date : 24 th november 2016 time : 8.30am -9.30am … · 16/11/2016 2 16/11/2016 no. date...

42
16/11/2016 1 MSA MASTER SERVICE AGREEMENT DATE : 24 TH NOVEMBER 2016 TIME : 8.30AM - 9.30AM PRESENTER : MR. HAZMAN AHMAD BENGKEL PENENTUAN KAEDAH PEMBAIKAN CERUN UNTUK PIHAK BERKUASA TEMPATAN (PBT) I-KPKT 2016 16/11/2016 PRESENTATION OUTLINE 1.CHRONOLOGY 2.MASTER SERVICE AGREEMENT 3.SCHEDULE II : SERVICE FEES OR SCHEDULE OF RATES 1.0 CHRONOLOGY

Upload: others

Post on 30-Jan-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

  • 16/11/2016

    1

    MSAMASTER SERVICE AGREEMENT

    DATE : 24TH NOVEMBER 2016TIME : 8.30AM - 9.30AM

    PRESENTER : MR. HAZMAN AHMAD

    BENGKEL PENENTUAN KAEDAH PEMBAIKAN CERUN UNTUK PIHAK BERKUASA TEMPATAN (PBT) I-KPKT 2016

    16/11/2016

    PRESENTATION OUTLINE

    1.CHRONOLOGY

    2.MASTER SERVICE AGREEMENT

    3.SCHEDULE II : SERVICE FEES OR SCHEDULE OF RATES

    1.0 CHRONOLOGY

  • 16/11/2016

    2

    16/11/2016

    NO. DATE DESCRIPTION

    1 24 FEBRUARY 2015 Appointment of technical committee member and workshop invitation

    2 2 - 4 MARCH 2015 Master Service Agreement (MSA) workshop

    3 5 MARCH 2015IKRAM first submission of Schedule of Rates and additional item to

    JKR(CKUB)

    4 6 MARCH 2015 Meeting with JKR (CKUB)

    5 9 – 11 MARCH 2015 Meeting preparation of Schedule of Rates (SOR)

    6 12 MARCH 2015 IKRAM final submission of Schedule of Rates (SOR) to JKR(CKUB)

    7 13 MARCH 2015 Meeting preparation MSA

    8 16 MARCH 2015 Meeting preparation of Master Service Agreement (MSA)

    9 17 MARCH 2015 IKRAM first submission of Schedule of Rates and additional item to JKR Cerun

    10 10 APRIL 2015 IKRAM final submission and result of Schedule of Rates to JKR Cerun

    1.0 CHRONOLOGY

    16/11/2016

    NO. DATE DESCRIPTION

    11 30 JUNE 20151st Meeting with MOF on Master Service Agreement (MSA) with KKR and JKR

    Cerun and Kumpulan IKRAM

    12 8 July 2015 Discussion Meeting With PUU KKR

    13 10 JULY 2015 1st Meeting with JKR Cerun on MSA with JKR CKUB, PUU KKR

    14 13 July 2015 Discussion with MOF

    15 13 July 2015 Preparation of Master Service Agreement (MSA)

    16 27 JULY 2015 2nd meeting with JKR Cerun on MSA with JKR CKUB, PUU KKR

    17 29 July 2015 Meeting with Public Works Department (JKR)

    18 30 JULY 2015 IKRAM application letter for minimum contract price to KKR

    19 30 JULY 2015 IKRAM proposal letter for including state roads in MSA

    20 30 JULY 2015 2nd meeting with MOF on MSA with JKR Cerun

    21 29 DEC 2015 Contract Sign Between KISB And Government Malaysia

    1.0 CHRONOLOGY

    16/11/2016

    9/5/2011

    10/1/2013

    14/2/2013

    10/1/2014

    2014

    16/6/2014

    Memo of end of IKRAM

    concession

    Order letter from KPKR

    Applicationletter from

    IKRAM to MOF

    First memo IKRAM to MOF

    based on 14/2/2013

    letter

    Invitation letter from

    MOF to IKRAMLetter from IKRAM to

    Minister of Finance Malaysia

    1.0 PROJECT CORRESPONDENCE

  • 16/11/2016

    3

    16/11/2016

    24 FEBRUARY 2015Appointment of technical

    committee member and

    workshop invitation

    10 APRIL 2015Meeting result on Schedule of

    Rates with JKR(CKUB)17 MARCH 2015Second submission of

    Schedule of Rates and

    additional item to

    JKR(CKUB)

    5 MARCH 2015First submission of Schedule

    of Rates and additional item

    to JKR(CKUB)

    1.0 PROJECT CORRESPONDENCE

    16/11/2016

    26 JUNE 2015Invitation letter for

    meeting with MOF on

    30 Jun 2015

    1 JULY 2015Invitation letter for

    meeting with

    JKR(CKUB) on 10 July

    2015

    10 JULY 2015Second Invitation

    letter for meeting

    with JKR(CKUB) on 27

    July 2015

    15 JULY 2015Invitation letter for

    meting with MOF on

    30 July 2015

    1.0 PROJECT CORRESPONDENCE

    16/11/2016

    29 DEC 2015CONTRACT SIGNED BETWEEN KISB AND

    GOVERNMENT OF MALAYSIA

  • 16/11/2016

    4

    16/11/2016

    COOPERATION OF IKRAM WITH OTHER AGENCIES

    1. LONG TERM SERVICE AGREEMENT WITH DEWAN BANDARAYA KUALA LUMPUR (30 MARCH 2012 – 29 MARCH 2017)

    2. LONG TERM SERVICE AGREEMENT WITH TENAGA NASIONAL BERHAD (24 MAY 2012 – 23 MAY 2017)

    3. PERKHIDMATAN KUMPULAN IKRAM WITH PEJABAT PERBENDAHARAAN NEGERI TERENGGANU

    4. MASTER SERVICE AGREEMENT (MSA) FOR EMERGENCY RESPONSE FORENSIC SLOPE FAILURE WITH MINISTRY OF FINANCE, GOVERNMENT OF MALAYSIA

    (1ST JAN 2016- 31ST DEC 2018)

    16/11/2016

    ROADSHOWROADSHOW

    DATE LOCATION REGION

    19.1.2016 PUTRAJAYA (LAUNCHING CENTRAL REGION

    26.1.2016 KUALA TERENGGANU EASTERN REGION

    2.2.2016 KUCHING SARAWAK

    4.2.2016 KOTA KINABALU SABAH

    16.2.2016 MELAKA SOUTHERN REGION

    23.2.2016 PULAU PINANG NORTHERN REGION

    KISB REGISTRATION

    NO. ITEM

    COMPANY

    KISB IPCSB

    1 REGISTRATION NO SSM 360785-A 966129-U

    2 REGISTRATION NO. MOF 357-02179864 465-02033960

    3 REGISTRATION NO. BEM - 1512-1000-MD-33

    4 ALAMATUNIPARK SURIA, JALAN IKRAM-UNITEN 43000, KAJANG, SELANGOR DARUL EHSAN

    NOTE :KISB : KUMPULAN IKRAM SDN BHDIPCSB : IKRAM PREMIER CONSULTING SDN. BHD

  • 16/11/2016

    5

    CENTRAL REGION/HQ

    (Selangor, WP KL/Putrajaya,

    N.Sembilan, Melaka)[Kajang] (HQ )

    SOUTHERN REGION(Johor)

    [Skudai] (1)

    EASTERN REGION(Kelantan, Terengganu, Pahang)

    [K. Terengganu, Kota Bharu](2)

    NORTHERN REGION(Perlis, Kedah, Pinang, Perak)

    [Perai, Alor Setar, Ipoh](3)

    SABAH REGION(Sabah, Labuan)[Kota Kinabalu] (1)

    SARAWAK REGION(Sarawak) [Kuching] (1)

    KISB’S REGIONAL OFFICES

    IKRAM ENGINEERING FACILITIES & MANPOWER

    46 Site/Soil Investigation Teams

    - ISO 9001:2008

    11 Engineering Labs

    • Geotechnical• Material/Structural & Pavement- ISO 17025

    KISB

    484 (1.1.2016) EMPLOYEES

    PROFESSIONAL 107 (22%)

    • PE (Ir.) – 20• ENGINEERS – 55• GEOLOGIST – 32

    16/11/2016

    GENERAL INFORMATION OF MSA

    NO. ITEM DESCRIPTION

    1 DURATION 3 YEARS + 2 YEARS (OPTIONAL)

    2 CONCESSION DATE 01.01. 2016 – 31.12.2018

    3 CONTRACT VALUE RM 25 M PER YEAR

    4 BON RM 1.25 M

    5 GRANT ALLOCATION FEDERAL GOVERNMENT *

    6 AGENCY

    1. KEMENTERIAN

    2. JABATAN

    3. INSTITUSI

    4. SURUHANJAYA

    5. KERAJAAN NEGERI

    6. PIHAK BERKUASA TEMPATAN

    7. BADAN BERKANUN (AGENSI)

    Dibawah Peruntukan/Pembiayaan Kerajaan PersekutuanSemua Agensi Pelaksana Tertakluk Menggunakan Perkhidmatan KISB

