stability ofembankments on soft ground lessons from...

17
PertanikaJ. Sci. & Techno!. 3(1):12:\-139(1995) 1SSN: 0128-7680 © Universiti Pertanian Malaysia Press Stability of Embankments on Soft Ground - Lessons from Failures Bujang B.K. Huat Faculty oj Eng;i.neering Universiti Malaysia Sarawak 94300 Kota Samarahan, Sarawak, Malaysia Received 4 February 1994 ABSTRAK Beberapa benteng yang dibina di atas tanah liat lembut runtuh sewaktu pembi- naan sebuah projek lebuh raya utama di Malaysia. Tiga daripada benteng tersebut dianalisis semula berdasarkan geometri benteng sebelum keruntuhan berlaku. Kekuatan ram ricih di situ tanah diguna dalam analisis sewaktu keruntuhan. Prestasi tanah dalam bentuk anjakan tegak dan mengufuk, dan respons piezometer sewaktu keruntuhan diperihalkan. ABSTRACT A number of embankments founded on soft clays have become unstable during construction of a major highway project in Malaysia. Three of the embankments were back analysed based on their geometries before the failure. Measured in situ vane shear strengths were used in total stress analyses to determine the fac- tor of safety at failure. Performances of the soft clay foundation with regards to vertical and horizontal displacements, and piezometric response, when the failure was imminent were also described. Keywords: embankment, failure, soft clay INTRODUCTION Extensive deposits of low strength, compressible soils are found worldwide, and the difficulties of supporting loads on such foundations have been widely reported. In Malaysia, Quaternary erosion accentuated by climatic and sea level changes has produced widespread, thick deposits of soft clays in the coastal areas and major river valleys, varying from 5 m to 30 m in thickness. Reviews of the basic and engineering properties of some of these deposits have been published by Ting et al. (1987) and Abdullah & Chandra (1987). Roads founded on the soft deposits often have to be raised on high embank- ments, giving rise to problems of instability during construction, and long- term, persistent settlement subsequently. This paper presents the findings of back analysis of three embankment failures on soft ground. The aim is to establish whether: a] conventional total stress stability analysis is sufficient for routine calcula- tions, and

Upload: others

Post on 03-Feb-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

PertanikaJ. Sci. & Techno!. 3(1):12:\-139(1995)1SSN: 0128-7680

© Universiti Pertanian Malaysia Press

Stability of Embankments on Soft Ground ­Lessons from Failures

Bujang B.K. HuatFaculty ojEng;i.neering

Universiti Malaysia Sarawak94300 Kota Samarahan, Sarawak, Malaysia

Received 4 February 1994

ABSTRAK

Beberapa benteng yang dibina di atas tanah liat lembut runtuh sewaktu pembi­naan sebuah projek lebuh raya utama di Malaysia. Tiga daripada benteng tersebutdianalisis semula berdasarkan geometri benteng sebelum keruntuhan berlaku.Kekuatan ram ricih di situ tanah diguna dalam analisis sewaktu keruntuhan.Prestasi tanah dalam bentuk anjakan tegak dan mengufuk, dan responspiezometer sewaktu keruntuhan diperihalkan.

ABSTRACT

A number of embankments founded on soft clays have become unstable duringconstruction of a major highway project in Malaysia. Three of the embankmentswere back analysed based on their geometries before the failure. Measured insitu vane shear strengths were used in total stress analyses to determine the fac­tor of safety at failure. Performances of the soft clay foundation with regards to

vertical and horizontal displacements, and piezometric response, when the failurewas imminent were also described.

Keywords: embankment, failure, soft clay

INTRODUCTION

Extensive deposits of low strength, compressible soils are found worldwide,and the difficulties of supporting loads on such foundations have been widelyreported. In Malaysia, Quaternary erosion accentuated by climatic and sealevel changes has produced widespread, thick deposits of soft clays in thecoastal areas and major river valleys, varying from 5 m to 30 m in thickness.Reviews of the basic and engineering properties of some of these depositshave been published by Ting et al. (1987) and Abdullah & Chandra (1987).Roads founded on the soft deposits often have to be raised on high embank­ments, giving rise to problems of instability during construction, and long­term, persistent settlement subsequently.

