keputusan muktamad jawatankuasa sebut · pdf filekerja pendawaian semula elektrik dan kerja...
TRANSCRIPT
KEPUTUSAN MUKTAMAD JAWATANKUASA SEBUT HARGA BIL.3/2017
BIL. NAMA PROJEK NAMA
KONTRAKTOR HARGA
TAWARAN TEMPOH SIAP
1.
KKLW.SH.148/2017/SWK05 SEBUT HARGA SEMULA KONTRAK 24 BULAN PERKHIDMATAN SEWAAN, MEMBEKAL, MENGHANTAR DAN MENYELENGGARA (2) UNIT MESIN PENYALIN BERWARNA DI PEJABAT KEMENTERIAN KEMAJUAN LUAR BANDAR DAN WILAYAH NEGERI SARAWAK
SEBUT HARGA SEMULA
2.
KKLW.SH.426/2017/SWK11 KERJA PENDAWAIAN SEMULA ELEKTRIK DAN KERJA BAIKPULIH BANGUNAN MINI RTC BUNTAL, KUCHING, SARAWAK
TIADA SYARIKAT YANG LAYAK PEROLEHAN KERJA REQUISITION SECARA CABUT UNDIAN
3.
KKLW.SH.774/2017/SWK12 KERJA-KERJA NAIKTARAF JALAN KE TANAH PERKUBURAN ISLAM KAMPUNG TEMENGGONG, KUCHING, SARAWAK
SYARIKAT
SHASHA
(8/11)
RM 89,298.00 6 MINGGU
4.
KKLW.SH.777/2017/SWK14 MENAIKTARAF JALAN PERTANIAN DI KAMPUNG SEGALI KAMPUNG STIKA, SEBUYAU, SIMUNJAN, SARAWAK
SUTERA
ENTERPRISE
(1/21)
RM 443,820.00
8 MINGGU
Nota: Harga tawaran belum termasuk 6% Cukai Barang dan Perkhidmatan (GST) jika berkenaan.
Disediakan Oleh:
URUSETIA MESYUARAT
JAWATANKUASA SEBUT HARGA
PEJABAT KEMENTERIAN KEMAJUAN LUAR BANDAR DAN WILAYAH
NEGERI SARAWAK TARIKH: 14 SEPTEMBER 2017