RENCANA PENGELOLAAN SUMBER DAYA AIR

WILAYAH SUNGAI

SERAYU – BOGOWONTO

TAHUN 2016

i

DAFTAR ISI

DAFTAR ISI ..........................................................................................i

DAFTAR GAMBAR.............................................................................. vii

DAFTAR TABEL ................................................................................. xii

BAB I PENDAHULUAN ..........................................................................1

1.1 Latar Belakang .............................................................................. 1

1.2 Maksud dan Tujuan ....................................................................... 2

1.2.1 Tujuan ................................................................................ 3

1.2.2 Sasaran............................................................................... 3

BAB II GAMBARAN UMUM WILAYAH SUNGAI ......................................4

2.1 Karakteristik Wilayah Sungai .......................................................... 4

2.1.1 Kondisi Geografis dan Administrasi...................................... 11

2.1.2 Kondisi Topografi ............................................................... 11

2.1.3 Kondisi Geologi .................................................................. 13

2.1.4 Kondisi Pentupan Lahan ..................................................... 34

2.2 Isu Strategis Pengelolaan Sumber Daya Air .................................... 36

2.2.1 Isu Nasional ...................................................................... 36

2.2.2 Isu Lokal ........................................................................... 38

2.3 Potensi dan Permasalahan Sumber Daya Air .................................. 43

2.3.1 Potensi Sumber Daya Air .................................................... 43

2.3.2 Permasalahan Sumber Daya Air .......................................... 46

BAB III PEMILIHAN STRATEGI...........................................................61

3.1 Dasar Pertimbangan Dalam Pemilihan Strategi ............................... 61

3.1.1 Strategi Jangka Pendek ...................................................... 61

3.1.2 Strategi Jangka Menengah .................................................. 62

3.1.3 Strategi Jangka Panjang ..................................................... 63

3.2 Pemilihan Strategi........................................................................ 63

ii

BAB IV INVENTARISASI SUMBER DAYA AIR.......................................66

4.1 Kondisi Hidrologis, Hidrometeorologis, dan Hidrogeologis ................ 66

4.1.1 Kondisi Hidrologis .............................................................. 66

4.1.2 Kondisi Hidrometeorologis................................................... 86

4.1.3 Kondisi Hidrogeologis ......................................................... 91

4.2 Kuantitas dan Kualitas Sumber Daya Air ..................................... 101

4.2.1 Tampungan Air Eksisting .................................................. 101

4.2.2 Potensi Mata Air............................................................... 108

4.2.3 Evaluasi Kualitas Sumber Air

Wilayah Sungai Serayu – Bogowonto .................................. 147

4.3 Kondisi Lingkungan Hidup dan Potensi

Yang Terkait Sumber Daya Air .................................................... 165

4.3.1 Kerusakan Hutan ............................................................. 165

4.3.2 Erosi Lahan ..................................................................... 168

4.3.3 Sedimentasi Sungai .......................................................... 171

4.3.4 Pencemaran Sungai.......................................................... 173

4.3.5 Daerah Defisit Air............................................................. 173

4.3.6 Kerusakan Pantai............................................................. 184

4.4 Kelembagaan Pengelolaan Sumber Daya Air ................................. 195

4.5 Kondisi Sosial Ekonomi Masyarakat Terkait Sumber Daya Air ....... 200

4.5.1 Kependudukan ................................................................ 200

4.5.2 Pertumbuhan Ekonomi

di Wilayah Sungai Serayu – Bogowonto .............................. 206

4.6 Kebijakan Terkait Pengelolaan Sumber Daya Air ........................... 206

4.7 Rencana Strategis dan Rencana Pembangunan Daerah ................. 207

4.7.1 Rencana Pembangunan Jangka Menengah Daerah (RPJMD)

Provinsi Jawa Tengah Tahun 2013-2018 ............................ 207

4.7.2 Rencana Tata Ruang Wilayah (RTRW)

Provinsi Jawa Tengah Tahun 2009 – 2029 .......................... 210

BAB V ANALISIS DATA DAN KAJIAN

PENGELOLAAN SUMBER DAYA AIR .......................................214

5.1 Daerah Resapan Air, Daerah Tangkapan Air,

dan Zona Pemanfaatn Sumber Air ............................................... 214

iii

5.1.1 Daerah Resapan Air (DRA) ................................................ 214

5.1.2 Daerah Tangkapan Air (DTA) ............................................. 217

5.1.3 Zona Pemanfaatan Sumber Air (ZPSA) ................................ 220

5.2 Konservasi Sumber Daya Air....................................................... 223

5.2.1 Analisis Kesesuaian Tata Guna Lahan................................ 223

5.2.2 Analisis Lahan Kritis ........................................................ 226

5.2.3 Analisis Tampungan Air .................................................... 229

5.2.4 Upaya Rencana Pengelolaan Sumber Daya Air .................... 232

5.2.5 Desain Dasar Non Fisik .................................................... 255

5.3 Pendayagunaan Sumber Daya Air ............................................... 260

5.3.1 Analisis Kebutuhan Air Tahun 2015 dan Proyeksinya.......... 260

5.3.2 Analisis Imbangan Air....................................................... 265

5.3.3 Analisis Alokasi Air Untuk Pengusahaan Air ....................... 278

5.3.4 Upaya Rencana Pengelolaan Sumber Daya Air .................... 286

5.3.5 Desain Dasar Non Fisik .................................................... 370

5.4 Pengendalian Daya Rusak Air ..................................................... 373

5.4.1 Analisis Genangan Banjir.................................................. 373

5.4.2 Upaya Rencana Pengelolaan Sumber Daya Air .................... 391

5.4.3 Desain Dasar Non Fisik .................................................... 422

5.5 Sistem Informasi Sumber Daya Air .............................................. 426

5.5.1 Analisis Kerapatan Jaringan Stasiun Hidroklimatologi ......... 426

5.5.2 Analisis Kerapatan Pos Pengamatan/Pemantauan

Kualitas Air Sungai .......................................................... 432