This paper presents the findings of back analysis of three embankmentfailures on soft ground. The aim is to establish whether:a] conventional total stress stability analysis is sufficient for routine calcula­

tions, and

Page 2: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Bujang B.K. Buat

b] field instrumentation such as settlement gauges, inclinometer andpiezometer may be used for control of field construction

SITE AND HISTORY OF THE FAILED EMBANKMENTS

All three embankments (designated Embankment 1,2 and 3) were part ofarecently constructed highway in northern Peninsular Malaysia

Fig. lea), l(b) and l(e) show plan, profile and instrumentation of thefailed embankment sections and their vicinity. All these embankments wereinstrumented with settlement markers. Additional instrumentation in theform of piezometers and inclinometers was also incorporated in one of theembankments (embankment 3).

Fig. 1(a) shows location of Embankment 1. It lies north of an expresswaybridge, located in the area of an oil palm plantation. The embankment wasto be built on untreated soft clay foundation to a height of about 5 m with aside slope of 2 horizontal to 1 vertical. Tension crack was discovered at theleft-hand side of the embankment by mid:July 1992, i.e. on Day 155 fromstart of filling. This was discovered as the final fill layer was being placed.The height of fill above original ground level was then about 4.6 m. On thefollowing day the crack opened wider with more new cracks developing. OnDay 158 about 1 m fill was removed and counterberm was constructed on theleft-hand side to prevent complete collapse of the embankment.

_. __ .~il_pa~_.

• Settlement markers

Embankment Ir---!

Bridge TE 6

om~

i-5m~

---,,' -~------- -,Io 20 40 horizontalO~ vertical

124

Fig. l(a). Plan nnd flrofilr oJl'lnbrmkmPIII I

Pertanika.J. Sci. & Techno!. Vol. 3 No.1, 1995

Page 3: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons h'om Failures

Fig. 1(b) shows location of Embankment 2 and its vicinity. The failedembankment lies just north of an existing water canal. Beneath the embank­ment vertical drains were installed to the full depth of the clay foundation(13 m) at a triangular grid spacing of 1.2 m centre to centre. Constructionof the embankment commenced with placement of geotextile separatorlayer and 400 mm thick sand blanket in February 1992, followed by installa­tion of the drain in May 1992. The earth filling was commenced by mid~June

1992 and was almost to the final level when the failure occurred at the endof October 1992, i.e. on Day 220 (Day 0 being placement of sand blanket).The fill thickness was then about 3.6 m above original ground level.

• Settlement markers

I' Errbonkment 2 'II I

[omt ====~5m -- -----

Om --~_ -' - --- -;, .--t'\/'-\,_- ---- -- - --,---- ---

Scale'

o 20 40 horizontalO~ vertical

Fig. 1(b). Plan anrltnojile ojembankment 2

The location of Embankment 3 is shown in Fig. 1(c). This embankmenttransversed an area of rubber and oil palm estate. It was to be built to about3.2 m height above original ground level, inclusive of a 1.5 m surcharge. Siteclearing was commenced in early January 1992 followed by placement ofgeotextile separator layer with 400 mm thick sand blanket. Earth filling wascommenced in early March 1992 and was completed to final level by mid~uly

1992 (i.e. on Day 140). Five days later (Day 145) the embankment collapsedwithout prior sighting of any tension crack. It was reported that during con­struction the embankment was used as part of a haulage road for trans­portation of earth, piles and other construction materials from an existing

PertanikaJ. Sci. & Techno!. Va!. :I No.1, 1995 125

Page 4: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Bujang B. K. Hllal

Oil palm

_Foiled area /

-=bank~rn 3 ''-/ . __

• Settlement markers• Pleza~terI Inclina~ter

Embarl<~nt 3r---

S<xlle:

~ horizontalO~ vertical

Fig. J(t). Plan and fnoJile a/embankment 3

main road to nearby sections. It is also of interest to note that in all the casescited, no period of exceptional weather conditions, such as heavy rainfall, wasreported prior to the embankment failure.

