CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
1. KEMAJUAN KERJA DI BLOK AHLI PARLIMEN
Pandangan Keseluruhan Blok Ahli Parlimen
Pandangan Dari Sudut A
Pandangan Dari Sudut B
A B
C D
CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
Pandangan Dari Sudut C
Pandangan Dari Sudut D
Pandangan Belakang
CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
Brickwork Aras 4
Brickwork di Mini Auditorium
Brickwork table top di mockup tandas
Pemasangan drywall panel Aras 1 & 2
Pemasangan drywall panel Bilik Kementerian
Aras 3 (Mockup)
CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
Pemasangan aluminium glass frame Aras 3
Pemasangan bumbung di LML
Formwork & steel reinforcement roof slab link bridge platform platform
CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
2. KEMAJUAN KERJA DI BLOK DEWAN SERBAGUNA
Pandangan Keseluruhan Blok Dewan Serbaguna
A
B
Pandangan Hadapan
CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)
17/5/2018
3. KEMAJUAN KERJA DI GEOGRID RETAINING WALL
Pandangan Belakang
Pandangan Dari Sudut A
Pandangan Dari Sudut B
Earthwork dari CH 220- CH 266 Level 61.0m