5.5.3 Desain Dasar Non Fisik .................................................... 435

5.6 Pemberdayaan Dan Peningkatan Peran Masyarakat,

Dunia Usaha, dan Swasta .......................................................... 437

5.6.1 Lembaga Pengelola Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto .................................. 437

5.6.2 Stakeholders Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto .................................. 439

5.6.3 Tim Koordinasi Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto .................................. 441

5.6.4 Keterlibatan Masyarakat Dalam

Pengelolaan Sumber Daya Air............................................ 442

iv

5.6.5 Desain Dasar Non Fisik .................................................... 443

BAB VI UPAYA RENCANA PENGELOLAAN SUMBER DAYA AIR WILAYAH

SUNGAI SERAYU – BOGOWONTO...........................................448

6.1 Rekapitulasi Perkiraaan Biaya

Rencana Pengelolaan Sumber Daya Air ........................................ 448

6.2 Matrik Dasar Penyusunan Program dan Kegiatan

Rencana Pengelolaan Sumber Daya Air ........................................ 450

6.2.1 Aspek Konservasi Sumber Daya Air ................................... 451

6.2.2 Aspek Pendayagunaan Sumber Daya Air ............................ 466

6.2.3 Aspek Pengendalian Daya Rusak Air .................................. 485

6.2.4 Aspek Sistem Informasi Sumber Daya Air ........................... 499

6.2.5 Aspek Pemberdayaan Dan Peningkatan Peran Masyarakat,

Dunia Usaha, dan Swasta ................................................. 504

v

DAFTAR GAMBAR

Gambar 2-1 Peta Wilayah Administrasi di Wilayah Sungai Serayu –

Bogowonto.......................................................................... 5

Gambar 2-2 Peta Wilayah Sungai Serayu – Bogowonto Berdasarkan

Peraturan Menteri Pekerjaan Umum & Perumahan Rakyat

Nomor 04/PRT/M/2015 Tentang Kriteria dan Penetapan

Wilayah Sungai ................................................................... 9

Gambar 2-3 Peta Daerah Aliran Sungai................................................. 10

Gambar 2-4 Peta Topografi .................................................................. 12

Gambar 2-5 Peta Geologi Lembar Banjarnegara dan Pekalongan ............. 14

Gambar 2-6 Peta Geologi Lembar Purwokerto dan Tegal ......................... 23

Gambar 2-7 Peta Geologi Lembar Kebumen ........................................... 27

Gambar 2-8 Peta Lingkungan Pengendapan Geologi ............................... 30

Gambar 2-9 Peta Formasi Geologi......................................................... 31

Gambar 2-10 Peta Penyebaran Jenis Batuan ......................................... 32

Gambar 2-11 Peta Bahaya Geologi ........................................................ 33

Gambar 2-12 Peta Tutupan Lahan........................................................ 35

Gambar 2-13 Layout Gambar Rencana Pelabuhan Samudera ................. 42

Gambar 2-14 Kondisi Penyimpangan Lahan .......................................... 48

Gambar 2-15 Peta Daerah Kerentanan Gerakan Tanah .......................... 58

Gambar 3-1 Berita Acara Pemilihan Strategi Rencana Pengelolaan Sumber

Daya Air Wilayah Sungai Serayu – Bogowonto Tahun 2011 ... 65

Gambar 4-1 Peta Jaringan Pos Hidrologi di Wilayah Sungai Serayu –

Bogowonto........................................................................ 67

Gambar 4-2 Grafik Total Ketersediaan Air (Non Cekungan Air Tanah dan

Cekungan Air Tanah) di Wilayah Sungai Serayu – Bogowonto

Tahun 2005 – 2014 (mm) ................................................... 76

Gambar 4-3 Grafik Ketersediaan Air Untuk Debit Andalan 80% di Wilayah

Sungai Serayu – Bogowonto (mm) ....................................... 77

Gambar 4-4 Grafik Tinggi Potensi Air Untuk Debit Andalan 80% CAT Tiap-

Tiap Daerah Aliran Sungai di Wilayah Sungai Serayu –

Bogowonto........................................................................ 79

vi

Gambar 4-5 Grafik Tinggi Potensi Air Untuk Debit Andalan 80% Non CAT

Tiap-Tiap Daerah Aliran Sungai di Wilayah Sungai Serayu –

Bogowonto........................................................................ 81

Gambar 4-6 Grafik Rekapitulasi Debit Andalan 80% Wilayah Sungai Serayu

– Bogowonto ..................................................................... 82

Gambar 4-7 Grafik Rekapitulasi Debit Andalan 80% pada 8 Daerah Aliran

Sungai Utama di Wilayah Sungai Serayu – Bogowonto.......... 82

Gambar 4-8 Peta Daerah Imbuhan dan Lepasan Air ............................... 93

Gambar 4-9 Peta Kedalaman Air Tanah di Provinsi Jawa Tengah dan

Provinsi Daerah Istimewa Yogyakarta.................................. 97

Gambar 4-10 Peta Cekungan Air Tanah .............................................. 100

Gambar 4-11 Peta Potensi Bendungan/Waduk .................................... 102

Gambar 4-12 Peta Eksisting Lokasi Bendung ...................................... 105

Gambar 4-13 Peta Eksisting Lokasi Bangunan Pengendali Sedimen....... 107

Gambar 4-14 Peta Lokasi Mata Air ..................................................... 110

Gambar 4-15 Peta Hasil Uji Petik Kualitas Air...................................... 164

Gambar 4-16 Peta Kawasan Hutan ..................................................... 167

Gambar 4-17 Peta Potensi Erosi ......................................................... 170

Gambar 4-18 Peta Kekurangan Air RKI Tanpa Upaya Tahun 2015 –

2020............................................................................ 176

Gambar 4-19 Peta Kekurangan Air RKI Tanpa Upaya Tahun 2020 –

2025............................................................................ 177

