    JADUAL PURATA KADAR HARGA 2014

    JABATAN PENGAIRAN DAN SALIRAN,MALAYSIA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    3/98

  • 8/17/2019 Buku Purata Kadar Harga 2014

    4/98

    BAHAGIAN PERKARA MUKASURAT

    1.0 Pendahuluan Dan Panduan Pengunaan 1 - 3

    2.0 Kos Kerja-Kerja Am (General Items) 4

    2.1 Tujuan Dan Definisi

    2.2 Bentuk Maklumat Dan Pembahagian

    2.2.1 5

    2.2.2 6 - 7

    3.0 Kos Item-Item Kerja 8

    3.1 Tujuan3.2 Bentuk Maklumat

    3.3 Klasifikasi Kerja

    3.3.1  Environmental Protection and Enhancement  9 - 11

    3.3.2 Traffic Management And Control 12

    3.3.3 Site Investigation Work 13

    3.3.4 Demolition & Site Clearance 14 - 15

    3.3.5  Earthworks 16 - 25

    3.3.6 Geotechnical Work 26 - 33

    3.3.7 Piling Work 34 - 42

    3.3.8 Concrete Work 43 - 47

    3.3.9  Brickwork, Blockwork & Masonry 48

    3.3.10 Timber Work 49

    3.3.11  Metal Work 50 - 51

    3.3.12  Building Work 52 - 60

    3.3.13 Painting Work 61

    3.3.14 Pipeworks 62 - 63

    3.3.15 Drainage Work 64 - 70

    3.3.16 Roads And Pavings 71 - 75

    3.3.17  Miscellaneous Works 76 - 79

    4.0 Kos Upah Buruh 80 - 81

    5.0 Kos Sewa Loji & Peralatan 82 - 84

    ISI KANDUNGAN

    Peratusan Kos Keseluruhan Kerja Am Daripada

    Kos Kerja Pembina

    Peratusan Kos Terperinci Kerja Am Daripada

    Kos Kerja Pembina

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    5/98

    PENDAHULUAN DANPANDUAN PENGGUNA 

    JABATAN PENGAIRAN DAN SALIRAN,MALAYSIA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    6/98

  • 8/17/2019 Buku Purata Kadar Harga 2014

    7/98

    1.0 PENDAHULUAN DAN PANDUAN PENGGUNAAN

    1.1 TUJUAN

    1.1.1

    1.2 KANDUNGAN

    1.2.1

    i) Kerja-kerja Saliran dan Tebatan Banjir

    ii) Kerja-kerja Kejuruteraan Pantai

    iii) Kerja-kerja Kejuruteraan Sungai

    1.2.2

    i) Kos Kerja-kerja Am (General Items)

    ii) Kos Item-item Kerja

    iii) Kos Upah Buruh

    iv) Kos Sewa Loji & Peralatan

    Tujuan buku ini dikeluarkan adalah untuk memberikan maklumat

    berkenaan dengan kos bagi melaksanakan kerja-kerja Jabatan

    Pengairan dan Saliran. Maklumat-maklumat kos ini boleh digunakan

    sebagi panduan untuk menyediakan anggaran kos, membuat

    pelarasan kadar harga atau untuk tujuan perundingan kadar harga.

    Maklumat-maklumat yang terkandung di dalam buku ini adalah

    berdasarkan kepada dokumen-dokumen tender bagi kerja-kerja

    Jabatan Pengairan dan Saliran yang pada amnya adalah terdiri dari:

    Maklumat-maklumat ini disusun dalam empat (4) bahagian utama

    iaitu;

    1

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    8/98

    2

    1.2.3

    KATEGORI KAWASAN NEGERI

    Kawasan Utara - Perlis

    - Kedah

    - Pulau Pinang

    - Perak

    Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur

    - Selangor

    - Negeri Sembilan- Melaka

    - Johor

    Kawasan Timur - Pahang

    - Terengganu

    - Kelantan

    1.3 SUMBER MAKLUMAT / PEMILIHAN SAMPEL

    1.3.1

    1.3.2

    1.4 ANALISA DAN SUSUNAN DATA

    1.4.1

    Data-data di dalam buku ini adalah diabstrak dari dokumen-

    dokumen tender secara konvensional bagi projek yang ditender

    dalam tahun 2014 dan ditutup di Ibu Pejabat Jabatan Pengairan Dan

    Saliran Malaysia.

    Maklumat-maklumat kos ini juga dibahagikan mengikut kategori

    kawasan di mana projek tersebut dilaksanakan iaitu sepert berikut:

    Kadar harga diambil daripada dokumen tender yang disediakan

    berasaskan kepada senarai kuantt.

    Data-data bagi item yang serupa dikumpulkan dan dijadikan dalam

    bentuk purata. Data-data yang terlalu   tnggi atau rendah   tdak

    diambilkira.

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    9/98

    3

    1.4.2

    1.4.3

    1.4.4

    1.5 PEMAKAIAN DATA

    1.5.1

    1.5.2

    i) Nilai kontrak

    ii) Keperluan spesifikasi

    iii)

    iv) Lokasi projek

    v) Keadaan pasaran semasa

    Data-data di dalam buku ini hendaklah digunakan sebagai panduan

    sahaja.

    Pengguna hendaklah menggunakan budibicara bagi memilih kos

    yang bersesuaian dengan berdasarkan kepada;

    Cara pengukuran bagi projek yang akan dilaksanakan

    Melalui penganalisaan tersebut adalah didapat   wujudnya

    ketdakseragaman di dalam penyediaan dokumen tender/tawaran,

    samada dari segi pengukuran kuantt  dan keterangan kerja bagi

    beberapa item kerja. Sehubungan dengan itu, item-item yangserupa/hampir serupa telah dikumpulkan bersekali dan dikira dalam

    bentuk purata. Pertmbangan   tdak diberikan sekiranya cara

    pengukuran berbeza walaupun ia adalah item kerja yang sama.

    'Harga Purata' bagi sesuatu kawasan diperolehi berdasarkan kepada

     jumlah nilai data-data kos bagi sesuatu item kerja yang dibahagikan

    kepada bilangan sampel mengikut kawasan berkenaan.

    Purata keseluruhan adalah berdasarkan kepada nilai purata bagi

    semua kawasan.

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    10/98

    KOS KERJA-KERJA AM

    JABATAN PENGAIRAN DAN SALIRAN,MALAYSIA

    (GENERAL ITEMS) 

  • 8/17/2019 Buku Purata Kadar Harga 2014

    11/98

  • 8/17/2019 Buku Purata Kadar Harga 2014

    12/98

    4

    2.0 KOS KERJA-KERJA AM (GENERAL ITEMS)

    2.1 TUJUAN DAN DEFINISI

    2.2 BENTUK MAKLUMAT DAN PEMBAHAGIAN

    2.2.1   Peratusan Kos Keseluruhan Kerja Am Daripada Kos kerja Pembina

    2.2.2 Peratusan Kos Terperinci Kerja Am Daripada Kos Kerja Pembina

    Petunjuk: i) G.I =

      ii) T.S =

      iii) P.S =

      iv) P.C = Wang Kos Prima (Prime Cost Sum)

    Maklumat bagi kos terperinci adalah berdasarkan kepada penganalisaan

    ke atas kos bagi setap item Kerja-kerja Am (General Items).

    Cara pengiraan peratusan:

    Item in G.I.

    Wang Peruntukan Sementara

    (Provisional Sum)

    Harga Tender (Tendered Sum)

    Bahagian ini mengandungi maklumat berhubung dengan kos bagi melaksanakan

    kerja-kerja di bawah kategori 'Kerja-kerja Am' (General Items). Terdapat sesetengah

    dokumen yang menamakan bahagian ini sebagai 'Preliminaries', 'Kerja Awalan'

    ataupun 'Kerja-kerja Pendahuluan'.

    Maklumat bagi bahagian ini diberikan dalam bentuk peratusan dan dibahagikan

    kepada dua bahagian sepert berikut:-

    Maklumat bagi kos keseluruhan adalah berdasarkan kepada

    penganalisaan ke atas kos keseluruhan bagi Kerja-kerja Am (General

    Items).

     X 100%T.S - (G.I + P.S + P.C)

    Kos Kerja Am (General Items)

    Cara pengiraan peratusan:

    G.I  X 100%T.S - (G.I. + P.S + P.C)

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    13/98

    5

    2.2.1 : PERATUSAN KOS KESELURUHAN KERJA AM DARIPADA KOS KERJA PEMBINA

    (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

    UTARA TENGAH TIMUR KESELURUHAN

    BIL NILAI TENDER UNIT PURATA PURATA PURATA PURATA

    (%) (%) (%) (%)

    1 Melebihi 5 juta tdak melebihi 10 juta - 11.75 - 11.75

    2 Melebihi 10 juta tdak melebihi 20 juta - 4.75 - 4.75

    3 Melebihi 20 juta 3.05 3.55 3.44 3.35

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    14/98

    6

    2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA

    (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

    UTARA TENGAH TIMUR KESELURUHAN

    BIL KETERANGAN KERJA UNIT PURATA PURATA PURATA PURATA

    (%) (%) (%) (%)

    A Contractual Requirement

    1 Contractor's All Risk 0.31 0.30 0.19 0.27

    - Insurance Of Works

    - Public Liability Insurance

    2 Performance Bond 0.28 0.33 0.15 0.25

    3 Perkeso / SOCSO 0.06 0.10 0.04 0.07

    4 Compliance with laws, regulatons and all relevant

    authorites

    - - 0.27 0.27

    B Engineer / SO / PD's Requirement

    1 Establishment & Removal Of SO's Site Office 0.22 0.11 - 0.17

    2 Establishment, Maintenance & Removal Of SO's Site

    Office

    - - 0.15 0.15

    3 Maintenance Of SO's Site Office 0.01 - - 0.01

    4 Laboratory Equipment - - - -

    5 Pre & Post Survey - - - -

    6 Preparaton & Submission Of 'As Built Drawings' 0.08 0.08 0.07 0.08

    7 Progress Photographs - - - -

    8 Progress Report - 0.01 0.03 0.02

    9 Project Signboard 0.04 0.06 0.01 0.04

    10 Survey Works - 0.32 0.30 0.31

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    15/98

    7

    2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA

    (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

    UTARA TENGAH TIMUR KESELURUHAN

    BIL KETERANGAN KERJA UNIT PURATA PURATA PURATA PURATA

    (%) (%) (%) (%)