    16/11/2016

    PERTINENT COMPONENTS OF MSA(KKR/BPP/04/2016)

    • MSA AGREEMENT• SCHEDULES

    – Schedule I• Scope of Services• Terms of Reference• KISB Services• Letter of Appointment

    – Schedule II• Board of Engineers (BEM)• Scale of Fees (Revised

    1998)

    • Manual PerolehanPerkhidmatan PerundingEdisi 2011

    • Schedule of Rates

    - Schedule III• Indent

    - Schedule IV• Borang Penilaian

    Prestasi PerkhidmatanSyarikat

    * Note: Elaborated in 1PP/PK 2.2 to facilitate the Implementation

  • 16/11/2016

    6

    2.0 MSAMASTER SERVICE AGREEMENT

    A. SCOPE OF SERVICESB. RIGHT OF FIRST REFUSAL (ROFR)

    C. EMERGENCY RESPONSED. NON-EMERGENCY RESPONSE

    16/11/2016

    A. SCOPE OF SERVICES

    PERKHIDMATAN KEJURUTERAAN FORENSIK (CERUN & STRUKTUR BERKAITAN CERUN)

    1. Cerun2. Struktur Berkaitan Cerun (Slope

    Associated Structures)

    3. Struktur Berdekatan Yang Terlibat (Slope Affected Structures)

    4. Perkhidmatan Lain-lain Termasuk Ujian Di Lapangan Dan Makmal Yang Diperlukan

    5. Penyeliaan Tapak Bagi Projek Fizikal6. National Repository Center

    16/11/2016

    A. TECHNICAL DEFINITIONS

    1. ‘Slope Associated Structures’ means any or all structural components which

    form(s) an integral part of the Slope and

    contribute(s) towards(s) its stability

    including but without limitation to soil

    nail, retaining wall, reinforced earth wall,

    rubble wall, etc; and

    2. ‘Slope Affected Structures’ means any or all structures located in the vicinity of the

    Slope and is/ are affected by the Failure.

  • 16/11/2016

    7

    16/11/2016

    A. EXCLUSION SCOPE OF SERVICES

    1. SEMUA JALAN PERSEKUTUAN DI MALAYSIA*

    * Nota: Sekiranya Jabatan Kerja Raya Tidak Mempunyai Kapasiti Untuk

    Menjalankan Perkhidmatan Tersebut, Maka Jkr Bolehlah Melantik

    KISB Tertakluk Kepada “ROFR”.

    2. SEMUA KONTRAK KERAJAAN YANG MEMPUNYAI SKOP PERKHIDMATAN

    KEJURUTERAAN FORENSIK YANG SEDANG BERKUAT KUASA*

    * NOTA: Setelah Kontrak Tersebut Tamat, Agensi Bolehlah Melantik KISB

    Bagi Menjalankan Perkhidmatan Tersebut Tertakluk Kepada Pekeliling

    Pk 2.2.

    3. SEMUA JALAN BERTOL DI BAWAH PERJANJIAN KONSESI PENSWASTAAN

    4. PROJEK-PROJEK PEMBANGUNAN BAHARU YANG MASIH DALAM PERINGKAT PEMBINAAN YANG BELUM DISERAHKAN KEPADA AGENSI

    16/11/2016

    B. “RIGHT OF FIRST REFUSAL” (ROFR)

    DEFINISI :

    Agensi Hendaklah Terlebih Dahulu

    Menawarkan Kepada KISB Untuk

    Mendapatkan Perkhidmatan Kejuruteraan

    Forensik Tersebut Sebelum Tawaran Boleh

    Dibuat Kepada Pihak Ketiga

    16/11/2016

    B. TATACARA “ROFR”

    1. Agensi Mengeluarkan Surat Pelawaan (Pk 2.2 Lampiran

    D)* Yang Mengandungi Maklumat-maklumat Berikut

    Kepada KISB :

    a. Deskripsi Perkhidmatan;

    b. Anggaran Kos Perkhidmatan;

    c. Jangkaan Tarikh Mula Dan

    d. Tarikh Siap Perkhidmatan

    e. Lokasi Perkhidmatan

    * NOTA: TEMPOH SAH SURAT TAWARAN ADALAH 14 HARI DARI TARIKH SURAT TAWARAN TERSEBUT

  • 16/11/2016

    8

    16/11/2016

    SURAT PELAWAAN

    16/11/2016

    SURAT AKUAN KISB

    16/11/2016

    B. TATACARA “ROFR”

    2. CADANGAN TEKNIKAL & KEWANGAN (CTK) YANG MENGANDUNGI:

    i) MAKLUMAT-MAKLUMAT YANG DINYATAKAN DI TATACARA (1) DI ATAS

    ii) YURAN BAYARAN*

    * NOTA: YURAN BAYARAN ADALAH BERDASARKAN KEPADA KADAR-KADAR

    HARGA YANG TELAH DIMUKTAMADKAN OLEH LEMBAGA PEROLEHAN ‘A’

    KKR SEPERTI BERIKUT:-

    a) SKALA YURAN PIAWAI : BOARD OF ENGINEERS MALAYSIA (BEM)

    SCALE OF FEES (REVISED 1998) [PU (B) 548] - PK 2.2 LAMPIRAN A

    b) INPUT MASA DAN IMBUHAN BALIK : BAB 5 DALAM MANUAL PEROLEHAN

    PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA) – PK 2.2

    LAMPIRAN B

    c) JADUAL KADAR HARGA – PK 2.2 LAMPIRAN C

  • 16/11/2016

    9

    16/11/2016

    B. TATACARA “ROFR”

    3. INDEN KERJA:

    INDEN KERJA AKAN DIKELUARKAN OLEH AGENSI PELAKSANA SETELAH CTK DIPERSETUJUI OLEH KEDUA-DUA BELAH PIHAK

    INDEN KERJA TERSEBUT AKAN MENJADI SEBAHAGIAN DARIPADA MSA DAN MENGIKAT KEDUA-DUA BELAH PIHAK

    NOTA :

    UNTUK SITUASI KECEMASAN (KEGAGALAN CERUN), ARAHAN KERJA AKAN DIKELUARKAN SECARA LISAN DAN PERLU DISUSULI DENGAN INDEN KERJA DALAM TEMPOH 7 HARI DARI ARAHAN KERJA SECARALISAN DIKELUARKAN

    16/11/2016

    INDEN KERJA

    16/11/2016

    B. TATACARA “ROFR”

    4. PELAKSANAAN PERKHIDMATAN:

    i) PERKHIDMATAN KEJURUTERAAN FORENSIK TERSEBUT AKAN DILAKSANAKAN OLEH IKRAM PREMIER CONSULTING SDN BHD (IPCSB)

    ii) IPCSB AKAN MENANDATANGANI KESEMUA “DELIVERABLES”* BERKAITAN DENGAN PERKHIDMATAN PERUNDINGAN KEJURUTERAAN

    FORENSIK* NOTA: REKA BENTUK, PELAN, PENGIRAAN, LUKISAN, LAPORAN DLL

    iii) PERLANTIKAN IPCSB SEBAGAI PELAKSANA PERKHIDMATANTERSEBUT TIDAK AKAN SAMA SEKALI MELEPASKAN KISB DARIPADA TANGGUNGJAWABNYA SEPERTI YANG TERKANDUNG DI DALAM MSA

  • 16/11/2016

    10

    16/11/2016

    PENILAIAN PRESTASI SYARIKAT

    PELANTIKAN

    PENGARAH PROJEK/

    WAKIL PENGARAH PROJEK

    TANGGUNGJAWABAGENSI

    BANTUAN DARI SEGI AKSES KE TAPAK, MAKLUMAT, DATA DAN LAIN-LAIN

    Tanggungjawab Pengarah Projek

    1. Mentadbir Dan Mengawal Selia Setiap Inden Kerja

    2. Mengambil Apa-apa TindakanAtau Mengeluarkan Apa-apaArahan

    16/11/2016

    C.EMERGENCY RESPONSE

    IKRAM with its nine (9) branches shall respond to the reported failure situation upon directive of authority in the following

    manner:

    ii. If the failure location is more than 50 km from its nearest branch office - response time shall be within 24 hours.

    i. If the failure location is within 50 km from its nearest branch office - response time shall be within 3 hours.

