    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    BILL AMOUNTNO. (RM)

    1 BQ1-1/4 - BQ1-4/4 .

    2 BQ2-1/5 - BQ2-5/5 .

    3 BQ3-1/4 - BQ3-4/4 ..

    4 BQ4-1/6 BQ4-6/6 .

    5 BQ5-1/16 - BQ5-16/16 .

    6 BQ6-1/6 - BQ6-6/6 .

    7 BQ7-1/9 - BQ6-9/9 .

    8

    BRIDGE WORKS

    8.1A TEMPORARY CROSSING BQ8.1A-1/4 - BQ8.1A-4/4 N/A

    8.1B PILING WORKS BQ8.1B-1/7 - BQ8.1B-7/7 N/A

    8.1C SUBSTRUCTURE BQ8.1C-1/6 - BQ8.1C-6/6 N/A

    8.1D SUPERSTRUCTURE BQ8.1D-1/14 - BQ8.1D-14/14 N/A

    8.1E APPROACH ROAD AND PAVEMENT BQ8.1E-1/4 - BQ8.1E-4/4 N/A

    8.1F MISCELLANEOUS WORKS BQ8.1F-1/3 - BQ8.1F-3/3 N/A

    CULVERT & VEHICULAR UNDERPASS

    8.2.1 TEMPORARY CROSSING BQ8.2-1/9 - BQ8.2-9/9 N/A

    PEDESTRIAN BRIDGE BQ8.3-1/12 - BQ8.3-12/12 N/A

    9 BQ9-1/4 - BQ9-4/4 N/A

    10 BQ10-1/5 - BQ10-5/5 N/A

    11 BQ11-1/7 - BQ11-7/7 N/A

    12 BQ12-1/3 - BQ12-3/3 .

    TOTAL AMOUNT

    .

    Name: .

    Company .

    Stamp: .

    .

    Date: .

    Name:

    NRIC No.:

    Date:

    Completion period:.. Weeks

    Contractor Witness

    Signature: Signature:.

    ROUTINE MAINTENANCE WORKS

    PROVISIONAL SUM

    RINGGIT MALAYSIA:

    ..

    8.2

    8.3

    TRAFFIC MANAGEMENT AND CONTROL

    ENVIRONMENTAL PROTECTION WORKS

    ROAD FURNITURE

    GEOTECHNICAL WORKS

    STRUCTURES

    8.1

    SITE CLEARANCE AND DEMOLITION WORKS

    EARTHWORKS

    DRAINAGE

    PAVEMENT WORKS

    SUMMARY OF TENDER

    DESCRIPTION OF WORKS PAGE

    GENERAL ITEMS

    * Delete where not applible SUMMARY - 1/1

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    2/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRKJ ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATENO. RM SEN

    1.1 CONTRACTUAL REQUIREMENTS

    1.1.1 Performance Bond

    a) Banker's/ Insurance/ Financial Institution Guarantee* sum

    b) Performance Guarantee Sum* sum

    1.1.2 Insurances

    1.1.2.1 Insurance of the Works including Insurance Against

    Personal Injuries and Damage to Properties sum

    1.1.2.2 SOCSO/ Workmen Compensation Insurance sum

    1.2 SO/PD'S REQUIREMENTS

    1.2.1 Accommodation for the SO/PD's Staff

    1.2.1.1 Establishment, maintenance and removal of office

    including fittings and furnitures ans listed in

    Appendix `1F' of the Specification**

    a) Alternative I - JKR Design Type A/B/C/D/E/F/G** sum

    b) Alternative II - Relocatable Type (new/used)* sum

    c) Alternative III - Rental of shoplot* sum

    1.2.1.2 Establishment, maintenance and removal of laboratories sum N/A

    1.2.2 Services for the SO/PD's Staff

    1.2.2.1 Provision of suitable transport services as listed in

    Appendix `1C' of the Specification

    a) ___ no type ___ (___ vehicle months)# sum N/A

    b) ___ no type ___ (___ vehicle months)# sum N/A

    1.2.2.2 Operation and maintenance of vehicles

    a) ___ no type ___ (___ vehicle months)# sum N/A

    b) ___ no type ___ (___ vehicle months)# sum N/A

    1.2.3 Equipments for use by the SO/PD's Staff

    1.2.3.1 Provision and maintenance of laboratory equipments as

    listed in Appendix 1D' of the Specification sum N/A

    1.2.3.2 Provision and maintenance of office equipments as

    listed in Appendix '`1E' of the Specification**

    a) 1 no. computer sum

    b) ___ no. photocopy machine sum N/A

    c) 1 no. digital camera sum

    d) ___ no. fax sum N/A

    e) 1 no. printer sum

    Carried to Collection

    AMOUNT

    BILL NO. 1 - GENERAL ITEMS

    (ALL ITEMS ARE PROVISIONAL)

    * Tenderer to delete where not applicable

    ** Designer to decide which is applicable

    # Duration to be inserted by tenderer based on tendered periodBQ1 - 1/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    3/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRKJ ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATENO. RM SEN

    AMOUNT

    BILL NO. 1 - GENERAL ITEMS

    (ALL ITEMS ARE PROVISIONAL)

    f) ___ no. scanner sum N/A

    g) ___ no. _____ sum N/A

    1.2.4 Attendance for the SO/PD's staff

    1.2.4.1 Drivers (____ man month)# sum N/A

    1.2.4.2 Laboratory assistants (____ man month)# sum N/A

    1.2.5 Setting out, levelling and checking of all Works sum

    1.2.6 Miscellaneous

    1.2.6.1 Project sign boards (2 no.)** sum

    1.2.6.2 Progress photograph (12 months)# sum

    1.2.6.3 Performance report comprising 5 sets** of progress

    report, project report and quality control report

    (12 months)# sum

    1.2.6.4 Provide and update the Works Programme using Master

    Programme to produce Critical Path Method (CPM) and

    Works Breakdown Structure (WBS) etc. including supply

    of software as specified in Appendix `1G' sum

    1.2.6.5 As-built drawing including periodic updating as specified

    in Appendix `1H' sum

    1.2.6.6 Clearing up of site on completion sum

    1.2.7 License security services sum

    1.2.8 Quality Assurance Plans sum

    1.3 CONTRACTOR'S REQUIREMENTS

    1.3.1 Establishment, maintenance and removal of

    accommodation and buildings

    1.3.1.1 Office sum

    1.3.1.2 Stores and workshops sum

    1.3.1.3 Workmen accommodations sum

    Carried to Collection

    * Tenderer to delete where not applicable

    ** Designer to decide which is applicable

    # Duration to be inserted by tenderer based on tendered periodBQ1 - 2/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    4/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRKJ ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATENO. RM SEN

    AMOUNT

    BILL NO. 1 - GENERAL ITEMS

    (ALL ITEMS ARE PROVISIONAL)

    1.3.2 Temporary works** sum

    a) access and haul roads,

    b) hoardings,

    c) temporary drainage

    1.3.3 Supervision (___man-months)# sum

    1.3.4 Mobilisation and demobilisation of construction sum

    plants and equipments excluding piling and

    specialise plants

    1.4 OCCUPATIONAL SAFETY AND HEALTH

    REQUIREMENT**

    1.4.1 Occupational safety and health officer (__ man month)# sum N/A

    1.4.2 Health and safety report (___month)# sum N/A

    1.5 DESIGN AND BUILD ELEMENT**

    1.5.1 Design fees sum N/A

    1.5.2 Supervision fees (___ man-months)# sum N/A

    1.5.3 Independent Checkers

    1.5.3.1 Structural sum N/A

    1.5.3.2 Geotechnical sum N/A

    1.5.3.3 Road safety sum N/A

    1.5.4 Data Collection

    1.5.4.1 Detailed Engineering survey sum N/A

    1.5.4.2 Traffic survey sum N/A

    1.5.4.3 Soil investigation sum N/A

    1.6 PAYMENT FOR LEVY TO CIDB

    sum

    Carried to Collection

    Allow a Provisional Sum for payment to Lembaga

    Pembangunan Industri Malaysia (CIDB) under Part VIII of

    the Act 1994 and the construction Industry (Levy

    * Tenderer to delete where not applicable

    ** Designer to decide which is applicable

    # Duration to be inserted by tenderer based on tendered periodBQ1 - 3/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    5/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRKJ ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATENO. RM SEN

    AMOUNT

    BILL NO. 1 - GENERAL ITEMS

    (ALL ITEMS ARE PROVISIONAL)

    COLLECTION PAGE

    BQ 1 - 1/4

    BQ 1 - 2/4

    BQ 1 - 3/4

    TOTAL CARRIED TO SUMMARY

    * Tenderer to delete where not applicable

    ** Designer to decide which is applicable

    # Duration to be inserted by tenderer based on tendered periodBQ1 - 4/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    6/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JA

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM)

    2.1 SITE CLEARANCE

    2.1.1 Upgrading of existing road

    a) General site clearance ha. 1

    2.1.2 Construction of new road

    a) Bushes ha. 0.5

    b) Paddy Plantation ha. N/A

    c) Swampy Land ha. N/A

    d) Plantation ha. 0.2

    e) Forest Reserve ha. N/A

    f) . ha.

    g) ha.