Gambar 4-20 Peta Kekurangan Air RKI Tanpa Upaya Tahun 2025 –

2030............................................................................ 178

Gambar 4-21 Peta Kekurangan Air RKI Tanpa Upaya Tahun 2030 –

2035............................................................................ 179

Gambar 4-22 Peta Kekurangan Air RKI Dengan Upaya Tahun 2015 –

2020............................................................................ 180

Gambar 4-23 Peta Kekurangan Air RKI Dengan Upaya Tahun 2020 –

2025............................................................................ 181

Gambar 4-24 Peta Kekurangan Air RKI Dengan Upaya Tahun 2025 –

2030............................................................................ 182

Gambar 4-25 Peta Kekurangan Air RKI Dengan Upaya Tahun 2030 –

2035............................................................................ 183

vii

Gambar 4-26 Peta Kawasan Rawan Bencana Tsunami di Provinsi Jawa

Tengah ........................................................................ 193

Gambar 4-27 Peta Kawasan Rawan Bencana Tsunami di Provinsi Daerah

Istimewa Yogyakarta ..................................................... 194

Gambar 4-28 Luas Per Kabupaten Yang Masuk Ke Wilayah Sungai Serayu

– Bogowonto (Km2) ........................................................ 202

Gambar 4-29 Jumlah Penduduk Tahun 2014 Per Kabupaten Yang Masuk

Ke Wilayah Sungai Serayu – Bogowonto (Jiwa) ................ 203

Gambar 4-30 Kepadatan Penduduk Per Kabupaten Yang Masuk Ke

Wilayah Sungai Serayu – Bogowonto (Jiwa/Km2) ............. 203

Gambar 4-31 Persentase penyebaran Penduduk Per Kabupaten Yang

Masuk Ke Wilayah Sungai Serayu – Bogowonto (%) .......... 204

Gambar 4-32 Peta Proyeksi Sebaran Penduduk Tahun 2020 – 2035 ...... 205

Gambar 5-1 Peta Daerah Resapan Air ................................................. 216

Gambar 5-2 Peta Daerah Tangkapan Air ............................................. 219

Gambar 5-3 Peta Zona Pemanfaatn Air ............................................... 222

Gambar 5-4 Peta Rencana Pola Ruang ................................................ 225

Gambar 5-5 Peta Lahan Kritis ............................................................ 228

Gambar 5-6 Peta Rencana Lokasi Tampungan Air Bendungan/Waduk .. 231

Gambar 5-7 Grafik Upaya Konservasi Sipil Teknis Berdasarkan Luas per

Kab/Kota di Wilayah Sungai Serayu – Bogowonto .............. 243

Gambar 5-8 Grafik Upaya Konservasi Sipil Teknis Berdasarkan Skenario

Penanganan Konservasi di Wilayah Sungai Serayu –

Bogowonto...................................................................... 244

Gambar 5-9 Grafik Upaya Konservasi Sipil Vegetatif Berdasarkan Luas per

Kab/Kota di Wilayah Sungai Serayu – Bogowonto .............. 244

Gambar 5-10 Grafik Upaya Konservasi Sipil Vegetatif Berdasarkan Skenario

Penanganan Konservasi di Wilayah Sungai Serayu –

Bogowonto ................................................................... 245

Gambar 5-11 Grafik Komposisi Upaya Konservasi di Wilayah Sungai

Serayu – Bogowonto ...................................................... 245

Gambar 5-12 Peta Kegiatan Konservasi Teknik .................................... 246

Gambar 5-13 Peta Kegiatan Konservasi Vegetatif ................................. 247

Gambar 5-14 Peta Kegiatan Konservasi Lainnya .................................. 248

viii

Gambar 5-15 Contoh Sediment Trap dari Bambu ................................. 249

Gambar 5-16 Desain Sediment Trap Tipe 2 Lapis ................................. 250

Gambar 5-17 Contoh Check Dam Tipe Kedap Air ................................. 251

Gambar 5-18 Denah Situasi Rencana Check Dam Kambangan di Desa

Kambangan Kecamatan Kaliwiro Kabupaten Wonosobo

(Daerah Aliran Sungai Wawar) ....................................... 251

Gambar 5-19 Potongan Memanjang Check Dam Kambangan ................ 252

Gambar 5-20 Potongan Melintang Check Dam Kambangan................... 252

Gambar 5-21 Peta Rencana Lokasi Check Dam.................................... 254

Gambar 5-22 Grafik Total Kebutuhan Air Saat Intensifikasi Daerah Irigasi

di Wilayah Sungai Serayu – Bogowonto Tahun 2015 – 2035

(m3/dtk)....................................................................... 263

Gambar 5-23 Grafik Total Kebutuhan Air Saat Terjadi Alih Fungsi Lahan

Daerah Irigasi di Wilayah Sungai Serayu – Bogowonto Tahun

2015 – 2035 (m3/dtk) .................................................... 264

Gambar 5-24 Grafik Potensi Air Q80 di Wilayah Sungai Serayu – Bogowonto

(m3/dtk)....................................................................... 266

Gambar 5-25 Grafik Potensi Neraca Air Daerah Aliran Sungai Serayu ... 269

Gambar 5-26 Grafik Potensi Neraca Air Daerah Aliran Sungai Tipar ..... 269

Gambar 5-27 Grafik Potensi Neraca Air Daerah Aliran Sungai Ijo ......... 270

Gambar 5-28 Grafik Potensi Neraca Air Daerah Aliran Sungai Donan ... 270

Gambar 5-29 Grafik Potensi Neraca Air Daerah Aliran Sungai Telomoyo 271

Gambar 5-30 Grafik Potensi Neraca Air Daerah Aliran Sungai Luk Ulo . 271

Gambar 5-31 Grafik Potensi Neraca Air Daerah Aliran Sungai Wawar ... 272

Gambar 5-32 Grafik Potensi Neraca Air Daerah Aliran Sungai Suwuk ... 272

Gambar 5-33 Grafik Potensi Neraca Air Daerah Aliran Sungai

Majingklak ................................................................... 273