SOIL PROFILES AND PROPERTIES

Fig. 2(a), 2(b) & 2(c) show subsoil profiles of each of the embankments asobtained from the site investigation carried out during the design stage. Ingeneral they comprise soft silty clays of 7 m - 13 m thickness, underlain by alayer of loose to medium dense sand. The liquid limits of the soft clays varyfrom 50% - 120% with natural water content clsoe to the liquid limit, andplasticity indices in the range of 30% - 80%. Undrained strengths obtainedfrom the vane test show a general trend of strength (Sll) increase below aweathered upper crust which varies from 1 m - 1.5 m in thickness (Fig. 3),with SU/0 c ratio in the range of 0.3 - 0.4. The clays are shown to be moderatelysensitive, with sensitivity ratios in the range of 3 - 12. Results obtained fromthe oedometer tests indicated that the clays are slightly over-consolidated buthighly compressible. This apparent over-consolidation of the clay is believedto be due to that of the weathered crust. The values of Cv are typically low,ranging from 1 - 10m2/yr.

126 PertanikaJ. Sci. & Techno!. Vol. 3 No.1, 1995

Page 5: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons from Failures

,_Foiled_aeoEmb I

o

10m

------- ,

7/~Loose silly sond - ,~;y~Dense clayey sand ///

F//" -/ / //~~>~ "/./ lif( SO~~y cloy' , './ / / ' - -/ '// ---~-Meel. dense 5 / C!2::> . . _-=_

.7/

Fig, 2(a), Subsoil profile o/embrmlullent J

Foiled area

~,;

tiff clay

20m

Fig 2(b) , SII!J"'iljlrojile ofelllbankrneni 2

!'C Foiled oreaEmb.3

I

Loose 10 med. dense sand

Fig, 2(r), Subsoil Profile of fln!Jauklllent 3

PertanikaJ Sci. & Techno!' Va!. 3 No, I, 1995 127

Page 6: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Fig. 3. AVf)"agp vane sll"mgths

INVESTIGATION OF FAILURE

Soon after the failure, attempts were made to obtain sufficient geotechnicaldata at each of the distressed embankments to enable analyses of the failureto be carried out.

For this purpose, the following were done:a) Survey was carried out to map the collapsed section of the embankment

to determine the probable mode of failure.b) Additional soil strength measurements were made. These were in the

form of consolidated isotropic undrained triaxial tests on undisturbedsamples recovered, using Mazier sampler, from the embankment fill. Forthe clay foundation, additional soil strengths were measured in situ bymeans of field vanes at locations beneath the embankment centre, at toeand at some distance forward of the toe. According to Brand andKrasaesin (1971), the field vane is the most reliable method for deter­mining undrained shear strength of a soft, reasonably sensitive clay.

ANALYSES OF THE FAILURE

Mode offailureCross-sections of the embankment surveyed after the failure are shown in

12R PertanikaJ. Sci. & Techno!. Vol. 3 No.1, 1995

Page 7: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Cronnd - Lessons from Failures

~

30m

Fig. 4((1). Cross-sP,/iO!1 o!I'III!)({!1!wlI'n/1

RHSLHSI

65 PVS 2

PVS I 4 I~--~~--~-~-----------+~--------O+"---"2~1---------,;J1(\-------~------,5~---------­

PVS - Post failure vane test

Fig. 4(1J). Cross-sP('tiO!1 o! PIJI!HlnkIJlP!1/ 2

PVS 6

IpvS 3 PVS 4PVS I

2~

5m

4m ~

3m ",2m ,1m

Om20m 10m Om 10m 20m 30m 40m

PVS - Post-failure vane test

Fig. 4(a). Cross-sec/ion ofembllnkml'l1/ 3

Fig. 4 (a), 4(b) and 4(c). For comparison purposes, designed cross-sections ofthe embankment are superimposed. In all cases, failure of the embankmentwas characterized by wide open cracks through embankment fill with a sig­nificant heave at the embankment toe. This indicated that the mode of theembankment failure has been that of a rotational slip.