    2.2 DEMOLITION AND REMOVAL FROM

    SITE OF ALL BUILDINGS AND EXISTINGSTRUCTURES

    2.2.1 Buildings

    a) Brickwork buildings

    i) Single storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    ii) Double storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    iii) storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    Carried to Collection

    (ALL ITEMS ARE PROVISIONAL)

    AMO

    BILL NO. 2 - SITE CLEARANCE AND DEMOLITION WORKS

    * Delete where not applicable BQ 2 - 1/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    7/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JA

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM)

    (ALL ITEMS ARE PROVISIONAL)

    AMO

    BILL NO. 2 - SITE CLEARANCE AND DEMOLITION WORKS

    b) Concrete buildings

    i) Single storey

    Plan area : less than 100m2 nr 8

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    ii) Double storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    iii) storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    c) Mansonry buildings

    i) Single storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    ii) Double storey

    Plan area : less than 100m2

    nr N/A100 - 200m

    2 nr N/A

    exceedin 200m2 nr N/A

    iii) storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    d) Steel buildings

    i) Single storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    ii) Double storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    iii) storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    Carried to Collection

    * Delete where not applicable BQ 2 - 2/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    8/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JA

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM)

    (ALL ITEMS ARE PROVISIONAL)

    AMO

    BILL NO. 2 - SITE CLEARANCE AND DEMOLITION WORKS

    e) Timber buildings

    i) Single storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    ii) Double storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    iii) storey

    Plan area : less than 100m2 nr N/A

    100 - 200m2 nr N/A

    exceedin 200m2 nr N/A

    f) . .

    2.2.2 Other Structures

    a) Fences and Gates m N/A

    b) m2 N/A

    c) Pipe Culverts ..mm diameter m N/A

    Box Culverts .. x .mm m N/A

    d) Surface l ined drains ( irrespective of size ) m N/A

    e) Guardrails m N/A

    f) Sump . x .m nr N/A

    g) Retaining W all m2 1000

    h) Inlet / outlet structures nr N/A

    i) ...

    Carried to Collection

    (.Type.) Bridges ...m length x ...m

    width

    * Delete where not applicable BQ 2 - 3/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    9/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JA

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM)

    (ALL ITEMS ARE PROVISIONAL)

    AMO

    BILL NO. 2 - SITE CLEARANCE AND DEMOLITION WORKS

    2.3

    a) Fences and Gates m N/A

    b) Guardrails m N/A

    c) Sign Board nr N/A

    d) ...

    e) ...

    Carried to Collection

    DISMANTLE AND SEND TO STORE FOR

    REUSE AS DIRECTED BY S.O/P.D*.

    * Delete where not applicable BQ 2 - 4/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    10/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JA

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM)

    (ALL ITEMS ARE PROVISIONAL)

    AMO

    BILL NO. 2 - SITE CLEARANCE AND DEMOLITION WORKS

    COLLECTION PAGE

    BQ 2 - 1/5

    BQ 2 - 2/5

    BQ 2 - 3/5

    BQ 2 - 4/5

    TOTAL CARRIED TO SUMMARY

    * Delete where not applicable BQ 2 - 5/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    11/59

    AN

    (SEN)

    UNT

    * Delete where not applicable BQ 2 - 6/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    12/59

    AN

    (SEN)

    UNT

    * Delete where not applicable BQ 2 - 7/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    13/59

    AN

    (SEN)

    UNT

    * Delete where not applicable BQ 2 - 8/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    14/59

    AN

    (SEN)

    UNT

    * Delete where not applicable BQ 2 - 9/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    15/59

    AN

    (SEN)

    UNT

    * Delete where not applicable BQ 2 - 10/10

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    16/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM

    NO. DESCRIPTION OF WORKS UNIT QTY RATE

    (RM) (RM) (SEN)

    3.1 STRIPPING OF TOPSOIL

    3.1.1 Stripping topsoil average depth 150mm and

    dispose to Contractor's dump site as

    approved by the S.O/P.D*. m2

    1500

    3.1.2 Stripping topsoil average depth 150mm and

    stockpile for reuse. m2

    N/A

    3.2 EXCAVATE, LOAD, HAUL AND DEPOSITTO FORM EMBANKMENT

    3.2.1 Common excavation in cuttings or in bulk to

    form embankment. m3

    6300

    3.2.2 Excavation of hard material in cuttings or in

    bulk to form embankment. m3

    N/A

    3.2.3 Rock excavation by open blasting to form

    embankment. m3

    N/A

    3.2.4 Rock excavation by control blasting to formembankment. m

    320

    3.2.5 Rock excavation by ripper unit to form

    embankment. m3

    N/A

    3.2.6 Rock excavation by pneumatic to form

    embankment. m3

    10

    3.3 EXCAVATE, LOAD, HAUL AND DISPOSE

    3.3.1 Common excavation in cuttings or in bulk and

    dispose to Contractor's dump site as

    approved by S.O/P.D*. m3 1000

    3.3.2 Excavation of hard material in cuttings or in

    bulk and dispose to Contractor's dump site as

    approved by S.O/P.D*. m3

    50

    3.3.3 Rock excavation by open blasting and

    dispose to Contractor's dump site as

    approved by S.O./P.D*. m3

    20

    Carried to Collection

    AMOUNT

    BILL NO. 3 - EARTHWORKS

    (ALL ITEMS ARE PROVISIONAL)

    * Delete where not applicable BQ 3 - 1/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    17/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM

    NO. DESCRIPTION OF WORKS UNIT QTY RATE

    (RM) (RM) (SEN)

    AMOUNT

    BILL NO. 3 - EARTHWORKS

    (ALL ITEMS ARE PROVISIONAL)

    3.3.4 Rock excavation by control blasting and

    dispose to Contractor's dump site as

    approved by S.O./P.D*. m3

    10

    3.3.5 Rock excavation by ripper unit and dispose to

    Contractor's dump site as approved by

    S.O./P.D*. m3

    N/A

    3.3.6 Rock excavation by pneumatic and dispose

    to Contractor's dump site as approved byS.O./P.D*. m

    35

    3.4 EXCAVATE UNSUITABLE MATERIAL,

    LOAD, HAUL AND DISPOSE

    3.4.1 Excavate unsuitable material below

    embankments, below culverts or below

    formation in cuttings as shown in drawing or

    as per specification as approved by S.O/P.D*

    and dispose to Contractor's dump site.

    m3

    500

    3.4.2 Excavate unsuitable material in cuttings as

    per specification as approved by S.O/P.D*

    and dispose to Contractor's dump site. m3

    N/A

    3.5 SPREAD, GRADE AND COMPACT TO

    FORM EMBANKMENT

    3.5.1 Suitable material from common excavation to

    form embankment. m3

    N/A

    3.5.2 Imported suitable material to form

    embankment from Contractor's own source. m3

    6300

    3.5.3 Suitable hard material from excavation to

    form embankment. m3

    N/A

    3.5.4 Rockfill from rock excavation to form

    embankment. m3

    N/A

    3.5.5 Imported rock to form embankment from

    Contractor's own source. m3

    N/A

    Carried to Collection

    * Delete where not applicable BQ 3 - 2/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    18/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM

    NO. DESCRIPTION OF WORKS UNIT QTY RATE

    (RM) (RM) (SEN)