    ii. If the failure location is REMOTE AREA – response time shall be within 48 hours

    NOTE : Subject to the “ACCESSIBILITY” of site location

  • 16/11/2016

    11

    � Year of Failure : 2012

    � Location : Bukit Setiawangsa, KL

    � No. of casualties : none

    � Evacuation : 88 residents

    BUKIT SETIAWANGSA SLOPE FAILURE (2012)

    BRIEFING TO PUBLIC & MEDIA ON EMERGENCY RESPONSE OF SLOPE FAILURE AT SETIAWANGSA

    Briefing To Public Briefing To Media And Kuala Lumpur Mayor

    Briefing To Media At SiteBriefing At Site

    16/11/2016

    1.KAJANG HEADQUARTERS

  • 16/11/2016

    12

    16/11/2016

    2. IKRAM UTARA (ALOR SETAR) 3. IKRAM UTARA (PERAI)

    4. IKRAM UTARA (IPOH) 5. IKRAM SELATAN

    16/11/2016

    6. IKRAM TIMUR (KELANTAN)

    8. IKRAM SABAH

    9. IKRAM SARAWAK

    6. IKRAM TIMUR (TERENGGANU)

    16/11/2016

    D. NON EMERGENCY CASES

    A. PREVENTIVE

    B. NORMAL CONSULTANCY

    SERVICE

  • 16/11/2016

    13

    16/11/2016

    FLOW CHART OF FORENSIC

    ENGINEERING INVESTIGATION

    (SLOPES & SLOPERELATED

    STRUCTURES)

    AGENSIKEGAGALAN

    CERUN

    (KECEMASAN)

    CENTRAL NORTHERN EASTERN SOUTHERN SABAH SARAWAK

    Head Of Project : Ir. Hj. Abd Ghani

    ShaabanTel : 012-3685659

    Deputy Head

    Project :Syuri Hidayah

    Sangaji

    Tel : 012-3685659

    Project Officer 1 :Suffian Abd

    RahmanTel : 013-9306658

    Head Of Project : Ir.Hj.Azhari b.

    AbdullahTel : 019-

    4574847

    Deputy Head Project :

    Mohamad Zaidi b.

    SaadiTel : 019-

    4726963

    Project Officer 1:Hamizat bin

    Othman

    Tel : 012-4726944

    Head Of Project : Ir. Mohamed Bin

    DaudTel :012-9892959

    Deputy Head

    Project : MohdSaiful Bahri

    Tel : 019-9678989

    Project Officer 1 :

    Mohd Azri B. JusohTel : 013-9863955

    Head Of Project : Kamarudin Bin

    ZakariaTel :019-8888016

    Deputy Head

    Project :Jeya Pirathaba

    Tel : 016-7716471

    Project Officer 1 :

    Nur Basarah MohdShukri

    Tel : 013-

    Head Of Project : Ir. Hiew Vun Heng

    Tel :012-8288804

    Deputy Head Project :

    Edward Voo Lok Zan

    Tel : 016-8320535

    Project Officer 1 :

    Kenneth NigelTel : 019-8211169

    Head Of Project : Zaba Mason

    Tel : 014-6866863

    Deputy Head Project :

    Victor SungTel : 014-9941917

    Project Officer 1 :Rachel Lynn

    Tel : 016-8799236

    Head Of Project : Ir. Mohamed Bin Daud Tel :012-9892959Deputy Head Project : Mohd Saiful Bahri Tel : 019-9678989

    Project Officer 1 :Mohd Azri B. JusohTel : 013-9863955

    TALIAN BEBAS TOL

    1 800 18 0700

    ALIRAN KOMUNIKASI ( A: Kegagalan Cerun –Emergency

    Head Of Project : Ir. Hj. Abd Ghani Shaaban

    Tel : [email protected]

    Deputy Head Project : Syuri Hidayah Sangaji

    Tel : [email protected]

    Head Of Project : Ir.Hj.Azhari b. Abdullah

    Tel : [email protected]

    Deputy Head Project : Mohd Zaidi b. Saadi

    Tel : [email protected]

    Head Of Project : Ir. Mohamed Bin Daud

    Tel :[email protected]

    Deputy Head Project : Mohd Saiful Bahri

    Tel : [email protected]

    Head Of Project : Kamarudin Bin Zakaria

    Tel :[email protected]

    Deputy Head Project :Jeya Pirathaba

    Tel : [email protected]

    TEAM APROJECT DIRECTOR

    Ir. Md Rozi Shaari

    0192240755TEAM B

    PROJECT DIRECTOR

    Ir. Sobri b. Aziz

    012-3295817

    Head Of Project : Zaba Mason

    Tel : 014-6866863

    Deputy Head Project :Victor Sung

    Tel : 014-9941917

    Head Of Project : Ir. Hiew Vun Heng

    Tel :012-8288804

    Deputy Head Project :Edward Voo Lok Zan

    Tel : [email protected]

    EASTERNNORTHERN

    SOUTHERN SARAWAK

    TEAM CPROJECT DIRECTOR

    Dato’ Ir. Dr. Ashaari Mohamad

    012-4720444

    CENTRAL SABAH

    Head Of Project :

    Ir. Mohamed Bin DaudTel :012-9892959

    [email protected]

    Deputy Head Project :

    Mohd Saiful BahriTel : 019-9678989

    [email protected]

    EASTERNALIRAN KOMUNIKASI ( A: Kegagalan Cerun –Emergency

    TALIAN BEBAS TOL

    1 800 18 0700AGENSI

  • 16/11/2016

    14

    Agensi MemberiArahan Lisan KepadaKISB Untuk Tinjauan

    Tapak

    KISB GerakkanKumpulan

    Tindakan KeTapak

    (3jam/24jam)

    KISB MenyediakanLaporan Awal

    Dalam Tempoh 3 Jam Selepas TibaDi Kawasan Tapak

    3jam / 24 Jam

    3 Jam

    7 Hari

    KISB Kemukakan CTK Dengan JadualPerlaksaanan Kerja

    Agensi Keluarkan Inden Kerja SebagaiArahan Memulakan Perkhidmatan

    PenyiasatanForensik Tapak

    Analisa Data Dan Reka

    Bentuk OlehKISB

    Pemilihan RekaBentuk Oleh

    Agensi

    Penyediaan RekaBentuk Terperinci

    Dan DokumenTender Kerja

    LaporanAkhir Dan Tuntutan

    Akhir

    Agensi Membuat BayaranTuntutan Akhir Selepas

    Semua Dokumen DiserahkanKepada JKR Termasuk

    Borang Peniliaian PrestasiPerkhidmatan Syarikat

    Agensi KeluarkanInden Kerja

    Sekiranya Ada Penyeliaan Tapak

    Tuntuan Kemajuaan 95%

    Baki Bayaran5%

    Arahan Lisan Disusuli DenganInden Kerja Daripada Agensi

    TATACARA PELAKSANAAN PERKHIDMATAN KEJURUTERAAN FORENSIK

    (CERUN DAN STRUKTUR BERKAITAN CERUN)

    (KEGAGALAN CERUN)

    Agensi mengeluarkan

    Surat Pelawaankepada KISB

    KISB

    menjalankanTinjauan

    Tapak

    KISB menyediakan

    Laporan Awal

    14 hari

    KISB Kemukakan CTK dengan

    Jadual Perlaksaanan Kerja

    Agensi keluarkan Iden Kerja

    sebagai arahan memulakan

    perkhidmatan

    Penyiasatan

    Forensik Tapak

    Analisa data

    dan rekabentuk oleh

    KISB

    Pemilihan reka

    bentuk olehAgensi

    Penyediaan

    reka bentukterperinci dan

    dokumen tender

    kerja

    Laporan

    Akhirdan

    tuntutan

    akhir

    Agensi keluarkan

    Iden Kerjasekiranya ada

    penyeliaan tapak

    Tuntuan Kemajuaan 95%

    Agensi membuat bayaran

    tuntutan akhir selepas semuadokumen diserahkan kepada JKR

    termasuk Borang Peniliaian

    Prestasi Perkhidmatan Syarikat

    TATACARA PELAKSANAAN PERKHIDMATAN KEJURUTERAAN FORENSIK

    (CERUN DAN STRUKTUR BERKAITAN CERUN)

    (MENGKAJI KESTABILAN CERUN)

    Baki Bayaran5%

    3.0 SCHEDULE II : SERVICE FEES OR SCHEDULE OF

    RATESA. BOARD OF ENGINEERS MALAYSIA (BEM)

