 1 Press 2

    PRESS RUNNING This Month HOURS Last Month DOWN TIME This Month

    Last Month

    2.2.5. OIL RECOVERED

    This Month F F A (%) DOBI

    VM (%)OLWB (%)

    Press 1 Press 2 Press 3 Press 4 Press 5 Press 6 Press 7 Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)

    2.2.6. SPLITTER

    RUNNING HOURSThis Month Last Month

    No. 1 No. 2

    Comments :

    Last Month

    No EFB press installed in this mill.

  • PAGE 10

    2.3. CLARIFICATION STATION

    2.3.1. CLARIFICATION TANK

    This Month Last MonthTank 1 Tank 2 Tank 3 Tank 1 Tank 2 Tank 3

    X 96.00 94.00S.D 2.64 2.40

    % Oil in underflow X 5.30 5.27 (% OLWB) S.D 0.31 0.64

    2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

    S1 S2 S3 C1 C2 C3 C4 C5 C6 C7 C8X 0.83 0.80 0.82

    S.D 0.08 0.06 0.06X 0.83 0.85 0.85

    S.D. 0.10 0.08 0.11T Mth X 288.13 185.00 278.52L Mth X 320.91 318.71 227.59T Mth X 1.60 1.60 1.60L Mth X 1.60 1.60 1.60T Mth X 1725.37 1107.81 1667.82L Mth X 2071.95 2057.68 1469.38T Mth X 1.56 0.96 1.48L Mth X 1.59 1.62 1.15

    Comments :

    Separate Waste Basculator (mt)

    Oil losses on Absolute Terms (Kg/tn FFB)

    OLWB in underflow was recorded at 5.30%.Temperature of underflow was recorded at 94 C.

    Temperature OC

    This MonthLast

    Month

    % Oil loss on wet basis (x)

    Operating Hours (hrs)

    Nozzle size (mm)

    Main Menu

  • PAGE 11

    2.3.2. DECANTER (D)

    Inlet

    D1 D2 D1 D2 D1 D2X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.T Mth XL Mth X

    Comments :

    Last Month

    No Decanters are installed in the mill.

    Temperature (oC)

    Operating Hours

    NOS % (x)

    Last Month

    Heavy Phase

    This MonthLast

    Month

    This Month Solid Phase Light Phase

    Oil % (x)

    This MonthLast

    Month

    VM % (x)

    This Month

  • PAGE 12

    2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS

    X S.D. X S.DDILUTION RATE % 26.00 1.21 25.00 1.47Separator Waste to FFB ratioDecanter cake to FFB ratioAbsolute Oil loss in Separator/Centrifuge kg/mt FFB 4.13 4.36Absolute Oil loss in Decanter Cake kg/mt FFBTotal Oil loss kg/MT FFB 4.13 0.00 4.36 0.00

    2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

    DescriptionAfter Deoiling tank (OLWB)After Cooling pond

    Comments :

    No decanter cake is produced.

    0.690.750.72

    Oil losses after cooling pond recorded below 1%.

    This Month Last Month

    This Month Last Month

    Absolute oil loss in kg/mt FFB recorded at 4.13kg/FFB

    0.75

  • PAGE 13

    2.3.5. PURIFIER & VACUUM DRYER

    No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.

    2.3.6. VACUUM DRYER

    X S.D X S.D X S.DThis Month 75.00 0.69 0.30 0.03 0.13 0.03 56.67Last Month 76.00 0.50 0.30 0.04 0.12 0.03 60.00This MonthLast MonthThis MonthLast Month

    Comments :

    % VM

    This MonthLast

    Month

    % Dirt

    This MonthLast

    Month

    VM % Before Dryer

    VM Rem. Eff

    This MonthLast

    Month

    Dirt Rem. Eff

    This MonthLast

    Month

    PURIFIER After PurifierBefore Purifier

    VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM.

    Removal Eff.

    No: 1

    No: 2

    No: 3

    Vacuum dryer efficiency was satisfactory.

  • 2.4. NUT & KERNEL STATION PAGE 13.1

    2.4.1. NUT SILO & KERNEL SILOS

    DESCRIPTION No: 1 No: 2 No: 3 No: 4X 19.22 19.48

    S.D 0.70 0.80X 19.30 19.17

    S.D. 0.82 0.41X 14.65 15.67

    S.D 1.12 0.58X 14.67 15.10

    S.D. 0.59 19.56X 23.78

    S.DX 23.99 21.23

    S.D.

    2.4.2. KERNEL SILO

    1 2 3 4 5 1 2 3 4 5Top

    Middle 50.00 40.00 50.00 45.00Bottom 61.00 66.00 64.00 70.00

    % VM Fresh Kernel X 20.22 20.36 20.17 19.90S.D 0.90 0.74 0.91 0.61X 5.40 5.48 5.49 5.50

    S.D 0.29 0.08 0.22 0.42% Drying Efficiency 73.29 73.08 72.78 72.36

    Comments :

    This MonthLast

    Month

    Kernel drying efficiency was satisfactory.

    This Month Last Month

    % Drying Efficiency

    % Dried Kernel

    Temperature oC

    % VM Fresh Nut

    This MonthLast

    Month

    % Dried Nut

    This MonthLast

    Month

  • 2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2

    X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%) 83.62 1.59 83.04 1.45Broken Nut (%) 8.89 1.71 8.53 1.58Whole Kernel (%) 0.54 0.16 0.43 0.12Brokern Kernel (%) 0.32 0.18 0.61 0.07

    X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 35.61 1.18 35.97 0.48Broken Kernel (%) 11.70 1.00 11.36 0.22Uncracked Nut (%) 0.17 0.08 0.17 0.05Half cracked Nut (%) 0.25 0.06 0.27 0.06

    X SD X SDRipple Mill No: 1 98.83 0.41 99.19 0.37Ripple Mill No: 2 99.11 0.22 99.32 0.24Ripple Mill No: 3Ripple Mill No: 4Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9

    Comments :

    Nut cracking eff. & kernel recovery eff. was satisfactory.

    No: 4 No: 5

    Nut Cracking Eff.

    Kernel Recovery Eff.

