CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019 Mukasurat 1 1. KEMAJUAN BLOK AHLI PARLIMEN Blok MP - Pandangan Sisi Hadapan Blok MP - Pandangan Sisi Belakang

Upload: others

Post on 05-Feb-2021

39 views

Category:

Documents


0 download

TRANSCRIPT

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 1

    1. KEMAJUAN BLOK AHLI PARLIMEN

    Blok MP - Pandangan Sisi Hadapan

    Blok MP - Pandangan Sisi Belakang

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 2

    Blok MP – Pandangan Belakang Aras Besmen – Moisture barrier installation

    Aras Besmen – Moisture barrier installation Aras Tanah – Baggage scanner

    Aras Tanah – Lobi Aras Tanah- Kaunter resepsi

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 3

    Aras Tanah – Jata Negara Aras Tanah – Pemasangan Signage

    Aras Tanah – Kafetaria Aras Tanah – Kafetaria

    Aras Tanah – Baggage scanner Aras Tanah – Bilik Jamuan

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 4

    Aras Tanah – Bilik CCTV Aras Tanah – Bilik Kawalan Mekanikal

    Aras Tanah – Pejabat Keselamatan Aras Tanah – Papan tanda

    Aras 1 – Timber wall panelling Aras 1 – Bilik persediaan

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 5

    Aras 1 – Bilik Perkhidmatan Aras 1 – Bilik Perkhidmatan

    Aras 1 – Ruang Istirahat Ahli Parlimen Aras 1 – Laluan

    Aras 1 – Laluan Aras 2 – mock up cermin hiasan

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 6

    Aras 2 – ramp ke Blok Utama Aras 2 – Ruang Istirahat Ahli Parlimen

    Aras 2 – Bilik Persediaan Aras 2 – Bilik Ahli Parlimen

    Aras 2 – Timber wall paneling Aras 2 – Timber wall paneling

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 7

    Aras 3 – Bilik Mesyuarat 25 pax Aras 3 – Bilik Mesyuarat 50 pax

    Aras 3 – Pejabat Menteri Aras 3 – Pejabat Timbalan Menteri

    Aras 4 – Pejabat KPPM Aras 4 – Ruang pejabat KPPM

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 8

    Aras 4 – Bilik KPPM Aras 4 – Bilik KPPM

    Aras 4 – Ruang pejabat Aras 4 – Ruang pejabat

    Aras 4 – Bilik Latihan Aras 4 –ruang kerja

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 9

    2. KEMAJUAN DEWAN SERBAGUNA

    Pandangan Hadapan

    Pandangan Sisi

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 10

    Dewan Utama Kaunter dan JATA

    3. KEMAJUAN KERJA-KERJA LUAR/ SEKITAR BANGUNAN

    Kerja Lanskap Kerja Lanskap

    Kerja Lanskap Kerja pemasangan fire hydrant dan kabinet peti api hos

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 6 Disember 2019

    Mukasurat 11

    MH6s-MH8 – kerja mengeluarkan mesin slurry dari kawasan pembinaan

    MH6s-MH8 – ujian bagi mengenalpasti kabel HDD yang dijumpai

    MH5-MH5S-MH6s – Paip DI yang telah dimasukkan

    MH5-MH5S-MH6s – Kerja pembersihan manhole sedang dijalankan

    Kerja pembersihan di tapak

    Kerja membaiki siar kaki