    11 Surveying Equipment 0.10 0.05 0.04 0.06

    12 Testng & Sampling 0.03 - - 0.03

    13 Work Programme 0.03 0.15 - 0.09

    C Contractor's Requirement

    1 Clearing & Cleaning Up Upon Completon - 0.07 - 0.07

    2 Establishment, Maintenance & Removal Of  

    Contractor's Site Office

    - 0.22 - 0.22

    3 Establishment, Maintenance & Removal Of  

    Contractor's Office, Workmen Accommodaton, Store

    etc

    - - - -

    4 Establishment, Maintenance & Removal Of Workmen

    Accommodaton

    - - - -

    5 Moblizaton & Demobilizaton Of Constructon Plant &

    Equipment

    - 0.20 0.44 0.32

    6 Site Agent 0.68 - - 0.68

    7 Temporary works 1.24 1.28 0.44 0.99

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    16/98

    KOS ITEM-ITEM KERJA 

    JABATAN PENGAIRAN DAN SALIRAN,MALAYSIA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    17/98

  • 8/17/2019 Buku Purata Kadar Harga 2014

    18/98

    8

    3.0 KOS ITEM-ITEM KERJA

    3.1 TUJUAN

    3.2 BENTUK MAKLUMAT

    3.3 KLASIFIKASI KERJA

    Klasifikasi kerja adalah sepert berikut:-

    3.3.1 Environmental Protect on and Enhancement (CLASS B)

    3.3.2 Tra ffi c Management And Control (CLASS C)

    3.3.3 Site Invest gat on Work (CLASS D)

    3.3.4 Demoli t on & Site Clearance (CLASS E)

    3.3.5 Earthworks (CLASS F)3.3.6

    3.3.7 Piling Work (CLASS H)

    3.3.8

    3.3.9 Brickwork, Blockwork & Masonry (CLASS J)

    3.3.10 Timber Work (CLASS K)

    3.3.11 Metal Work (CLASS L)

    3.3.12 Building Work (CLASS M)

    3.3.13

    3.3.14 Pipeworks (CLASS O)

    3.3.15 Drainage Work (CLASS P)

    3.3.16 Roads and Pavings (CLASS Q)

    3.3.17 Miscellaneous Works (CLASS T)

    Bahagian ini memberikan maklumat berhubung dengan data-data kos bagi item-

    item kerja yang dilaksanakan.

    Maklumat bagi bahagian ini diberikan di dalam bentuk kadar harga purata dan

    dibahagikan mengikut klasifikasi kerja sebagaimana ditetapkan di dalam

    MyCESMM (Malaysian Civil Engineering Standard Method Of Measurement).

    Geotechnical Work (CLASS G)

    Concrete Work (CLASS I)

    Paint ng Work (CLASS N)

    JADUAL PURATA 

    KADAR HARGA 2014

  • 8/17/2019 Buku Purata Kadar Harga 2014

    19/98

    9

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

    ENVIRONMENTAL MANAGEMENT PLAN (EMP)

    1 Preparaton of environmental management plan to

    the approval of the S.O. which shall include erosion

    and sediment control plan (ESCP), noise, air and

    water quality monitoring and compliance with

    requirements of the local Authorites'.

    Item 18,083.03 15,100.00 16,591.52

    2 Appointment of certfied professional in ESCP

    officer along the duraton of the contract.

    mth 2,100.00 2,100.00

    EROSION AND SEDIMENT CONTROL PLAN (ESCP)

    3 Constructon and maintenance of ESCP and

    environmental monitoring facilites and including

    implementaton of the environmental managemant

    plan and making good upon completon of the

    works.

    Item 41,110.93 32,350.00 36,730.46

    4 Silt fence of 1.0 m height as per Specificaton clause1.5.2 and as shown in the drawings.

    m 20.36 20.36

    5 Sand bag as per Specificaton clause 1.5.2 and as

    shown in the drawings.

    no. 32.80 32.80

    Maintenance

    Items for maintenance of silt fence and sand bags

    shall be deemed to include disposal of accumulated

    debris, sediment and silt to approved site, unless

    otherwise stated.

    6 Silt fence. Item 3,954.55 3,954.55

    7 Sand bag. Item 3,831.83 3,831.83

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    20/98

    10

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    WATER QUALITY CONTROL AND MONITORING

    8 Mechanical Mobile Silt Trap for online river storage

    works to comply with Standard (A/B) of the

    Environmental Quality Act. Rate should be include

    chemicals supply, operaton and maintenance upon

    completon of work.

    no. 39,727.27 39,727.27

    Water Quality Sampling and In situ Testng

    Water quality sampling and monitoring by

    accredited laboratory on a monthly basis at the

    discharge outlet of actve treatment system to

    comply with the requirements of Standard (A/B) of 

    the Environmental Quality Act for the following

    parameters.

    9 pH no. 102.27 102.27

    10 Total suspended solid (TSS). no. 103.18 103.18

    11 Dissolved Oxygen (DO) no. 99.32 99.32

    12 Ammoniacal nitrogen no. 106.82 106.82

    AIR QUALITY CONTROL AND MONITORING

    13 Construct and maintenance entrance access and

    provide washing pit upon the completon of works

    as per specificaton and as shown in drawing.

    Item 15,863.64 15,863.64

  • 8/17/2019 Buku Purata Kadar Harga 2014

    21/98

    11

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    WASTE MANAGEMENT

    14 Constructon solid waste as per Specificaton clause

    1.5.2. (General Specificaton) Rate to include

    provision of collecton bins, temporary storage

    area, and disposal to approved site.

    Item 9,931.80 9,931.80

    ENVIRONMENTAL REPORT

    15 Sampling, laboratory testng, monitoring and

    submission of monthly reports for water quality, air

    quality, noise and vibraton control, waste

    management and health.

    mth 2,070.19 2,070.19

    16 Environmental monitoring report in 5 (five) sets on

    a monthly basis for the TSS content at the

    discharge outlet of the Actve Treatment System.

    Item 5,336.37 5,336.37

    17 Environmental audit report on a annual basis in five

    sets.

    Item 4,454.55 4,454.55

    18 Environmental closure audit report in five sets. Item 3,795.46 3,795.46

  • 8/17/2019 Buku Purata Kadar Harga 2014

    22/98

    12

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.2: TRAFFIC MANAGEMENT AND CONTROL (CLASS C)

    TRAFFIC MANAGEMENT PLAN

    Traffic Management Team

    1 Traffic Management Officer. man-

    mth

    2,746.43 2,746.43

    BIL KETERANGAN KERJA UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

  • 8/17/2019 Buku Purata Kadar Harga 2014

    23/98

    13

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.3: SITE INVESTIGATION WORK (CLASS D)

    TESTING

    1 To carry out Field Density Test & Moisture Content

    Test in accordance to BS 1377 on each 300mm

    layer of compacted earth using sand replacement

    method. Rate shall include sampling, material

    testng & reportng. The test results falling below

    the specified value will not be paid.

    no. 153.85 153.85

    2 To carry out Aerberg Limit test. The tests shall

    include Liquid Limit, Plastc Limit, Plastcity Index

    and Linear Shrinkage. Rate shall include sampling,

    material testng and reportng.

    no. 242.77 242.77

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    24/98

    15

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.4: DEMOLITION & SITE CLEARANCE (CLASS E)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    BUILDING / STUCTURES / PIPELINES

    Demoliton and removal from worksite and dispose

    off  site to contractor's own dumping ground of 

    existng structures and obstructons.

    8 House or building

    i) concrete no. 3,000.00 3,000.00ii) Wooden no. 2,166.67 2,166.67

    9 Individual buildings - store of total gross built-up

    area 25m2.

    no. 1,500.00 1,500.00

    10 Demoliton of existng RC concrete bridge 15m

    length with cart away to contractor's own site.

    no. 15,000.00 15,000.00

    11 Demoliton of existng concrete bridge of 5.0 m (W)

    x 30 m (L) shall be deemed to include demoliton

    and removal of supports.

    no. 45,000.00 45,000.00

    12 Bridges no. 6,690.00 6,690.00

    13 Pipe culvert m 60.00 60.00

    14 Manhole or sump no. 191.57 191.57

    15 Existng Road m2 4.55 4.55

    16 Below ground - precast Monsoon Drain including

    headwall and wingwall 350m long x 5m wide x

    0.75m deep.

    m 50.00 50.00

    17 Below ground - precast L-shape Drain including

    foundaton of 400m long x 7.12 m wide x varies inheight (3.5m - 5.0m).

    m 210.00 210.00

    18 Above ground - (one number of 15m x 4m existng

    bridge including their foundaton)

    no. 15,000.00 15,000.00

    19 Existng Concrete Drain. m 10.00 10.00

  • 8/17/2019 Buku Purata Kadar Harga 2014

    25/98

    14

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.4: DEMOLITION & SITE CLEARANCE (CLASS E)

    GENERAL CLEARANCE

    Clearing and stripping off  top layer of spillway

    foundaton and other related works.