    Mixture Composition after Cracker

    No: 1

    R I P P L E M I L L

    R I P P L E M I L L

    No: 1 No: 2 No: 3 No: 7 No: 8 No: 9Nut Composition before Cracker (INPUT)

    No: 4 No: 5 No: 6

    No: 8 No: 9No: 2 No: 3 No: 6 No: 7

  • PAGE 142.4.4. KERNEL LOSSES / COST

    X SD X SD X SD X SD X SD X SD

    0.63 0.09 0.69 0.06

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    0.77 0.10 0.77 0.10

    Claybath 0.67 0.14 0.75 0.20

    2.4.5. RUNNING COST

    Comments :

    Line 3Line 1 Line 2 Line 3 Line 1 Line 2Last MonthThis Month

    Kernel Produced (mt)Total Kaolin or Calcium Carbonate Cost (RM)

    485.607 457.875

    Last Month Todate

    4392.534

    2320.500 2915.500 21060.500

    Cyclone Fibre

    LTDSHydrocyclone (PK in wet shell)

    This Month

    Cost / MT of PK (RM)

    Cost / MT of FFB (RM)

    4.779 6.367 4.795

    Other Cost e.g Sodium Silicate (RM)

    0.250 0.267 0.220

    All kernel losses was within the in-house target.

  • PAGE 152.5. BOILER / POWER HOUSE

    2.5.1. BOILER HOUSE

    Description This Month Last Month TodateBoiler Chemical Cost (RM) 1390.30 1638.62 14068.89 Cost / MT FFB (RM) 0.15 0.15 0.15

    2.5.2. POWER HOUSE

    DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month

    Turbines > Dresser RandNo. 1 (700 KW) 356.0 428.4 143560 173530 403.3 405.1No. 2 (400 KW)No. 3 (0 KW)No. 4 (0 KW)Diesel Gen Set > CumminsNo. 1 (300 KW) 2.9 4.6 69.0 228.00 23.79 49.57No. 2 (640 KW)No. 3 (640 KW)KwHr / mt FFB (Turbine + Genset)

    2.5.3. TNB POWER SUPPLY

    KwHr RM KwHr RM KwHr RMPalm Oil Mill 36139.00 16553.14 37689.00 17263.67 399510.00 184979.12Rubber FactoryEcomat PlantTotal 36139.00 16553.14 37689.00 17263.67 399510.00 184979.12

    Comments :

    This Month

    Steam Consumption per KwHr (Turbine)

    Diesel genset warmed up to maintain its condition.TNB supply is used to start the mill operation by using change over switch.

    Last Month Todate

    Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption

    (Litres)

  • PAGE 16

    2.6. WATER TREATMENT PLANT

    2.6.1. WATER CONSUMPTION

    Description This Month Last Month This Month Last Month m3/mt FFBOwnEstate

    Mill 12300.00 14910.00 1.33 FCTOTAL 12300.00 14910.00 0.00 0.00 1.33

    2.6.2. WATER TREATMENT COST

    This Month Last Month TodateChemical Cost (RM) 2164.91 2779.82 24678.52Cost /m3 water (cts / m3) 0.18 0.19 0.20Cost /mt FFB (cts / mt FFB) 0.23 0.25 0.25Water Consumption (m3 / mt FFB) 1.33 1.36 1.26

    2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER

    This Month Last Month TodateTotal Volume of water (m3) consumed 12300.00 14910.00 120676.00Total Cost (RM)

    Comments :

    Domestic

    Water consumed%

    Water treatment cost is 0.18cts/m3 of water.Belt press production : 2.10 mt/hrCost of cake Production : 9.76 Rm/mt of cake

  • PAGE 17

    2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)

    2.7.1. Visitation

    Date21/09-22/9/16

    26-09-16

    2.7.2. Training

    Date08-09-16

    2.7.3. Security

    Date27-09-16

    2.7.4. OSH Matter

    Date

    2.7.5. RSPO Matter

    Date

    2.7.6. Amenities

    Date

    2.7.7. Water Supply

    Date

    2.7.8. EFB DISPOSAL

    2.7.9. DECANTER CAKE DISPOSAL

    Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

    2,008.500 124.489 Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

    14.682 2,118.307

    Remarks

    Remarks

    RemarksPersonTQCC auditJKKP audit

    Remarks

    Remarks

    RemarksPDRM Bandar Bahru Renewal Gun Licience

    RemarksJKKP seminar at Alor setar (Mr.Yeo & En Azimil)

  • PAGE 17.1

    2.8.0. Effluent Treatment

    Date

    2.8.1 Mill Downtime

    Date Hours Date Hours

    Total 0 0

    2.8.2 Housekeeping / Beautification / Linesite / Compound

    Date

    2.8.3. Others

    Date

    Comments

    Remarks

    Details DetailsLine 1 Line 2

    Remarks

    Remarks

  • PAGE 17.2

    2.8.4. Effluent Result For September 2016

    abcdefgh

    2.8.5 Trailing Report

    5000 MAX

    DOE LimitpH N/A

    TQCC Result879BOD (mg / l)

    100680

    COD (mg / l) N/ATotal Nitrogen (mg / l) N/A

    39

    4861Total Solids (mg / l)

    Oil & Grease (mg / l) N/AN/A

    43

    Suspended Solids (mg / l)N/A

    302

    Ammonical Nitrogen (mg / l) N/A

  • PAGE 183.0 MANPOWER

    3.1. EMPLOYEES

    MALAYS CHINESE INDIANS OTHERS TOTAL Executives 1 2 2 0 5 Subordinate Staff 5 0 13 0 18 TOTAL 6 2 15 0 23

    3.2. SUBORDINATE STAFF LEAVE STATUS

    Leave Leave Leave B/F from Earned Todate TakenYear '15 for Year '16 (A+B) This Bal

    No. Position (Days)-A (Days)-B Total Month (A+B-C)1 C/CLERK 21 16 37 4 17 202 2ND CLERK 11 18 29 2 22 73 CHARGEMAN 1 18 19 0 18 14 SUPERVISOR 7 18 25 3 21 45 SUPERVISOR 9 4 13 2 13 06 E/DRIVER 3 13 16 1 15 17 BOILERMAN -5 13 8 3 15 -78 BOILERMAN 18 13 31 0 10 219 LAB OPER 2 13 15 1 27 -1210 MECHANIC 18 13 31 0 14 1711 MECHANIC 11 13 24 0 11 1312 MECHANIC 8 12 20 3 11 91314 FOREMAN 16 18 34 3 18 1615 E/DRIVER 0 13 13 1 10 316 MECHANIC -1 11 10 0 7 317 S/KEEPER 31 16 47 0 0 4718 W/B OPER 0 12 12 3 13 -119 BOILERMAN 2 11 13 1 12 120 SUPERVISOR 0 12 12 0 7 52122232425262728

    Comments :