    B. MANUAL PEROLEHAN PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA - DISEMBER 2014) (PK3.2/2013)

    C. FIELD TESTING/ SITE INVESTIGATIOND. REIMBURSABLE

  • 16/11/2016

    15

    16/11/2016

    PROJECT CLAIM STRUCTURE FOR

    CONSULTANCY OF SLOPE FORENSIC WORKS

    2. FIELD TESTING

    B. IKRAM

    Privitazation1996

    A. Jabatan

    Kerja Raya Malaysia

    (JKR), 2012

    3.REIMBURSABLE

    A. Ministry Of Finance

    (MOF), 2014

    4.OTHERS

    1. PROFESSIONAL

    FEES

    A. Board Of

    Engineers Malaysia

    (BEM), 1998

    B. Ministry Of

    Finance (MOF), 2014

    SLOPE FORENSIC WORKS

    ADDITIONAL ITEMS:

    1. Detailed Engineering Survey

    2. Geophysical Survey3. Surface Mapping4. Instrumentation5. Terrestrial Laser Scanner (TLS)6. Unmanned Aerial Vehicle

    (UAV)

    16/11/2016

    BAB 5.0 Kos Perkhidmatan Perunding

    CONTENT OF SCHEDULE II

    2. KEMENTERIAN KEWANGAN MALAYSIA MANUAL

    PEROLEHAN PERKHIDMATAN PERUNDING EDISI

    2011 (PINDAAN KEDUA) (PK3.2/2013)

    3. SCHEDULE OF RATES

    JKR RATE 20121. General Conditions & Preliminaries

    2. Deep Boring With Boring Plants

    3. Deep Sounding And Piezocone

    4. Other Field Tests

    5. Collection Of Soil And Water Samples In Bulk

    6. Laboratory Tests

    7. Material Testing

    1. BOARD OF ENGINEERS

    MALAYSIA (BEM): SCALE

    OF FEES

    BEM Scale of

    Fees (1982)

    {P.U. (B) 346}

    BEM Scale of Fees

    (Revised 1998)

    {PU(B) 548}

    SCHEDULE II

    ADDITIONAL ITEMS:1. Detailed Engineering Survey

    2. Geophysical Survey

    3. Surface Mapping

    4. Instrumentation

    5. Terrestrial Laser Scanner (TLS)

    6. Unmanned Aerial Vehicle (UAV)

    A. BOARD OF ENGINEERS MALAYSIA (BEM)

  • 16/11/2016

    16

    16/11/2016

    INTRODUCTION TO BEM

    1. The job market for engineering consultants(especially the C&S and geotechnical) can be divided into:

    – Public (government & GLC) sector – Private sector

    2. The public sector implementing agencies will adopt professional fees

    3. based on :

    – Scale of Fees (Based on BEM scale of fees)– Man Month (Based on the latest “Manual Perolehan Perunding MOF”)

    4. The functions of BEM is to establish the scale of fees as a reference for any consultant professional engineer to provide their services

    5. The objectives of “THE BEM SCALE OF FEES” it to prevent undercutting among engineering consultants

    16/11/2016

    CONTENT OF SCALE OF FEES, BEM 1998

    PART A :

    WORK

    1. Construction &

    Supervision

    2. Tender

    3. Analysis And Design

    4. Site Investigation And

    Laboratory

    5. Other Additional

    Services

    PART B:

    PROFESSIONAL FEES

    1. BEM Scale Of Fees

    2. Salary Cost Times

    Multiplier

    3. Stages Of

    Payment

    PART C: OTHERS PAYMENT

    1.Equipment

    2. Reimbursable

    3. Supervision

    ENGINEERING WORKS

    16/11/2016

    TYPE A

    • Namely civil and structural engineering works (other than structural engineering works in building), mechanical engineering works and electrical engineering works (other than the engineering systems in buildings);

    TYPE B

    • Namely, structural engineering works in buildings of more than four storeyshigh

    TYPE C

    • Engineering systems in buildings of more than four storeys high

    CLASSIFICATION OF WORKS(Based on BEM 1998)

  • 16/11/2016

    17

    16/11/2016

    • Scale of fees for Basic

    Professional

    Service (Type A)

    • *Type A = Civil and Structural

    Work

    Total Cost of Components of the Works in The

    Respective Type in RMP (max) P(min)

    100,000 & below 10.00% 8.25%

    250,000 8.65% 7.45%

    500,000 7.60% 6.85%

    1,000,000 6.80% 6.30%

    2,500,000 6.00% 5.65%

    5,000,000 5.50% 5.20%

    10,000,00 5.00% 4.75%

    20,000,000 4.65% 4.25%

    25,000,000 4.50% 4.10%

    50,000,000 4.25% 3.80%

    75,000,000 4.10% 3.70%

    100,000,000 3.95% 3.60%

    200,000,000 3.55% 3.40%

    250,000,000 3.40% 3.25%

    300,000,000 3.30% 3.10%

    350,000,000 3.20% 3.00%

    400,000,000 3.10% 2.90%

    500,000,000 2.95% 2.80%

    600,000,000 2.85% 2.70%

    700,000,000 2.75% 2.60%

    800,000,000 2.67% 2.50%

    900,000,000 2.60% 2.40%

    1,000,000,000 & above 2.54% 2.28%

    SCALE OF FEES, BEM 1998

    16/11/2016

    FORMULA SCALE OF FEES, BEM 1998

    FORMULA :

    1)P max & P min =(y2-y1)/(x2-x1) = (y2-y3)/x2-x3)

    2)P average = (P max + P min)/2

    3)Professional fees = P average x Estimate contract amount

    EXAMPLE CALCULATION SCALE OF FEES, BEM 1998

    No. ItemsContract

    amountP max P min

    1. Lower bound 2.5 million 6.0 5.65

    2. Lower bound 4 million x y

    3. Upper bound 5.0 million 5.5 5.2

    Estimate Cost = RM4,000,000

    P max= (y2-y1)/(x2-x1) = (y2-y3)/x2-x3)

    = (4-2.5)/(x-6) = (4-5)/(x-5.5)= 1.5/(x-6)= (-1)/(x-5.5)= 1.5(x-5.5)=(-1) (x-6)

    = 1.5x – 8.25 = -x + 6= 1.5x + x = 6+8.25= 2.5 x = 14.25

    x = 14.25/2.5x = 5.7

    P min = (y2-y1)/(x2-x1) = (y2-y3)/x2-x3)

    = (4-2.5)/(y-5.65) = (4-5)/(y-5.2)= 1.5/(y-5.65)= (-1)/(y-5.2)= 1.5(y-5.2)=(-1) (y-5.65)

    = 1.5y – 7.8 = -y + 5.65= 1.5y + y = 5.65+7.8= 2.5 y = 13.45

    y = 13.45/2.5y = 5.38

  • 16/11/2016

    18

    • Estimate Contract Amount = RM4,000,000

    No. ItemsContract

    amountP max P min

    1. Lower bound 2.5 million 6.0 5.65

    2. Lower bound 4 million x y

    3. Upper bound 5.0 million 5.5 5.2

    P average = (P max + P min)/2

    = (5.7+5.38)/2

    = 5.54%

    Professional fees = P average x Estimate Contract Amount

    = 5.54/100 x RM 4,000,000

    = RM 221,600.00

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

    4.00

    4.50

    5.00

    5.50

    6.00

    6.50

    7.00

    7.50

    8.00

    8.50

    9.00

    9.50

    10.00

    10.50

    Pvalue

    COMPARISON OF PVALUE FOR SOF 1998 vs 1982

    P (max) 1998

    P (min)1998

    P 1982

    SCALE OF FEES, BEM 1998Estimate Contract Amount = RM4,000,000

    P value = 5.54%

    RM4,000,000

    P value: 4.45

    SCALE OF FEES, BEM 1982Estimate Contract Amount = RM4,000,000

    P. value : 4.45%

    P value: 5.54

    16/11/2016

    PAYMENT PROPORTION STAGES FOR SCALE OF FEES

  • 16/11/2016

    19

    16/11/2016

    FEE FOR SITE SUPERVISION

    B. MANUAL PEROLEHAN PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA -

    DISEMBER 2014) (PK3.2/2013)

    16/11/2016

    INTRODUCTION

    1. The consultancy service fee comprises of

    a. consultancy fees

    b. reimbursable cost

    2. There are two methods for determining the

    consultancy services fee namely:

    a. Scale of Fees (BEM)

    b. Man Month

    3. The method of determining consultancy fees

    for man-month is based on Time Basis.

    Source: MOF – 2014 (5.1-5.2)

  • 16/11/2016

    20

    16/11/2016

    METHOD OF CALCULATION FOR MAN MONTH

    YP= GP x FP x IMYP= YURAN PERUNDING

    (i)GP= GAJI POKOK

    (ii) FP=FAKTOR PENGGANDA

    (iii) IM= INPUT MASA

    16/11/2016

    1.BASIC SALARY

    1. Basic Salary is the basic monthly salary which is not included any allowance and other

    payments to consultant staff.