    1 Site clearance to areas within the boundary of  

    works inclusive of cung down all trees

    irrespectve of sizes, undergrowth bushes, shrubs,

    tall grass etc grubbing up roots stumps, and

    disposal of all debris away from site.

    ha 3,114.80 3,114.80

    2 General clearance to primary forest including

    removal of trees and stumps, undergrowth, shrubs,

    roots, and the likes. All trees of 0.5 m girth and

    above shall become the property of the Employer.

    ha 5,144.55 5,144.55

    3 At water bodies including pumping out of waterand to include removal of items (such as tree trunk,

    sludge, solid waste, debris) either   floatng,

    submerged or at the bed of the water body.

    ha 3,500.00 5,522.73 4,511.36

    4 The reserve width of the new waterway alignment. ha 2,480.38 2,480.38

    TREES

    Cung down and dispose of trees having a girth of 

    5 a) 500mm - 1m   no. 50.20 50.20

    6 b) 1-2m   no. 93.00 93.00

    7 c) 2-3m   no. 217.00 217.00

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    26/98

    16

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    EXCAVATION

    Cut to Fill

    Excavaton in cut shall be deemed to include

    trimming and preparaton of excavated surface and

    transportaton from source to place of fill.

    1 Excavate in earth material from original ground

    level to form embankment within the site to  finish

    level of RL+13.00m.

    m3 4.97 4.97

    2 m3 5.70 5.70

    3 m3 5.70 5.70

    4 Excavate from existng ground level within

    proposed channel/river reserve or project area to

    construct diversion channel to the alignment,

    levels, width and slopes as shown in the Contract

    plan and stockpile suitable excavated material for

    the constructon of river bund.

    m3 2.88 2.88

    5 Excavate and dispose off    site the surplus or

    unsuitable excavated material to contractor's own

    dump site. Contractor to get approval from

    relevant athorites and S.O for dump site.

    m3 15.80 15.80

    6 Excavate in rock material by controlled blastng

    including dispose to stock pile area, loading and

    unloading of rocks.

    m3 22.30 22.30

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    Excavate in earth material from original ground level

    to form Collector Drain.

    Excavaton and trimming of existng river slopes (in

    front of anchored sheet pile at river edge) to

    required bed levels as per constructon drawings or

    as directed by the S.O.

    Cut and Dispose

  • 8/17/2019 Buku Purata Kadar Harga 2014

    27/98

    17

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    7 Excavate in natural hard material. m3 21.00 21.00

    8 Excavate in rock using hydraulic rock breaker. m3 32.09 32.09

    9 Excavate in rock profile of diversion channel

    without the use of explosive and dispose off   site

    the excavated rock to contractor's own dump site.

    m3 20.15 20.15

    10 Excavaton in cut shall be deemed to include

    trimming and preparaton of excavated surface and

    transportaton from source to place of   fill or

    disposal.

    m3 10.41 8.05 9.23

    11 Dio; Excavate in earth material at the base of the

    main bund down to a level where the ground

    strength is equal to or more than SPT N value of 10.

    For approximaton, it is assumed that excavaton

    will be 1 m deep.

    m3 6.00 8.05 7.02

    12 Dio; Excavate in earth material commencing from

    RL +29.0m to 27.0m to construct Side Spillway

    approved by S.O.

    m3 8.74 8.74

    13 Dio; Excavate in earth material dispose to the

    designated dumping area within 6 km approved by

    the S.O./Engineer.

    m3 9.16 9.16

    14 Excavate in Detenton Pond commencing from level

    RL+13.0m to RL+5.0m and dispose, spread and

    level it within the project site as approved by the

    S.O.

    m3 4.79 4.79

    15 Excavate in Detenton Pond commencing from level

    RL+13.0m to RL+5.0m and dispose to the

    contractors disposal site approved by the S.O.

    m3 5.19 5.19

  • 8/17/2019 Buku Purata Kadar Harga 2014

    28/98

    18

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    16 Excavate in earth material commencing from EL

    +14m to +5m to construct Side Spillway approved

    by S.O.

    m3 5.77 5.77

    17 Excavate in earth material commencing from

    existng level (approx. 35.79m - 40.61m) to

    proposed design level (approx.32.99m - 32.81m)

    not exceeding 9m to disposal site approved by theS.O.

    m3 14.00 14.00

    18 Excavate in earth material commencing from

    existng level (approx. 39.24m - 40.56m) to

    proposed design level (approx. 32.04m - 32.09m)

    not exceeding 9m to disposal site approved by the

    S.O.

    m3 13.45 13.45

    19 Excavate in earth material for pile caps and

    abutments to disposal site approved by the S.O.

    m3 10.05 10.05

    20 m3 8.62 8.62

    21 Excavate in earth material commencing from level

    as specified.

    m3 8.41 8.41

    22 m3 8.92 8.92

    23 Excavate in unsuitable material to construct the log

    boom.

    m3 9.09 9.09

    24 Excavate in unsuitable material to disposal site

    approved by the S.O/Engineer.

    m3 10.82 10.82

    25 Excavate in unsuitable material to construct the

    Buress wall.

    m3 9.62 9.62

    Excavate in earth material to construct the Buress

    wall.

    Excavate in earth material to construct the log

    boom.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    29/98

    19

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    26 Excavaton for foundaton shall include upholding

    sides of excavaton, preparaton of excavated

    surface, additonal excavaton to provide working

    space and removal of dead services.

    m3 8.59 8.59

    FILLING

    27 Using suitable excavated material to form river

    bank to level RL+13.00m including formaton of 

    benches.

    m3 5.52 5.52

    28 m3 3.60 3.60

    29 m3 22.60 22.60

    30 Imported material from Contactor's own source

    with grading limits as per Specificaton for Earthfill,

    Type 1 material to form embankment. Rate to

    include formaton of benches.

    m3 24.56 24.56

    31 Imported material from Contactor's own source

    with grading limits as per Specificaton for Earthfill,

    Type 2 material to form embankment. Rate to

    include formaton of benches.

    m3 21.47 21.47

    32 Imported material from Contractor's own source

    with grading limit as per Specificaton (Type 1

    Material) for use as clay core material for bund.

    m3 20.85 20.85

    Import material from Contactor's own source with

    grading limits as per Specificaton to   filling (1m

    depth) to form embankments & access roads at

    back of Steel Sheet Pile Walls including formaton of 

    benches.

    Using suitable excavated material to grading limits

    for backfill at back of sheet pile area.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    30/98

    20

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    33 Imported material from Contractor's own source

    with grading limits as per Specificaton (Crusher

    Run) for U drain foundaton as indicated.

    m3 62.13 62.13

    34 Imported material from Contractor's own source

    with grading limit as per Specificaton (Rip Rap) for

    use as slope protect

    on for bund.

    m3 73.63 73.63

    35 Imported material from Contactor's own source

    approved by the S.O.

    m3 19.45 19.45

    36 Imported sand as backfill material to a depth of  

    maximum 0.5m.

    m3 53.22 53.22

    37 Granular material asfill below transiton slab. m3 30.38 30.38

    38 Granular material asfill behind walls of culverts. m3 31.13 31.13

    39 Granular material as per Specificaton (fine   filter)

    for use in the toe drain.

    m3 59.04 59.04

    40 Granular material as per Specificaton (medium

    filter) for use in the toe drain.

    m3 61.27 61.27

    41 Granular material asper Specificaton (coarse filter)

    for use in the toe drain.

    m3 59.17 59.17

    42 Supply, spread, level and compact in layers

    imported granular backfill behind abutments and

    under approach slab as specified.

    m3 56.86 56.86

    43 300mm thick permeable layer comprising of 20mm -

    40mm crushed stone.

    m3 24.22 24.22

    44 200 mm thick compacted mearth material as

    bedding.

    m2 6.65 6.65

  • 8/17/2019 Buku Purata Kadar Harga 2014

    31/98

    21

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    45 m2 1.22 1.22

    46 Handle, transport, spread and level 75mm thick

    local top soil (from Item 2.1.3) including trimming,

    level and grading of slope.

    m2 1.50 1.50

    47 Dio - imported top soil. m2 4.97 4.97

    Concrete Interlocking Blockmat VIP LINER

    48 Supply and lay 50 to 100 mm diameter underlayer

    stones of VIP LINER or as directed by S.O.

    m3 71.15 71.15

    FILLING ANCILLARIES

    49 Provision and placement of Geotextle Polyfelt

    TS65 or approved equivalent/as per manufacturer's

    specificaton.

    m2 8.39 8.39

    Geotextle

    Supply and lay geotextle type :

    50 -TS 50 or equivalent m2 7.32 7.32

    51 -F68 or equivalent. m2 10.08 10.08

    52 Supply and lay non woven geotextle TS-50 or

    equivalent.

    m2 6.62 6.62

    53 Supply and lay MXC 50 non woven geotextles or

    equivalent. .

    m2 5.07 5.07

    54 m2 7.32 7.32

    55 Supply and Lay geotextle at toe as separator Type

    TS50 or equivalent.

    m2 4.86 4.86

    (Nonwoven) geotextle with nominal weight of 280

    g/m2 at pond inlets.