    MAHD HANIFFAH

    A.MOHANATHASSYED MOHAMAD ADNAN

    P.SANKARANAVR.MOGANAKRISHNANR.RAJOOS.MUNIANDYR.BALAN

    Leave Taken Todate

    (C)ALIZA BINTI MAT ISA

    G.LOGANATHANA.PUGALENTHY

    S.SUBRAMANIAMSAMSUDDIN BIN ISHAK

    G. KRISHNASAMY

    SARAVANANGV. THANARASUMANJULA A/P PERUMALUMOHD KHAIRIL ABDULLAHS. JAMESON

    NAME

  • PAGE 18.13.3 EMPLOYEE (MILL WORKERS)

    (A) CHECKROLL

    (1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 20 3 23 - 23 Chinese - - - - Indian 23 3 26 - 26 Grand Total 43 6 49 - - - 49

    (2) NON-MALAYSIAN Sri Lanka - - - India 7 - 7 - 7 Indonesia 13 - 13 - 13 Bangladeshi - - - Thai - - - Filipino - - - Grand Total 20 - 20 - - - 20 Total Checkroll 63 6 69 - - - 69

    (B) CONTRACT / TEMPORARY

    (1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 2 - 2 - 2 Chinese - - - Indian 1 1 - 1 Grand Total 3 - 3 - - - 3

    Employees Dependants (Resident)Total

    Employees Dependants (Resident)Total

  • PAGE 19Appendix 1

    Unit This Month Last Month Todate1.0 FFB

    1.1.1 Weight of FFB processed MT 9,268.670 10,924.070 95,846.760 1.1.2 Estimate MT 14,158.000 14,350.000 148,881.000 1.1.3 Shift Hours Hrs -

    2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 2,055.669 2,541.438 21,145.984 2.1.2 Estimate MT 3,118.000 3,156.000 32,753.000 2.1.3 Oil Extraction Rate % 22.18 23.26 22.06 2.1.4 Estimate % 22.02 21.99 22.00 2.1.5 Press Running Hours Hrs. 625.05 754.51 6,177.59 2.1.6 Production Hours Hrs. 379.50 443.50 3,886.80 2.1.7 Downtime (Line 1) Hrs. 3.00 2.1.8 Downtime (Line 2) Hrs. - 2.1.9 Press Capacity per unit MT / hr 14.83 14.48 15.52 2.2.0 F.F.B. Manufactured / Hours MT / hr 24.42 24.63 24.66 2.2.1 Oil Recovered / Hours MT / hr 5.42 5.73 65.05

    3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 485.607 457.875 4,392.061 3.1.2 Estimate MT 706.000 718.000 7,452.000 3.1.3 Kernel Extraction Rate % 5.24 4.19 4.58

    ;3.1.4 Estimate % 4.99 5.00 5.01 3.1.5 Production Hours Hrs. 379.50 443.50 3,883.55 3.1.6 Kernel Recovered / Hr MT / hr 1.28 1.03 1.13

    4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 2,197.350 2,909.830 20,077.366 4.1.2 Oil in Stock MT 376.329 518.010 10,146.333 4.1.3 Kernels Despatched MT 466.190 542.680 4,491.850 4.1.4 Kernels in stock MT 90.426 71.009 1,217.621

    - Packed / Bulk Silo MT 90.426 71.009 1,217.621 - Kernel in Bag MT -

    Remarks :

    PROGRESS REPORT FOR THE MONTHOF SEPTEMBER 2016

  • PAGE 20

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION

  • PAGE 21

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION

  • PAGE 22

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION

  • PAGE 23

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

    CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4

    Main

    KKS Progress Report version 1.44 for September 2016

    Please select your desire section by a mouse click

    Section ASection B

    Print

    3

    Save

    Information for the Progress Report

    Co NameKUALA LUMPUR KEPONG BERHAD

    Co Reg No.15043-VSetup

    OC Code024

    OC NameKILANG KELAPA SAWIT BATU LINTANG

    Co Start of Fin Mth10

    Current Year2016Reset

    Current Month9September

    Current Month, YrSeptember 2016

    Current Fin Mth #12th

    Current Fin Mth12th

    Current Fin Yr2016

    Current Period2015/16

    Asst/Manager NameYEO BOON KEATTitleManager

    Wt Shortage Limit80Kg

    By: Chan Kok LeongInstalled to:C:\eProgressRep\version 1.44

    Sys last updated:25-Oct-2013Set:16-Jun-2015

    Title ListYearMonthYesNo

    Assistant20111No

    Senior Assistant20122Yes

    Acting Manager20133

    Manager20144

    Senior Manager20155

    20166

    20177

    20188

    20199

    202010

    202111

    202212

    Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out

    Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size

    ++ means click tab for more pages

    11. Process Performance

    1. Highlights

    2. Production Report

    4. FFB Quality

    5. LF and Trash Content

    6. Production Quality

    7. Production and Despatch Kernel

    8. CPO Despatch Loads with wt shortage

    9. GPS Violation Report

    10. Cost of Production

    12. Digesting & Pressing Station ++

    13. EFB Pressing

    1. Clarification Station

    2. Decanter

    3. Dilution Rate & Absolute Oil Loss

    4. Purifier & Vacuum Dryer

    5. Nut & Kernel Station

    6. Nut Cracking Efficiency

    7. Kernel Losses / Cost

    8. Boiler / Power House

    9. Water Treatment Plant

    10. General (Visitors/Security/Breakdown, etc.) ++

    11. Man Power

    12. Appendix 1

    3. FFB Composition

    13. Major Maintenance Report ++

    CoverPage

    KILANG KELAPA SAWIT BATU LINTANG

    Progress Report

    For the month of

    SEPTEMBER 2016

    Date10/13/16KUALA LUMPUR KEPONG BERHAD

    (No. Syarikat: 15043-V)

    KILANG KELAPA SAWIT BATU LINTANG

    .

    (YEO BOON KEAT)

    Manager

    Highlights

    PROGRESS REPORT ONPAGE 1

    KILANG KELAPA SAWIT BATU LINTANG

    FOR THE MONTH OF SEPTEMBER 2016

    (12TH MONTH OF FINANCIAL YEAR)

    HIGHLIGHTS

    Estimated percentage of FFB pushed by shovel

    Percentage FFB pushed due to grading

    PRODUCTION

    Current Financial YearSame Period Last Year

    This MonthLast MonthTodateThis MonthTodate

    O.E.R %22.1823.2622.0621.3821.39

    K.E.R %5.244.194.585.344.77

    RAINFALL RECORD (mm)Year2016

    Fin YearOctNovDecJanFebMarAprMayJunJulAugSep

    Last FY365.00428.00415.00144.00178.00145.00328.00252.00176.00202.00153.00321.00

    This FY312.00520.00364.00133.0058.0042.0060.00319.00141.00212.00246.00342.00

    OTHER HIGHLIGHTS

    ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS

    Comments :

    The month OER decreased by 1.08% as compared to last month and KER increase by 1.05%

    Todate OER for FY 2015/16 is 0.06% higher than the estimate of 22.00 and todate KER is 0.48% lower

    than the estimate of 5.00%.