    2. Basic Salary for permanent staff is based on current salary slip of the staff.

    3. Basic Salary for temporary staff shall not exceed the maximum salary scale establised by

    the Ministry of Financial shown in Appendix 5B to 5C.

    4. Basic salary for temporary who works for supervision under government project shall

    based on maximum salary scale which needed application approval by MOF.

    5. Basic Salary for temporary staff taken among university lecturers is based on the actual

    salary slip while government servants who have retired is based on verification /

    statements / last salary slip.

    6. Remuneration for the Board of Directors / Share Partners is based on the maximum

    salary scale approved by the Ministry of Finance in Appendix 5A.

    Source: MOF – 2011 & 2014 (5.2.3)

    16/11/2016

    APPENDIX 5A: MAXIMUM SALARY SCALE OF DIRECTORS (THE FIRM OWNER) / PARTNERS (SHAREHOLDERS)

    YEARS OF

    EXPERIENCE

    SALARY RATE (RM) %

    DIFFERENCE YEAR 2014 YEAR 2014 (P.2)

    5 6000.00 6000.00 0

    6 6300.00 6300.00 0

    7 6600.00 6600.00 0

    8 6900.00 6900.00 0

    9 7200.00 7200.00 0

    10 7500.00 7500.00 0

    11 7800.00 7800.00 0

    12 8100.00 8100.00 0

    13 8400.00 8400.00 0

    14 8700.00 8700.00 0

    15 9000.00 9000.00 0

    16 9300.00 9300.00 0

    17 9600.00 9600.00 0

    Source: MOF 2014 (5.2.3)

  • 16/11/2016

    21

    16/11/2016

    YEARS OF

    EXPERIENCE

    SALARY RATE (RM) %

    DIFFERENTYEAR 2014 YEAR 2014 (P.2)

    18 9900.00 9900.00 0

    19 10200.00 10200.00 0

    20 10500.00 10500.00 0

    21 10800.00 10800.00 0

    22 11100.00 11100.00 0

    23 11400.00 11400.00 0

    24 11700.00 11700.00 0

    25 12000.00 12000.00 0

    26 12300.00 12300.00 0

    27 12600.00 12600.00 0

    28 12900.00 12900.00 0

    29 13200.00 13200.00 0

    30 13500.00 13500.00 0

    31 & above 13800.00 13800.00 0

    Source: MOF 2014 (5.2.3) Continue from previous

    APPENDIX 5A: MAXIMUM SALARY SCALE OF DIRECTORS (THE FIRM OWNER) / PARTNERS (SHAREHOLDERS)

    16/11/2016

    APPENDIX 5B: MAXIMUM SALARY SCALE FOR PROFESSIONAL STAFFTEMPORARY STAFF – BACHELOR & ABOVE

    YEARS OF

    EXPERIENCE

    SALARY RATE (RM) (BACHELOR DEGREE AND ABOVE)%

    DIFFERENTYEAR 2014 YEAR 2014 (P.2)

  • 16/11/2016

    22

    16/11/2016

    APPENDIX 5C: MAXIMUM SALARY SCALE OF SEMI PROFESSIONAL STAFF / TECHNICAL SUPPORT (TEMPORARY STAFF)

    YEARS OF EXPERIENCE

    SALARY RATE (RM) %DIFFERENTYEAR 2014 YEAR 2014 (P.2)

    SALARY RATE 1 (WITHOUT

    DIPLOMA)

    SALARY RATE 2(WITH DIPLOMA)

    SALARY RATE 1 (WITHOUT

    DIPLOMA)

    SALARY RATE 2(WITH DIPLOMA)

    SALARY RATE 1 (WITHOUT

    DIPLOMA)

    SALARY RATE 2(WITH DIPLOMA

  • 16/11/2016

    23

    16/11/2016

    3.MULTIPLYING FACTOR

    • Agencies should ensure FP adopted by consultants shall not

    exceed the prescribed

    coefficients by the Ministry of

    Finance as in tables F & G.

    Source: MOF -2011 & 2014 (5.2.1 (b))

    16/11/2016

    COMPARISON OF MULTIPLIER FACTOR FOR MAN MONTH (APPENDIX 5D)

    CATEGORIES MULTIPLIER FACTOR%

    PERSONNEL/CONSULTANTS 1996 2014 MSA 2015

    A Local Consultant

    1 Professionals 2.2 2.7 2.5 -7.4

    2Semi Professionals and Technical

    Support Staff1.8 2.1 2.0 -4.8

    3All Categories of Lecturers from Private

    and Local Universities1.1 2.2 2.1 -4.5

    B Foreign Consultant

    4 Foreign Consultant 1.0

    1.0

    -(based on

    charge rate)-

    C Individual Consultant

    5Local Individual Consultant Appointed

    directly to Goverment Agencies1.1 1.6 - -

    6Foreign Individual Consultant Appointed

    directly to Goverment Agencies1.0

    1.0

    -(based on

    charge rate)-

    16/11/2016

    MULTIPLYING FACTOR FOR PROFESSIONAL STAFF

    COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE

    DIFFERENCES (%)

    A. Benefit of Named employee MOF 2014 MSA 2015

    Salary 1.0 1.0 0%

    Bonus, allowance, perks and leave 0.37 0.37 0%

    EPF/SPF 0.11 0.11 0%

    SOCSO 0.01 0.01 0%

    Training 0.02 0.02 0%

    Subscription to professional bodies, permits and licenses 0.05 0.05 0%

    Health and medical benefits 0.03 0.03 0%

    Retirement/ superannuation funds 0.03 0.015 -50%

    B. Firm's Overhead

    Rental 0.10 0.10 0%

    Groupp Insurances 0.05 0.05 0%

    Utilities and office supplies 0.05 0.05 0%

    IT hardware/ network 0.03 0.03 0%

    Software 0.04 0.04 0%

    System (e.g ISO, library) 0.02 0.02 0%

    Professional services including secretarial, audit and legal 0.04 0.04 0%

    Salaries of non-bilable staff including administrative/ directors 0.20 0.20 0%

    Research and development 0.02 0.02 0%

    Depreciation amortization 0.07 0.07 0%

    Cost of Capital 0.10 0.10 0%

    Profit before tax 0.20 0.20 0%

    Others 0.15 0 -100%

    TOTAL 2.702.525

    Proposed 2.50-7.4%

  • 16/11/2016

    24

    16/11/2016

    MULTIPLYING FACTOR FOR SEMI PROFESSIONALS AND TECHNICAL SUPPORT STAFF

    COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE

    DIFFERENCES (%)

    A. Benefit of Named employee MOF 2014 MSA 2015

    Salary 1.0 1.0 0%

    Bonus, allowance, perks and leave 0.15 0.37 0%

    EPF/SPF 0.11 0.11 0%

    SOCSO 0.02 0.01 0%

    Training 0.01 0.02 0%

    Health and medical benefits 0.02 0.05 150%

    B. Firm's Overhead

    Rental 0.04 0.04 0%

    Group Insurances 0.03 0.03 0%

    Utilities and office supplies 0.04 0.04 0%

    IT hardware/ network 0.01 0.01 0%

    Software 0.03 0.03 0%

    System (e.g ISO, library) 0.01 0.01 0%

    Professional services including secfretarial, audit and

    legal0.02 0.02 0%

    Salaries of non-billable staff including administrative/

    directors0.17 0.17 0%

    Depreciation amortization 0.07 0.07 0%

    Cost of Capital 0.10 0.10 0%

    Profit before tax 0.20 0.20 0%

    Others 0.07 0 -100%

    TOTAL 2.102.03

    Proposed 2-4.7%

    16/11/2016

    MULTIPLYING FACTOR FOR ALL CATEGORIES OF LECTURERS FROM PRIVATE AND LOCAL UNIVERSITIES

    COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE

    DIFFERENCES (%)

    A. Benefit of Named employee MOF 2014 MSA 2015

    Salary 1.00 1.00 0%

    Incentive and leave 0.50 0.50 0%

    Research and Development 0.05 0.05 0%

    B. University Consultancy Bureau's Fee 0.30 0.30 0%

    B. Firm's Overhead

    Utilities and office supplies 0.05 0.05 0%

    IT hardware 0.03 0.03 0%

    Profit before tax 0.20 0.20 0%

    Others 0.07 0 -100%

    TOTAL 2.20

    2.13

    Proposed 2.10

    -4.5%

    16/11/2016

    EXAMPLE CALCULATION OF CONSULTANCY FEE BETWEEN MOF 2014 AND MSA 2015

    GEOTECHNICAL INVESTIGATION STUDY FOR SLOPE FAILURE AT DEWAN FLAT TAMAN MULIA, BANDAR TUN RAZAK, KUALA LUMPUR

    NO DESIGNATION YEARS OF

    EXPERIENCEMAN

    MONTHSALARY(RM)