    Top soil of average depth of 150 mm and stockpile

    for reuse as top soil for turfing.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    32/98

    22

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    Cemented Rubble Pitching

    56 Supply and lay cemented rubble pitching 300 mm

    thick along river channel including all necessary

    weepholes and filter aggregates.

    m2 74.62 74.62

    57 Contnous polypropylene   filament, non-wovengeotextle with tensile strength of 19 kN/m,

    eff ectve opening size of 0.09 mm and nominal

    mass of 250 g/m2 as per Specificaton.

    m2 5.81 5.81

    LANDSCAPING

    Items for landscaping shall be deemed to include

    digging, plantng media, bedding, stalking,

    protecton, watering, weeding, required fertlising,

    58 Spot turfing to flat areas. m2 3.40 3.40

    59 Supply and lay spot turfing. m2 4.42 4.42

    60 Supply, spread evenly 50mm top soil and spot

    turfing.

    m2 5.47 5.47

    61 Close turfing to slopes including pegging down with

    stakes.

    m2 4.92 4.28 4.60

    62 m2 4.68 4.68

    63 To supply, spread and lay close turfing inclusive of 

    all necessary pegging, soil watering, weeding and

    tending untl establishment, all as prescribed to

    slope.

    m2 5.27 5.27

    64 Dio - spot turfing at an angle exceeding 10 degree

    to the horizontal.

    m2 3.16 3.16

    65 Dio - spot turfing at an angle not exceeding 10

    degree to the horizontal.

    m2 3.22 3.22

    Close turfing including placement of 50mm thick

    approved topsoil as directed by SO.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    33/98

    23

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    66 Hydroseeding as per Specificaton Clause 12007 to

    the slopping area approved by S.O.

    m2 4.53 4.53

    Turf Reinforcement Mat (TRM)

    67 Supply and Install Turf Reinforcement Mat (TRM)

    Type C350 or equivalent, inclusive of cu

    ng,handling, laying and jointng.

    m2 12.64 12.64

    68 Hydroseeding with selected grass species as specify

    in the specificaton or as approve by S.O and

    inclusive of approved fertlizer, necessary soil

    watering, weeding and tending untl establishment,

    all as prescribed to slope.

    m2 4.03 4.03

    69 Supply and Install Galvanised Mild Steel Staple pin

    size R12- 600 mm as shown in the drawing or as

    directed by S.O.

    no. 2.88 2.88

    70 Water seepage / cut-off  control measure. m2 91.45 91.45

    TREE

    71   Spathodea campanulata   (Fountain Tree) O.H.

    4.0m, Trunk Diameter 50mm - 65mm.

    no. 309.09 309.09

    72   Melaleuca leucadendron (Gelam) O.H. 4.0m, Trunk 

    Diameter 50mm - 65mm.

    no. 337.36 337.36

    73   Syzygium cumini (Salam)   O.H. 4.0m, Trunk

    Diameter 50mm - 65mm.

    no. 326.90 326.90

    74   Hopea odorata (Cengal Pasir)   O.H. 4.0m, Trunk

    Diameter 50mm - 65mm.

    no. 343.72 343.72

    75   Pomelia pinnata (Taun Tree)   O.H. 4.0m, Trunk

    Diameter 50mm - 65mm.

    no. 332.72 332.72

    76   Delonix regia (Flamboyant)   O.H. 4.0m, Trunk

    Diameter 50mm - 65mm.

    no. 348.63 348.63

  • 8/17/2019 Buku Purata Kadar Harga 2014

    34/98

    24

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    77   Pandanus tectorius (Screwpine) O.H. 4.0m, Trunk

    Diameter 50mm - 65mm.

    no. 411.81 411.81

    78   Pelthophorum pterocarpum (Yellow Flamboyant)

    O.H. 4.0m, Trunk Diameter 50mm - 65mm.

    no. 389.09 389.09

    SHRUB

    79   Orthosiphon stamineus (Misai Kucing) O.H. 0.3m,

    Plantng distance 300mm.

    no. 5.77 5.77

    80   Calathea lutea (Pampano) O.H. 0.6m, Plantng

    distance 300mm.

    no. 7.04 7.04

    81   Acalypha siamensis (Wild Tea) O.H. 0.6m, Plantng

    distance 300mm.

    no. 6.29 6.29

    PLANTING WORKS

    HOLE EXCAVATION

    To supply all labour, equipment, tools, transport,

    etc and excavate plantng hole and cart away all

    excavated materials to contractor's own dump site.

    82 Tree ( 1.0m x 1.0m x 1.0m) no. 16.45 16.45

    83 Shrubs (0.3m x 0.3m x 0.3m) no. 2.61 2.61

    TOPSOIL MIXTURE

    To supply all labours, equipment, tools,transport,

    etc. and spread approved soil mixture (rato3:2:1)

    (Topsoil: Organic fertl izer : sand) to  fill excavated

    holes.

    84 Tree ( 1.0m x 1.0m x 1.0m) m3 39.81 39.81

    85 Shrubs (0.3m x 0.3m x 0.3m) m3 34.36 34.36

  • 8/17/2019 Buku Purata Kadar Harga 2014

    35/98

    25

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.5: EARTHWORKS (CLASS F)

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNITBIL

    TREE STAKES AND TIES

    Provide stakes and   tes for all planted trees

    according to plantng specificaton. All the staking

    shall peproper  tght to the new planted trees to L.A

    approval; The stakes shall be painted with green

    colour for protecton.

    86 Trees no. 20.27 20.27

    MULCHING

    Supply, deliver and lay minimum 50mm thick coco

    fiber around the planted plants as stated in

    plantng plan and directed by S.O./ Landscape

    Architect.

    87 Trees no. 7.90 7.90

    88 Shrubs no. 2.95 2.95

  • 8/17/2019 Buku Purata Kadar Harga 2014

    36/98

    27

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    Supply and Install of Sandfill Maress as shown in

    the contract plan or directed by SO, inclusive of 

    trimming, cung, handling, laying and jointng.

    7 a) Dio - Infill with sand as approved by S.O m2 67.61 67.61

    8 b) Dio - Without sand in fill m2 43.67 43.67

    9 To construct top trenching work (0.6m width by

    0.6m depth) for sandfill maress anchoring and

    backfill with compacted local suitable material.

    m 4.23 4.23

    Green Matress

    10 Supply and deliver Green Maress 230mm thk

    inclusive of 150mm x 225mm rock and labour. Rate

    shall include all alignment, machineries and related

    works.

    m2 59.09 59.09

    11 Installaton of Green Maress 300mm thk inclusive

    of stone size 100mm - 200mm.

    m2 36.36 36.36

    Reno Matress

    12 Supply and deliver Reno Maress 300mm thk

    inclusive of 150mm x 225mm rock and labour. Rate

    shall include all alignment, machineries and related

    works.

    m2 46.00 46.00

    13 Installaton of Reno Maress 300mm thk inclusive

    of stone size 100mm - 200mm

    m2 28.55 28.55

    Macmat S Matress

    14 Supply, Lay and Spread evenly 50mm top soil ontop of lid and 75mm top soil under Macmat 10 or

    approved equivalent.

    m2 4.41 4.41

  • 8/17/2019 Buku Purata Kadar Harga 2014

    37/98

    26

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    RETAINING STRUCTURES

    GABION

    11.0 m x 1.0 m x 1.0 m rock-filled gabion with PVC-

    coated wire gauge size of 2.7 mm dia. as shown in

    the drawings including for laying underwater.

    m3 224.55 224.55

    2 2.5 m x 1.0 m x 1.0 m rock-filled gabion with PVC-

    coated wire gauge size of 3 mm as per Specificaton

    clause 6002 and as shown in the drawings.

    m3 180.00 180.00

    3 2.0 m x 1.0 m x 1.0 m rock-filled gabion with PVC-

    coated wire gauge size of 3 mm as per Specificaton

    clause 6002 and as shown in the drawings.

    m3 180.00 180.00

    4 1.5 m x 1.0 m x 1.0 m rock-filled gabion with PVC-

    coated wire gauge size of 3 mm as per Specificaton

    clause 6002 and as shown in the drawings.

    m3 150.00 150.00

    REVETMENT MATTRESS

    Sandfill Matress

    5 Slope trimming for base preparaton to receive

    slope revetment materials.

    m2 3.14 3.14

    6 Supply, deliver and install the Sand Filled Maress

    with minimum weight of 180kg/m2 as specified in

    the specificaton and tender drawing including all

    necessary works for proper completon.

    Measurement will be based on ne

      quant

    ty of work done on site including the shrinkage of the

    fabric.

    m2 44.75 44.75

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

  • 8/17/2019 Buku Purata Kadar Harga 2014

    38/98

    28

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    15 Supply and delivery MacMat S or approved

    equivalent three dimensional mang,

    monofilaments with open structure of more than

    95% area holding capacity as per necessary

    equipment and alignment with manufacture

    specificaton.

    m2 20.86 20.86

    16 Install MacMat S or approved equivalent inclusive

    of J pins (12mm diameter x 500mm @ 1m c/c

    spacing vertcally and horizontally.

    m2 8.37 8.37

    17 Supply, Deliver Green Reinforced MacMat A three

    dimensional mang, monofilaments with open

    structure of more than 80% area holding capacity

    as per necessary equipment and alignment with

    manufacture specificaton or equivalent.

    m2 35.00 35.00

    18 Supply and delivery TM-53 Toe Protecton

    Hydraulic Terramesh with Green MacMat 10 &

    Biomac facing for the constructon of Mechanical

    Stabilise Earth (MSE) system or equivalent.

    no. 318.26 318.26

    19 Install and lay TM-53 Toe Protecton Hydraulic

    Terramesh inclusive of 6" x 9" rock  fill , labour and

    others related work within the Hydraulic Green

    Terramesh units. Rate shall include all alignment,

    machineries and related works.

    m3 178.00 178.00

    RIPRAP EMBANKMENT

    20 Supply, deliver and lay the Rip rap with average size

    of 300mm diameter.

    m3 87.75 87.75

    21 Average 600mm thick rip rap of 300mm diameter

    stone for embankment.

    m3 81.50 81.50

  • 8/17/2019 Buku Purata Kadar Harga 2014

    39/98

    29

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    22 Supply, lay and stch to the manufacture's

    specificaton non-woven needle punch geotextle of

    Type A as   filter material. (Measured ne - no

    allowance made for laps)

    m2 6.30 6.30

    23 Supply and construct 200mm thick   filter bedding

    materials.

    m3 61.50 61.50

    24 Supply and lay 225mm thick 200/400mm cement

    Grouted rip-rap.

    m2 31.35 31.35

    25 Supply and lay 200mm thick 10/50mm stone. m2 13.86 13.86

    26 Supply and lay rip-rap stone size 300mm - 550mm

    diameter.

    m3 73.48 73.48

    27 (300 mm) thick rip rap as per specificaton to form

    the surface protecton at the pond inlets (3

    locatons).

    m2 72.23 72.23

    Armour Rocks

    28 Supply and lay rip-rap granatc rock with size D50

    =500mm minimum thickness of 1000mm.

    m3 62.05 62.05

    MSE Wall TYPE A

    Green Terramesh

    29 Supply and deliver TM 254 GREEN TERRAMESH or

    approved equivalent for the constructon of  

    Mechanical Stabilise Earth (MSE) system.