    The month rainfall recorded at 342mm.

    Main Menu

    ProductionReport

    PAGE 2

    1PRODUCTION REPORT

    1.1.FFB STATEMENT

    1.1.1.FFB CONTRIBUTION

    Estimate forEstimate+/- Estimate+/- Estimate

    This MonthTodateThis MonthTodateThis MonthTodate

    KLK EstatesMTMTMTMTMTMT

    Batu Lintang2,220.03025,797.0904,081.00043,078.000-45.60%-40.12%

    Kedah445.3406,431.850

    Buntar595.9707,049.3102,064.00020,885.000-71.13%-66.25%

    Ghim Khoon544.9805,864.470--

    Nagalelai531.8805,851.000--

    Subur374.1903,801.4902,837.00026,563.000-86.81%-85.69%

    Norseman873.2108,748.630--

    Sungai Pulau356.5804,231.720--

    Pelam2,536.22026,521.5405,176.00059,438.000-51.00%-55.38%

    Senggang- 0- 0--

    Serapoh- 0- 0--

    --

    --

    --

    --

    --

    --

    Sub Total8,478.40094,297.10014,158.000149,964.000-40.12%-37.12%

    Non-KLK Estates

    --

    Bukit Tebuan- 0- 00.0000.000

    Genting Selama655.270776.490--

    Genting Chong Meng135.000773.170--

    --

    --

    --

    --

    --

    --

    --

    Sub Total790.2701,549.660- 0- 0--

    Outsiders

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    Sub Total- 0- 0- 0- 0--

    Grand Total9,268.67095,846.76014,158.000149,964.000-34.53%-36.09%

    Comment :

    Total FFB received for the month of September 16 is 9268.670mt which is 34.53% lower than the estimate.

    Main Menu

    FFBComposition

    PAGE 3

    1.1.2.FFB COMPOSITION

    Composition of crop from various years of planting are :-

    Year of PlantingThis MonthTodate

    MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above

    1980- 0- 0- 0- 03602515.475064.471688.73

    1981- 0- 0- 0- 035023751.4250118.5221976.82

    1982- 0- 0- 0- 034

    1983- 0- 0- 0- 033

    1984- 0- 0- 0- 032

    1985- 0- 0- 0- 031

    1986- 0- 0- 0- 030

    1987- 0- 0- 0- 029

    1988- 0- 02.110.0028

    1989- 0- 0- 0- 027

    199081.750.881,575.141.6426

    199189.390.961,802.401.8825

    199227.330.29488.240.5124

    199334.130.3769.170.0723

    1994163.821.772,047.662.1422

    1995324.983.514,571.074.7721

    1996190.942.062,596.502.7120

    1997567.346.126,401.886.6819

    1998886.289.569,753.6910.1818

    1999729.217.878,664.919.0417

    2000679.267.337,068.687.3716

    2001425.514.594,719.124.9215

    2002429.224.633,777.773.9414

    2003556.436.005,561.855.8013

    2004837.389.037,553.587.8812

    2005230.432.491,655.771.7311

    2006290.753.141,363.151.4210

    2007501.555.414,068.314.249

    2008443.014.783,659.043.828

    2009510.505.515,353.545.597

    2010665.267.186,674.846.966

    2011395.154.263,995.694.175

    2012/13209.052.262,422.652.5399

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    Total9,268.670100.0095,846.76100.00

    Append below the classification of Palms According to Age :-

    CategoryPalm Age (years)TM %RemarksTD %

    Immature1st - 3rd0%0%

    Young4th - 9th27%25%

    Prime10th - 18th55%52%

    Old19th and above18%23%

    Comments :

    FFB composition vary from the year 1990 to 2012 with most of the crop

    coming from the year of 1998 & 1999.

    Main Menu

    FFBQuality

    PAGE 4

    1.1.3.FFB QUALITY

    No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch

    CONTRIBUTINGThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast

    ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth

    Total/Average00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0

    1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

    LOADING RAMPFFB GRADING

    FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%

    9,268.670- 0- 0- 0

    Comments :

    No grading is carried out by the mill.

    Main Menu

    LF_TrashContent

    PAGE 4.1

    1.1.5.LOOSE FRUIT & TRASH CONTENT

    No. of Grading% LooseTrash Content inTrash Content in

    Fruit in LoadLoose Fruit (%)FFB %

    ThisLastThisLastThisLastThisLast

    NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Average00- 0- 0- 0- 0- 0- 0

    NOOutsider Estate

    1

    2

    3

    Average00- 0- 0- 0- 0- 0- 0

    1.1.6.LOOSE FRUITS TO FFB RATIO

    Total Tonnage% to FFB

    NOESTATESThis MonthLast MonthThis MonthLast Month

    1Batu Lintang

    2Pelam

    3Kedah

    4

    5

    6

    7

    8

    1.1.7.STONES & TRASH IN FFB

    Trash

    NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB

    1

    2

    3

    4

    5

    6

    7

    8

    Comments :

    No Grading is carried out by the mill.

    Main Menu

    ProductionQuality

    PAGE 5

    1.2.PRODUCTION QUALITY

    1.2.1.PRODUCTION OIL / DESPATCH OIL

    PRODUCTIONDESPATCHMarketing

    This MonthLast MonthThis MonthLast MonthSpecification

    XS.D.XS.D.XS.D.XS.D.

    4.110.363.560.303.910.283.710.22

    FFA %< 5.0

    0.130.030.120.030.150.010.120.02< 0.25

    Moisture (VM) %

    0.0200.0210.0200.0180.0180.0130.0180.009

    Dirt %

    Peroxide Value %

    2.660.032.670.042.650.052.670.04

    DOBI> 2.31

    ANALYSIS RESULT BY (KDC/TQCC)

    1st Week2nd Week3rd Week4th WeekTaiko

    SAMPLEAverageStandard

    FFA3.573.904.124.794.103.0 Max

    VM0.210.150.130.220.180.13 Max

    DIRT0.0600.0380.0370.0280.040.03 Max

    PEROXIDE VALUE0.700.800.800.700.750.60 Max

    IODINE VALUE51.9051.9051.9052.1051.9550 - 54

    DOBI VALUE2.732.592.672.662.663.0 Min

    CAROTENE573.00540.00540.00610.00565.75600 Min

    E233 (1% CORR.)1.211.181.161.251.201.20 Max

    E269 (1% CORR.)0.280.290.270.310.290.20 Max

    IRON0.005.0 - 3.0

    PHOSPHORUS0.008.0 - 5.0

    D.F. (Delta Y)16.4014.3315.6115.4515.4520.0 Min

    QUALITY RATING0.00NIL

    Comments :

    The quality of despatched Oil within the Marketing specifications.