Gambar 5-34 Grafik Potensi Neraca Air Daerah Aliran Sungai Mangli ... 273

Gambar 5-35 Grafik Potensi Neraca Air Daerah Aliran Sungai Jintung.. 274

Gambar 5-36 Grafik Potensi Neraca Air Daerah Aliran Sungai Jemenar 274

Gambar 5-37 Grafik Potensi Neraca Air Daerah Aliran Sungai

Watugemulung ............................................................. 275

Gambar 5-38 Grafik Potensi Neraca Air Daerah Aliran Sungai

Cokroyasan .................................................................. 275

ix

Gambar 5-39 Grafik Potensi Neraca Air Daerah Aliran Sungai

Bogowonto ................................................................... 276

Gambar 5-40 Neraca Air Skenario Kondisi Pertumbuhan Ekonomi Sedang

di Wilayah Sungai Serayu – Bogowonto........................... 277

Gambar 5-41 Peta Potensi Pembangkit Listrik Tenaga Air di Wilayah

Sungai Serayu – Bogowonto ........................................... 280

Gambar 5-42 Peta Potensi Pembangkit Listrik Tenaga Mikro Hidro ........ 282

Gambar 5-43 Rencana Periode Pembangunan Waduk Dan Potensi Volume

Tampungan Per Kabupaten Tahun 2015 – 2035 .............. 288

Gambar 5-44 Rencana Periode Pembangunan Embung Dan Potensi Volume

Tampungan Per Kabupaten Tahun 2015 – 2035 .............. 289

Gambar 5-45 Grafik Proyeksi Kebutuhan Air RKI Per Kabupaten .......... 291

Gambar 5-46 Grafik Upaya Pemenuhan Air RKI Tahun 2015 – 2035 di

Wilayah Sungai Serayu – Bogowonto Per Kabupaten

(m3/dtk)....................................................................... 291

Gambar 5-47 Grafik Upaya Pemenuhan Air Irigasi Tahun 2015 – 2035 di

Wilayah Sungai Serayu – Bogowonto Per Kabupaten

(m3/dtk)....................................................................... 292

Gambar 5-48 Baseline Pemenuhan Air di Daerah Hulu Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2015 (m3/dtk) 293

Gambar 5-49 Rencana Pemenuhan Air di Daerah Hulu Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2015 – 2020

(m3/dtk)....................................................................... 294

Gambar 5-50 Rencana Pemenuhan Air di Daerah Hulu Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2020 – 2025

(m3/dtk)....................................................................... 295

Gambar 5-51 Rencana Pemenuhan Air di Daerah Hulu Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2025 – 2035

(m3/dtk)....................................................................... 296

Gambar 5-52 Baseline Pemenuhan Air di Daerah Hilir Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2015 (m3/dtk) 297

Gambar 5-53 Rencana Pemenuhan Air di Daerah Hilir Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2015 – 2020

(m3/dtk)....................................................................... 298

x

Gambar 5-54 Rencana Pemenuhan Air di Daerah Hilir Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2020 – 2025

(m3/dtk)....................................................................... 299

Gambar 5-55 Rencana Pemenuhan Air di Daerah Hilir Wilayah Sungai

Serayu – Bogowonto Per Kabupaten Tahun 2025 – 2035

(m3/dtk)....................................................................... 300

Gambar 5-56 Peta Lokasi Keberadaan Daerah Patahan dengan Rencana

Waduk Gintung ............................................................ 306

Gambar 5-57 Peta Lokasi Keberadaan Daerah Patahan dengan Rencana

Waduk Maung .............................................................. 317

Gambar 5-58 Peta Lokasi Rencana Pembangunan Embung di Wilayah

Sungai Serayu – Bogowonto ........................................... 369

Gambar 5-59 Peta Genangan Banjir Eksisting Hingga Tahun 2015........ 390

Gambar 5-60 Grafik Reduksi Banjir di Wilayah Sungai Serayu –

Bogowonto ................................................................... 393

Gambar 5-61 Peta Genangan Banjir Eksisting Hingga Tahun 2015........ 394

Gambar 5-62 Peta Genangan Banjir Setelah Upaya Jangka Pendek Tahun

2015 – 2020 ................................................................. 395

Gambar 5-63 Peta Genangan Banjir Setelah Upaya Jangka Menengah

Tahun 2020 – 2025....................................................... 396

Gambar 5-64 Peta Genangan Banjir Setelah Upaya Jangka Panjang Tahun

2025 – 2035 ................................................................. 397

Gambar 5-65 Kerusakan Sungai di Daerah Aliran Sungai Bogowonto .... 399

Gambar 5-66 Kerusakan Sungai di Daerah Aliran Sungai Cokroyasan ... 400

Gambar 5-67 Kerusakan Sungai di Daerah Aliran Sungai Wawar .......... 401

Gambar 5-68 Proses Penutupan Muara dan Penampang Memanjang

Sungai, Muara, dan Laut............................................... 405

Gambar 5-69 Peta Panjang Garis Pantai dan Pantai Kritis di Wilayah

Sungai Serayu – Bogowonto ........................................... 407

Gambar 5-70 Lokasi Rencana Jetty di Wilayah Sungai Serayu –

Bogowonto ................................................................... 410

Gambar 5-71 Tampak Atas Jetty ........................................................ 411

Gambar 5-72 Pemasangan Rangkaian Buis Beton Jetty........................ 411

xi

Gambar 5-73 Lokasi Rencana Break Water di Wilayah Sungai Serayu –

Bogowonto ................................................................... 414

Gambar 5-74 Desain Break Water Pantai Keburuhan ........................... 415

Gambar 5-75 Desain Break Water Pantai Logending ............................. 415