    AMOUNT

    BILL NO. 3 - EARTHWORKS

    (ALL ITEMS ARE PROVISIONAL)

    3.6 TURFING AND HYDROSEEDING

    3.6.1 Close turfing. m2

    1200

    3.6.2 Hydroseeding. m2

    N/A

    3.6.3 Hydroseeding with fibromat or equivalent. m2

    N/A

    3.6.4 Vertiver grass or equivalent at 250mm

    spacing (in group of 3 rows). m N/A

    3.7 FIELD DENSITY TEST

    3.7.1 Carry out compaction test to verify the degree

    of compaction by using sand replacement

    method or other approved method by

    S.O/P.D*.

    no 20

    Carried to Collection

    * Delete where not applicable BQ 3 - 3/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    19/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM

    NO. DESCRIPTION OF WORKS UNIT QTY RATE

    (RM) (RM) (SEN)

    AMOUNT

    BILL NO. 3 - EARTHWORKS

    (ALL ITEMS ARE PROVISIONAL)

    COLLECTION PAGE

    BQ 3 - 1/4

    BQ 3 - 2/4

    BQ 3 - 3/4

    TOTAL CARRIED TO SUMMARY

    * Delete where not applicable BQ 3 - 4/4

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    20/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    4.1 TEMPORARY WORKS

    sum

    4.4

    4.4.1

    i) Excavate, load, haul and deposit to spoil any

    material except rock to any depth for structuralfoundation. m

    320

    ii) -Ditto- for rock m3

    15

    4.4.2 Types of Foundation

    4.4.2.1

    iii) Lean concrete grade 15/20, 100mm thick. m 20

    4.4.2.2

    i) Allow for mobilization and demobilization of all

    labour, plants piling, equipments, etc on site for

    proposed piling works sum N/A

    ii) 150 x 150mm precast RC piles 12m length,

    inclusive of all reinforcements,mild steel plates

    and provision for extension and lifting holes

    nr N/A

    4.4.3

    i) 1200mm x 1200mm size box culvert. m 13

    ii) 1500mm x 1500mm size box culvert. m N/A

    Carried to Collection

    Pile Foundation

    Precast Box Culvert

    Box culvert and flat lid including joint.

    (ALL ITEMS ARE PROVISIONAL)

    Earthworks

    Normal Foundation

    Fill, spread, grade and compact granular fill material.

    NEW PRECAST BOX CULVERT FOR SIZE < 3.0m

    WIDE

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    Provide, erect,maintain and remove from site on

    completion of works temporary crossing all in

    accordance with the relevant sub section of the

    specification for the proposed culverts.

    BQ 4 - 1/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    21/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    4.4.4

    i) Box culvert (irrespective size) nr 4

    4.4.5

    i) Filling with suitable material in layers up to

    formation level including compaction. m 20

    4.6

    4.6.1

    i) Excavate, load, haul and deposit to spoil any

    material except rock to any depth for structural

    foundation. m3

    N/A

    ii) -Ditto- for rock m3

    N/A

    4.6.2 Types of Foundation

    4.6.2.1

    i) Mining / river sand * m N/A

    ii) Crushed aggregate. m N/A

    iii) Lean concrete grade 15/20, 100mm thick. m N/A

    Carried to Collection

    Reinforced concrete headwall, wingwall, base slab

    including excavation work, formworks, concrete,

    reinforcement, lean concrete and shoring for:-

    Fill Material

    Inlet / Outlet Structures

    CAST INSITU BOX CULVERT FOR SIZE < 3.0 mWIDE

    Earthworks

    Normal Foundation

    Fill, spread, grade and compact granular fill material.

    BQ 4 - 2/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    22/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    4.6.2.2

    i) Allow for mobilization and demobilization of all

    labour, plants piling, equipments, etc on site for

    proposed piling works sum N/A

    ii) 350 x 350mm precast RC piles 36m length,

    inclusive of all reinforcements,mild steel plates

    and provision for extension and l ifting holes nr N/A

    4.6.3 Formwork

    m2 N/A

    4.6.4 Reinforcement

    4.6.4.1

    i) 12mm diameter t N/A

    ii) 16mm diameter t N/A

    iv) 25mm diameter t N/A

    4.6.5 Concrete

    m3

    100

    4.6.9

    i) Filling with suitable material in layers up to

    formation level including compaction. m 500

    Carried to Collection

    Fill Material

    Grade 40/20 concrete at box culvert, wingwall and

    headwall.

    Formwork for box culvert,headwall and wingwall with

    Class F1 Finishes.

    Reinforcement for insitu box culvert High Yield Steel.

    Pile Foundation

    BQ 4 - 3/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    23/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    4.8

    4.8.1

    i) 900mm U Drain m 250

    4.8.7

    i) Embankment shoulder drain Type 1 (SD 1 )

    - 300mm to 500mm deep m N/A

    4.8.8

    i) Stone pitching Type 1 (OD1) with handrails. m N/A

    4.10

    4.10.2

    i) Type SF1 at shoulder . nr N/A

    4.11

    m2

    50

    Carried to Collection

    Sump At Fill

    Brick sump including excavation, lean concrete,

    concrete bedding, plastering, formworks, joints,

    backfilling and disposal of surplus material.

    SUMPS

    Cascade Drain

    RUBBLE RETAINING WALLS

    225mm thick grouted stone pitching including all

    necessary excavation works at both inlet and outlet

    of culverts as show in the drawing.

    Shoulder Drain

    SURFACE DRAINS

    Unlined drains, half round glazed earthenware and

    Insitu Reinforced Concrete grade 20/20 drains at

    any inclination including excavation,cascading,lean

    concrete,jointing,reinforcement,formwork,rendering,

    fixing precast RC slab,backfilling and disposal of

    surplus material.

    Roadside Drains For Rural Area

    BQ 4 - 4/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    24/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    4.12

    i) Earth Channel excavation. m N/A

    Carried to Collection

    EARTH CHANNELS EXCAVATION

    Excavate for earth channels to shapes and sizes as

    shown in the drawings including slopes protection.

    BQ 4 - 5/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    25/59

    Project : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    ITEM ITEM DESCRIPTION UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO 4 - DRAINAGE WORKS

    AMOUNT

    COLLECTION PAGE

    BQ 4 - 1/6

    BQ 4 - 2/6

    BQ 4 - 3/6

    BQ 4 - 4/6

    BQ 4 - 5/6

    TOTAL CARRIED TO SUMMARY

    BQ 4 - 6/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    26/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    5.1 FLEXIBLE PAVEMENT

    5.1.1 NEW PAVEMENT

    5.1.1.1 Preparation of Formation

    m2 1,368

    5.1.1.2 Carriageway and Paved Shoulder

    5.1.1.2.1 Subbase

    a) Granular Material - 150 mm thick m2 1,026

    b) Cement-Bound Granular Material - .mm thic m2 N/A

    5.1.1.2.2 Roadbase

    a)

    i) Crushed Aggregate - 300 mm thick m2 1,026

    ii) Wet Mix Macadam - ... mm thick m2 N/A

    iii) Dry Bound Macadam - ... mm thick m2 N/A

    iv) Cement-Bound Granular Material - .mm thick

    m2

    N/A

    b)

    i) Bound Roadbase BMR 40 - ... mm thick m2 N/A

    ii) Bound Roadbase BMR 28 - ... mm thick m2 N/A

    Carried to Collection

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    (ALL ITEMS ARE PROVISIONAL)

    Spread, grade and compact roadbase material

    complying with Type I or Type II grading limits of

    Table 4.3 of the standard specifications.

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    Preparation of formation as specified and as

    directed by the S.O/P.D* for receiving road

    pavement.

    Subbase material (CBR > 30 %) complying with

    Type C or Type D grading limits of Table 4.1 of the

    standard specifications.

