IBS Score Calculation
Examples
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah pasang Keluasan penggunaan kaedah pasang siap (precast) beam/column/slabsiap (precast) beam/column/slab
= 750m2 = 75%= 750m2 = 75%
Table 1, for precast beam/column/slab, F = 1.0Table 1, for precast beam/column/slab, F = 1.0
Keluasan penggunaan kaedah Keluasan penggunaan kaedah konvensional (insitu)konvensional (insitu)
= 250 m2 = 25%= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 m2Jumlah keluasan pembinaan 1,000 m2
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah pasang Keluasan penggunaan kaedah pasang siap (precast) beam/column/slabsiap (precast) beam/column/slab
= 750m2 = 75%= 750m2 = 75%
Table 1, for precast beam/column/slab, F = 1.0Table 1, for precast beam/column/slab, F = 1.0
Table 1, for in-situ, F = 0Table 1, for in-situ, F = 0
Keluasan penggunaan kaedah Keluasan penggunaan kaedah konvensional (insitu)konvensional (insitu)
= 250 m2 = 25%= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 Jumlah keluasan pembinaan 1,000 m2m2
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah Keluasan penggunaan kaedah pasang siap (precast) pasang siap (precast) beam/column/slabbeam/column/slab
= 750m2 = 75%= 750m2 = 75%
From Table 1, for precast beam/column/slab, F = 1.0From Table 1, for precast beam/column/slab, F = 1.0
From Table 1, for in-situ, F = 0From Table 1, for in-situ, F = 0
Area using in-situArea using in-situ= 250 m2 = 25%= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 Jumlah keluasan pembinaan 1,000 m2m2
Maka, bagi Part 1 (Structural System) IBS Score Maka, bagi Part 1 (Structural System) IBS Score = ( (75% x 1.0) + (25% x 0) ) x 50% = ( (75% x 1.0) + (25% x 0) ) x 50% = 37.5 %= 37.5 %
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Panjang dinding panel pasangsiap (precast Panjang dinding panel pasangsiap (precast panel)panel)
= 7,500m = 75%= 7,500m = 75%
Table 2, panel pasangsiap, F = 1.0Table 2, panel pasangsiap, F = 1.0
Table 2, dinding bata, F = 0Table 2, dinding bata, F = 0
Panjang dinding bata (brick)Panjang dinding bata (brick)
= 2,500 m = 25%= 2,500 m = 25%
Jumlah panjang keseluruhan dinding Jumlah panjang keseluruhan dinding ialah = 10,000 m runialah = 10,000 m run
Panjang dinding panel pasangsiap Panjang dinding panel pasangsiap (precast panel) = 7,500m = 75%(precast panel) = 7,500m = 75%
Table 2, panel pasang siap, F = 1.0Table 2, panel pasang siap, F = 1.0
Table 2, dinding bata, F = 0Table 2, dinding bata, F = 0
Panjang dinding bata (brick)Panjang dinding bata (brick)
= 2,500 m = 25%= 2,500 m = 25%
Jumlah panjang keseluruhan dinding Jumlah panjang keseluruhan dinding ialah = 10,000 m runialah = 10,000 m run
Maka, jumlah score Part 2 (Wall System) Maka, jumlah score Part 2 (Wall System) = ( (75% x 1.0) + (25% x 0) ) x 20% = ( (75% x 1.0) + (25% x 0) ) x 20% = 15%= 15%
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
EXAMPLE
IBS Score Calculation
&
Example 1
2-storey Terrace House
Say, from measurement taken from drawings:
1) Construction area
i) Construction area ground floor = 117.0 m2 ii) Construction area 1st floor = 117.0 m2 iii) Construction roof area = 117.0 m2 Total construction area = 351.0 m2
2)Structural Systems
i) Beams: Precast concrete beamsii) Columns : In-situ concrete using steel formworksiii) Floor slab: Precast half slabs floor iv) Roof truss: Prefabricated timber roof truss.