Gambar 5-76 Desain Break Water Pantai Tanggul Angin....................... 416

Gambar 5-77 Pemasangan Flood Warning System ................................ 417

Gambar 5-78 Peta Rencana Lokasi Pemasangan Flood Warning System . 418

Gambar 5-79 Pemasangan Tsunami Early Warning System ................... 420

Gambar 5-80 Peta Rencana Lokasi Pemasangan Tsunami Early Warning

System ........................................................................ 421

Gambar 5-81 Grafik Hubungan Antara Jarak Stasiun Hujan dengan

Koefisien Korelasi di Wilayah Sungai Serayu – Bogowonto 426

Gambar 5-82 Grafik Hubungan Antara Jarak Stasiun Klimatologi dengan

Koefisien Korelasi di Wilayah Serayu – Bogowonto ........... 427

Gambar 5-83 Typikal Pos Stasiun Hujan ............................................. 430

Gambar 5-84 Peta Rencana Lokasi Stasiun Hujan ............................... 431

Gambar 5-85 Peta Rencana Lokasi Pos Kualitas Air ............................. 434

xii

DAFTAR TABEL

Tabel 2-1 Distribusi Luas Wilayah Kabupaten dalam Wilayah Sungai

Serayu – Bogowonto ................................................................ 4

Tabel 2-2 Profil Wilayah Sungai Serayu – Bogowonto ................................ 6

Tabel 2-3 Karakterisitik Daerah Aliran Sungai di Wilayah Sungai Serayu –

Bogowonto ............................................................................. 8

Tabel 2-4 Luas Penutupan Lahan di Wilayah Sungai Serayu – Bogowonto 34

Tabel 2-5 Penyimpangan Peruntukan Lahan di Wilayah Sungai Serayu –

Bogowonto ........................................................................... 46

Tabel 2-6 Prakiraan Potensi Erosi untuk Wilayah Sungai Serayu –

Bogowonto ........................................................................... 49

Tabel 2-7 Prakiraan Potensi Lahan Kritis untuk Wilayah Sungai Serayu –

Bogowonto ........................................................................... 49

Tabel 2-8 Perkiraan Volume Penambangan Pasir ................................... 50

Tabel 2-9 Pencemaran Air Tanah di Wilayah Sungai Serayu – Bogowonto 51

Tabel 2-10 Pencemaran Air Sungai di Wilayah Sungai Serayu –

Bogowonto ........................................................................... 52

Tabel 2-11 Hasil Analisis Data Air di Wilayah Sungai Serayu – Bogowonto 54

Tabel 2-12 Tingkat Kerentanan Gerakan Tanah di Wilayah Sungai Serayu –

Bogowonto ........................................................................... 57

Tabel 3-1 Pertumbuhan Ekonomi di Nasional dan Provinsi Jawa Tengah . 61

Tabel 4-1 Stasiun Debit Wilayah Sungai Serayu – Bogowonto.................. 66

Tabel 4-2 Rekapitulasi Ketersediaan Air Non CAT dan CAT di Wilayah

Sungai Serayu – Bogowonto Tahun 2005 – 2014 (mm) ............. 68

Tabel 4-3 Rekapitulasi Tinggi Potensi Air Untuk Debit Andalan 80% CAT

Tiap-Tiap Daerah Aliran Sungai di Wilayah Sungai Serayu –

Bogowonto ........................................................................... 78

Tabel 4-4 Rekapitulasi Tinggi Potensi Air Untuk Debit Andalan 80% Non

CAT Tiap-Tiap Daerah Aliran Sungai di Wilayah Sungai Serayu –

Bogowonto ........................................................................... 80

Tabel 4-5 Ketersediaan Air di Daerah Aliran Sungai Telomoyo Sistem

Sempor ................................................................................ 83

xiii

Tabel 4-6 Ketersediaan Air di Daerah Aliran Sungai Bogowonto Sistem

Bogowonto ........................................................................... 83

Tabel 4-7 Ketersediaan Air di Daerah Aliran Sungai Luk Ulo, Wawar,

Jali/Cokroyasan Sistem Wadaslintang.................................... 84

Tabel 4-8 Ketersediaan Air di Daeah Aliran Sungai Serayu Sistem Serayu

Hulu, Tengah, dan Hilir......................................................... 84

Tabel 4-9 Ketersediaan Air di Daerah Aliran Sungai Donan ..................... 85

Tabel 4-10 Ketersediaan Air di Daerah Aliran Sungai Ijo ......................... 86

Tabel 4-11 Ketersediaan Air di Daerah Aliran Sungai Tipar ..................... 86

Tabel 4-12 Stasiun Hujan Wilayah Sungai Serayu – Bogowonto............... 87

Tabel 4-13 Curah Hujan di Wilayah Sungai Serayu – Bogowonto ............. 89

Tabel 4-14 Luas Daerah Imbuhan dan Lepasan Air di Wilayah Sungai

Serayu – Bogowonto ........................................................... 92

Tabel 4-15 Potensi Cekungan Air Tanah di Pulau Jawa .......................... 94

Tabel 4-16 Luas Daerah Aliran Sungai yang Merupakan Daerah Cekungan

Air Tanah di Wilayah Sungai Serayu – Bogowonto (Km²) ........ 98

Tabel 4-17 Luas Kabupaten/Kota yang Masuk Wilayah Sungai Serayu –

Bogowonto yang Merupakan Daerah Cekungan Air

Tanah (Km²)....................................................................... 99

Tabel 4-18 Daftar Kondisi Saat Ini Bendungan/Waduk yang Terdapat di

Wilayah Sungai Serayu – Bogowonto .................................. 101

Tabel 4-19 Bendung di Wilayah Sungai Serayu – Bogowonto ................. 103

Tabel 4-20 Bangunan Pengendali Sedimen .......................................... 106

Tabel 4-21 Danau di Wilayah Sungai Serayu – Bogowonto .................... 108

Tabel 4-22 Sebaran Sumber Mata Air di Kabupaten Banjarnegara ......... 141

Tabel 4-23 Evaluasi Kualitas Air Sungai Serayu Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 147

