Pengiraan Kos1. Kos BahanBAHANKUANTITIKOS SEUNIT(RM)

KOS(RM)

Fabrik Kapas1.5 meter

4.006.00

Benang jahit1 buku

1.001.00

Butang6 biji0.402.40

Kertas pola1 helai0.500.50

JUMLAH

9.90

2. Kos Upah

Jumlah Pekerja

MasaKos SejamKos ( RM )

Seorang10 jamRM318.00

Jumlah 18.00

3) Kos sampingan RM

i. Upah jahit kemas tepi 2.00 ii. Elektrik 0.60 iii. Upah jahit lubang butang 4.00

Jumlah 6.60

Kos projek

Kos projek = Kos bahan + Kos upah + Kos sampingan =RM 9.90 + RM 18.00 + RM 6.60

= RM 34.50Jumlah Kos Projek = RM34.50