    The quality of production oil was satisfactory.

    Main Menu

    ProdDesKernel

    PAGE 6

    1.2.2.PRODUCTION / DESPATCH KERNEL

    PRODUCTIONDESPATCH

    THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING

    XS.D.XS.D.XS.D.XS.D.SPECIFICATION

    MOISTURE %5.420.275.220.424.330.355.480.086%

    DIRT %4.380.305.080.545.510.124.580.267%

    FFA %0.210.030.220.23

    TOTAL BROKEN KERNEL %12.200.0312.202.68

    STONE CONTENT %0.250.070.310.070.220.050.230.08

    1.2.3.CPO DESPATCH

    BUYERMILLBUYER'S+ / -

    NETNETON MILL

    WEIGHTWEIGHTNET WEIGHT

    tntntn

    1-WILMAR (KLKC/00351-S)0.0000.0000.000

    2-MEWAH OIL(ISCC)0.0000.0000.000

    3-MEWAH OIL - (SG)0.0000.0000.000

    4-TAIKO BLEACHING0.0000.0000.000

    5-KL-KEPONG OLEOMAS (MB)0.0000.0000.000

    6-UNITATA (SG)493.920494.1600.240

    7-FELDA IFFCO SDN BHD (SG)917.120918.8901.770

    8-CARGILL PALM (SG)283.780284.0700.290

    9-KL-KEPONG OLEOMAS (ISCC)499.890500.2300.340

    10-KL-KEPONG OLEOMAS0.000

    2194.7102197.3502.640

    1.2.4.PK DESPATCH

    BUYERMILL

    NET

    WEIGHT

    tn

    1-SANG KEE0.000

    2-SINN HWAT HENG0.000

    3-ISI SAWIT

    4-FLEET PALM0.000

    5-UNITATA (SG)466.190

    6-

    7-

    Total :466.190

    1.2.5.CXC REPORT

    THIS MONTHLAST MONTH

    Total CPO tankers dispatched with active GPS (A)5877

    Total CPO tankers dispatched with non-active GPS (B)

    Total CPO tankers dispatched with no GPS installed (C)

    Total number of CPO tankers dispatched (A+B+C)5877

    No. of loads with the weight shortage of 80kg and above12

    Comments :

    The kernel quality is within the Marketing Specification.

    The difference in weight for CPO despatch between the mill and the buyers was 2.640 mt

    Month of Sept 2016 - 100% of CPO-SG despatched from total despatch of 2194.710mt

    - 100% of PK SG despatched from total despatch of 466.190 mt

    Main Menu

    CPODes

    PAGE 6.1

    EXTRACTED FROM CXC REPORT

    CPO Despatch Loads With Weight Shortage of 80kg and Above

    LOADS FROM MONTH: September 2016

    Weight Details (MT)Actual oil recovered (MT) at Mill (B)Charges to the transporters (MT) *Tanker with GPS

    Ticket NoDriverVehicleDateMillBuyerLoss (A)Buyer

    0.0000.000

    A094607A.THANASEGARANAJG11399/27/1640.57040.4800.090CARGILL20.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    Total0.09020.0000.000

    * Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.

    Comments

    The shortage is charged to the transporters.

    Main Menu

    GPSRep

    PAGE 6.2

    GPS VIOLATION REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON September 2016

    On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only

    No.Tanker numberDateTimeAction Taken / RemarksNett Weight diff. with buyers (+/-) (MT)

    None of the tankers that doesn't follow the authorised

    route during delivery.

    Total0.000

    Main Menu

    COP

    PAGE 7

    1.3.COST OF PRODUCTION

    (Basis : Cost per tonne CPO)

    This

    MonthTodateYear ' s

    September 201612 mthsEstimate

    RM / tnRM / tnRM / tn

    Indirect Cost69.3483.1661.53

    Depreciation15.6918.3011.73

    Manufacturing Cost179.42219.73177.98

    Ex-Mill Cost264.45321.19251.24

    Cooking Oil Cess0.000.000.00

    Palm Oil Stabilisation Cess2.002.002.00

    CPO (Sabah) Sales Tax

    Despatch & Selling49.5448.4438.34

    TOTAL EXPENDITURE315.99371.63291.58

    A/cThis MonthEstimateComments

    CodeRM/ton CPORM/ton CPODiff. (%)

    10.970.7332.9%Higher cost due to low crop processed(34%)

    220.2711.2380.5%Under estimate the additional executive salary.

    38.415.4853.5%Higher cost due to renewal work permit for 3 Indonesia Foreign Workers (RM2520)& public holiday paid

    111.871.1562.6%Higher cost due to purchase clinical charges by BLE(RM1819)

    121.351.0726.2%Higher cost due to expenses for Family Day(RM1500)

    196.104.2045.2%Higher AP wages and OT levied by BLE

    413.832.8733.4%Higher due to low crop processed(34%)

    4321.4111.8980.1%Under estimate the new OT rate due to minimun wages.

    487.526.6612.9%Higher lab operator overtime due to grader worker resign

    0.0%

    0.0%

    0.0%

    0.0%

    5028.4619.7344.2%Purchased 1 unit new FFB cages (RM5500) & 4 pcs cages side plate (RM5120.00)

    0.0%

    5214.168.6463.9%Replaced crane travelling wheel,motor & shaft(RM18,000)

    5515.7411.0143.0%Replaced 2 unit digester bottom plate (RM5700) and repair CO pump (RM2500)

    7149.5438.3429.2%Under estimate cpo transport to Port Klang area.

    Comments :

    Manufacturing cost was at RM 179.42/tonne oil against estimate of RM 177.98/tonne oil.

    Main Menu

    ProcPerf

    PAGE 8

    2PROCESS PERFORMANCE

    2.1.STERILIZATION

    Summary of sterilisation cycle for the month is tabulated as follows :-

    FunctionX (min)S.D.

    Deaeration2BarPsi

    1st. Peak(1.2 Bar / 17.4 psi)101.217.4

    1st. Peak exhaust2

    2nd. Peak(1.2 Bar / 17.4 psi)61.217.4

    2nd. Peak exhaust2

    3rd. Peak(1.2 Bar / 17.4 psi)61.217.4

    3rd. Peak exhaust2

    4th. Peak(2.9 Bar / 42 psi)112.942

    Holding Time45

    Final exhaust5

    Steaming cycle910

    Door Open to Door Shut Time15

    This MonthLast Month

    XS.D.XS.D.