Tabel 4-24 Evaluasi Kualitas Air Waduk Wadaslintang Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 148

Tabel 4-25 Evaluasi Kualitas Air Bendung Pejengkolan Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 149

Tabel 4-26 Evaluasi Kualitas Air Sungai Gentan Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 149

xiv

Tabel 4-27 Evaluasi Kualitas Air Sungai Pucang Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 150

Tabel 4-28 Evaluasi Kualitas Air Sungai Wawar Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 151

Tabel 4-29 Evaluasi Kualitas Air Sungai Kutowinangun Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 152

Tabel 4-30 Evaluasi Kualitas Air Sungai Kedungbener Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 153

Tabel 4-31 Evaluasi Kualitas Air Sungai Luk Ulo Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 153

Tabel 4-32 Evaluasi Kualitas Air Sungai Ketek Terhadap Kriteria Mutu Air

Peraturan Pemerintah Nomor 82 Tahun 2001 ..................... 154

Tabel 4-33 Evaluasi Kualitas Air Sungai Karang Anyar Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ...... 155

Tabel 4-34 Evaluasi Kualitas Air Sungai Kemit Terhadap Kriteria Mutu Air

Peraturan Pemerintah Nomor 82 Tahun 2001 ..................... 156

Tabel 4-35 Evaluasi Kualitas Air Sungai Gombong Terhadap Kriteria Mutu

Air Peraturan Pemerintah Nomor 82 Tahun 2001 ................ 157

Tabel 4-36 Evaluasi Kualitas Air Sungai Semali Terhadap Kriteria Mutu Air

Peraturan Pemerintah Nomor 82 Tahun 2001 ..................... 158

Tabel 4-37 Evaluasi Kualitas Air Waduk Sempor di Intake PDAM Terhadap

Kriteria Mutu Air Peraturan Pemerintah Nomor 82

Tahun 2001 ..................................................................... 158

Tabel 4-38 Evaluasi Kualitas Air Sungai Jatinegara Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 159

Tabel 4-39 Evaluasi Kualitas Air Sungai SuwukTerhadap Kriteria Mutu Air

Peraturan Pemerintah Nomor 82 Tahun 2001 ..................... 160

Tabel 4-40 Evaluasi Kualitas Air Sungai Bogowonto Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 161

Tabel 4-41 Evaluasi Kualitas Air Sungai Jali Terhadap Kriteria Mutu Air

Peraturan Pemerintah Nomor 82 Tahun 2001 ..................... 162

Tabel 4-42 Evaluasi Kualitas Air Sungai Kedung Puteri Terhadap Kriteria

Mutu Air Peraturan Pemerintah Nomor 82 Tahun 2001 ....... 163

xv

Tabel 4-43 Luas Kawasan Hutan Berdasarkan Pengelolaan di Wilayah

Serayu – Bogowonto ......................................................... 166

Tabel 4-44 Perkiraan Besarnya Erosi Masing-Masing Daerah Aliran Sungai

di Wilayah Sungai Serayu – Bogowonto (ton/ha/tahun) ....... 168

Tabel 4-45 Klasifikasi Bahaya Erosi Masing-Masing Daerah Aliran Sungai

di Wilayah Sungai Serayu – Bogowonto .............................. 168

Tabel 4-46 Total Erosi Masing-Masing Daerah Aliran Sungai di Wilayah

Sungai Serayu – Bogowonto (ton/thn) ................................ 169

Tabel 4-47 Hasil Sedimen Per Satuan Luas Masing-Masing Daerah Aliran

Sungai di Wilayah Sungai Serayu – Bogowonto (ton/tahun). 171

Tabel 4-48 Pemenuhan Sumber Air Wilayah Sungai Serayu – Bogowonto

Terhadap Klasifikasi Kriteria Mutu Air Peraturan Pemerintah

Nomor 82 Tahun 2001 ...................................................... 173

Tabel 4-49 Daerah Defisit Air (Kekeringan Air) per Kabupaten di Wilayah

Sungai Serayu – Bogowonto .............................................. 174

Tabel 4-50 Lembaga Pengelolaan Sumber Daya Air di Wilayah Sungai

Serayu – Bogowonto ......................................................... 195

Tabel 4-51 Daftar Anggota Tim Koordinasi Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto .................................. 199

Tabel 4-52 Jumlah Penduduk Menurut Kabupaten/Kota di Wilayah Sungai

Serayu – Bogowonto ......................................................... 201

Tabel 4-53 Jumlah Penduduk, Luas Wilayah, dan Tingkat Kepadatan di

Wilayah Sungai Serayu – Bogowonto .................................. 202

Tabel 5-1 Potensi Daerah Resapan Air untuk Wilayah Sungai Serayu –

Bogowonto ......................................................................... 214

Tabel 5-2 Potensi Daerah Tangkapan Air untuk Wilayah Sungai Serayu –

Bogowonto ........................................................................ 217

Tabel 5-3 Variabel dan Kriteria Tata Guna Lahan, Kawasan Resapan Air,

dan Daerah Tangkapan Air untuk Zona Pemanfaatan Sumber

Air..................................................................................... 220

Tabel 5-4 Potensi Zona Pemanfaatan Air untuk Wilayah Sungai Serayu –

Bogowonto ......................................................................... 221

Tabel 5-5 Luas Tata Guna Lahan di Wilayah Sungai Serayu –

Bogowonto ......................................................................... 223

xvi

Tabel 5-6 Luas Lahan Kritis Masing-Masing Derah Aliran Sungai di

Wilayah Sungai Serayu – Bogowonto ................................... 226

Tabel 5-7 Tampungan Air Rencana Bendungan/Waduk di Wilayah Sungai

Serayu – Bogowonto ........................................................... 229

Tabel 5-8 Rekapitulasi Perkiraan Biaya Aspek Konservasi Sumber Daya

Air..................................................................................... 232