    * Delete where not applicable BQ 5 - 1/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    27/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.1.2.3 Surfacing

    a) Bituminous Prime Coat m2 1,026

    b) Bituminous Tack Coat m2 1,026

    c) Asphaltic Concrete

    i) Asphaltic concrete binder course - 70 mm

    thickm

    2 1,026

    ii) Asphaltic concrete wearing course - 50 mm

    thickm

    2 1,026

    d) Bituminous Macadam

    i) Levelling Course BML 10 t N/A

    ii) Binder Course BMB 28 - .. mm thick m2 N/A

    iii) Binder Course BMB 20 - ... mm thick m2 N/A

    iv) Wearing Course BMW 14 - ... mm thick m2 N/A

    v) Wearing Course BMW 20 - ... mm thick m2 N/A

    e) Micro Surfacing

    m2 N/A

    f) Chip Sealing

    Carried to Collection

    Single / double layer chip seal of material

    according to standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    10 to 12 mm nominal thickness modified micro

    surfarcing in 2 layers of material according to

    the standard specifications.

    Asphaltic concrete material complying with

    Table 4.8 of the standard specifications.

    * Delete where not applicable BQ 5 - 2/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    28/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    i) Rubber modified bitumen for the chip seal

    layer for bitumen application rate ... to

    ... litres / m2.

    m2 N/A

    ii) Precoated cover aggregate as "Chip Seal"

    layer - .mm thickm

    2 N/A

    iii) - ditto - for second "Chip Seal" layer -

    .mm thickm

    2 N/A

    5.1.1.3 Median and Island

    5.1.1.3.1 Subbase

    a) Granular Material - ... mm thick m2 N/A

    b) m2 N/A

    5.1.1.3.2 Roadbase

    a)

    i) Crushed Aggregate - ... mm thick m2 N/A

    ii) Wet Mix Macadam - ... mm thick m2 N/A

    iii) Dry Bound Macadam - ... mm thick m2 N/A

    iv) Cement-Bound Granular Material - .mm thick

    m2 N/A

    b)

    i) Bound Roadbase BMR 40 - ... mm thick m2 N/A

    ii) Bound Roadbase BMR 28 - ... mm thick m2 N/A

    Carried to Collection

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Subbase material (CBR > 30 %) complying with

    Type C or Type D grading limits of Table 4.1 of the

    standard specifications.

    Roadbase material complying with Type I or

    Type II grading limits of Table 4.3 of the

    standard specifications.

    Cement-Bound Granular Material - . mm

    thick

    * Delete where not applicable BQ 5 - 3/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    29/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.1.3.3 Surfacing

    a) Bituminous Prime Coat m2 N/A

    b) Bituminous Tack Coat m2 N/A

    c) Asphaltic Concrete

    i) Asphaltic concrete binder course - ..

    mm thickm

    2 N/A

    ii) Asphaltic concrete wearing course - ...

    mm thickm

    2 N/A

    d) Bituminous Macadam

    i) Levelling Course BML 10 t N/A

    ii) Binder Course BMB 28 - .. mm thick m2 N/A

    iii) Binder Course BMB 20 - ... mm thick m2 N/A

    iv) Wearing Course BMW 14 - ... mm thick m2 N/A

    v) Wearing Course BMW 20 - ... mm thick m2 N/A

    5.1.1.4 Bus Lay By

    5.1.1.4.1 Subbase

    a) Granular Material - ... mm thick m2 N/A

    b) m2 N/A

    Carried to Collection

    Cement-Bound Granular Material - .. mm

    thick

    Asphaltic concrete material complying with

    Table 4.8 of the standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Subbase material (CBR > 30 %) complying with

    Type C or Type D grading limits of Table 4.1 of the

    standard specifications.

    * Delete where not applicable BQ 5 - 4/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    30/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.1.4.2 Roadbase

    a)

    i) Crushed Aggregate - .. mm thick m2 N/A

    ii) Wet Mix Mcadam - .. mm thick m2 N/A

    iii) Dry Bound Macadam - .. mm thick m2

    N/A

    iv) Cement-Bound Granular Matterial - .

    mm thickm

    2 N/A

    b)

    i) Bound Roadbase BMR 40 - ... mm thick m2 N/A

    ii) Bound Roadbase BMR 28 - ... mm thick m2 N/A

    5.1.1.4.3 Surfacing

    a) Bituminous Prime Coat m2 N/A

    b) Bituminous Tack Coat m2 N/A

    c) Asphaltic Concrete

    i) Asphaltic concrete binder course - ..

    mm thickm

    2 N/A

    ii) Asphaltic concrete wearing course - ...

    mm thickm

    2 N/A

    d) Bituminous Macadam

    i) Levelling Course BML 10 m2 N/A

    Carried to Collection

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Roadbase material complying with Type I or

    Type II grading limits of Table 4.3 of the

    standard specifications.

    Asphaltic concrete material complying with

    Table 4.8 of the standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    * Delete where not applicable BQ 5 - 5/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    31/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    ii) Binder Course BMB 28 - .. mm thick m2 N/A

    iii) Binder Course BMB 20 - ... mm thick m2 N/A

    iv) Wearing Course BMW 14 - ... mm thick m2 N/A

    v) Wearing Course BMW 20 - ... mm thick m2 N/A

    5.1.1.5 Access Road

    5.1.1.5.1 Subbase

    a) Granular Material - ... mm thick m2 N/A

    b) m2 N/A

    5.1.1.5.2 Roadbase

    a)

    i) Crushed Aggregate - ... mm thick m2 N/A

    ii) Wet Mix Macadam - ... mm thick m2 N/A

    iii) Dry Bound Macadam - ... mm thick m2 N/A

    iv) Cement-Bound Granular Material - . m2 N/A

    b)

    i) Bound Roadbase BMR 40 - ... mm thick m2 N/A

    ii) Bound Roadbase BMR 28 - ... mm thick m2 N/A

    Carried to Collection

    Roadbase material complying with Type I or

    Type II grading limits of Table 4.3 of the

    standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Subbase material (CBR > 30 %) complying with

    Type C or Type D grading limits of Table 4.1 of the

    standard specifications.

    Cement-Bound Granular Material - . mm

    thick

    * Delete where not applicable BQ 5 - 6/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    32/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.1.5.3 Surfacing

    a) Bituminous Prime Coat m2 N/A

    b) Bituminous Tack Coat m2 N/A

    c) Asphaltic Concrete

    i) Asphaltic concrete binder course - ..

    mm thickm

    2 N/A

    ii) Asphaltic concrete wearing course - ...

    mm thickm

    2 N/A

    d) Bituminous Macadam

    i) Levelling Course BML 10 t N/A

    ii) Binder Course BMB 28 - .. mm thick m2 N/A

    iii) Binder Course BMB 20 - ... mm thick m2 N/A

    iv) Wearing Course BMW 14 - ... mm thick m2 N/A

    v) Wearing Course BMW 20 - ... mm thick m2 N/A

    Carried to Collection

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Asphaltic concrete material complying with

    Table 4.8 of the standard specifications.

    * Delete where not applicable BQ 5 - 7/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    33/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.1.6 Fill Material On Unpaved Shoulder

    a) m3 N/A

    b) m3 N/A

    5.1.1.7 Fill Material On Unpaved Median and Island

    a) m3 N/A

    b) m3 N/A

    Carried to Collection

    Suitable material from common excavation.

    Imported suitable material from Contractor's

    own source.

    Earth shoulder material complying with sub section

    2.2.1 of the standard specifications and constructed

    to method specified in clause 4.3.3 of the standard

    specifications.

    Suitable material from common excavation.

    Imported suitable material from Contractor's

    own source.

    Earth shoulder material complying with sub section

    2.2.1 of the standard specifications and constructed

    to method specified in clause 4.3.3 of the standard

    specifications.

    * Delete where not applicable BQ 5 - 8/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    34/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.2 TREATMENT TO EXISTING PAVEMENT

    5.1.2.1 Patching

    m3 N/A

    5.1.2.2 Milling

    a) m2 N/A

    b) Tack coat to receive ACB 28. m2 N/A

    c) . mm thick ACB 28 inlay. m2 N/A

    5.1.2.3 Regulation

    t 3

    5.1.2.4 Reconstruction Of Existing Pavement

    5.1.2.4.1 Mark, cut, break up, remove and cart away

    m2 N/A

    5.1.2.4.2 Subbase

    a) Granular Material - ... mm thick m2 N/A

    b) m2 N/A

    Carried to Collection

    Mark, cut, break up, remove existing pavement and

    cart away spoil to designated dumping ground - up

    to .. mm thick

    Bituminous macadam levelling course BML 10 tothe required formation level.