    MULTIPLIER FACTOR (MF)

    TOTAL (RM) PERCENT DIFFEREN

    CE(%)2014 MSA 2014 MSA

    1 Project Director 18 0.25 8,200.00 2.7 2.5 5,535 5,125 -7%

    2 Project Manager 14 1 7,000.00 2.7 2.5 18,900 17,500 -7%

    3Professional Geotechnical

    Engineer

    24 1 10,200.00 2.7 2.5 27,540 25,500 -7%

    4

    Senior Geotechnical

    Engineer

    9 1.5 4,800.00 2.7 2.5 19,440 18,000 -7%

    5Geotechnical

    Engineer1 2.5 3,000.00 2.7 2.5 20,250 18,750 -7%

    6 Technical Assistant 3 1.5 2,370.00 2.1 2.0 7,465.5 7,110 -5%

    7 Site Supervisor 3 2.5 2,370.00 2.1 2.0 12,442.5 11,850 -5%

    8 Draughtsman 2 1.5 1,980.00 2.1 2.0 6,237 5,940 -5%

    TOTAL OF PROFESSIONAL FEES 117,810 109,775 -7%

  • 16/11/2016

    25

    C. FIELD TESTING/ SITE a. GENERAL CONDITION AND PRELIMINARIES

    b. DEEP BORING WITH BORING PLANTSc. DEEP SOUNDING AND PIEZOCONE

    d. OTHER FIELD TESTSe. COLLECTION OF SOIL AND WATER SAMPLES IN BULK

    f. LABORATORY TESTg. MATERIAL TESTING

    16/11/2016

    SCOPE OF WORK FOR SITE INVESTIGATION

    • BILL No. 1 : GENERAL CONDITION AND PRELIMINARIES

    BILL No. 2 : DEEP BORING WITH BORING PLANTS

    BILL No. 3 : DEEP SOUNDING AND PIEZOCONE

    BILL No. 4 : OTHER FIELD TESTS

    BILL No. 5 : COLLECTION OF SOIL AND WATER SAMPLES IN BULK

    BILL No. 6 : LABORATORY TEST

    BILL No. 7 : MATERIAL TESTING

    D. REIMBURSABLE

  • 16/11/2016

    26

    16/11/2016

    • 41 total of item for reimbursable were established in MOF 1996.

    • In 2014, MOF has 54 reimbursable items.

    REIMBURSABLE ITEMS ACCORDING TO MOF 1996 & 2014

    DETAILS REIMBURSABLE ITEMMOF 1996

    (Item)

    MOF 2014(Item)

    A Cost Of Transportation / Travel 15 19

    B Accommodation And Subsistence 11 11

    C Communication Cost 3 3

    D Documentation And Report Preparation Cost 4 8

    E Project Assets 3 5

    F Technical Testing And Other Test 2 2

    G Cost Of Rental Office And Utilities 1 2

    H Costs For Conducting Research Survey 2 4

    TOTAL ITEM 41 54

    16/11/2016

    NO DESCRIPTION

    TOTAL AMOUNT (RM)

    DIFFERENCE(%)IKRAM ,1996

    MOF 2014 AND

    JKR 2012

    a Professional Fees 101,136.75 122,457.98 21.08%

    b Field Testing 61,500.20 70,015.00 13.85%

    c Reimbursable 6,230.00 9,650.00 54.90%

    GRAND TOTAL 138,170.20 197,475.00 42.92%

    OVERALL SUMMARY DISTRIBUTION OF CLAIM FOR SLOPE FORENSIC WORKS

    GEOTECHNICAL INVESTIGATION STUDY FOR SLOPE FAILURE AT DEWAN FLAT TAMAN

    MULIA, BANDAR TU RAZAK

    4. ADDITIONAL ITEMi. DETAILED ENGINEERING SURVEY

    ii. GEOPHYSICAL SURVEYiii. SURFACE MAPPINGiv. INSTRUMETATION

    v. TERRSTRIAL LASER SCANNING (TLS)vi. UNMANNED AERIAL VEHICLE (UAV)

  • 16/11/2016

    27

    16/11/2016

    SITE PHOTOS OF ENGINEERING SURVEY

  • 16/11/2016

    28

    16/11/2016

    SCOPE OF WORKS ENGINEERING SURVEY

    1. Mobilisation and Demobilisation

    2. Preparatory Work

    3. Planimetric Control

    4. Demarcation or Along the propose route / within site area

    5. Height Control

    6. Monumenting

    7. Contour and Detail

    8. Grid Heighting

    9. Cross-Section

    10. Demarcation of BH/MP

    11. Processing, Conversion and Translation of Digital Data

    16/11/2016

    RATES OF DETAILED ENGINEERING SURVEY

    ITEM DESCRIPTION OF WORK UNIT RATE

    8.0 Mobilisation of personnel and all equipment's necessary for execution of the site

    operations to site and demobilisation on completion:-

    8.1 Work rates for mobilization and demobilization per party are as follow (Peninsular):

    8.1.1 i)50 kilometres or less perday Nil

    8.1.2 ii)More than 50 kilometres but not exceeding 150 kilometres (1 party/day) perday 743.00

    8.1.3 iii)More than 150 kilometres but not exceeding 300 kilometres (2 party/day) perday 1,486.00

    8.1.4 iv)More than 300 kilometres (3 party/day) perday 2,229.00

    8.2 Work rates for mobilization and demobilization per party are as follow (Sabah/Sarawak):

    8.2.1 i)50 kilometres or less perday Nil

    8.2.2 ii)More than 50 kilometres but not exceeding 150 kilometres (1 party/day) perday 966.00

    8.2.3 iii)More than 150 kilometres but not exceeding 300 kilometres (2 party/day) perday 1,932.00

    8.2.4 iv)More than 300 kilometres (3 party/day) perday 2,898.00

    8.2 Preparatory Work

    Work rate for preparatory work is 1 party-day perday 743.00

    8.3 Planimetric Control

    The accuracy for planimetric control and connection shall not be less than 1 in 4000. The planimetric

    control and connection includes:

    8.3.1 Connection to GPS Datum

    8.3.1.1 i)Peninsular

    Flat and undulating area km 2,000.00

    Hilly area km 2,500.00

    Swampy area km 2,500.00

    Built up area km 2,500.00

    8.3.1.2 ii)Sabah/Sarawak

    Flat and undulating area km 2,600.00

    Hilly area km 3,250.00

    Swampy area km 3,250.00

    Built up area km 3,250.00

    8.3.2 Along the proposed or existing routes or alignment

    8.3.2.1 i)Peninsular

    Flat and undulating area km 2,000.00

    Hilly area km 2,500.00

    Swampy area km 2,500.00

    Built up area km 2,500.00

    8.3.2.2 ii)Sabah/Sarawak

    Flat and undulating area km 2,600.00

    Hilly area km 3,250.00

    Swampy area km 3,250.00

    Built up area km 3,250.00

    8.4 Height Control and Connection

    The height control and connection includes:

    8.4.1 Connection to JUPEM Bench Marks Flat and Undulating km 743.00

    8.4.2 Along the proposed or existing routes or alignment Flat and Undulating km 743.00

    8.5 Reimbursable

    8.5.1 Expenses for purchase of Property Model sht 170.00

    8.5.2 Expenses for Communication pday 743.00

    8.5.3 Hiring charge of special equipment/software as agreed with client pday

    8.5.4 Expenses for Travel & Accomodation pday 743.00

    8.5.5 Expenses incurred in the use of special transportation e.g. helicopter, boat, etc as agreed with the client pday

    16/11/2016

    RATES OF DETAILED ENGINEERING SURVEY

    ITEM DESCRIPTION OF WORK UNIT RATE

    8.6 Site Survey with Contour and Detail - 1m Contour

    8.6.1 Built-up ha 1486.00

    8.7 Detail Site Survey - Grid Heighting

    8.7.1 Built-up ha 4903.80

    8.8 Cross-Section (cost per section @ +/- 150-200m length)

    8.8.1 Built-up section 495.33

    8.9 Demarcation of BH/MP unit 100.00

    SUB-TOTAL i

    8.10 Processing, Conversion and Translation of Digital Data (20% from SUB TOTAL i)

    8.10.1Where the survey result is required to be submitted in a designated format, a charge of 20%

    of the total

    survey fees is applicable.