Tabel 5-9 Arahan Rekomendasi Rencana Pemulihan Hutan dan Lahan

Pada Kawasan Hutan Lindung ............................................ 233

Tabel 5-10 Arahan Rekomendasi Rencana Pemulihan Hutan dan Lahan

Pada Kawasan Hutan Produksi.......................................... 233

Tabel 5-11 Arahan Rekomendasi Rencana Pemulihan Hutan dan Lahan

Pada Kawasan Lindung (Di Luar Kawasan Hutan) ............... 235

Tabel 5-12 Arahan Rekomendasi Rencana Pemulihan Hutan dan Lahan

Pada Kawasan Budidaya ................................................... 236

Tabel 5-13 Jenis dan Volume Perlakuan Kegiatan Pengendalian Erosi dan

Sedimentasi Secara Sipil Teknis Berupa Dam Pengendali, Dam

Penahan, Gully Plug ......................................................... 238

Tabel 5-14 Jenis dan Volume Perlakuan Kegiatan Pengendalian Erosi dan

Sedimentasi Secara Vegetatif Berupa Pengendalian Kanan

Kiri/Tebing Sungai ........................................................... 239

Tabel 5-15 Jenis dan Volume Perlakuan Kegiatan Pengendalian Erosi dan

Sedimentasi Secara Vegetatif Berupa Pembuatan Strip Rumput

(Grass Barrier).................................................................. 239

Tabel 5-16 Jenis dan Volume Perlakuan Kegiatan Rencana Erosi dan

Sedimentasi Secara Vegetatif Berupa Pengembangan Sumber

Daya Air .......................................................................... 240

Tabel 5-17 Jenis dan Volume Perlakuan Kegiatan Perlindungan Erosi dan

Sedimentasi Secara Vegetatif Berupa dan Pelestarian Mata Air

Secara Vegetatif ............................................................... 240

Tabel 5-18 Rencana Rehabilitasi Hutan pada Hutan Lindung................ 241

Tabel 5-19 Rencana Rehabilitasi Hutan pada Kawasan Hutan Produksi . 242

Tabel 5-20 Rencana Rehabilitasi Hutan pada Kawasan Lindung (Di Luar

Kawasan Hutan)............................................................... 242

Tabel 5-21 Rencana Rehabilitasi Hutan pada Kawasan Budidaya .......... 242

xvii

Tabel 5-22 Kebutuhan Air Rumah Tangga dan Kota Per Kabupaten/Kota di

Wilayah Sungai Serayu – Bogowonto .................................. 261

Tabel 5-23 Kebutuhan Air Industri Per Kabupaten/Kota di Wilayah Sungai

Serayu – Bogowonto ......................................................... 261

Tabel 5-24 Rekapitulasi Luasan dan Kebutuhan Air Daerah Irigasi

Kewenangan Pemerintah Pusat di Wilayah Sungai Serayu –

Bogowonto ....................................................................... 262

Tabel 5-25 Rekapitulasi Potensi Neraca Air Per Daerah Aliran Sungai

(m³/detik) ........................................................................ 267

Tabel 5-26 Potensi Sumber Daya Air di Wilayah Sungai Serayu – Bogowonto

untuk Pembangkit Listrik Tenaga Air ................................. 279

Tabel 5-27 Hasil Inventarisasi Potensi PLTMH di Kabupaten Purworejo .. 283

Tabel 5-28 Hasil Inventarisasi Potensi PLTMH di Kabupaten Kebumen .. 283

Tabel 5-29 Hasil Inventarisasi Potensi PLTMH di Kabupaten Banyumas . 284

Tabel 5-30 Hasil Inventarisasi Potensi PLTMH di Kabupaten

Purbalingga ..................................................................... 285

Tabel 5-31 Rekapitulasi Perkiraan Biaya Aspek Pendayagunaan Sumber

Daya Air .......................................................................... 286

Tabel 5-32 Upaya Pemenuhan Air di Wilayah Sungai Serayu – Bogowonto

Tahun 2015 – 2035 .......................................................... 286

Tabel 5-33 Proyeksi Kebutuhan Air untuk Rumah Tangga, Kota, dan

Industri Per Kabupaten di Wilayah Sungai Serayu –

Bogowonto ....................................................................... 290

Tabel 5-34 Rencana Pembangunan Waduk di Wilayah Sungai Serayu –

Bogowonto ....................................................................... 301

Tabel 5-35 Perhitungan Debit Banjir Rencana Masing-Masing Daerah Aliran

Sungai di Wilayah Sungai Serayu – Bogowonto dengan Metode

Der Weduwen .................................................................. 374

Tabel 5-36 Perhitungan Debit Banjir Rencana Masing-Masing Daerah Aliran

Sungai di Wilayah Sungai Serayu – Bogowonto dengan Metode

Haspers........................................................................... 380

Tabel 5-37 Perhitungan Debit Banjir Rencana Masing-Masing Daerah Aliran

Sungai di Wilayah Sungai Serayu – Bogowonto dengan Metode

Melchior .......................................................................... 384

xviii

Tabel 5-38 Perhitungan Debit Banjir Rencana Masing-Masing Daerah Aliran

Sungai di Wilayah Sungai Serayu – Bogowonto dengan Metode

Rasional .......................................................................... 388

Tabel 5-39 Rekapitulasi Perkiraan Biaya Aspek Pengendalian Daya Rusak

Air .................................................................................. 391

Tabel 5-40 Rencana Pembangunan Jetty di Wilayah Sungai Serayu –

Bogowonto ....................................................................... 409

Tabel 5-41 Rencana Pembangunan Break Water di Wilayah Sungai Serayu

– Bogowonto .................................................................... 413

Tabel 5-42 Hasil Analisis Kesalahan Perataan dan Panjang Sisi Jaringan

Stasiun Hujan dan Klimatologi di Wilayah Sungai Serayu –

Bogowonto ....................................................................... 428