    USB after 1st Threshing (%)

    USB after 2nd Threshing (%)1.340.041.370.06

    Threshing Efficiency (%)

    STERILIZER CONDENSATE

    This MonthLast Month

    XS.D.XS.D.

    Steriliser condensate (Oil Content in Wet Basis)0.950.080.930.10

    Condensate / FFB Ratio

    Absolute oil loss (kg/tn FFB)

    Comments :

    The percentage of USB is 1.34% .

    OLWB in steriliser condensate at range of 1.00%.

    The condensate is recycled to system as press dilution.

    Sterilization using four peak sterilising.

    Main Menu

    DigPressStation

    PAGE 9.0

    2.2.DIGESTING & PRESSING STATION

    2.2.1.DIGESTER TEMPERATURE OC

    ThisMonthLastMonth

    DIGESTERXS.D.XS.D.

    Digester No. 195.000.4496.000.45

    Digester No. 296.000.4595.000.44

    Digester No. 395.000.4695.000.50

    Digester No. 4

    Digester No. 5

    Digester No. 6

    Digester No. 7

    Digester No. 8

    Digester No. 9

    2.2.2.PRESSING

    PressPressPressPressPressPressPressPressPressAverage

    No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9

    OIL LOSS ON WET BASIS (OLWB)This MonthX5.125.185.165.15

    S.D.0.180.290.290.25

    Last MonthX5.185.135.305.20

    S.D.0.200.260.090.18

    OIL LOSS ON DRY BASIS (OLDB)This MonthX7.747.657.807.73

    S.D.0.110.240.080.14

    Last MonthX7.697.727.757.72

    S.D.0.190.160.200.18

    NUT BREAKAGE (%)This MonthX19.6620.3919.7519.93

    S.D.1.250.791.031.02

    Last MonthX19.4719.9819.7819.74

    S.D.0.910.610.420.65

    PRESS RUNNING HOURSThis MonthX73.95279.51271.59208.35

    S.D.0.00

    Last MonthX280.95241.0274.33198.77

    S.D.0.00

    Comments :

    - Digester temperature was >90 C

    - Nut Breakage was recorded at 19.93% and will strive to control below 15%.

    - Average OLDB of Press Fibre was recorded at 7.73%

    Main Menu

    DigPressStation2

    PAGE 9.1

    2.2.3.

    True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash

    This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

    X28.1620.7231.9734.3260.2461.246.376.697.477.7023.0620.7211.4111.32

    S.D.0.772.816.605.250.471.601.421.491.011.363.532.811.532.85

    N

    Main Menu

    EFBPressing

    PAGE 9.2

    2.2.4.EFB PRESSING

    PressPressPressPressSuperSuper

    No. 1No. 2No. 3No. 4Press 1Press 2

    PRESS RUNNINGThis Month

    HOURSLast Month

    DOWN TIMEThis Month

    Last Month

    2.2.5.

    OIL RECOVERED

    This MonthLast Month

    F F A(%)

    DOBI

    VM(%)

    OLWB(%)

    Press 1Press 2Press 3Press 4Press 5Press 6Press 7

    Press Fibre (OLDB)

    Ratio EFB Liquor to FFB (%)

    2.2.6.SPLITTER

    Running HoursRUNNING HOURS

    This MonthLast Month

    No. 1

    No. 2

    Comments :

    No EFB press installed in this mill.

    Main Menu

    ClarificationStation

    PAGE 10

    2.3.CLARIFICATION STATION

    2.3.1.CLARIFICATION TANK

    This MonthLast Month

    Tank 1Tank 2Tank 3Tank 1Tank 2Tank 3

    Temperature OCX96.0094.00

    S.D2.642.40

    % Oil in underflowX5.305.27

    (% OLWB)S.D0.310.64

    2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

    S1S2S3C1C2C3C4C5C6C7C8

    % Oil loss on wet basis (x)This MonthX0.830.800.82

    S.D0.080.060.06

    Last MonthX0.830.850.85

    S.D.0.100.080.11

    Operating Hours (hrs)T MthX288.13185.00278.52

    L MthX320.91318.71227.59

    Nozzle size (mm)T MthX1.601.601.60

    L MthX1.601.601.60

    Separate Waste Basculator (mt)T MthX1725.371107.811667.82

    L MthX2071.952057.681469.38

    Oil losses on Absolute Terms (Kg/tn FFB)T MthX1.560.961.48

    L MthX1.591.621.15

    Comments :

    OLWB in underflow was recorded at 5.30%.

    Temperature of underflow was recorded at 94 C.

    Main Menu

    Decanter

    PAGE 11

    2.3.2.DECANTER (D)

    InletSolid PhaseLight PhaseHeavy Phase

    Temperature (oC)This Month

    Last MonthD1D2D1D2D1D2

    Oil % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    VM % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    NOS % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    Operating HoursT MthX

    L MthX

    Comments :

    No Decanters are installed in the mill.

    Main Menu

    Dilution

    PAGE 12

    2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS

    This MonthLast Month

    XS.D.XS.D

    DILUTION RATE %26.001.2125.001.47

    Separator Waste to FFB ratio

    Decanter cake to FFB ratio

    Absolute Oil loss in Separator/Centrifuge kg/mt FFB4.134.36

    Absolute Oil loss in Decanter Cake kg/mt FFB

    Total Oil loss kg/MT FFB4.130.004.360.00

    2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

    DescriptionThis MonthLast Month

    After Deoiling tank (OLWB)0.750.75

    After Cooling pond0.690.72

    Comments :

    Absolute oil loss in kg/mt FFB recorded at 4.13kg/FFB

    No decanter cake is produced.

    Oil losses after cooling pond recorded below 1%.

    Main Menu

    Purifier

    PAGE 13

    2.3.5.PURIFIER & VACUUM DRYER

    PURIFIERBefore PurifierAfter Purifier

    No: 1No: 2No: 1No: 2No: 3No: 4No: 5

    % VMThis MonthX

    S.D

    Last MonthX

    S.D.

    % DirtThis MonthX

    S.D

    Last MonthX

    S.D.

    VM Rem. EffThis MonthX

    S.D

    Last MonthX

    S.D.

    Dirt Rem. EffThis MonthX

    S.D

    Last MonthX

    S.D.

    2.3.6.VACUUM DRYER

    VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.