In the case of embankment 1, the cracks extend over a longitudinal dis­tance of 80 m. A 0.25 m differential settlement was measured between the

PertanikaJ. Sci. & Techno!. Vo!. ~ No. I, 1995 129

Page 8: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Bujang B.K Huat

failed and intact portions of the embankment. The toe heave extends overa distance of 7 m from the embankment toe.

In the case of embankment 2, the cracks extend over a longitudinal dis­tance of 110 m. Movement of the ground beyond the embankment toe wasin evidence over a distance of about 5 m.

In embankment 3, the failure stretched over a distance of 140 m. A crackabout 400 mm wide (at surface) appeared about 4.0 m away from the cen­treline, with about 1 m differential settlement across the crack. A 1.26 mhigh heave was observed at the embankment toe, and the width of thisupheaval was about 20.5 m.

SOIL STRENGTH PARAMETERSAdditional soil strength measurements were made after the failures. Thesewere in the form of isotropic undrained trial (CIU) test on undisturbed sam­ples of the fill material of each of the three embankment sections. Theresults of the CIU tests, general descriptions and index properties of theembankment fill are summarized in Table 1. The fills are of sandy, silty claywith greater than 60% of the material in the silt-clay range. The plasticityindices are low, in the range of 17% to 23%. Shear strength parameters areC'= 17 - 42 KPa, and 0' = 23 - 27°.

TABLE 1Description and properties of embankment fill

Embankment 1Soil DescriptionAtterberg's LimitSieve AnalysisMax. Dry DensityStrength Parameters (CIU):

Dark grey sandy silty clayWI. = 35% Wp = 17% PI = 18%Gravel 25% Sand 7% Silt and Clay 68%1.95 Mg/m3 OMC = 12%C' = 17 kPa 0' = 27

Embankment 2Soil DescriptionAtterberg's LimitMax. Dry DensityStrength Parameters (CIU):

Brownish yellow silty clayWI. = 41% Wp = 18% PI2.13 Mg/m:~ OMC = 13.5%C' = 42 kPa 0' = 26

23%

Embankment 3Soil DescriptionAtterberg's LimitSieve AnalysisMax. Dry DensityStrength Parameters (CIU):

Reddish sandy clayWI. = 42% Wp = 25% PI = 17%Gravel 8% Sand 23% Silt and Clay 69%2.07 Mg/m3 OMC = 10.2%C' = 25 kPa 0' = 23

1::10 PenanikaJ. Sci. & Technol. Vol.::I '0. 1, 1995

Page 9: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons from Failures

Vane strength ( kPa)

o5 ~ 15 2() ~_3~ 3p 40 4,5 50

2

4

6

- 8E

.cCi.Q)

010

12

14

\

\\\\\\\\\\\

-PVS 1-15 m fromtae

XPVS2-toe

"PVS 3- centre

_.- prefailure strenqlh (average)- - - prefailure strength (corrected)

Fig. 5. Postfailure vane strengths of emban!onenl 2

Post failure in situ vane shear tests were also carried out for embank­ments 2 and 3. Positions of the vane tests are shown in Fig. 4(b) and 4(c). Forembankment 2, the vane measurements were carried out at a location closeto the embankment centre, at toe and at a location about 15 m beyond thetoe, about 1 month after the failure. The data obtained are presented in Fig.5. Superimposed also on the figure are the average vane strengths of the ini­tial (pre-failure) investigation (see also Fig. 3).

It is of interest to note that there appears to be no significant gain inshear strengths at locations beneath the embankment centre after construc­tion. Note that at this particular embankment section prefabricated verticaldrains were installed. There also appears to be no significant difference inundrained strength beneath the embankment centre compared with that atlocations at the embankment toe, and away from the toe.

Fig. 6 shows the post-failure vane strengths of embankment 3. Thesemeasurements were carried out in November 1992, three months after thefailure. As in the case of embankment 2, there appears to be minimalstrength gain when the post and prefailure vane strengths are compared. Itmay therefore be concluded that the failure of both embankments 2 and 3(and embankments 1) occurred essentially under undrained conditions. A

PertanikaJ. Sci. & Techno!. Vo!. ~ No.1, 1995 1~1

Page 10: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

BlIjang B.K. HlI<ll

Vane strength (kPa)O;-__I-i.0 20~__30~ 40-,,--__5~O__

2

4

6

E

.s:: 8a.c3

10

12

14

. ..