Tabel 5-43 Pos Pengamatan Kualitas Air Sungai Eksisting di Wilayah

Sungai Serayu – Bogowonto .............................................. 432

Tabel 5-44 Pos Pengamatan Kualitas Air Sungai Rencana di Wilayah Sungai

Serayu – Bogowonto ......................................................... 433

Tabel 6-1 Total Rekapitulasi Perkiraaan Biaya Rencana Pengelolaan

Sumber Daya Air Wilayah Sungai Serayu – Bogowonto .......... 448

Tabel 6-2 Matrik Dasar Penyusunan Program dan Kegiatan Rencana

Pengelolaan Sumber Daya Air WS Serayu Bogowonto ............ 451

1

BAB I

PENDAHULUAN

1.1 Latar Belakang

Dalam Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat

Republik Indonesia Nomor 10/PRT/M/2015 tentang Rencana Dan Rencana

Teknis Tata Pengaturan Air Dan Tata Pengairan pasal 1 disebutkan bahwa

tata pengaturan air adalah segala usaha untuk mengatur pembinaan

seperti pemilikan, penguasaan, pengelolaan, penggunaan, pengusahaan,

dan pengawasan atas air beserta sumber-sumbernya, termasuk kekayaan

alam bukan hewani yang terkandung didalamnya, guna mencapai manfaat

yang sebesar-besarnya dalam memenuhi hajat hidup dan peri kehidupan

rakyat.

Rencana tata pengaturan air dan tata pengairan adalah hasil

perencanaan tata pengaturan air dan tata pengairan pada setiap wilayah

sungai yang bersifat makro, dimuat dalam suatu dokumen pola

pengelolaan sumber daya air.

Pola pengelolaan sumber daya air merupakan kerangka dasar dalam

merencanakan, melaksanakan, memantau, dan mengevaluasi kegiatan

konservasi sumber daya air, pendayagunaan sumber daya air, dan

pengendalian daya rusak air wilayah sungai dengan prinsip keterpaduan

antara air permukaan dan air tanah, yang merupakan keterpaduan dalam

pengelolaan yang diselenggarakan dengan memperhatikan wewenang dan

tanggung jawab instansi masing-masing sesuai dengan tugas pokok dan

fungsinya.

Pola pengelolaan sumber daya air disusun secara terkoordinasi

diantara instansi terkait, berdasarkan asas kelestarian, asas keseimbangan

fungsi sosial, lingkungan hidup, dan ekonomi, asas kemanfaatan umum,

asas keterpaduan dan keserasian, asas keadilan, asas kemandirian, serta

asas transparansi dan akuntabilitas. penyusunan pola pengelolaan sumber

daya air perlu melibatkan seluas-luasnya peran masyarakat dan dunia

usaha baik koperasi, BUMN, BUMD maupun badan usaha swasta. Sejalan

dengan prinsip demokratis, masyarakat tidak hanya diberi peran dalam

penyusunan pola pengelolaan sumber daya air, tetapi berperan pula dalam

2

proses perencanaan, pelaksanaan konstruksi, operasi dan pemeliharaan,

pemantauan, serta pengawasan atas pengelolaan sumber daya air.

Untuk dapat menyusun rancangan pola pengelolaan sumber daya air

wilayah sungai perlu diketahui sistem pengelolaan sumber daya air yang

sedang berjalan saat ini, mencakup aspek aspek konservasi sumber daya

air, pendayagunaan sumber daya air, pengendalian daya rusak air, sistem

informasi sumber daya air dan peran serta masyarakat, swasta dan dunia

usaha dalam pengelolaan sumber daya air.

Disamping inventarisasi sistem pengelolaan sumber daya air saat ini,

juga dilakukan inventarisasi permasalahan yang ada dalam pengelolaan

sumber daya air di wilayah sungai, yang akan dijadikan acuan dalam

penyusunan rancangan rencana pengelolaan sumber daya air di masa yang

akan datang yang kini disebut sebagai rencana teknis tata pengaturan air

dan tata pengairan.

Rencana teknis tata pengaturan air dan tata pengairan adalah hasil

perencanaan teknis tata pengaturan air dan tata pengairan pada setiap

wilayah sungai yang dimuat dalam suatu dokumen rencana pengelolaan

sumber daya air.

Untuk hal tersebut di atas, dilakukan kegiatan Penyusunan Rencana

Pengelolaan Sumber Daya Air Wilayah Sungai Serayu – Bogowonto guna

mewujudkan pemanfaatan dan pendayagunaan sumber air di Wilayah

Sungai Serayu – Bogowonto secara serasi dan optimal, sesuai dengan

kebutuhan dan kemampuan daya dukung lingkungan serta sesuai dengan

kebijaksanaan pembangunan nasional dan daerah yang berkelanjutan.

1.2 Maksud dan Tujuan

Maksud dari disusunnya Rencana Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto adalah menyusun rencana umum

pengelolaan sumber daya air di WS Serayu – Bogowonto untuk jangka

waktu 20 (dua puluh) tahun ke depan, dengan prinsip keterpaduan antara

air permukaan dan air tanah, hulu dan hilir, kuantitas dan kualitas, serta

keseimbangan antara upaya konservasi sumber daya air, pendayagunaan

sumber daya air dan pengendalian daya rusak air.

3

1.2.1 Tujuan

Tujuan dari disusunnya Rencana Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto adalah terwujudnya kelestarian

sumber daya air, pemanfaatan dan pendayagunaan sumber daya air yang

serasi dan optimal sesuai dengan kebutuhan dan kemampuan daya

dukung lingkungan dan mengurangi daya rusak air serta sesuai dengan

kebijakan pembangunan nasional dan daerah yang berkelanjutan.

1.2.2 Sasaran

Sasaran dari disusunnya Rencana Pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto adalah agar menjadi dokumen acuan,

tolak ukur di dalam mewujudkan suatu pengelolaan Sumber Daya Air

Wilayah Sungai Serayu – Bogowonto yang baik.