tauqeer ahmad

29

Upload: tauqeer-ahmed

Post on 15-Apr-2017

174 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tauqeer Ahmad
Page 2: Tauqeer Ahmad

“Mechanical Engineer-with 14 years hands on Experience from Pakistan, Japan, Korea, Taiwan and Saudi Arabia in the fields of Process Improvement & Production Management”

A Brief synopsis of

Eng. Tauqeer Ahmad

Page 3: Tauqeer Ahmad

LEAN SIX SIGMA

Areas of Work

Conducted study and suggested measures to reduce waste (MUDA) by streamlining various processes in molding and assembly operations.

Reduced variation in process by optimizing SOPresulting decrease in amount of Defective products.(DPMO)

Page 4: Tauqeer Ahmad

YAMAZUMI

Performed time and motion study for various processes in molding, assembly and work shop to determine MUDA or waste in processes.

Based on this study, suggested measures like line balancing, level production, flexible workforce and automation to minimize/eliminate them.

Page 5: Tauqeer Ahmad

KAIZEN

Trained and participated in Kaizen convention held by Indus Motor Company(Manufacturer of Toyota vehicles in Pakistan) with following themes;

“ To reduce mold loading/unloading time”

“To improve Cycle time of molded parts”

“To improve the quality of the quality department”

Page 6: Tauqeer Ahmad

TOYOTA PRODUCTION SYSTEM (TPS) Studied and trained TPS to sub ordinates

(Dy. Managers, Asst. Managers and Supervisors) mainly focused on;

Concept of Cost, MUDA and Efficiency

JIT (Just-In-Time)

The Pull System

Continuous Flow Processing

Developed and organized “Quality Circle” & “Creative Suggestion System” to get maximum involvement of team members.

Page 7: Tauqeer Ahmad

Conducted study of various process elements for the seriousness of their failure and ultimate impact on quality, cost and reputation of the organization.

FMEA (Failure Mode & Effect Analysis)

OEE (Overall Equipment Efficiency) Prepared and maintained Overall Equipment

Efficiency record for different machines/equipment in terms of their availability, performance rate and quality rate.

Page 8: Tauqeer Ahmad

PROBLEM ANALYSIS

Fish Bone (Cause and Effect Diagram)

5 W and 1H methodology

Used these powerful tools to resolve various day to day technical production and quality problems.

Page 9: Tauqeer Ahmad

5S- Housekeeping Tool

1.Seiri 2.Seiton 3.Seiso 4.Seiketsu 5.Shitsuke

Trained and implemented 5S culture in the organization.

Developed and implemented check sheet for different shop floor like production, work shop, clean room, tool room, ware hose etc.

Page 10: Tauqeer Ahmad

5S-Implementation (Tool Room)

Before After

Page 11: Tauqeer Ahmad

HEAVY MOULDING 420T~3000T

Page 12: Tauqeer Ahmad

LIGHT MOULDING 75T~350T

Page 13: Tauqeer Ahmad

Boundary Sample Rack

Component Assy. Area

In Process Storage

5S IMPLEMENTATION

Page 14: Tauqeer Ahmad

5S IMPLEMENTATION

Extrusion section

Page 15: Tauqeer Ahmad

5S IMPLEMENTATION

In process storage at Injection area

Page 16: Tauqeer Ahmad

5S IMPLEMENTATION

CRUSHING AND MIXING

OF RAW MATERIAL

Page 17: Tauqeer Ahmad

VISUAL MANAGEMENT

Page 18: Tauqeer Ahmad

VISUAL MANAGEMENT

Page 19: Tauqeer Ahmad

Developed and maintained Safety Program in accordance with OHSAS 18001:2007 in Main Factory, Warehouses and Head Office)

Perform Hazard Identification and Risk Assessment for all locations

Arrange and provide internal trainings (Firefighting, First Aid, Basic Health & Safety, Mock Drills)

Prepare and maintain “Monthly Surveillance Report”, “Incident Notification/investigation Report” for all locations

HEALTH & SAFETY

Page 20: Tauqeer Ahmad

INTERNATIONAL EXPOSURE1. AOTS SCHOLARSHIP (JAPAN)

2. KOITO MANUFACTURING CO. (JAPAN)

3. TOYODA GOSSIE CO. (JAPAN)

4. MURAKAMI CORPORATION (JAPAN)

5. AUTO KOREA (KOREA)

6. FU CHUN SHIN MACHINE MANUFACTURING

(TAIWAN)

7. ASCEND’S INDUSTRIES (TAIWAN)

8. CHEN YU PLASTICS (TAIWAN)

Page 21: Tauqeer Ahmad

TRAININGS

Total Productive Management(TPM)

By Mr. Genji Tanaka, TPM expert from Japan

Production Management

at AOTS Yokohama Kenshu Centre, Japan

Managerial GRID

By Mr. Zia Shafi Khan (Grid International Inc. )

Internal Auditor

ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007

ISO 13485:2003 & EN ISO 13485-2012 (Medical Devices)

Page 22: Tauqeer Ahmad

Thank you

Page 23: Tauqeer Ahmad

GRID CERTIFICATE

Page 24: Tauqeer Ahmad

GRID TRAINEES&TRAINERS

Page 25: Tauqeer Ahmad

AOTS CERTIFICATE

Page 26: Tauqeer Ahmad

YOKOHAMA KENSHU CENTRE-Japan

Page 27: Tauqeer Ahmad

TOTAL PRODUCTIVE MANAGEMENT

Page 28: Tauqeer Ahmad

AT KOITO JAPAN

Page 29: Tauqeer Ahmad

AT KOITO JAPAN