    Mark, cut, break up existing pavement and cart

    away to designated spoil dumping ground, clearing

    of debris, patch and compact with asphaltic

    concrete ACW 20 including tack coat application.

    Milling of existing pavement including clean and

    remove all debris to receive new surface inlay

    . mm thick.

    Subbase material (CBR > 30 %) complying with

    Type C or Type D grading limits of Table 4.1 of the

    standard specifications.

    Cement-Bound Granular Material - . mm

    thick

    * Delete where not applicable BQ 5 - 9/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    35/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.1.2.4.3 Roadbase

    a)

    i) Crushed Aggregate - ... mm thick m2 N/A

    ii) Wet Mix Macadam - ... mm thick m2 N/A

    iii) Dry Bound Macadam - ... mm thick m2 N/A

    iv) Cement-Bound Granular Material - .

    mm thickm

    2 N/A

    b)

    i) Bound Roadbase BMR 40 - ... mm thick m2 N/A

    ii) Bound Roadbase BMR 28 - ... mm thick m2 N/A

    5.1.2.5 Overlay

    a) Bituminous Prime Coat m2 200

    b) Bituminous Tack Coat m2 200

    c) Asphaltic Concrete

    i) Asphaltic concrete binder course - . mm

    thickm

    2 N/A

    ii) Asphaltic concrete wearing course - 50 mm

    thickm

    2 200

    d) Bituminous Macadam

    Carried to Collection

    Roadbase material complying with Type I or

    Type II grading limits of Table 4.3 of the

    standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    Asphaltic concrete material complying with

    Table 4.8 of the standard specifications.

    Roadbase material complying with Table 4.12 of

    the standard specifications.

    * Delete where not applicable BQ 5 - 10/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    36/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    i) Levelling Course BML 10 for regulating t N/A

    ii) Binder Course BMB 28 - ... mm thick m2 N/A

    iii) Binder Course BMB 20 - ... mm thick m2 N/A

    iv) Wearing Course BMW 14 - ... mm thick m2 N/A

    v) Wearing Course BMW 20 - ... mm thick m2 N/A

    e) Micro Surfacing

    m2 N/A

    f) Chip Sealing

    i) Rubber modified bitumen for the chip seal

    layer for bitumen application rate . litres

    / m2

    to . litres / m2.

    m2 N/A

    ii) Precoated cover aggregate as "Chip Seal"

    layer - . mm thick.m

    2 N/A

    iii) - ditto - for second "Chip Seal" layer - .

    mm thick.m

    2 N/A

    Carried to Collection

    10 mm to 12 mm nominal thickness modified

    micro surfarcing in 2 layers of material

    according to the standard specifications.

    Single / double layer chip seal of material

    according to standard specifications.

    * Delete where not applicable BQ 5 - 11/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    37/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.2 CONCRETE PAVEMENT

    5.2.1 NEW PAVEMENT

    5.2.1.1 Preparation Of Formation

    m2 N/A

    5.2.1.2 Carriageway And Paved Shoulder

    5.2.1.2.1 Subbase

    a) Unbound

    i) Sand m2 N/A

    ii) Crushed aggregate m2 N/A

    b) Lean Concrete

    mm thick lean concrete grade . :

    i) Manual laying m2 N/A

    ii) Slip forming m2 N/A

    5.2.1.2.2 Curing Compound For Lean Concrete

    m2 N/A

    5.2.1.2.3 Bond Breaking Treatment

    m2 N/A

    5.2.1.2.4 Plain Concrete

    mm thick plain concrete Grade .:

    a) Manual laying m2 N/A

    Carried to Collection

    Wax based emulsion curing compound using

    mechanical spraybar.

    Bond breaking compound using wax based

    emulsion or equivalent as approved by S.O/P.D*.

    Subbase material according to Table 4.1 of the

    standard specifications

    Preparation of formation as specified and as

    directed by the S.O/P.D* for receiving road

    pavement.

    * Delete where not applicable BQ 5 - 12/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    38/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    b) Slip forming m2 N/A

    5.2.1.2.5 Formwork

    a) Manual laying

    i) Steel side formwork .. mm deep for lean

    concrete.

    m N/A

    ii) Steel side formwork .. mm deep for

    plain concrete.

    m N/A

    5.2.1.2.6 Longitudinal Construction Joint

    a) U - shape Y.mm bars nr N/A

    b) Y.mm bars t N/A

    c) mm long Y .mm tiebars. t N/A

    5.2.1.2.7 Transverse Contraction Joint

    a) U - shape Y.mm bars nr N/A

    b) Y.mm bars t N/A

    c) ...mm long Y ... mm dowel bars. t N/A

    5.2.1.2.8 Expansion Contraction Joint

    a) U - shape Y.mm bars nr N/A

    b) Y.mm bars t N/A

    c) ...mm long Y ... mm dowel bars. t N/A

    Carried to Collection

    Steel bar for expansion contraction joint at ... m

    interval as shown in the drawings.

    Steel bar for tranverse contraction joint at . m

    interval as shown in the drawings.

    Steel bars for longitudinal construction joint as

    shown in the drawings.

    * Delete where not applicable BQ 5 - 13/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    39/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.2.1.2.9

    a) U - shape Y.mm bars nr N/A

    b) Y.mm bars t N/A

    c) t N/A

    5.2.1.2.10 Texturing

    Texturing on plain concrete slab surface. m2 N/A

    5.2.1.2.11 Curing Compound

    m2 N/A

    5.2.1.2.12 Silicone Sealant

    m N/A

    5.2.1.2.13

    m N/A

    5.2.1.2.14 Movable Shaded Cover

    m2 N/A

    Carried to Collection

    Steel bar for construction joint at transverse

    contraction joint as shown in the drawings

    ..mm long Y ... mm dowel bars

    inclusive of sleeve.

    Curing compound/sealer coat on finished concrete

    slab.

    Construction Joint at Transverse Contraction Joint

    Silicone sealant to form contraction joint as shown

    in the drawings.

    Anchor beam (..mm x mm) using Concrete

    Grade .... as shown in the drawings.

    To provide movable shaded cover for protection of

    plain concrete pavement and lean mix concrete

    subbase from rain during paving, as shown in thedrawings and as directed by the S.O/P.D*. on site.

    Anchor Beam

    * Delete where not applicable BQ 5 - 14/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    40/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    5.2.1.2.15 Surface Stamp

    nr N/A

    5.2.1.3 Fill Material On Unpaved Shoulder

    a) m3 N/A

    b) m3 N/A

    5.2.1.4 Filter Material

    a) Crushed Aggregate

    m3 N/A

    b) Geotextile KET - 9

    m2 N/A

    Carried to Collection

    Imported suitable material from Contractor's

    own source.

    Crushed aggregate as filter material .mm

    thick complying with Table 3.4 of the standard

    specifications.

    Single layer of filter geotextile KET - 9 or

    equivalent as per standard specification.

    To provide labour and necessary equipment to

    stamp concrete slab surface with letterings as

    shown in the drawings and as directed by the

    S.O/P.D* on site.

    Earth shoulder material complying with sub section

    2.2.1 of the standard specifications and constructedto method specified in clause 4.3.3 of the standard

    specifications.

    Suitable material from common excavation.

    * Delete where not applicable BQ 5 - 15/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    41/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGAI HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMBUR LAUT

    ITEM DESCRIPTION OF WORKS UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 5 - PAVEMENT WORKS

    AMOUNT

    COLLECTION PAGE

    BQ 5 - 1/16

    BQ 5 - 2/16

    BQ 5 - 3/16

    BQ 5 - 4/16

    BQ 5 - 5/16

    BQ 5 - 6/16

    BQ 5 - 7/16

    BQ 5 - 8/16

    BQ 5 - 9/16

    BQ 5 - 10/16

    BQ 5 - 11/16

    BQ 5 - 12/16

    BQ 5 - 13/16

    BQ 5 - 14/16

    BQ 5 - 15/16

    TOTAL CARRIED TO SUMMARY

    * Delete where not applicable BQ 5 - 16/16

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    42/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    6.1 SIGNBOARDS

    6.1.1 Destination Signboard

    a) nr N/A

    b) nr N/A

    c) nr N/A

    d) nr N/A

    e) nr N/A

    6.1.2 Gantry Directional Signboard

    a) Not exceeding 10 m

    2

    nr N/Ab) More than 10 m

    2nr N/A

    6.1.3 Butterfly gantry

    a) Not exceeding 10 m2

    nr N/A

    b) More than 10 m2

    nr N/A

    6.1.4 Warning and Regulatory Traffic signs

    a) Type 'RP 27' (mm x..mm) nr 2

    b) Type 'WD 39' (mm x ..mm) nr 3

    c) Type 'WD 44' (..mm x ..mm) nr 1

    d)

    Carried to Collection

    Fabrication, deliver to site and installation of butterfly

    gantry with installatiom of directional sign type high

    intensity retroreflective sheeting inclusive of

    foundations, posts, purlins frames and connections

    as specified and shown in the drawing.