    no. 315.78 315.78

    30 Install and lay TM 254 GREEN TERRAMESH or

    approved equivalent inclusive of 150mm x 225mm

    rock  fill, labour and others related work within the

    MSE wall units. Rate shall include all alignment,

    machineries and related works.

    m3 99.09 99.09

  • 8/17/2019 Buku Purata Kadar Harga 2014

    40/98

  • 8/17/2019 Buku Purata Kadar Harga 2014

    41/98

    31

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    38 Supply and deliver TM-0.5m thk. x 6m length Toe

    Protecton Terramesh MSE Wall with 10mm thk.

    erosion protecton mat & Biomac facing for the

    constructon of mechanical Stabilise Earth (MSE)

    system or equivalent.

    no. 331.91 331.91

    39 Install and lay TM-0.5m thk. x 6m length ToeProtecton Terramesh inclusive of 150mm x

    225mm rock   fill, labour and others related work

    within the MSE wall units. Rate shall include all

    alignment, machineries and related works.

    m3 109.86 109.86

    MSE Wall TYPE B

    Green Terramesh

    40 Supply and deliver TM 254 GREEN TERRAMESH orapproved equivalent for the constructon of  

    Mechanical Stabilise Earth (MSE) system.

    no. 315.78 315.78

     

    41 Install and lay TM 254 GREEN TERRAMESH or

    approved equivalent inclusive of 150mm x 225mm

    rock  fill, labour and others related work within the

    MSE wall units. Rate shall include all alignment,

    machineries and related works.

    m3 101.82 101.82

    42 Supply and deliver TM 2754 GREEN TERRAMESH or

    approved equivalent for the constructon of  

    Mechanical Stabilise Earth (MSE) system.

    no. 345.57 345.57

  • 8/17/2019 Buku Purata Kadar Harga 2014

    42/98

    32

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    43 Install and lay TM 2754 GREEN TERRAMESH or

    approved equivalent inclusive of 150mm x 225mm

    rock  fill, labour and others related work within the

    MSE wall units. Rate shall include all alignment,

    machineries and related works.

    m3 101.82 101.82

    44 Supply and deliver GTM 70 2445 GREEN

    TERRAMESH or approved equivalent for the

    constructon of Mechanical Stabilise Earth (MSE)

    system.

    no. 377.73 377.73

    45 Install and lay GTM 70 2445 GREEN TERRAMESH or

    approved equivalent. Rate shall include all

    alignment,machineries and related works.

    m3 40.45 40.45

    Hydraulic Green MSE Wall

    46 Install and lay TM-0.5m thk x. 6m length Toe

    Protecton Terramesh inclusive of 150mm x

    225mm rock   fill, labour and others related work

    within the MSE wall units. Rate shall include all

    alignment, machineries and related works.

    m3 109.86 109.86

    47 Supply and deliver GTM-0.45m thk. x 5m length 45

    Deg Hydraulic Green MSE Terramesh with 10mm

    thk. Erosion protecton mat & Biomac facing for the

    constructon of Mechanical Stablise Earth (MSE)

    system or equivalent.

    no. 316.68 316.68

  • 8/17/2019 Buku Purata Kadar Harga 2014

    43/98

    33

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.6 : GEOTECHNICAL WORK (CLASS G)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    48 Installed and lay GTM-0.45m thk. x 5m length 45

    Deg Hydraulic MSE Green Terramesh with

    prefabricated with 10mm thk. Erosion protecton

    mat & Biomac. Rate shall include all alignment,

    machineries and related works.

    no. 42.09 42.09

  • 8/17/2019 Buku Purata Kadar Harga 2014

    44/98

    34

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    PILES

    BORED PILES

    1000mm Nominal Diameter Bored Pile

    1 Drill 1000mm nominal diameter vertcal holes

    through whatever soil strata other than rock with

    provision of temporary casing.

    m 423.76 423.76

    2 Drilled 1000mm nominal diameter vertcal holes in

    rock.

    m 1,890.00 1,890.00

    3 1000mm Nominal diameter x 12mm thick

    permanent casing.

    m 1,512.88 1,512.88

    4 High yield reinforcement as specified:

    a). Up to 12mm diameter. t 3,484.62 3,484.62

    b). 16mm diameter and above. t 3,476.92 3,476.92

    5 4 nos x 50mm Nominal diameter x 4mm thick wall

    mild steel pipe in accordance with the

    Specificaton.

    m 102.86 102.86

    6 Concrete Grade 40/20 as specified. m3 358.50 358.50

    7 Non-shrink grout Grade 40 to be  fill in sonic logging

    tubes as specified.

    m3 544.00 544.00

    8 Cung off  piles head to required length including

    preparing pile head.

    no. 333.33 333.33

    600mm Nominal Diameter Bored Pile

    9 Drill 600mm nominal diameter vertcal holes

    through whatever soil strata other than rock with

    provision of temporary casing.

    m 259.55 259.55

    10 Drill 600mm nominal diameter vertcal holes in

    rock

    m 1,021.43 1,021.43

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

  • 8/17/2019 Buku Purata Kadar Harga 2014

    45/98

    35

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    11 Drill 600mm Nominal diameter x 12mm thick

    permanent casing.

    m 879.00 879.00

    12 High yield reinforcement as specified:

    a). Up to 12mm diameter. t 3,430.77 3,430.77

    b). 16mm diameter and above. t 3,430.77 3,430.77

    13 50mm Nominal diameter GI pipe aached to main

    bar for sonic logging in accordance with the

    Specificaton.

    m 37.75 37.75

    14 Concrete Grade 40/20 as specified. m3 348.41 348.41

    15 Non-shrink grout Grade 40 to be  fill in sonic logging

    tubes as specified.

    m3 477.93 477.93

    16 Cung off  piles head to required length including

    preparing pile head.

    m 276.90 276.90

    17 Boring in earth using odex drilling system or

    equivalent.

    m 105.78 105.78

    18 Boring through rock including natural and existng

    concrete.

    m 243.88 243.88

    19 m 152.37 152.37

    20 High tensile reinforcement straight bars, nominal

    diameter not exceeding 40 mm including

    supportng reinforcement.

    t 3,442.38 3,442.38

    21 t 3,389.06 3,389.06

    300 mm diameter micropiles as working piles.

    Supply and install 267 mm OD x 257 mm diameter

    I.D permanent casing.

    Mild steel R6 spiral link at 150mm pitch.

    MICROPILES

  • 8/17/2019 Buku Purata Kadar Harga 2014

    46/98

    36

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    22 Groutng with non-shrink cement grout Grade C30

    as specified into drilled hole including excess

    cement required when the grout volume exceeded

    the theoretcal volume.

    m3 757.06 757.06

    23 Cut-off  piles including preparing heads. no. 150.00 150.00

    250 mm diameter micropiles as working piles.

    24 Boring in earth, up to 12 m for 40 nos. of pile

    points.

    m 101.14 101.14

    25 Boring through rock, up to 3 m for 40 nos. of pile

    points including natural and artficial hard material.

    m 223.28 223.28

    26 Supply and install 177.8 mm øD x 10 mm thick

    Grade N-80 API pipe.

    m 209.37 209.37

    27 Supply and install 12mm thk. M.S Stff eners welded

    API pipe head by 10mm   fil let weld all round c/w

    400mm x 400mm x 25mm thk. M.S. top plate.

    no. 318.64 318.64

    28 Groutng with non-shrink cement grout Grade C30

    as specified into drilled hole including excess

    cement required when the grout volume exceeded

    the theoretcal volume.

    m3 623.91 623.91

    29 Cut-off  piles including preparing heads. no. 166.92 166.92

  • 8/17/2019 Buku Purata Kadar Harga 2014

    47/98

    37

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    PRECAST REINFORCED CONCRETE PILES (R.C)

    Supply

    30 Supply 200 x 200mm precast R.C. pile complete

    with mild steel pile shoe, of 6m length.

    no. 197.89 197.89

    31 Supply 200 x 200mm precast R.C. pile complete

    with mild steel pile shoe, of 9m length.

    no. 329.08 329.08

    32 Supply 230 x 230mm precast R.C. pile complete

    with mild steel pile shoe, of 6m length.

    no. 274.83 274.83

    33 Supply 300 x 300mm precast R.C. pile complete

    with mild steel pile shoe, of 6m length.

    no. 493.80 493.80

    34 Supply 300 x 300mm precast R.C. pile complete

    with mild steel pile shoe, of 9m length.

    no. 740.80 740.80

    35 Supply 300 x300mm precast R.C. extension pile

    complete with mild steel pile shoe, of 6m length .

    no. 491.81 491.81

    Handle, Pitch and Drive

    36 Driving vertcal 200 x 200mm precast R.C. pile

    through whatever soil other than rock.

    m 9.50 9.50

    37 Driving vertcal 230 x 230mm precast R.C. pile

    through whatever soil other than rock.

    m 14.00 14.00

    38 Driving vertcal 230 x 230mm precast R.C. pile

    through rock.

    m 21.75 21.75

  • 8/17/2019 Buku Purata Kadar Harga 2014

    48/98

    38

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    39 Driving vertcal 300 x 300mm precast R.C. pile

    through whatever soil than rock.

    m 12.90 12.90

    40 Driving raked piles to the required depth. m 11.80 11.80

    Cut Off  Piles

    41 Cut-off  200 x 200mm precast R.C. pile to required

    level including preparing pile head.

    no. 41.54 41.54

    42 Cut-off  230 x 230mm precast R.C. pile to required

    level including preparing pile head.

    no. 47.38 47.38

    43 Cut-off  300 x 300mm precast R.C. pile to required

    level including preparing pile head.

    no. 51.33 51.33

    PRECAST PRESTRESSED CONCRETE PILES

    Supply

    44 Supply inital pile with rock shoes (oslo) of 12 m

    length.

    no. 1,007.13 1,007.13

    45 Supply extension pile of 6 m length. no. 482.50 482.50

    Handle, Pitch and Drive

    46 m 23.54 23.54

    Jointng, Filling Concrete, Cut Off  Piles

    47 Jointng 300mm dia. of pile with bu weld all

    round.

    no. 45.93 45.93

    300 mm diameter spun piles (class A) with a working

    load of 75 tonne

    Depth driven.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    49/98

    39

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    48 Filling hollow piles with concrete grade C30

    including removal of materials from within the piles

    before concretng.

    m 80.44 80.44

    49 no. 76.69 76.69

    INTERLOCKING STEEL SHEET PILES

    Interlocking Grade 43A steel sheet piles,

    OΩ650/730-secton , at 66.6 kg/m, secton

    modulus of 668 cm³/m.