    XS.DXS.DXS.D

    No: 1This Month75.000.690.300.030.130.0356.67

    Last Month76.000.500.300.040.120.0360.00

    No: 2This Month

    Last Month

    No: 3This Month

    Last Month

    Comments :

    Vacuum dryer efficiency was satisfactory.

    Main Menu

    NutKernelStation

    2.4.NUT & KERNEL STATIONPAGE 13.1

    2.4.1.NUT SILO & KERNEL SILOS

    DESCRIPTIONNo: 1No: 2No: 3No: 4

    % VM Fresh NutThis MonthX19.2219.48

    S.D0.700.80

    Last MonthX19.3019.17

    S.D.0.820.41

    % Dried NutThis MonthX14.6515.67

    S.D1.120.58

    Last MonthX14.6715.10

    S.D.0.5919.56

    % Drying EfficiencyThis MonthX23.78

    S.D

    Last MonthX23.9921.23

    S.D.

    2.4.2.KERNEL SILO

    This MonthLast Month

    1234512345

    Temperature oCTop

    Middle50.0040.0050.0045.00

    Bottom61.0066.0064.0070.00

    % VM Fresh KernelX20.2220.3620.1719.90

    S.D0.900.740.910.61

    % Dried KernelX5.405.485.495.50

    S.D0.290.080.220.42

    % Drying Efficiency73.2973.0872.7872.36

    Comments :

    Kernel drying efficiency was satisfactory.

    Main Menu

    NutCrackingEff

    2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2

    R I P P L E M I L L

    Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

    XSDXSDXSDXSDXSDXSDXSDXSDXSD

    Whole Nut (%)83.621.5983.041.45

    Broken Nut (%)8.891.718.531.58

    Whole Kernel (%)0.540.160.430.12

    Brokern Kernel (%)0.320.180.610.07

    R I P P L E M I L L

    Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

    XSDXSDXSDXSDXSDXSDXSDXSDXSD

    Whole Kernel (%)35.611.1835.970.48

    Broken Kernel (%)11.701.0011.360.22

    Uncracked Nut (%)0.170.080.170.05

    Half cracked Nut (%)0.250.060.270.06

    Nut Cracking Eff.Kernel Recovery Eff.

    XSDXSD

    Ripple Mill No: 198.830.4199.190.37

    Ripple Mill No: 299.110.2299.320.24

    Ripple Mill No: 3

    Ripple Mill No: 4

    Ripple Mill No: 5

    Ripple Mill No: 6

    Ripple Mill No: 7

    Ripple Mill No: 8

    Ripple Mill No: 9

    Comments :

    Nut cracking eff. & kernel recovery eff. was satisfactory.

    Main Menu

    KernelLosses

    PAGE 14

    2.4.4.KERNEL LOSSES / COST

    This MonthLast Month

    Line 1Line 2Line 3Line 1Line 2Line 3

    XSDXSDXSDXSDXSDXSD

    Cyclone Fibre0.630.090.690.06

    LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage

    0.770.100.770.10

    Hydrocyclone (PK in wet shell)

    Claybath0.670.140.750.20

    2.4.5.RUNNING COST

    This MonthLast MonthTodate

    Kernel Produced (mt)485.607457.8754392.534

    Total Kaolin or Calcium Carbonate Cost (RM)2320.5002915.50021060.500

    Other Cost e.g Sodium Silicate (RM)

    Cost / MT of PK (RM)4.7796.3674.795

    Cost / MT of FFB (RM)0.2500.2670.220

    Comments :

    All kernel losses was within the in-house target.

    Main Menu

    BoilerPowerHouse

    PAGE 15

    2.5.BOILER / POWER HOUSE

    2.5.1.BOILER HOUSE

    DescriptionThis MonthLast MonthTodate

    Boiler Chemical Cost (RM)1390.301638.6214068.89

    Cost / MT FFB (RM)0.150.150.15

    2.5.2.POWER HOUSE

    DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw

    This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

    Turbines>Dresser RandAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers

    No. 1 (700 KW)356.0428.4143560173530403.3405.1700

    No. 2 (400 KW)400

    No. 3 (0 KW)0

    No. 4 (0 KW)0

    Diesel Gen Set >CumminsCaterpillarCumminsListerOthers

    No. 1 (300 KW)2.94.669.0228.0023.7949.57300

    No. 2 (640 KW)640

    No. 3 (640 KW)640

    KwHr / mt FFB (Turbine + Genset)Steam Consumption per KwHr (Turbine)

    2.5.3.TNB POWER SUPPLY

    This MonthLast MonthTodate

    KwHrRMKwHrRMKwHrRM

    Palm Oil Mill36139.0016553.1437689.0017263.67399510.00184979.12

    Rubber Factory

    Ecomat Plant

    Total36139.0016553.1437689.0017263.67399510.00184979.12

    Comments :

    TNB supply is used to start the mill operation by using change over switch.

    Diesel genset warmed up to maintain its condition.

    Main Menu

    WaterTreatment

    PAGE 16

    2.6.WATER TREATMENT PLANT

    2.6.1.WATER CONSUMPTION

    Water consumed

    %

    DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB

    DomesticOwn

    Estate

    Mill12300.0014910.001.33

    FC

    TOTAL12300.0014910.000.000.001.33

    2.6.2.WATER TREATMENT COST

    This MonthLast MonthTodate

    Chemical Cost (RM)2164.912779.8224678.52

    Cost /m3 water (cts / m3)0.180.190.20

    Cost /mt FFB (cts / mt FFB)0.230.250.25

    Water Consumption (m3 / mt FFB)1.331.361.26

    2.6.3.MONTHLY LICENCE COST

    PUMPING RAW WATER FROM RIVER

    This MonthLast MonthTodate

    Total Volume of water (m3) consumed12300.0014910.00120676.00

    Total Cost (RM)

    Comments :

    Water treatment cost is 0.18cts/m3 of water.