    Not exceedin 1 m2

    1 - 2 m2

    2 - 3 m

    2

    3 - 4 m2

    More than 4 m2

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    Destination sign type high intensity retroreflective

    sheeting inclusive of posts, footing and frames as

    specified and shown in the drawing.

    Fabrication, deliver to site and installation of

    overhead gantry not exceeding ..m span with

    installation of directional sign type high intensity

    retroreflective sheeting inclusive of foundations,

    posts, purlin frames and connections as specified

    and shown in the drawing.

    DESCRIPTION OF WORKSAMOUNT

    * Delete where not applicable BQ 6 - 1/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    43/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    DESCRIPTION OF WORKSAMOUNT

    6.2 TRAFFIC BARRIER

    6.2.1 Guardrails

    a)

    i) 1.95m post spacing m 114

    ii) 3.8m post spacing m N/A

    b)

    i) 1.95m post spacing m N/A

    ii) 3.8m post spacing m N/A

    c) Guardrail Ends

    i) Type 1 nr 1

    ii) Type 2 nr 1

    iii) Type 3 nr N/A

    6.2.2 New Jersey Barrier (NJB)

    a) Precast concrete NJB m N/Ab) Cast insitu concrete NJB m N/A

    6.2.3 Wire rope

    Wire rope as shown in the drawing. m N/A

    6.3 ROAD MARKING

    6.3.1

    a) Type 1 m N/A

    b) Type 2 m N/A

    c) Type 3 m N/A

    d) Type 4 m N/A

    e) Type 5 m N/A

    Carried to Collection

    Hot-applied superimposed reflectorised

    thermoplastic road markings with 20% glassbead asspecified in BS 3262 and in the drawing.

    Single mounted corrugated steel beam guardrail

    inclusive of delineators.

    Double mounted corrugated steel beam guardrailinclusive of delineators.

    Hot-applied superimposed reflectorised

    thermoplastic road markings

    * Delete where not applicable BQ 6 - 2/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    44/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    DESCRIPTION OF WORKSAMOUNT

    f) Type 6 m 450

    g) Type 7 m N/A

    h) Type 8 m N/A

    i) Type 9 (Pedestrian zebra crossing) m2

    N/A

    j) Type 10 m 250

    k) Type 11 m N/A

    l) Type 12 m N/A

    m) Type 13

    n) Type 14 (Yellow box marking) m2

    N/A

    o) Chevron marking m2

    N/A

    p)Transverse bar m

    2

    N/Aq) Raised rib thermoplastic m2

    N/A

    6.3.2 Directional Arrow for roads in urban area

    a) Single Straight nr N/A

    b) Single turning nr N/A

    c) Double headed nr N/A

    d) Pavement marking m2

    N/A

    6.3.3 Directional Arrow for roads in rural area

    a) Single Straight nr N/A

    b) Single turning nr N/Ac) Double headed nr N/A

    6.4 BUS-SHELTER

    nr N/A

    6.5 MS RAILING

    m N/A

    6.6 ANTIGLARE SCREEN

    m2

    N/A

    Carried to Collection

    Bus-shelter inclusive of roofing, RC foundation,

    seating, railing, lighting etc as shown in the drawing.

    Mild steel pedestrian railing as shown in the drawing

    or as directed by the S.O/P.D*.

    Antiglare screen as shown in the drawing or as

    directed by S.O/P.D*.

    * Delete where not applicable BQ 6 - 3/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    45/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    DESCRIPTION OF WORKSAMOUNT

    6.7 INTERLOCKING PAVING BLOCK FOR

    FOOTPATH

    m2

    N/A

    6.8 KILOMETRE POST

    Kilometre post inclusive of all necessary works at

    location and details as shown in the drawingor as directed by the S.O/P.D*

    a) Type A nr N/A

    b) Type B nr N/A

    6.9 CONCRETE KERB

    a)

    i) Type SM1 m N/A

    ii) Type SM2 m N/A

    b)

    i) Type SM1 m N/A

    ii) Type SM2 m N/A

    6.10 DELINEATORS

    6.10.1 Delineator post

    Delineator post as shown in the drawing. nr N/A

    Carried to Collection

    Interlocking paving block to approved colour and

    patern inclusive of compacted sand layer and other

    accessories as shown in the drawing or as directed

    by the S.O/P.D*.

    Cast-in-situ concrete kerb including jointing,

    excavation, backfilling, bedding and disposal of

    surplus materials as shown in the drawing or as

    directed by the S.O/P.D* all in accordance with

    Sub-Section 6.4 of the standard specification.

    Precast concrete kerb including jointing,

    excavation, backfilling, bedding and disposal of

    surplus materials as shown in the drawing or as

    directed by the S.O/P.D* all in accordance with

    Sub-Section 6.4 of the standard specification.

    * Delete where not applicable BQ 6 - 4/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    46/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    DESCRIPTION OF WORKSAMOUNT

    6.10.2

    nr 100

    6.10.3 Chevron delineators

    Chevron delineators as shown in the drawing. nr N/A

    6.10.4 Flexible post

    Flexible post as shown in the drawing. nr N/A

    6.11 IMPACT ATTENUATOR

    nr N/A

    6.12 RIGHT OF WAY MARKER

    nr N/A

    Carried to Collection

    Right of Way marker as shown in the drawing.

    Impact attenuator with number of bays of

    overall length .mm including nose, concrete pad,

    anchor block, and all necessary fitting as specified

    and shown in the Drawing.

    Retroreflective Raised Pavement Marker as shown

    in the drawing.

    Retroreflective Raised Pavement Marker (Road

    Stud)

    * Delete where not applicable BQ 6 - 5/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    47/59

    PROJECT : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM UNIT QTY RATE

    NO. (RM) (RM) (SEN)

    (ALL ITEMS ARE PROVISIONAL)

    BILL NO. 6 - ROAD FURNITURE

    DESCRIPTION OF WORKSAMOUNT

    COLLECTION PAGE

    BQ 6 - 1/6

    BQ 6 - 2/6

    BQ 6 - 3/6

    BQ 6 - 4/6

    BQ 6 - 5/6

    TOTAL CARRIED TO SUMMARY

    * Delete where not applicable BQ 6 - 6/6

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    48/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    7.1 SOFT GROUND IMPROVEMENT

    7.1.1

    7.1.1.1 m N/A

    7.1.1.2 m N/A

    7.1.1.3 m N/A

    7.1.1.4m

    3N/A

    7.1.1.5

    m3

    N/A

    7.1.2

    7.7.2.1

    Sum N/A

    7.1.2.2 m2

    N/A

    7.1.2.3 m2

    N/A

    7.1.2.4

    m2

    N/A

    7.1.2.5 m N/A

    7.1.2.6 m N/A

    7.1.3

    7.1.3.1

    Sum N/A

    7.1.3.2 m2

    N/A

    7.1.3.3 m2

    N/A

    Carried to Collection

    Mobilization/demobilization including moving of

    equipment and plant from location to location.

    (type) non-woven geotextile as separator.

    (tensile strength)... woven geotextile.

    PREFABRICATED VERTICAL DRAINS

    Mobilization/demobilization including moving of

    equipment and plant from location to location.

    (type) non-woven geotextile as separator.

    (tensile strength)... woven geotextile.

    mm thick river/mining* sand as drainage

    blanket.

    (type)...prefabricated vertical drains.

    Placement and compaction of river/mining* sand.

    STONE COLUMNS / GEOPIERS / SOIL CEMENT

    COLUMNS / CHEMICAL COLUMNS / SAND

    COLUMNS*

    Placement and compaction of imported earth from

    Contractor's own source.