    50 Supply in 3 m length. m 1,173.50 1,173.50

    51 Supply in 6 m length. m 1,461.00 1,461.00

    52 Depth driven. m2 36.20 36.20

    53 Supply in 9 m length, double coated. m 342.60 342.60

    54 Depth driven m2 53.38 53.38

    55 Cut-off  piles including preparing heads. m 55.75 55.75

    56 Supply in 6 m length. m 1,070.36 1,070.36

    57 Depth driven. m2 55.00 55.00

    58 Cut-off  piles including preparing heads. m 70.00 70.00

    CONCRETE PILES

    175 mm G40 square precast reinforced concrete

    piles

    59 Supply inital piles with rock shoes of 12 m length. no. 321.71 321.71

    Cut-off  piles including preparing heads.

    Interlocking Grade 43A steel sheet piles, Z secton,

    at 66.1 kg/m, secton modulus of 1200 cm3/m. To

    be installed at places where constructon-in-the-

    wet bund construct

    on type will be performed.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    50/98

    40

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    60 Supply extension piles of 6 m length no. 151.67 151.67

    61 Depth driven including handling and pitch m 11.24 11.24

    62 Cut-off  piles including preparing heads. no. 30.42 30.42

    200 mm G40 square precast reinforced concrete

    piles

    63 Supply inital piles with rock shoes of 12 m length. no. 362.29 362.29

    64 Supply extension piles of 9 m length. no. 284.14 284.14

    65 Depth driven including handling and pitch m 15.40 15.40

    66 Jointng with bu weld all round no. 31.94 31.94

    67 Cut-off  piles including preparing heads/ socket no. 33.37 33.37

    250 mm square piles (class A) with a working load

    of 95 tonne

    68 Supply inital pile with rock shoes (oslo) of 12 m

    length.

    no. 732.50 732.50

    69 Depth driven including handle and pitch m 16.06 16.06

    70 Cut-off  piles. Rate to include preparing heads/

    socket

    no. 27.78 27.78

    300 mm square piles (class A) with a working load

    of 140 tonne

    71 Supply inital pile with rock shoes (oslo) of 12 m

    length. (168 nos.)

    no. 934.38 934.38

    72 Supply extension pile of 6 m length. (168 nos.) no. 560.00 560.00

    73 Depth driven including handle and pitch m 19.15 19.15

  • 8/17/2019 Buku Purata Kadar Harga 2014

    51/98

    42

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    84 Carry out subsequent maintained load test to 2.0

    tmes of maximum working load 800 kN in

    accordance with the specificaton.

    no. 12,845.00 12,845.00

    85 Carry out subsequent maintained load test to 2.0

    tmes of maximum working load 1000 kN in

    accordance with the specificaton.

    no. 16,920.00 16,920.00

    86 Carry out subsequent maintained load test to 2.0

    tmes of maximum working load 1200 kN in

    accordance with the specificaton.

    no. 15,375.00 15,375.00

    87 Carry out subsequent maintained load test to 2.0

    tmes of maximum working load 4400 kN in

    accordance with the specificaton.

    no. 45,000.00 45,000.00

    88 Carry out subsequent maintained load test to 2.0

    tmes of maximum working load 5500 kN in

    accordance with the specificaton.

    no. 50,000.00 50,000.00

    89 Carry out integrity test using sonic logging method

    in accordance with the specificaton.

    no. 2,306.00 2,306.00

    90 Maintained load working test pile up to twice

    working load of 30 tons (300mm precast reinforced

    concrete piles).

    no. 11,000.00 11,000.00

    91 Provide a complete set of 5 piling driving and load

    test report.

    no. 190.00 190.00

  • 8/17/2019 Buku Purata Kadar Harga 2014

    52/98

    41

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.7: PILING WORK (CLASS H)

    BIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA

    74 Jointng with bu weld all round no. 23.50 23.50

    75 Cut-off  piles including preparing heads/socket. no. 35.00 35.00

    PILE TESTS

    76 Carry out pile driving analyser (PDA) in accordance

    with the specificaton.

    no. 1,815.66 2,044.16 1,929.91

    77 Carry out pile integrity test using impulse response

    method in accordance with the specificaton.

    no. 1,169.32 1,178.33 1,173.82

    78 Carry out inital maintained load test maximum

    load 600kn in accordance with the specificaton.

    no. 13,400.00 13,400.00

    79 Carry out inital maintained load test to 2.0  tmes of 

    maximum working load 800kN in accordance with

    the specificaton.

    no. 17,300.00 17,300.00

    80 Carry out inital maintained load test to 2.0  tmes of 

    maximum working load 1000kN in accordance with

    the specificaton.

    no. 21,000.00 21,000.00

    81 Carry o ut inital maintained load test to 2.0 tmes of 

    maximum working load 1200kN in accordance with

    the specificaton.

    no. 29,505.00 29,505.00

    82 Carry out inital maintained load test to 2.0 tmes of 

    maximum working load 4400knN in accordance

    with the specificaton.

    no. 75,000.00 75,000.00

    83 Carry out inital maintained load test to 2.0  tmes of 

    maximum working load 5500kN in accordance with

    the specificaton.

    no. 80,000.00 80,000.00

  • 8/17/2019 Buku Purata Kadar Harga 2014

    53/98

    43

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.8: CONCRETE WORK (CLASS I)

    IN SITU CONCRETE DESIGNED MIX

    Concrete Grade: C15

    1 50 mm thick lean concrete m2 10.79 13.89 12.34

    2 75 mm thick lean concrete m2 17.02 16.99 17.01

    3 100 mm thick lean concrete m2 17.45 17.45

    Concrete Grade: C30

    4 Reinforced concrete base m3 286.71 311.11 298.91

    5 Reinforced concrete footngs m3 287.05 287.05

    6 Reinforced concrete slab m3 285.33 285.33

    7 Reinforced concrete columns m3 288.30 288.30

    8 Reinforced concrete of beam m3 288.09 311.11 299.60

    9 Reinforced concrete walls m3 283.31 311.11 297.21

    10 Supply and lay reinforced concrete   floor slab

    225mm thick Grade 30 at channel bed of all

    necessary formwork as shown in the drawings or as

    directed by S.O.

    m2 64.20 64.20

    Concrete Lining

    11 Supply and lay concrete slab 200mm thick Grade

    30 at channel slope and bed as shown in the

    drawings or as directed by S.O.

    m2 61.78 61.78

    12 Reinforced concrete for water control gate base

    structure.

    m3 303.59 303.59

    13 Reinforced concrete for wall water control gate

    structure.

    m3 302.73 302.73

    14 Reinforced concrete for wall structure. m3 305.45 305.45

    Concrete Grade: C35

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

  • 8/17/2019 Buku Purata Kadar Harga 2014

    54/98

    44

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.8: CONCRETE WORK (CLASS I)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    15 m3 298.66 323.36 311.01

    16 m3 298.66 323.36 311.01

    17 m3 298.66 298.66

    18 m3 298.66 298.66

    19 m3 298.66 298.66

    20 m3 298.66 298.66

    21 Reinforced concrete foundaton & Abutments. m3 338.64 338.64

    22 Reinforced concrete piers & cross beams. m3 338.64 338.64

    High Performnce Concrete Grade 40/20 for

    23 Deck Slab m3 338.64 338.64

    24 Diaphragms m3 338.64 338.64

    25 RC approach Slab m3 338.64 338.64

    PRECAST CONCRETE

    Prestressed post-tensioned beams

    26 Supply, loading, unloading in castng yard, transport

    and launching 16.0m long high permonce concrete

    Pre-tensioned Prestressed M-Beams including

    strands, prestressing, groutng and anchorage all in

    accordance with the Specificaton and as shown in

    the Drawing.

    no. 31,500.00 31,500.00

    Key Wall

    Concrete Grade: C40

    Concrete Grade: C35A

    Base

    Wall

    Buress Wall

    Column

    Beam and Slab for Driveway

  • 8/17/2019 Buku Purata Kadar Harga 2014

    55/98

    45

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.8: CONCRETE WORK (CLASS I)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    Precast concrete parapets (1.2m) with High

    performance

    27 Precast concrete parapets (1.2m) with concrete

    grade 40 including reinforcement, anchorage,

    hooks etc. with ribbed finish as per Drawing.

    no. 404.44 404.44

    Concrete Interlocking Blockmat VIP LINER

    28 Supply and lay precast interlocking concrete

    blockmat 600mm thick VIP LINER or equivalent as

    shown in the drawings or as directed by S.O.

    m2 178.98 178.98

    Electrical Fitng Trenches cover

    29 Precast concrete;730mm(W) x 480mm (L) x 50mm

    thick

    m 66.45 66.45

    FORMWORK

    30 Class F1 : Rough finish m2 31.93 30.92 31.42

    31 Class F2 : Fair finish m2 33.57 34.86 34.21

    32 Class F3 : Smoothfinish m2 32.91 32.91

    REINFORCEMENT

    Mild Steel Bars

    33 Nominal diameter: 8 mm. t 3,172.73 3,172.73

    34 Nominal diameter: 10 mm. t 3,172.73 3,172.73

    High Tensile Bars

    35 Nominal diameter: 6 mm. t 3,475.74 3,475.74

    36 Nominal diameter: 10 mm. t 3,389.95 3,234.09 3,312.02

    37 Nominal diameter: 12 mm. t 3,365.41 3,234.85 3,300.13

  • 8/17/2019 Buku Purata Kadar Harga 2014

    56/98

    46

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.8: CONCRETE WORK (CLASS I)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    38 Nominal diameter: 16 mm. t 3,372.16 3,175.46 3,273.81