    Belt press production : 2.10 mt/hr

    Cost of cake Production : 9.76 Rm/mt of cake

    Main Menu

    General

    PAGE 17

    2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)

    2.7.1.Visitation

    DatePersonRemarks

    21/09-22/9/16TQCC audit

    9/26/16JKKP audit

    2.7.2.Training

    DateRemarks

    9/8/16JKKP seminar at Alor setar (Mr.Yeo & En Azimil)

    2.7.3.Security

    DateRemarks

    9/27/16PDRM Bandar Bahru Renewal Gun Licience

    2.7.4.OSH Matter

    DateRemarks

    2.7.5.RSPO Matter

    DateRemarks

    2.7.6.Amenities

    DateRemarks

    2.7.7.Water Supply

    DateRemarks

    2.7.8.EFB DISPOSAL

    Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

    14.6822,118.3072,008.500124.489

    2.7.9.DECANTER CAKE DISPOSAL

    Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

    Main Menu

    General2

    PAGE 17.1

    2.8.0.Effluent Treatment

    DateRemarks

    2.8.1Mill Downtime

    Line 1Line 2

    DateHoursDetailsDateHoursDetails

    Total00

    2.8.2Housekeeping / Beautification / Linesite / Compound

    DateRemarks

    2.8.3.Others

    DateRemarks

    Comments

    Main Menu

    General3

    PAGE 17.2

    2.8.4.Effluent Result For September 2016

    DOE LimitTQCC Result

    apHN/A8

    bBOD (mg / l)5000 MAX79

    cCOD (mg / l)N/A1006

    dTotal Nitrogen (mg / l)N/A80

    eAmmonical Nitrogen (mg / l)N/A43

    fTotal Solids (mg / l)N/A4861

    gSuspended Solids (mg / l)N/A302

    hOil & Grease (mg / l)N/A39

    2.8.5Trailing Report

    Main Menu

    ManPower

    PAGE 18

    3.0MANPOWER

    3.1.EMPLOYEES

    MALAYSCHINESEINDIANSOTHERSTOTAL

    Executives12205

    Subordinate Staff5013018

    TOTAL6215023

    3.2.SUBORDINATE STAFF LEAVE STATUS

    LeaveLeaveLeaveLeave Taken Todate (C)

    B/F fromEarned TodateTaken

    Year '15for Year '16(A+B)ThisBal

    No.NAMEPosition(Days)-A(Days)-BTotalMonth(A+B-C)

    1ALIZA BINTI MAT ISAC/CLERK21163741720

    2SYED MOHAMAD ADNAN2ND CLERK1118292227

    3A.MOHANATHASCHARGEMAN118190181

    4G.LOGANATHANSUPERVISOR718253214

    5A.PUGALENTHYSUPERVISOR94132130

    6R.BALANE/DRIVER313161151

    7S.MUNIANDYBOILERMAN-5138315-7

    8R.RAJOOBOILERMAN18133101021

    9AVR.MOGANAKRISHNANLAB OPER21315127-12

    10P.SANKARANMECHANIC18133101417

    11S.SUBRAMANIAMMECHANIC11132401113

    12SAMSUDDIN BIN ISHAKMECHANIC812203119

    1300

    14MAHD HANIFFAHFOREMAN16183431816

    15G. KRISHNASAMYE/DRIVER013131103

    16S. JAMESONMECHANIC-11110073

    17MOHD KHAIRIL ABDULLAHS/KEEPER3116470047

    18MANJULA A/P PERUMALUW/B OPER01212313-1

    19GV. THANARASUBOILERMAN211131121

    20SARAVANANSUPERVISOR01212075

    2100

    2200

    2300

    2400

    2500

    2600

    2700

    2800

    Comments :

    Main Menu

    Employee

    PAGE 18.1

    3.3EMPLOYEE (MILL WORKERS)

    (A)CHECKROLL

    EmployeesDependants (Resident)Total

    (1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

    Bumiputera20323- 023

    Chinese- 0- 0- 0- 0

    Indian23326- 026

    Grand Total43649- 0- 0- 049

    (2) NON-MALAYSIAN

    Sri Lanka- 0- 0- 0

    India7- 07- 07

    Indonesia13- 013- 013

    Bangladeshi- 0- 0- 0

    Thai- 0- 0- 0

    Filipino- 0- 0- 0

    Grand Total20- 020- 0- 0- 020

    Total Checkroll63669- 0- 0- 069

    (B)CONTRACT / TEMPORARY

    EmployeesDependants (Resident)Total

    (1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

    Bumiputera2- 02- 02

    Chinese- 0- 0- 0

    Indian11- 01

    Grand Total3- 03- 0- 0- 03

    Main Menu

    Appendix1

    PAGE 19

    Appendix 1

    PROGRESS REPORT FOR THE MONTH

    OF SEPTEMBER 2016

    UnitThis MonthLast MonthTodatePrevious Todate

    1.0FFB

    1.1.1Weight of FFB processedMT9,268.67010,924.07095,846.76086,578.090

    1.1.2EstimateMT14,158.00014,350.000148,881.000134,723.000

    1.1.3Shift HoursHrs- 0- 0

    2.0OIL MANUFACTURE

    2.1.1Weight of Oil ProducedMT2,055.6692,541.43821,145.98419,090.315

    2.1.2EstimateMT3,118.0003,156.00032,753.00029,635.000

    2.1.3Oil Extraction Rate%22.1823.2622.06

    2.1.4Estimate%22.0221.9922.00

    2.1.5Press Running HoursHrs.625.05754.516,177.595,552.54

    2.1.6Production HoursHrs.379.50443.503,886.803,507.30

    2.1.7Downtime (Line 1)Hrs.3.003.00

    2.1.8Downtime (Line 2)Hrs.- 0- 0

    2.1.9Press Capacity per unitMT / hr14.8314.4815.52

    2.2.0F.F.B. Manufactured / HoursMT / hr24.4224.6324.66

    2.2.1Oil Recovered / HoursMT / hr5.425.7365.0559.63

    3.0KERNEL MANUFACTURE

    3.1.1Weight of kernel ProducedMT485.607457.8754,392.0613,906.454

    3.1.2EstimateMT706.000718.0007,452.0006,746.000

    3.1.3Kernel Extraction Rate%5.244.194.58

    ;3.1.4Estimate%4.995.005.01

    3.1.5Production HoursHrs.379.50443.503,883.553,504.05

    3.1.6Kernel Recovered / HrMT / hr1.281.031.13

    4.0DESPATCH AND STOCK

    4.1.1Oil DespatchedMT2,197.3502,909.83020,077.36617,880.016

    4.1.2Oil in StockMT376.329518.01010,146.3339,770.004

    4.1.3Kernels DespatchedMT466.190542.6804,491.8504,025.660

    4.1.4Kernels in stockMT90.42671.0091,217.6211,127.195

    - Packed / Bulk SiloMT90.42671.0091,217.6211,127.195

    - Kernel in BagMT- 0- 0

    Remarks :

    Main Menu

    MajorMaintRep1

    PAGE 20

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION

    (4) HOISTING / TIPPER AND THRESHING STATION

    Main Menu

    MajorMaintRep2

    PAGE 21

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION

    (8) CLARIFICATION STATION

    Main Menu

    MajorMaintRep3

    PAGE 22

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION

    (12) EFFLUENT STATION

    Main Menu

    MajorMaintRep4

    PAGE 23

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2016

    (13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

    Main Menu