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    SOFT GROUND REPLACEMENT / STABILITY

    (type) non-woven geotextile as separator.

    (ALL ITEMS ARE PROVISIONAL)

    (tensile strength)... woven geotextile.

    Placement and compaction of river/mining* sand.

    Placement and compaction of excavated suitablematerial from the road way.

    * Delete where not applicable. BQ7 - 1/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    49/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    7.1.3.4

    m N/A

    7.1.3.5

    m2

    N/A

    7.1.3.6 m3

    N/A

    7.1.3.7

    nr N/A

    7.1.3.8

    nr N/A

    7.1.4

    7.1.4.1 i) Excavated suitable fill materials from roadway

    as surcharge. m3

    N/A

    ii) Imported fill materials as surcharge. m3

    N/A

    7.1.4.2 i) Excavate and transport surcharge material to

    place of fill for reuse. m3

    N/A

    ii) Removal of surplus surcharge material from

    site. m3

    N/A

    7.1.5 PILED EMBANKMENT

    7.1.5.1 .. x .. mm PRECAST Reinforced

    Concrete PILES :

    7.1.5.1.1

    sum N/A

    7.1.5.1.2 nr N/A

    7.1.5.1.3

    nr N/A

    7.1.5.1.4 m N/A

    Carried to Collection

    SURCHARGE

    Allow for mobilization and demobilization of alllabour, plants, piling and drilling equipments, etc. on

    site, for the proposed piling works.

    Supply and deliver to site .m length initial piles.

    Supply and deliver to site ..m length extension

    pile

    Handle, pitch and drive vertical piles.

    mm diameter stone columns / soil cement

    columns / chemical columns / geopiers / sand

    columns* as shown in Drawing.

    mm thick river/mining* sand as drainage

    blanket.

    Placement and compaction of river/mining* sand.

    Carry out load test to maximum test load of .. kN

    as per Specification.

    Carry out load test on group columns (4 no. per

    group) to maximum test load of ... kN as per

    Specification.

    * Delete where not applicable. BQ7 - 2/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    50/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    7.1.5.1.5 m N/A

    7.1.5.1.6 nr N/A

    7.1.5.1.7

    nr N/A

    7.1.5.1.8 m N/A

    7.1.5.1.9 nr N/A

    7.1.5.1.10

    nr N/A

    7.1.5.1.11

    nr N/A

    7.1.5.1.12

    nr N/A

    7.1.5.1.13

    nr N/A

    7.1.5.2

    7.1.5.2.1

    m3 N/A

    7.1.5.2.2 m3

    N/A

    7.5.12.3 m2

    N/A

    7.1.5.2.4

    m2

    N/A

    Carried to Collection

    Suitable material as fill up to O.G.L

    50mm thick grade 10/20 lean concrete

    Construct .mm thick reinforced concrete slab

    grade 30/20. Rate to include all necessary

    formwork and reinforcement as shown in the

    drawing.

    Handle, pitch and drive raked piles.

    Lengthening piles by jointing to detail.

    Cutting off piles head to required length including

    stripping off to expose main reinforcements to

    detail.

    Provide all labour, plants, temporary staging,

    kentledge, testing equipments etc. and test load on

    preliminary pile to the maximum load test.. kN

    (... working load).

    Provide all labour, plants, temporary staging,

    kentledge, testing equipments etc. and test load on

    working pile to the maximum load test.. kN (twice

    working load).

    Carry out pile driving analyser (PDA) monitoring on

    pile complete with all necessary preparation for

    installing transducers, setting up the necessary

    equipment and monitoring by experience personnel.

    RC Slab

    Excavate in any material except rock to any depth

    for structural foundation.

    Handle, pitch and drive raked piles.

    Lengthening of piles by jointing to detail.

    Cutting off piles head to required length including

    stripping off to expose main reinforcements to

    detail.

    * Delete where not applicable. BQ7 - 3/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    51/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    7.2

    7.2.1 nr N/A

    7.2.2 nr N/A

    7.2.3

    i) not exceeding 5m nr N/A

    ii) exceeding 5m but not exceeding 10m nr N/A

    iii) exceeding 10m but not exceeding 20m nr N/A

    7.2.4

    i) not exceeding 10m nr N/A

    ii) exceeding 10m but not exceeding 20m nr N/A

    iii) exceeding 20m but not exceeding 30m nr N/A

    7.2.5

    nr N/A

    7.2.6

    trip N/A

    7.2.7 Sum N/A

    7.3

    7.3.1 SOIL NAILING

    7.3.1.1

    Sum N/A

    7.3.1.2

    N/A

    Carried to Collection

    Install deep levelling datum penetrating to hard

    stratum to about .m depth or as instructed and

    complete the setting of temporary bench mark

    station as instructed by SO/PD*.

    Monitoring and analysing of data obtain from all

    instruments.

    3 copies of the monthly monitoring report.

    SLOPE STABILISATION WORKS

    Provide the necessary drilling and grouting

    equipment and all other appliances required for the

    installation of the soil nails including staging,

    storage of the above on Site during the progress of

    work and removal from the site on completion as

    directed by the S.O/P.D*.

    100mm diameter soil nails at .....m centres or

    directed by S.O/P.D* complete with head assembly

    including drilling borehole, grouting ...(size).. bar

    into 50mm diameter corrugated PVC tube with

    plastic cap using 20N/mm2 water/cement grout.

    The end of ...(size).. bar to extend out from soil for

    anchorage into nail wall as shown in the Drawings.

    INSTRUMENTATION

    Supply and install surface settlement marker.

    Supply and install settlement gauge.

    Supply and install ..(type)... piezometers.

    Supply and install ..(type).. inclinometers.

    * Delete where not applicable. BQ7 - 4/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    52/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    a) 6.0m long nr N/A

    b) 9.0m long nr N/A

    c) 12m long nr N/A

    d) Exceeding 12m long but not exceeding 18m

    long. (....m long) nr N/A

    7.3.1.3

    a) 6.0m long soil nail to . times working load(..kN) nr N/A

    b) 9.0m long soil nail to . times working load

    (.kN) nr N/A

    c) 12.0m long soil nail to . times working load

    (..kN) nr N/A

    d) Exceeding 12.0m long but not exceeding 18m

    long soil nail to . times working load

    (..m, ..kN) nr N/A

    7.3.1.4 nr N/A

    7.3.1.5

    nr N/A

    7.3.1.6

    m2

    N/A

    7.3.2 ROCK BOLT

    7.3.2.1

    Sum N/A

    7.3.2.2 Installation of rock bolt as specified. nr N/A

    a) 2m long

    b) 4m long

    Carried to Collection

    ..m long .mm diameter horizontal drains with

    ..mm diameter perforated pvc pipe wrapped with

    non-woven geotextile as shown in the Drawings.

    .mm thick guniting grade 25 concrete on slope

    face inclusive of weepholes nail head preparation

    and . layer of Steel Fabric Reinforcement as

    shown in the Drawings.

    Provide the necessary drilling and grouting

    equipment and all other appliances required for the

    installation of the rock bolt including staging,storage of the above on site during the progress of

    work and removal from the site on completion as

    directed by the S.O/P.D*.

    Provide all equipment, labour, materials and

    everything else necessary to carry out pull out test

    on the soil nails.

    Proof test for soil nail

    * Delete where not applicable. BQ7 - 5/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    53/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    c) 6m long

    d) exceeding 6m long but not exceeding 9m

    (.....m)

    7.3.2.3

    m2

    N/A

    7.3.2.4 Carry out pull-out test rock bolt nr N/A

    7.3.3 GROUND ANCHORAGE

    7.3.3.1

    Sum N/A

    7.1.3.2b

    nr N/A

    7.1.3.3b Pull out anchor test as specified nr N/A

    7.3.4

    7.3.4.1

    a) 9m long nr N/Ab) 12m long nr N/A

    Carried to Collection

    Construct ...mm thick sprayed grade . concrete

    on unstable fractured rock face as shown in the

    drawing.

    Provide the necessary drilling and grouting

    equipment and all other appliances required for the

    installation of the ground anchor including staging,

    storage of the above on site during the progress of

    work and removal from the site on completion as

    directed b the S.O/P.D*.