    39 Nominal diameter: 20 mm. t 3,349.33 3,192.43 3,270.88

    40 Nominal diameter: 25 mm. t 3,340.77 3,211.37 3,276.07

    41 Nominal diameter: 32 mm. t 3,150.00 3,150.00

    High Tensile Steel Fabric

    42 High tensile steel fabric – mesh A393 (A10), 6.16

    kg/m2.

    m2 20.44 20.44

    Fabric of Other Stated Material

    43 Supply and installed BRC A10 m2 19.07 19.07

    CONCRETE ANCILLARIES

    Joints

    44 m 93.84 93.84

    45 Constructon joint, 500mm wide. m 97.22 97.22

    Contracton joint

    46 Concrete Contracton joint (at every 10m) m 52.82 52.82

    Expansion joints

    47 Expansion joints. Rate to include 25 mm thick resin

    bonded cork filler .

    m 128.03 128.70 128.37

    48 Concrete Expansion joint ( at max. 30m) m 53.50 53.50

    49 Form Expansion joints at Abutment wall & deck

    slab.

    m 122.86 122.86

    Waterstop

    50 230 mm wide rubber waterstop including cung

    and jointng of waterstops and provision of special

    fings at angles and junctons.

    m 87.19 92.48 89.83

    Constructon joint.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    57/98

    47

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.8: CONCRETE WORK (CLASS I)

    KETERANGAN KERJABIL UNIT

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    ANCILLARY WORK FOR WATER RETAINING

    STRUCTURES

    Water Proofing Admixtures

    Asphalt

    51 One layer of 20 mm thick asphalt laid on sloping

    surface area at raf foundaton

    m2 23.20 23.20

    52 One layer of 5 mm thick waterproofing membrane

    laid on sloping flat roof surface area.

    m2 46.91 46.91

    53 m2 34.33 34.33Supply and install 300 wide x 1.5mm thk

    waterproofing membrane.

  • 8/17/2019 Buku Purata Kadar Harga 2014

    58/98

    48

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.9: BRICKWORK, BLOCKWORK & MASONRY (CLASS J)

    BRICKWORK

    1 m2 75.91 80.24 78.07

    2 110 mm thick common brickwork laid in stretcher

    bond, jointed in 1:3 cement mortar for vertcal

    straight walls.

    m2 41.15 41.15

    MISCELLANEOUS WORK

    Ancillaries

    3 Damp proof courses; to BS 743 Type D. m2 12.64 12.64

    230 mm thick brickwork laid in stretcher bond,

     jointed in 1:3 cement mortar for vertcal straight

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

  • 8/17/2019 Buku Purata Kadar Harga 2014

    59/98

    49

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.10: TIMBER WORK (CLASS K)

    Hand railing

    1 1150mm High (overall) of Cengal Wood handrailing

    to approved paern and varnish to   tmber

    including all necessary bend, joints, accessories etc.

    and all as per detail drawings.

    m 360.27 360.27

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

  • 8/17/2019 Buku Purata Kadar Harga 2014

    60/98

    50

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.11: METALWORK (CLASS L)

    1 Galvanised iron railing with post and handrail at

    parapets complete with and including 16mm

    diameter galvanised mild steel bolt bent to 'U'

    shape with nuts and washers and two coats of 

    bituminous paint on base of post as shown in the

    Drawing.

    m 172.50 172.50

    2 Safety Handrail on top of Flood channel Wall as per

    detail Drawing.

    m 240.00 160.83 200.42

    3 Supply and   fix in place 25mm diameter galvanized

    iron Cat Ladder or G.I. Rung for access to river edge

    all in accordance with details in Drawings and/or

    as directed by the S.O.

    no. 1,190.00 1,190.00

    4 Galvanised mild steel ladders; 75 diameter x 12mm

    thk. Hot Dip Galvernised G.I stringer with 20 mm

    diameter steel rungs at 300 mm centres. Rate to

    include full assemblies as shown in Drawing.

    no. 3,375.00 3,375.00

    5 Supply, fabricate and install of 2m x 2.2m Trash

    Screen (Hot Dip Galvanised M.S. Steel Gratng) for

    trash screen structure as shown in drawing no.

    RTBSL3/RPM/C/ DD/03.

    no. 5,759.00 5,759.00

    6 Galvanised mild steel gratng cover for [100 kN

    load] for sump.

    no. 4,520.00 4,520.00

    7 Galvanised mild steel gratng cover for [100 kN

    load]for pump house.

    no. 4,920.00 4,920.00

    8 Galvanised mild steel ladders; [70 x 70 x 10 mm

    thick x 10.3 kg/m stringer 400 mm] apart, with [25

    mm] diameter steel rungs at [300 mm] centres.

    Rate to include full assemblies.

    m 229.00 229.00

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

  • 8/17/2019 Buku Purata Kadar Harga 2014

    61/98

    51

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.11: METALWORK (CLASS L)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    9 Supply and  fix in place 900mm high galvanized iron

    posts to Pump Sump Wall including railing,

    accessories, etc. all in accordance with details in

    Drawings and/or as directed by the S.O.

    m 255.00 255.00

    10 Supply and installed 5mm thick aluminium stck

    gauge including all markings, leering and bolts

    and nuts as shown in the drawing

    no. 967.10 967.10

    11 0.6m long. 25mm diameter Galvanised Dowel Bars

    at Pier complete with rubber dowel cap.

    no. 31.18 31.18

    12 Supply and Install Cat Ladder m 504.00 504.00

    13 16mm diameter Galvanised steel Anchor at

    approach slab with spacing 300mm c/c.

    no. 45.64 45.64

    14 Supply and install mild steel grill for window and

    door.

    m2 211.59 211.59

  • 8/17/2019 Buku Purata Kadar Harga 2014

    62/98

    52

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    ROOFING WORK

    Roof Structure

    1 Proprietary roofing system shall be deemed to be

    roofing system and components to be design by

    contractor (Metal Roof Truss system).

    Approximate area of 45 m2.

    Item 5,469.79 5,469.79

    2 200mm x 25mm Thick wrought pressure-treated

    Group 'B'   tmber as described fascia board

    including one (1) undercoat and two (2)   finishing

    coats of gloss enamel paint as described.

    m 31.66 31.66

    3 200mm x 15mm Thick wrought pressure-treated

    Group 'B'  tmber as described gable end including

    one (1) undercoat and two (2)   finishing coats of 

    gloss enamel paint as described.

    m2 70.00 70.00

    Roof Covering

    4 Interlocking concrete roofing   tles laid to 25degrees to the horizontal as shown in Drawing

    including preparing surfaces, forming joints,

    overlaps, mitres, angles,   fillets, built-up edges,

    and laying to falls or cambers, cung, notching,

    bending, and bedding.

    m2 49.00 49.00

    5 Approved 'Monier' sunburn red concrete roof  tles

    at 25 degree laid to pitch roofing structure

    (measured separately) and jointed strictly in

    accordance with manufacturer's instructons and

    including all necessary apex  tles, ridge, hip, valley

    and end caps jointed in waterproofing coloured

    cement mortar (1:3) as described (measure  flat on

    plan)

    m2 50.44 50.44

    6 Roofing 25mm thk polycarbonate  flat sheet laid at

    14° Degree to the horizontal as shown in the

    Drawing No DNA/RS/12/ 053/PP/PS/HO/18

    m2 262.50 262.50

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

  • 8/17/2019 Buku Purata Kadar Harga 2014

    63/98

    53

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    Insulaton

    7 50 mm thick   fiberglass insulaton including

    preparing surfaces, forming joints, overlaps,

    mitres, angles,  fillets, built-up edges, and laying to

    falls or cambers, cung, notching, bending and

    bedding.

    m2 16.82 16.82

    8 Double sided 'Delta Foil' or other equivalent m2 8.85 8.85

    9 50mm Thick   fibre glass wool insulaton laid on

    roof trusses and including chicken wire mesh

    m2 10.85 10.85

    Guers and Downpipes

    10 100 mm diameter uPVC rain water down pipes. m 36.84 36.84

    11 100 mm diameter uPVC elbow for rain water

    down pipes.

    no. 35.91 35.91

    WINDOWS AND DOORS

    DOORS

    Timber

    12 Single leaf solid tmber door 900 mm × 2100 mm

    type waterproofing as supplied by manufacturer

    as shown in Drawing No. ETTKT/RPM/A/CH1/02

    no. 599.68 599.68

    13 Supply and install 950mm x 2100mm x 40mm

    thick single leaf internal laminated   flush door

    panel with 1.0mm thick GI Frames and approved

    ironmongery, jointng materials and other

    accessories and including approved   tmber and

    metal paintfi

    nish to all exposed surfaces.

    no. 621.61 621.61

    14 Supply and install 750mm x 2100mm x 40mm

    thick single leaf internal laminated   flush door

    panel with 1.0mm thick GI Frames and approved

    ironmongery, jointng materials and other

    accessories and including approved   tmber and

    metal paint finish to all exposed surfaces.

    no. 540.96 540.96

  • 8/17/2019 Buku Purata Kadar Harga 2014

    64/98

    54

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    15 Supply and install 900mm x 2100mm x 40mm

    thick single leaf solid hardwood (Grade B) door

    panel with 1.0mm thick GI Frames and approved

    ironmongery, jointng materials and other

    accessories and including approved   tmber and

    metal paint finish to all exposed surfaces.

    no. 686.73 686.73

    16 Single leaf plywoodflush door type flush door. no. 342.73 342.73

    17 Grade A, 2100 mm x 900 mm   tmber doors

    frames.

    no. 437.27 437.27

    Metal

    18 Supply and install 2500 mm x 2500 mm manual

    roller shuer door complete with rollers, guide,

    pelmet, and locks; as shown in Drawing.

    no. 3,827.27 3,827.27

    19 Supply and install 2500 mm x 1750 mm manual

    roller shuer door complete with rollers, guide,

    pelmet, and locks; as shown in Drawing.

    no. 2,968.18 2,968.18

    20 Natural anodised aluminium door frames 2100

    mm × 1700 mm as shown in Drawing.