    SUB-TOTAL ii ( Sub-total i + item 1.10.1)

    8.11 IKRAM Fees (10% from SUB-TOTAL ii)

    GRAND TOTAL (SUB-TOTAL ii + IKRAM Fees)

  • 16/11/2016

    29

    16/11/2016

    PHOTOS OF SEISMIC WORKS

    16/11/2016

    BH

    6

    BH

    7

    BH

    10

    BH

    9

    ZONE 2

    Seismic Refraction Survey Kundasang Project

  • 16/11/2016

    30

    16/11/2016

    PHOTOS OF RESISTIVITY WORKS

    16/11/2016

    RESISTIVITY SURVEY PENANG HILL PROJECT

    16/11/2016

    SCOPE OF WORKS FOR GEOPHYSICAL SURVEY

    1. General Condition and Preliminaries

    2. Mobilisation and Demobilisation

    3. Setting Out Equipment

    4. Seismic Refraction Survey

    5. Resistivity Survey

    6. Multi-Channel Analysis of Surface Wave

    (MASW)

    7. Report

  • 16/11/2016

    31

    16/11/2016

    RATES OF GEOPHYSICAL SURVEY

    ITEM DESCRIPTION OF WORK UNIT RATE

    ITEM DESCRIPTION OF WORK UNIT AGREED RATE

    9.1 Mobilisation

    9.1.1Mobilisation of personnel and all equipment's necessary for execution of the site operations to site and demobilization on completion:-

    9.1.1.1 Up to 25 Km from Kuala Lumpur LS 1200

    9.1.1.2 Over 25Km and up to 225 Km from Kuala Lumpur LS 1700

    9.1.1.3 Over 225Km and up to 425 Km from Kuala Lumpur LS 2100

    9.1.1.4 Over 425 Km from Kuala Lumpur LS 2400

    9.2 Setting Out

    9.2.1 Setting out of geophysical survey lines at fixed sensor interval and taking the reduce level at LS 1250

    9.3 Geophysical Survey

    9.3.1 Seismic Refraction Survey

    9.3.1.1

    Carry out seismic survey within a 24 channel seismograph with geophone at maximum 5m interval measured along

    the slope and 7 sheets per spread, sledge hammer as energy source, and analysis of data with seismic tomographic software and incorporating borehole data where available. (minimum length per line is 72m) Line 3000

    9.3.2 Multi-Channel Analysis of Surface Wave (MASW)

    9.3.2.1Carry out surface wave investigation with 3m interval with 24 geophone for investigation depth up to 20m depth,using Sledge Hammer As Seismic Source to obtain the S-Wave tomogram. (minimum length per line is 72m) Line 2500

    9.3.3 2-D Resistivity Profilling

    9.3.3.1

    Carry out 2D resistivity profiling using schlumberger - wenner configuration and roll-along technique within 40

    electrodes at roll-along technique within 40 electrodes at5m Intervals, each Interval measured as the slope distance between adjacent electrodes, determine levels of each electrode, and process data to produce resistivity profiles.(minimum length per line is 120m) Line 1800

    9.4 Report

    9.4.1Prepare and submit report which shall include the compilation of all data including result from ground investigation and 3D model of the study area and surrounding area nos 300

    16/11/2016

    SCOPE OF WORKS FOR SURFACE MAPPING

    1. Mobilization

    2. Geomorphological Mapping

    3. Engineering Geological Mapping

    4. Report

  • 16/11/2016

    32

    16/11/2016

    RATES OF SURFACE MAPPING

    ITEM DESCRIPTION OF WORK UNIT RATE

    10.1 Mobilization

    Mobilization of personnel and all equipment necessary for execution of the site operations to site

    and demobilization on completion:-

    10.1.1 Up to 25 km from Kuala Lumpur. LS 1200

    10.1.2 Over 25 km and up to 225 km from Kuala Lumpur. LS 1700

    10.1.3 Over 225 km and up to 425 km from Kuala Lumpur. LS 2100

    10.1.4 Over 425 km from Kuala Lumpur. LS 2400

    10.2 Geomorphological Mapping

    The works carried out inclusive filling up primary area based proforma, structural proforma (if

    exist), collection of structural proforma (if exist), collection of any visible evidences, data

    logging and expert judgement based on the site condition together with supporting illustration

    ha 18000

    10.3 Engineering Geological Mapping

    The works carried out inclusive collection of data structural discontinuities for rock, distresses

    using Rock Proforma and/or kinematic analyses, determination of critical area, potential mode

    of failure and illustration of geological features on the slope

    ha 18000

    10.4 Report

    Prepare and submit report which shall include the compilation of all data and analyses of the

    study area. nos 600

    iv. INSTRUMENTATION

    16/11/2016

    TYPES OF INSTRUMENTATION

    NO TYPES OF INSTRUMENTATION

    1 Building Settlement Marker

    2 Ground Settlement Marker

    3 Avongard Standard Tell-tale

    4 Damage Gauge

    5 Plate Tiltplate

    6 Brass Tiltplate

  • 16/11/2016

    33

    16/11/2016

    TYPE OF INSTRUMENTATION

    Building Settlement Marker Ground Settlement Marker

    DeMeg Gauge Avongard standard tell-tale

    16/11/2016

    TYPE OF INSTRUMENTATION

    Installation of Brass Tiltplate

    Installation of Ceramic Tiltplate

    16/11/2016

    SCOPE OF WORKS FOR INSTRUMENTATION

    1. Mobilisation

    2. Type of Instrumentation/Monitoring System Used

    3. Installation Works

    4. Establishment of TBM

    5. Monitoring/Supervision (Periodical Monitoring)

    6. Report

  • 16/11/2016

    34

    16/11/2016

    RATES OF INSTRUMENTATION & MONITORING

    ITEM DESCRIPTION UNIT RATE

    11.1 Mobilisation

    11.1.1Mobilisation of personnel and all equipment's necessary for execution of the site operations to site

    and demobilisation on completion:-

    11.1.1.1 Up to 25 Km from Kuala Lumpur LS 1,200.00

    11.1.1.2 Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.00

    11.1.1.3 Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.00

    11.1.1.4 Over 425 Km from Kuala Lumpur LS 2,400.00

    11.2 Instrument Installation (Supply & Install)

    11.1 Building / column settlemet marker no. 130.00

    11.2 Demec Gauge Station no. 100.00

    11.3 Ceramic Tilt Plate no. 450.00

    11.4 Brass Tilt Plate no. 500.00

    11.5 Avongard Standard Tell-Tale no. 120.00

    11.6 Setting up TBM no. 1,250.00

    11.3 Monitoring of the Above Instrument

    11.3.1 Up to 25 Km from Kuala Lumpur LS 1,200.00

    11.3.2 Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.00

    11.3.3 Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.00

    11.3.4 Over 425 Km from Kuala Lumpur LS 2,400.00

    11.4 Report

    11.4.1Prepare and submit the report which shall include the compilation of all monitoring data of the

    study area and surrounding areanos 300.00

    v. TERRESTRIAL LASER SCANNING (TLS)

    SAMPLE VIDEO OF POINT CLOUD DATA

  • 16/11/2016

    35

    16/11/2016

    RATES OF TERRESTRIAL LASER SCANNINGITEM DESCRIPTION OF WORK UNIT RATE

    12.1 Mobilisation of personnel and all equipment's necessary for execution of the site operations to site and demobilisation on completion:-

    12.1.1Up to 25 Km from Kuala Lumpur LS 1,200.0012.1.2Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.0012.1.3Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.0012.1.4Over 425 Km from Kuala Lumpur LS 2,400.00

    12.2 Terrestrial Laser Scanning Works

    Carry out Terrestrial Laser Scaning works using Laser Scanner Rental for Inclusive of : days 9,000.00

    Laser Scanner , GPS Receiver, Data Acquisition Software Site staff for data acquisition using scanner System

    12.2.1Carry out data processing works by using Point Cloud Processing software including of Point Cloud Registration, Course registration, Multistation Adjustment, & Filteration of features for producing deliverable

    Point Cloud (LAS format)Layout plan in autocadMeshing (Hold failure area and adjacent)Cross Section (10m interval)3D Fly Through ( In Avi format)2m Contour

    12.2.2Carry out features extraction works that can be seen from TLS procesed data

    Building - foor printLamp post - point locationRoads/RailwaySignages

    16/11/2016

    12.4 Terrestrial Laser Scanning Works

    Carry out Terrestrial Laser Scaning works using Laser Scanner Rental for Inclusive of : Days 13,900.00

    Laser Scanner ,

    Data Acquisition Software

    Site staff for data acquisition using scanner System

    Scanning frequency every 2 hour (24 hours)

    12.4.1Carry out data processing works by using Point Cloud Processing software including of Point Cloud Registration, Course registration, Multistation Adjustment, & Filteration of features for producing deliverable

    Point Cloud (LAS format) comparing every scan

    Meshing (Hold failure area and adjacent)

    Cross Section (5m interval)