~ PVS 1 - toe

• PVS 2 - centre

~ PVS 3 - toe

,'> PVS 4 -20m from toe

.. PVS 5 - centre

o PVS 6 - toe

- - prefailure vane strength(average )

___ prefailure vane strength{ corrected)

Fig. 6. Postjailufr lIanr shenK/I! ojembankment 3

total stress (0n = 0) analysis can therefore be applied. Wolski el al. (1989)have suggested that for a single-stage embankment construction on soft clay,the formation can be considered as practically undrained. All these embank­ments were essentially constructed in a single stage.

Rotalional Slij)In the total stress analysis the proportion of undrained shear strength, SIPmobilized at a point on a given surface of rotation, where the safety factor isF, is:

1m

F

and, for the whole surface:

FL1:I1lL

Pertanika.J. Sci. & Technol. Vol. 3 No.1, J995

Page 11: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons ii'om Failures

V\Then Bishop simplified method of slices is used for the integration aroundthe circuluar arc, this becomes:

FL, W Sin ~

where L is the length of the arc of the slice, W is the weight of the slice and~ is the angle the normal surface makes to the vertical of rotation,

The above analysis is used for calculating factor of safety of the embank­ment at failure. The properties of the fill are accounted for with valuesobtained from the CIU tests summarized in Table I. Neglect of the embank­ment strength as suggested by Bjerrum (1973) would be too conservative. Itcan also be argued that tension crack is a consequence, not the cause of failure.There is evidence from good case histories of embankment failures on softclays that compacted cohesive fill tends to playa part in resisting failure(Balasubramaniam et al. 1989; Brand & Premchitt, 1989).

For the clay foundation, the average vane strengths shown in Fig. 3 areused as input parameters. These were corrected with Bjerrum's (1973) cor­rection factors for the effect of anisotropy and shear rate. As shown in Fig. 7,

12020

• ~• ~

L>

(;,0

-----: (;, .L>(;,~ • •• •~6

(;, •00• ,.., 66 (;, I • •~(

•~ •

o· •.

"'"I

~,- --

1'--~

I'--t--f-

f---

40 60 80 100Plasticity Index (%)

Fig. 7. Relationship between [(llmlated factor of safety and ji/astirilyindex for embankment Ftilures, and deduced comxtion factorsfor measured vane strengths (Bjenum 1973)

1·0

0·5

'6 \·0lJ..

1,5

2·0

~

~ 0·8

~c:.2 0·6oe...ol>

PertanikaJ. Sci. & Techno1. Vol. 3 No.1, 1995 L~3

Page 12: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Bujang B.K. Huat

for plasticity index of 30 - 80%, the correction factor applied is between 0.7- 0.9. It is of interest to note that the corrected average vane strength of theclay lies close to the lower bound of the field data (See Fig. 5, 6). ote alsothat for embankment 3 surcharge loading of the traffic is accounted for, esti­mated in the order of 10 kN/m2. The results of the calculation are summa­rized in Table 2.

TABLE 2Factor of safety of embankment at failure

Fill height Fill strengthEmbankment above OGL (m) C' (kPa) Factor of safety

0' (deg)

1 4.6 17,27 0.91

2. 3.6 42,26 1.04

3 3.2 25,23 1.03

The factors of safety of the embankment at failure are essentially equalto unity. This indicated that given representative strength parameters havebeen obtained for both fill and foundation, the total stress analysis is suffi­cient for short-term failures of embankment on soft clays, i. e. till end of con­struction time. It has been suggested that the total stress analysis offers anunambiguous way of estimating stability (Pilot 1972; Brand, 1983; Wolski etal. 1989).

OBSERVED BEHAVIOUR OF EMBANKMENT AT THEONSET OF FAILURE

Rate of SettlementFig. 8 and Fig. 9 show construction histories and settlements of embankment2 and embankment 3 respectively. In both cases there was a dramaticincrease in settlement rate just prior to the failure.