    Supply and install ...kN ground anchors as shown

    in drawing including anchor heads and necessary

    inspection as specified.

    HORIZONTAL DRAINS

    Supply and install ..mm diameter horitonzal

    darins with ..mm diameter perforated pvc pipe

    wrapped with non-woven geotextile as shown in the

    drawing.

    * Delete where not applicable. BQ7 - 6/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    54/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    7.4 RETAINING SYSTEM

    7.4.1 REINFORCED SOIL WALLS

    7.4.1.1

    Sum N/A

    7.4.1.2

    m2

    N/A

    7.4.1.3

    m2

    N/A

    7.4.1.4

    m N/A

    7.4.1.5

    m2

    N/A

    7.4.1.6

    m3

    N/A

    7.4.2 REINFORCED SOIL SLOPES

    7.4.2.1

    m2

    N/A

    7.4.2.2

    m2

    N/A

    4.00Carried to Collection

    Provide teams of competent and experienced

    personnel including mobilisation of plant and

    equipment, workmanship and everything else

    necessary for the installation of reinforced soil wall

    including storage of the above on Site during the

    progress of work and removal from site on

    completion as directed by the S.O/PD*.

    Supply and delivery of reinforced soil wall

    components consisting of ........ shaped precast

    concrete panels, reinforcing tendons, anchor

    blocks, joint fillers, cushion pads, fasterners and

    inclusive of cast-in-situ wall panels as per

    specification and drawings.

    Erection and installation of . shaped precast

    concrete panels in successive horizontal lifts to

    form reinforced soil wall components consisting of

    tendons to the panels and anchor blocks andinsertion of joint fillers as per specification and

    drawings.

    350mm x 150mm cast-in-situ mass concrete grade

    20 levelling pad.

    ..mm single size aggregate as drainage blanket

    including .(type) non woven geotextile as filter.

    River/mining* sand fill to reinforced soil wall as per

    specification.

    Geogrid ..(strength)... or equivalent for

    reinforced walls or slopes on interface of cut & fill

    areas inclusive of non-woven geotextile

    reinforcement facing all as shown in the drawing.

    Geogrid (strength) or equivalent to stabilise

    embankment toe as shown in the drawing.

    * Delete where not applicable. BQ7 - 7/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    55/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    7.4.3

    7.4.3.1

    m3

    2200

    7.4.3.2 m2

    400

    7.4.3.3 Formwork with Class F1 finish. m2

    1100

    7.4.3.4 Grade 30 concrete m3

    2200

    7.4.3.5

    nr 1100

    7.4.3.6

    m2

    N/A

    7.4.3.7

    nr 100

    7.4.3.8

    nr 700

    7.4.3.9 Joint sealer at ..m interval. m N/A

    7.4.3.10

    i) Up to 12mm diameter. t 60

    ii) 16mm diameter. t 60

    iii) 20mm diameter. t N/A

    iv) 25mm diameter. t N/A

    v) 32mm diameter. t N/A

    7.4.3.11

    m2

    N/A

    Carried to Collection

    REINFORCED CONCRETE RETAINING WALL

    Excavate in any material except rock to any depth

    for structural foundation.

    50mm thick grade 15/20 lean concrete

    75mm dia. UPVC pipes at 2000 mm centres

    wrapped with approved filter cloth.

    Apply two layers of bituminous coating to internal

    surfaces of retaining walls as directed by the S.O.

    ..mm thick river/mining* sand as free draining

    material.

    .mm wide PVC waterstop for construction joint as

    shown in Drawing.

    .mm diameter m.s. dowel bars galvanised for

    expansion joint as in shown in Drawing.

    High Yield Steel Reinforcement:

    * Delete where not applicable. BQ7 - 8/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    56/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALA BUNGA HINAI DENGAN JALAN

    BUNGA KACA PIRING SEKITAR SRJK ( C ), DAERAH TIMUR LAUT

    ITEM DESCRIPTION OF WORK RATE

    NO. UNIT QTY (RM) (RM) (SEN)

    BILL NO. 7 GEOTECHNICAL WORKS

    AMOUNT

    (ALL ITEMS ARE PROVISIONAL)

    COLLECTION PAGE

    BQ 7 - 1/9

    BQ 7 - 2/9

    BQ 7 - 3/9

    BQ 7 - 4/9

    BQ 7 - 5/9

    BQ 7 - 6/9

    BQ 7 - 7/9

    BQ 7 - 8/9

    TOTAL CARRIED TO SUMMARY

    * Delete where not applicable. BQ7 - 9/9

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    57/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    ITEM AMOUNT

    NO. (RM)

    12.1 TELEPHONE BILLS FOR S.O/P.D*

    20,000.00

    12.2 STREET LIGHTING AND TRAFFIC LIGHTS

    250,000.00

    12.3 LANDSCAPING

    N/A

    12.4 RELOCATION OF UTILITY SERVICES

    350,000.00

    i) TNB

    ii) Telecommunication

    iii) Waterworks

    iv) Gas Supply

    v) Sewerage

    12.5 KTMB

    Allow Provisional Sum of RM for KTMB flaging and inconvenience charges. N/A

    12.6

    N/A

    12.7

    70,000.00

    12.8 ADDITIONAL UTILITY DETECTION AND MAPPING

    50,000.00

    Carried to Collection

    Allow a Provisional Sum of RM 50,000.00 to carry out utility detection and mapping

    during construction.

    ADDITIONAL TESTING OF MATERIALS AND WORKS

    Allow a Provisional Sum of RM . for the the testing of materials andworks as stipulated in Clause 9 of the Conditions of Contract.

    ADDITIONAL S.I WORKS DURING CONSTRUCTION

    Allow a Provisional Sum of RM 70,000.00 to carry out additional S.I works during

    construction.

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    BILL NO. 12 - PROVISIONAL SUM

    DESCRIPTION OF WORKS

    Allow a Provisional Sum of RM 350,000.00 for the protection and / or relocation of

    the following utilities services :

    Allow a Provisional Sum of RM 250,000.00 to provide for street lighting and traffic

    lights.

    Allow a Provisional Sum of RM . for landscaping works.

    Allow a Provisional Sum of RM 20,000.00 to provide for telephone bills for S.O/P.D*.

    (ALL ITEMS ARE PROVISIONAL)

    * Delete where not applible BQ 12 - 1/3

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    58/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    ITEM AMOUNT

    NO. (RM)

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    BILL NO. 12 - PROVISIONAL SUM

    DESCRIPTION OF WORKS

    (ALL ITEMS ARE PROVISIONAL)

    12.9 AERIAL INSPECTION

    N/A

    12.10 INTELLIGENCE "I-SUPERVISION"

    N/A

    12.11 CONSTRUCTION SUPERVISION

    N/A

    12.12 TRAINING AND NEW TECHNOLOGY

    N/A

    12.13

    N/A

    12.14

    100,000.00

    12.15

    Allow a provisional sum of RM30,000.00 to carry out additional survey work 30,000.00

    Carried to Collection

    Allow a Provisional Sum of RM . to carry out aerial inspection of the

    project site.

    ADDITIONAL SURVEY WORK

    Allow a Provisional Sum of RM . to carry out I-supervision of the

    progress of works during construction.

    Allow a Provisional Sum of RM . to carry out construction

    supervision during construction.

    TEMPORARY RELOCATION AND PROTECTION OF UTILITIES AND OTHER

    SERVICES

    Allow a Provisional Sum of RM 100,000.00 to identify, temporary protection and

    temporary relocation of utilities and other services.

    Allow a Provisional Sum of RM . to train JKR staff and for the

    acquisition of new technology.

    RECONSTRUCTION OF ACQUIRED GOVERNMENT / PUBLIC FACILITIES

    Allow a Provisional Sum of RM . for the acquisition of government /

    public facilities.

    * Delete where not applible BQ 12 - 2/3

  • 7/28/2019 17.2. CONTOH - SENARAI KUANTITI

    59/59

    PROJEK : CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN

    ITEM AMOUNT

    NO. (RM)

    BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT

    BILL NO. 12 - PROVISIONAL SUM

    DESCRIPTION OF WORKS

    (ALL ITEMS ARE PROVISIONAL)

    COLLECTION PAGE

    BQ 12 - 1/3

    BQ 12 - 2/3