    Update the officer in charge

    2m Contour

    12.5Carry out Target Control Survey using Total Station for determination of Ground Control Point LS 6,000.00

    Control monument site inspection

    Coordinating Control

    RTK-GNSS ground Control / Levelling

    Planimetric Survey processing

    ITEM DESCRIPTION OF WORK UNIT RATE

    RATES OF TERRESTRIAL LASER SCANNING

    vi. UNMANNED AERIAL VEHICLE (UAV)

  • 16/11/2016

    36

    16/11/2016

    SCOPE OF WORKS UNMANNED AERIAL VEHICLE (UAV)

    1. Mobilisation2. Project Preparation3. Unmanned Aerial Vehicle Works4. Carry out Target Control Survey using Total Station

    for determination of Ground Control Point

    16/11/2016

    UAV SPECIFICATION

    1. UAV Remotely Piloted Aircraft System Equipped With Laser

    Scanner Complete Miniaturized, Lightweight ALS System

    2. The Scanner Is Lightweight Airborne Laser Scanner Fully

    Integrated, Providing 230° FOV, An Effective Measurement

    Rate Up To 350,000 Meas./Sec, And 10 Mm Accuracy

    3. Fibre-optic Gyroscope And GPS/GLOSNASS Receiver

    Integrated

    4. Compact Control Unit With Various Interfacing Options

    5. Mounting Options For Highly Flexible Aircraft Installation

    6. Prepared For Remote Control Via Low-bandwidth Data Link

    7. Operates Up To 2 Digital Cameras

    16/11/2016

    Main Features

    1. Precision survey at hilly area

    2. Topography in open-cast mining

    3. Terrain mapping

    4. Archaeology and cultural heritage building documentation

    5. Surveying of urban environments

    6. Construction-site monitoring

    7. Corridor mapping: power line, railway track, and pipeline inspection

  • 16/11/2016

    37

    16/11/2016

    PHOTOS OF UAV

    ROVERS UNIT MAIN SCANNER UNIT

    GOUND CONTROL REMOTE CONTROL

    LASER SCANNER

    VIDEO OF UAV

    16/11/2016

    PHOTOS OF UAV

  • 16/11/2016

    38

    16/11/2016

    RATES OF UNMANNED AERIAL VEHICLE WORKSITEM DESCRIPTION UNIT RATE

    13.2 Project Preparation sum

    Flight Planning

    a) DCA Approval & Permit As Per Bill

    b) JUPEM Approval & Permit As Per Bill

    c) Execution table (flight path, area of interest, 3,300.00

    weather / environmental condition)

    13.3 Unmanned Aerial Vehicle Works

    Carry out UAV LiDAR works for inclusive of : Day 20,000.00

    Online waveform LiDAR sensor

    IMU/GNSS Receiver,

    Data Acquisition Software

    Camera

    Site staff for data acquisition using scanner System

    13.3.1

    Carry out data processing works by using processing software including of Point Cloud Registration, trajectory adjustment,

    georeferenced point cloud, combination and adjustment of laser scan data & Filteration of features for producing

    deliverable

    Point Cloud (LAS format)

    DTM & DSM classification

    Layout plan in autocad

    Aerial Photo

    Cross Section (5m interval)

    3D Fly Through ( In Avi format)

    2m Contour

    13.3.2 Carry out features extraction works that can be seen from UAV procesed data

    13.3.2.1 Building - foot print

    13.3.2.2 Slope Structure - point location

    13.3.2.3 Roads/Railway

    13.3.2.4 Signages / Lamp Post

    13.3.2.5 Other possible features

    13.4 Carry out Target Control Survey using Total Station for determination of Ground Control Point LS 6,000.00

    Control monument site inspection

    Coordinating Control

    RTK-GNSS ground Control / Levelling

    Planimetric Survey processing

    16/11/2016

    SUMMARY OF AGREED ITEMSNO. BILL NO. OF ITEM

    1. Bill 1: General Condition & Preliminaries 5

    2. Bill 2: Deep Boring With Boring Plants 109

    3. Bill 3: Deep Sound And Piezocone 35

    4. Bill 4: Other Field Test 50

    5. Bill 5: Collection Of Soil And Water Samples In Bulk 7

    6. Bill 6: Laboratory Tests 84

    7. Bill 7: Material Testing 138

    8. Bill 8: Detailed Engineering Survey 38

    9. Bill 9: Geophysical Survey 9

    10. Bill 10: Surface Mapping 7

    11. Bill 11: Instrumentation 15

    12. Bill 12: Terrestrial Laser Scanning (TLS) 10

    13. Bill 13: Unmanned Aerial Vehicle (UAV) 9

    TOTAL ITEM 516

    16/11/2016

    EXAMPLE OF COST ESTIMATION FOR SLOPE FORENSIC WORK

    (GEOTECHNICAL INVESTIGATION WORK AT LEBUHRAYA MAHAMERU)

    NO DESCRIPTION TOTAL AMOUNT (RM)

    a Professional Fees + 6% GST RM 81,734.60

    Sub Total Item a. RM 81,734.60

    6% Goverment Tax RM 4,904.08

    b Reimbursable Fee : Soil Investigation RM 30,589.80

    Reimbursable Fee : Instrumentation & Monitoring RM 13,998.00

    Reimbursable Fee : Laboratory Testing RM 9,941.40

    Reimbursable Fee : Detail Engineering Survey RM 36,839.11

    Reimbursable Fee : Seismic Refraction Survey RM 18,630.00

    Sub Total Item b. RM 109,998.31

    6% Goverment Tax RM 6,599.90

    c Others (Communication, Travelling & Report) RM 10,108.00

    GRAND TOTAL RM 213,344.89

  • 16/11/2016

    39

    vii. REPOSITORY CENTRE

    16/11/2016

    SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS

    ( FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)

    1. Data Storage. (Example of data orthophoto, UAV raw data, spatial & non-spatial data etc )

    i. Server (Application server and Database server) Powered by Nutanix Software

    ii. Backup server (One to one)

    iii. San Strorage

    iv. GIS Server (extension 3D, Spatial & Image)

    v. ABACO 3D

    vi. Database Microsoft SQL Server

    (Note: All tool and equipment inclusive of training and maintenance for 3 years)

    2. Data Submissioni. Manual Submission, i.e External hardisk, DVD

    3. Data Managementi. Global Mapper application (Latest Version)

    ii. ArcGis application (Latest Version) – 5 Concurrent license

    iii. Other necessary application to read supplied data

    iv. Data Management System required to be link with ISIS

    v. System development on slope data management system

    (Note: All tool and equipment inclusive of training and maintenance for 3 years)

    16/11/2016

    SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS

    (FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)

    4. Tools & Equipmenti. High Performance Laptop (built in GPS) – 10 unit

    ii. Handheld GPS – 10 unit Surface Pro

    5. Gathering Datai. Incident Proforma

    � To prepare the necessary form as per given samples. Need to be improvised and done in digital format.

    � The filling of form is required to be done in hardcopy and in digital form when slope failure occur

    � Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)

    ii. Slope Primary Proforma� To prepare the necessary form as per given samples. Need to be improvised and done in digital format.

    � The filling of form is required to be done in hardcopy and in digital form when slope failure has been remedied / treated

    � Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)

    iii. Structure Proforma� To prepare the necessary form as per given samples. Need to be improvised and done in digital format.

    � The filling of form is required to be done in hardcopy and in digital form when slope failure has been remedied / treated and involving slope structural construction works

    � Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)

  • 16/11/2016

    40

    16/11/2016

    SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS

    ( FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)

    iv. Data submission to JKR requires the Letter of Acknowledgment

    from the Consultant to ensure that the raw data, processed data

    and other related document pertaining to the implementation of

    a particular project have been completely submitted. The

    Consultant also has to state the accuracy of the Consultant’s own

    data.

    v. In the event that if inaccuracy of data is discovered after a

    particular project has been completed, the Consultant shall re-

    execute the related works to fulfil the required quality data.

    vi. The Consultant needs to upload the submitted data into the server

    with the monitoring of JKR

    16/11/2016FINAL REPORT to DBKL FINAL REPORT to JKR

    EXAMPLE OF FINAL REPORT

    16/11/2016

    EXAMPLE OF TECHNICAL AND FINANCIAL PROPOSAL

    COVER PAGE TABLE OF CONTENTS

  • 16/11/2016

    41

    16/11/2016

    EXAMPLE OF FINANCIAL PROPOSAL

    SUMMARY OF FINANCIAL

    16/11/2016

    EXAMPLE OF PROPOSED WORK SCHEDULE

    WORK SCHEDULE

    WHAT IS THE POSSIBLE MODE OF FAILURE AT

    THIS SLOPE??

  • 16/11/2016

    42