Lateral DeformationOnly embankment 3 was installed with an inclinometer and three piezo­meters in addition to the settlement markers. Fig. 10 shows plot of maximumlateral displacement (t.. y) versus centreline settlement (t.. S) of the embank­ment. It is of interest to note that when the fill was low, i.e. for fill thicknessof less than I m, the t.. y/ t.. S relation is small with t.. y == 0.29 t.. S. But at theonset of the failure, t.. y increases significantly; from approximately equal tot.. S to almost 3 times t.. S.

134 Pertanikaj. Sci. & Techno!. Vo!. 3 No.1, 1995

Page 13: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stahilil'- of Embankmenls on Soft GroUllrl- Lessons from Failures

300 400 500Time (days)

200100o

I

--lFailur

~-~~y '>.

I JII

i I

1 I, r

~

I r~ IT

I

4

E

5

1: 301.~

.r::.

i:L 2

o

500400

Time (days)

200 300Failure

100o

~f'-. ,

~~

I

i--f--- - ... --1-.-

-----t---- ~I--- -------- 1---

f----f------. - ----_...

i '\1,

\ I

1--- I -1

-"i .. _-+ \i t'

i +-I \....---\I \.I

I

o

-0-4

-0·2

E -0-6

i4J~+­Q)

(J)

Fig. 8_ Construction histmy and settlement of embankment 2

l'ertanikaJ. Sci. & Techno!. Vo!. 3 No. I, 1995 135

Page 14: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Bujang B.K. Huat

180

3·2

2·82nd pause

E 2·4

+- 2·0L:.01'iiiL:. 1·6

G: 1st1·2 poose

0·8 o SI

+ S20·4 oS3

00

0

~~~ rxf'oo-D-0-4

~~..........

E-0'8 l+-c.....E -1·2

Q)

+-+-

~ -\·6oS I

-2·0 +S2

oS3

-2,4

o I 20 I 40 I 60 I 80 1 100 1 120 1 140 f160 I 180

Time (days )

Fig. 9. Cons/Hu:/ion his/OJ)" ({nd settlement ofem/;rl11kmen/ 3

1'\6 PertanikaJ. Sci. & Techno!. Vol. '\ No. 1,199:)

Page 15: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons from Failures

800 1000 1200

Settlements (mm)

t::.y =2·75 t::.S

400 600

t::.y =0,29 t::.s

o

400

~ 800

x 200o~

U)

co~ 600L-

~"U

oL-ev....Q

1000,--,-----------------

Fig. 10. Max lateml de/ormations - centreline settlements oj' emullnkllumt 3

Piezomelric ResponseThe variation of excess pore water pressure (~ u) with time of embankment3 is shown in Ji'ig. 11, while Fig. 12 shows plot of ~ u with applied verticalstress ~ (j, v.

For low fill (less than 1 m), the piezometric response of the clay founda-tion is low; ~ u = 0.44 ~ (jv' The increase in the pore water pressure thenbecomes approximately equal to the applied vertical stress. However, on theonset of failure, the piezometric response is large; ~ u » ~ (jv' This is probablydue to the following scenario. Prior to collapse of the embankment, localfailures may have been initiated in the subsoil beneath the embankment.This results in strain softening, hence an increase in total horizontal stressesand pore water pressures. Therefore, prior to the failure one should expect~ u > ~ (jv' and this is shown in the pore pressure plot in Fig. 12. A similarobservation of ~ u > ~ (jv' at failure has also been made by D'Appolonia etal. (1971), and Davies and Parry (1985).

CONCLUSION

Provided adequate information has been obtained on the strengths of bothfill and soft clays, the total stress approach can be used for design of embank­ment on soft ground. Failure of the embankment occurred essentially at fac­tor of safety equals unity, based on stability analysis with vane readings cor­rected with Bjerrum's factor.

Pertanika J. Sci. & Techno!' Vo!. 3 No.1, 1995 137

