LUMBINI SPORT COMPLEX
Present by : Bandara K.A.J.M.
RU/E/2008/014
Department of Civil and Environmental EngineeringJanuary , 2012
-
8/3/2019 Lumbini Sport Complex
2/18
Department of Civil and Environmental EngineeringJanuary , 2012
TRAINING PLACEMENT
Central Engineering Consultancy Bureau
~ CECB is the largest engineering consultancy & construction organization
in Sri Lanka.
~ CECB is having about 10 regional base offices & 5 international base
offices.
~ It consist of over 400 Engineers and 50 Architects and 600 Para Engineering
staff.
~ It was established in 1973
-
8/3/2019 Lumbini Sport Complex
3/18
Department of Civil and Environmental EngineeringJanuary , 2012
INTRODUCTION
Contractor : Central Engineering Consulting Bureau.
Structural design : CECB Design office
Architectural design : CECB Design office
Client : Ministry of Education
Project cost : 87 million rupees
Time for completion : 410 days.
Project commencement date : 01/10/2010
Schedule date for completion : 15/11/2011
Source of fund : Source of funds is the Mahapola funds of
government of Sri Lanka.
Percentage of retention : 10% of initial contract price
-
8/3/2019 Lumbini Sport Complex
4/18
Department of Civil and Environmental EngineeringJanuary , 2012
LOCATION
-
8/3/2019 Lumbini Sport Complex
5/18
Department of Civil and Environmental EngineeringJanuary , 2012
PROJECT DETAILS
39.3m
26.8m
12.5m
-
8/3/2019 Lumbini Sport Complex
6/18
Department of Civil and Environmental EngineeringJanuary , 2012
PROJECT DETAILS
Floor AreasGround Floor - 1063.66 sq. m
First Floor - 517.64 sq. m
Superstructure
Superstructure consist of reinforced concrete 22 nos 300600 mm size columns,
06 nos 300300 mm size columns and 11 nos 225225 mm size columns fromground level to roof. First floor slab thickness is 150 mm and seating area of first
floor consist 150 mm thick slab strips and beam.
Roof
Zn/Al roofing materials rest on the steel trusses.
Floor finishes
Ground and First Floor - Cement rendered floor with approved colour
cement floating.
Play Area -Timber flooring
-
8/3/2019 Lumbini Sport Complex
7/18
Department of Civil and Environmental EngineeringJanuary , 2012
PROJECT DETAILS
Wall finishesInternal - Smooth wall finished by two coats of wall putty & painted with
one coat of primer & two coats of emulsion paint.
External - Semi rough plasters & painted with one coat of primer & two
coats of weather shield paint.
Soffit - Smooth finished with two coats of wall putty and painted with one primer
coat & two coats of emulsion paint.
Doors & Windows
Natural anodized aluminum doors and windows.
500 PEOPLE CAN SIT THE FIRST FLOOR SEATING AREAS.
-
8/3/2019 Lumbini Sport Complex
8/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
COLUMN CONSTRUCTION
~ Over vibrating
~ Released concrete from more than 1.2m
~ Slump of concrete lower or higher than required value
~ Leakage of grout though the form work which is not fixed properly
-
8/3/2019 Lumbini Sport Complex
9/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
6m>
Chemical
anchorage
-
8/3/2019 Lumbini Sport Complex
10/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
Opening panel
~ Vehicle entry into building
~ Easy access material
-
8/3/2019 Lumbini Sport Complex
11/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
75x75x8mm L angel
60x60x6mm L angel
ROOF CONSTRUCTION
450x200x76mm
-
8/3/2019 Lumbini Sport Complex
12/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCESSTEEL PROTECTION
~ Galvanising[galvanized coating is
expected to last 40 years]
~ Painting[10 years]
InitialGalvanizing
-
8/3/2019 Lumbini Sport Complex
13/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
Temporary bracing
Connection point
-
8/3/2019 Lumbini Sport Complex
14/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
Slag
Anchor bolt
-
8/3/2019 Lumbini Sport Complex
15/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
450x200x76mm I section
-
8/3/2019 Lumbini Sport Complex
16/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
Wall connection
BRACING SYSTEM
-
8/3/2019 Lumbini Sport Complex
17/18
Department of Civil and Environmental EngineeringJanuary , 2012
TECHNICAL EXPERIENCES
MC foil
GS mesh
JOINT
-
8/3/2019 Lumbini Sport Complex
18/18
Department of Civil and Environmental EngineeringJanuary , 2012
SAFETY
Provide Safety Equipment's (helmets, safetyshoes, boots, goggles, gloves and safety belts)
Safety Instruction Boards
Cutting goggle
Health protection