    No. 738.20 738.20

    Windows

    21 Natural anodised aluminium side hung casement

    window 1800 mm × 1650 mm complete with 6

    mm thick clear   float glass as shown in Drawing

    No. ETTKT/RPM/A/CH1/02

    No. 753.09 753.09

    22 Natural anodised aluminium frame to suit size

    2100 mm × 1700 mm as shown in Drawing

    ETTKT/RPM/A/CH1/02

    No. 979.03 979.03

  • 8/17/2019 Buku Purata Kadar Harga 2014

    65/98

    56

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    Ironmongeries

    31 Pair of stainless steel hinges;75 mm x 50 mm. no. 40.27 40.27

    32 Pair of stainless steel bu hinges;100 mm x 75

    mm.

    no. 38.55 38.55

    33 Cylindrical knobset with stainless steelfinish. no. 96.82 96.82

    34 Half deadbolt. no. 33.11 33.11

    35 Door closers, 140 mm x 22 mm no. 139.55 139.55

    FINISHES

    Floor Finishes

    36 Homogeneous  t les 300 mm × 300 mm × 7.6 mm

    including cement mortar screed.

    m2 71.96 71.96

    37 25 mm thick cement and sand pavings tofloor. m2 18.83 17.91 18.37

    38 25 mm thick cement and sand pavings 1:3 to

    apron.

    m2 17.45 17.45

    39 Supply and apply sand pebble wash as  finising for

    exposed surface with Architect's Specificatons.

    m2 95.20 95.20

    Wall Finishes

    40 19mm thick cement and sand (1:6) mixed with

    and approved plastciser with wooden   float at

    plainface walls, beams, columns and the likes.

    m2 16.42 16.42

    41 Glazed wall  tles  tles; 200mm x 200mm x 8.5 mm

    thick including cement mortar screed for toilet

    and shower slab finishes.

    m2 72.04 72.04

  • 8/17/2019 Buku Purata Kadar Harga 2014

    66/98

    55

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    Supply and   fix the following in approved brown

    anodised aluminium casement windows and

    frames fabricated from extruded secton, glazed

    with and including 5mm thick clear glass with

    glazing gasket complete with all necessary

    ironmongeries and other accessories including

    building in or cung and priming, bedding frames

    in cement mortar (1:3) and pointed internally with

    an approved tropical mastc and externally with

    and approved silicon sealant caulking accordance

    with manufacturer's instructon etc.

    23 1800mm x 1200mm High (overall size) fixed glass

    window comprise of 2 Nos x 900mm x 1200mm

    High equal panel c/w opening as per drawings.

    no. 640.47 640.47

    24 1200mm x 1200mm High (overall size) casement

    window comprise of 2 Nos x 600mm x 1200mm

    High equal panel.

    no. 407.66 407.66

    25 1200mm x 600mm High (overall size) top hung

    window comprise of 2 Nos x 600mm x 600mm

    High equal panel.

    no. 281.29 281.29

    26 600mm x 600mm High (overall size) top hung

    window.

    no. 169.62 169.62

    27 1150 mm x 1800 mm natural anodised aluminium

    side hung casement window complete with 6 mm

    thick clear float glass as shown in Drawing.

    no. 696.35 696.35

    28 Grade A   tmber windows; 500 mm x 600 mm

    fied with standard sill and complete with 6 mm

    thick float glass louvers and 10 mm security bar as

    shown in Drawing.

    no. 191.45 191.45

    29 Grade A   tmber windows; 1150 mm x 1800 mm

    fied with standard sill and complete with 6 mm

    thick clear float glass side hung casement window.

    no. 677.21 677.21

    30 Supply and   fix ant-vermin neng on outside to

    window.

    no. 169.88 117.27 143.58

  • 8/17/2019 Buku Purata Kadar Harga 2014

    67/98

    57

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    42 Approved glazed ceramic wall and   floor   tles

    including border  tles as described bedded, jointed

    and pointed in match coloured cement lining on

    20mm Thick cement and sand (1:3) screed and

    laid in approved paern as described all as per

    S.O's satsfacton.

    m2 83.05 83.05

    43 Non-slip ceramic tles; 200mm x 200mm x 7 mm

    thick including cement mortar screed for toiletwall finishes.

    m2 68.40 68.40

    44 Artficial  tmber wall cladding (Shera splendid wall

    plank or equivalent)  fix to external wall including

    framing, all accordance to manufacturers detail.

    m2 131.20 131.20

    Ceiling Finishes

    45 600mm x 1200mm x 3.2mm Thick 'UAC' superflex

    or other equal and approved suspended non

    asbestos sheet not exceeding 3.50m including

    light through, at necessary joints ant up lif insert

    rod on   tmber frame   fixed in accordance to

    manufacturer's instructons all as per S.O'ssatsfacton.

    m2 46.75 46.75

    PLUMBING WORK

    Cold Water Plumbing System

    46 Cold water plumbing system as shown

    schematcally in Drawing and including all  fings,

    stop-cocks, basin and taps.

    Item 7,809.10 7,809.10

    Water Storage Tank

    47 1500 litres HDPE water storage tank as per

    Specificaton for Water Supply Plumbing, Sanitary,

    & Rainwater Goods Installaton and includingsupportng frame.

    no. 1,703.63 1,703.63

    48 150 gallons Polytank c/w support and all

    accessories

    Set 1,040.21 1,040.21

    Sanitary Plumbing System

    49 Sanitary plumbing system as per specificaton and

    including all fings.

    Item 7,717.27 7,717.27

  • 8/17/2019 Buku Purata Kadar Harga 2014

    68/98

    58

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    Sanitary Appliances

    Supply and  fix the following 'Inax' or other equal

    and approved sanitary   fings and accessories

    including storing, assembling, bedding, plugging

    and screwing with matching screws, cung and

    pinning or building in pinning or building in

    brackets, jointng and connectng to services and

    to soil and waste pipes and making and makinggood all works disturbed all as per manufacturer's

    specificatons :-

    50 Pedestal water closet with 'P' or 'S' trap complete

    with seat cover and top inlet 6 litres manual  flush

    valve and all other necessary accessories

    no. 779.69 779.69

    51 Back inlet squang water closet complete with

    high level UPVC cistern and pull chain, concealed

    'P' or 'S' trap,  fing,   flush pipe,  fixing bracket for

    cistern and all other accessories

    no. 479.58 479.58

    52 Padestal water closet with low tank for wheel

    chair users (OKU) with 'P' or 'S' trap complete with

    seat cover and top inlet 6 litres manual   flush

    valve, handicapped grab bar and all other

    necessary accessories for OKU

    no. 925.75 925.75

    53 Wash hand basin (wall hung) with lever handle

    pillar tap and all necessary accessories to S.O's

    approval

    no. 293.72 293.72

    54 Semi-recessed wash hand basin c/w pillar tap and

    all necessary accessories to S.O's approval

    no. 242.27 242.27

    55 Stainless steel   floor trap with approved

    waterproof compound cement grout as per

    manufacturer's specificatons

    no. 47.53 47.53

    56 Chrome plated bib tap (DOE or equivalent) no. 58.82 58.82

  • 8/17/2019 Buku Purata Kadar Harga 2014

    69/98

    59

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    57 Water closets; Claytan 404 or approved

    equivalent 6-litre single   flush side lever, boom

    inlet overflow cistern with   flapper valve internal

    fings including medium duty plastc seat and

    cover.

    no. 450.00 450.00

    Septc Tank

    58 Design, supply, deliver, unload, install andconstruct septc tank of 5 PE, all as per

    manufacturer's specificaton including piling

    works, reinforced concrete structure,   finishes,

    mechanical and electrical works, plumbing,

    external works within compound and testng

    commissioning, spare parts,   final inspecton

    chamber etc. all as per manufacturer's

    specificatons and approved by JPP (contractor

    shall submit detail drawings and specificatons for

    approval and pay all fee in relaton therewith)(

    Deemed to include stand pipe )

    Item 3,600.77 3,600.77

    59 Septc tank for   five populaton equivalent (5 PE)with a minimum of 24 hours of hydraulic

    retenton   tme and a dual size aggregate down

    flow  filter media including foundaton, excavaton,

    upholding sides of excavaton, bedding,

    installaton,backfilling and all other related works

    where expressly required.

    no. 7,363.64 7,363.64

  • 8/17/2019 Buku Purata Kadar Harga 2014

    70/98

    60

    JADUAL PURATA 

    KADAR HARGA 2014

    3.3.12: BUILDING WORK (CLASS M)

    BIL

    PURATA KADAR HARGA 2014 (RM)

    KAWASAN

    UTARA

    KAWASAN

    TENGAH

    KAWASAN

    TIMURKESELURUHAN

    KETERANGAN KERJA UNIT

    TNB SUB-STATION

    60 Construct and complete TNB Substaton of overall

    size of 7.7m (L) x 5.1 m(W) x 4m (H) generally of 

    reinforced concrete foundatons, slab, ramp and

    apron on hardcore, reinforced concrete frame and

    RC  flat roof and guer, brickwall with plaster and

    paint externally and internally, paintn g t o off 

    form ceiling and beam, plywood   flush door, FRP

    louvered doors and windows with ant-vermin

    neng, approved waterproofing system to RC  flat

    roof and guer,ant-termite /pest control, UPVC

    downpipes with cement render  floor  finished with

    and including all necessary e xcavaton,

    reinforcements, formwork, hardware, paintng

    and supply and  fix of sanitary wares and  fings as

    per Drawings and Specificatons.(excluding piling

    works)

    no. 69,100.00 69,100.00

    PLANT SWITCH ROOM

    61 Construct and complete Control House overallsize of 8.65 m (L) x 4.0 m(W) x 4m (H) constructed

    generally of reinforced concrete foundatons, slab,

    ramp and apron on hardcore, reinforced concrete

    frame an