Page 16: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Blljang B.K. Huat

op II +P12 0 PI3

Failure

2nd pause ~'t--~

Ol--.J.fu==--F'''-------j------------------j

~ 20QlU)(

W

~IOO

o 20 I 40 I 60 I sO 1100 1120 I 140 I 160 Is;)Time (days)

Fig. II.Exress flore water fm'ssurp ojemhanlnnent 3

- ~u=1B=-MJv

8=2·22VIVI

~ 20)(

wOf--¥=.J~~""""''I-------+---------iI

+P12 +P13

o 10 20 30 40 50 60 70

Applied vertical stress ( kPo)

Fig. 12. Pom pressure ratio (B = L::,.u/dITv) ojemhanlmwnt 3

138 PertanikaJ. Sci. & Techno!' Vo!. 3 No.1, 1995

Page 17: Stability ofEmbankments on Soft Ground Lessons from Failurespsasir.upm.edu.my/.../3861/1/Stability_of_Embankments_on_Soft_Ground.pdf · Stability ofEmbankments on Soft Ground - Lessons

Stability of Embankments on Soft Ground - Lessons from Failures

For cases of compacted cohesive fill, the strength properties of the fillshould be accounted for in the stability analysis. The corrected average vanestrengths of the soft clay generally lie close to the lower bound any of thefield data.

Failure of the embankment is preceded by soft response of the founda­tion with regards to generation of excess pore water pressures, settlementand lateral deformations.

REFERENCES

ABI)LlUAH, A.M.L.B. and S. CJ IANDRA. 1987. Engineering properties of coastal subsoils inpeninsular Malaysia. In Proceedings 9th South East Asian Geotechnical Conference,Bangkok. p. 5.127-5.138.

Br\L\SUBRAMA:-.!IAM, A.S., N. PIIJEN-WEj, B. INDRARATNA and D.T. BERGADO. 1989. Predictedbehaviour of a test embankment on Malaysian marine clay. In ProceedingsInternational Symposium on Trial Embankments on Malaysian Marine Clays, KualaLumpur. Vol. 2, p.1.1-1.8.

~JERRU~I, L. 1973. Problems of soil mechanics and consu'uetions for soft clays. InPmreedings 8th International Conferenre on Soil Nlechanics and Foundation Engineering,Moscow. Vol. 3. p. 111-158.

BR.,\:-.!D. E.W. 1983, Discussion of effective su'ess analysis of the stability of em bankment onsoft clay. Canadian GeotechniwlJoumal 20: 558-561.

BRAND, E.W. and P, KR,\SAESIN. 1971. Investigation of an embankment failure in soft clay.Geoterhnical Engineeling 2: 53-66.

BR\ND, E.W. andJ. PREMCHIT. 1989. Ioderator's report for the predicted performances ofthe Muar test embankments. In Prot:eedings International Symposium on Prediction andPeI{ormance of1'11al Embankments on Malaysian Marine Clays, Kuala Lumpur. Vol. 2, p.l.32-1.49.

D'APPOl.ONlA, OJ., T.W. LAMBE and H.G. POULOS. 1971. Evaluation of pore pressuresbeneath an embankment. ASCEJounwl ofSoil Mechanics and Founrlation Div. 97 (SM6): 881-887.

D.WIES. M.C.R. and R.H.G. PARRY. 1985. Centrifuge modelling of embankments on clayfoundations. Soils and Foundation 25(4): 19-36.

PIl.OT, G. 1972. Study of five embankment failures on soft soils. In Proceedings SpecialityConferent:e on Pel!ormrt11ce of Earth and Earth SUjlporterl Structures, Lafayette, Indiana.Vol.l,p.81-100.

TINe. W.H., T.F. WO':'-lG and C.T. TOl'1. 1987. Design parameters for soft ground inMalaysia. In Proceedings 9th S.l::. Asian Geotechnical Conference, Bangkok, p. 5.45 - 5.60.

WOL~I,a, W., A. SYMANSKI, Z. LECHO\I'ICS, R. LARSSON, J. HARTl.EN and U. BERGDAHL. 1989.Full scale failure test on a stage constructed test fill on organic fill, SwedishGeotechnical Institute, Report No, 36.

PertanikaJ. Sci. & Techno!. Vo!. 3 No.1, 1995 139