3) Wall Systemi) Internal wall: Precast concrete panel ii) External wall: Precast blockworks
Other simplified construction solutions
i) Beams: 60% complies to MS 1064
Columns: 100% complies to MS 1064
Walls and slabs: Less than 50% complies to MS 1064
Doors : 80% complies to MS 1064
Windows: 0% complies to MS 1064
ii) Horizontal repetition of structure = 100%
72.1IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)
16Total Part 3
6100%iv) Horizontal repetition of structure = 100%
480%iii) 80% of door sizing follow MS 1064 Part 4: 2001
4100%ii) 100% of column sizing follow MS 1064 Part 10: 2001
260%i) 60% beam sizes follow MS 1064 Part 10: 2001
Part 3: Other simplified construction solutions
14.81.00167.3mTotal Part 2
0.48 x 1.0 x 20 =9.6
(79.5/167) =0.48
1.0079.5mInternal wall using precast concrete panel
0.52 x 0.5 x 20=5.2
(87.8/167)=0.52
0.587.8mExternal wall using precast concrete blockworks
Part 2: Wall System
41.31.00351.0 m2Total Part 1
0.33 x 1.0 x 50=16.5
(117/351)=0.33
1.0117.0 m2Roof truss using prefab roof trussRoof area = 117.0m2
0.33 x 0.6 x 50=9.9
(117 / 351)=0.33
0.6117.0 m2
Precast beams + in-situ column with reusable formwork (no floor)1st floor area = 117.0m2
0.33 x 0.9 x 50=14.9
(117 / 351)=0.33
0.9117.0 m2
Precast beams + in-situ column with reusable formwork + precast concrete half slab floor.Ground floor area = 117.0m2
Part 1: Structure Elements
IBS SCORE
COVERAGEIBS FACTOR(1)
AREA (m2) orLength (m)
ELEMENTS
Example 2
18 Storey Condominium
Say, from measurement taken from drawings:
1) Construction Area Area for 1 unit of condominium = 94.4 m2
Lift lobby area = 140 m2
Area for 1 floor = [94.4 x 6 units + 140] =706.4 m2
2) Structural Systemsi) Tunnel formwork system
ii) Roof truss: prefab steel roof truss.
3) Wall System/ floor i) precast blockworks (6 units + lobby area)= 263 m
length ii) Tunnel formwork (6 units + lobby area) = 120 m
length
4) Other simplified construction solutions i) Doors : 100% comply to MS 1064 Windows: 100% comply to MS 1064 ii) Repetition of floor to floor height =
90% Vertical repetition of structural floor layout =
80%
53.6IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)
12Total Part 3
280%iv) Vertical repetition of structure floor layout = 80%
290%iii) Repetition of floor height = 90%
4100%ii) 100% of windows complies to MS1064
4100%i) 100% door sizes complies to MS1064
Part 3: Other simplified construction solutions
Total Part 2 10.61.006,894
0.31x 0.6 x 20 =3.72
2,160/6,894 =0.310.62,160ii) Tunnel formwork Total length = 120 m x 18 storey
0.69 x 0.5 x 20 =6.9
4,734/6,894 =0.690.54,734i) Internal wall: precast blockwork Total length = 263 m x 18 storey
Part 2: Wall System
31.01.0013,421.4 m2Total Part 1
0.05 x 1.0 x 50 =2.5
706.4/13,421.4 =0.05
1.0706.4 m2ii) Roof truss - prefab steel Roof area = 706.4m2
0.95 x 0.6 x50=28.5
12,715 / 13,421.4=0.95
0.6012,715 m2
i) Tunnel formwork system Total area = 706.4m2 x 18 storey = 12,715m2
Part 1: Structure Elements
IBS SCORE
COVERAGEFACTORAREA (m2) orLength (m)
ELEMENTS
Example 3
Ibs score for project (group of buildings)
Project information: - Main buildings in the development consist of 5 blocks of buildings.
The IBS score for each building are:- i) Block A - 5 storey apartment
Construction area, QST (building)A = 3,000 m2 IBS Score(building A) = 83
ii) Block B - 5 storey apartmentConstruction area, QST (building)B = 3,000 m2 IBS Score(building B) = 87
iii) Block C - 4 storey apartmentConstruction area, QST (building)C = 3,200 m2 IBS Score(building C) = 35
iv) Block D - 4 storey apartmentConstruction area, QST (building)D = 3,200
m2 IBS Score(building D) = 47
v) Block E - 3 storey office blockConstruction area, QST (building)E= 3,000 m2 IBS Score(building E) = 75
Total construction area (block A + B + C + D + E ) = 15,400m2
BlockConstruction
Area (m2)Coverage
IBSScore(building)
IBS Score(project)
A 3,0003000 / 15400 =
0.19583 0.195 x 83 = 16.2
B 3,0003000 / 15400 =
0.19587 0.195 x 87 = 17.0
C 3,2003200 / 15400 =
0.2135 0.21 x 35 = 7.4
D 3,2003200 / 15400 =
0.2147 0.21 x 47 = 9.9
E 3,0003000 / 15400 =
0.19575 0.195 x 75 = 14.6
Total 15,400 1.0 65.1