sewer condition assessment - trenchless asia

70
www.jbptrenchless.com Exhibition Hall 5 Kuala Lumpur Convention Centre , Malaysia 7-8 May, 2018 TRENCHLESS ASIA 2018 Organised by Platinum Sponsors Event Partner Partner Sewer Condition Assessment Borje Persson / CEO JBP Consultancy Services SDN BHD Malaysia

Upload: others

Post on 02-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Sewer Condition Assessment

Borje Persson / CEO

JBP Consultancy Services SDN BHD Malaysia

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Content Outline

➢ Malaysia Overview

➢ Inspection, Assessment & Methods

➢ Rehabilitation Methods

➢ Training & Standards

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

Total sewer length: over 19,000 km

Est. 3600km (20%) in a critical state

Aging sewers:

Kuala Lumpur

Georgetown

Seberang Perai

Ipoh

Johor

Petaling Jaya

Labuan

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

SEWER PIPELINES MATERIAL PROFILE*

Sewer network – Malaysia - Facts & Figures:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

SEWER PIPELINES SIZE PROFILE

Malaysia - Facts & Figures:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

This part of the region gets high rainfall

throughout the year; causes high groundwater

level and heavy infiltration, which makes

sewer maintanance work more difficult.

Heavy infiltration causes high deposit of

sediments, which makes sewer pipe cleaning

work tougher. It also causes void around the

sewer pipe, which can cause very big traffic

trouble.

Conditions:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

Drinking water, net work situatio :

Malaysia water pipe network has a totel length

of approximatly 130.000 Km

Total of old and weak pipe are high,

AC pipe length stands for about

about 44.000 km

- 2010 MWIG

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

Drinking water,

net work situatio :

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Malaysia Overview:

Drinking water,

Actual net work situatio :

Source: data.gov.my

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

INSPECTION &

ASSESSMENT

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Contents:

1. Inspection

2. Assessment

3. Codification & Reporting

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Assesment:

Important of Conditions Assessment :

Condition assessment is the critical stage

in the physical engineering step of Asset

Management. This is the point at which

the condition, and therefore the economic

value, of the underground assets, which

form the great majority of the capital

assets of any water or wastewater utility,

become known.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Assesment:

Important of Conditions Assessment :

Condition assessment therefore has a

real impact on utilities’ balance sheets

and value and creates a platform for

management decisions and actions to

strengthen the business and improve its

performance.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Assesment:

Important of Conditions Assessment :

Inspection and investigation provides data.

Condition assessment is the process of

analysing this data so that it becomes

management information upon which

decisions can be made.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Assesment:

Important of Conditions Assessment :

Inspection and investigation done properly

requires a considerable depth of engineering

knowledge and experience together with a

clear understanding of the economic drivers of

the utility business.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

REHABILITATION DECISIONS

CONDITION ASSESSMENT

INSPECTION/INVESTIGATIONDIAGNOSTIC TOOLS

Pipeline Condition Assessment

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Field investigation has two purposes:

•To fill the gaps in information available from the desk study

•To identify sources and causes of problems and defects

It is important not to rush into field investigation because it is costly. Understand

what information is needed and design the investigation programme to obtain it

– enough but not more.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Field investigation has three possible stages which follow each other:

• Survey Level – e.g. Electro Scan, Acoustic Wave, Soil Chemistry,

Resistivity

• Invasive/Disruptive Level – e.g. CCTV, Laser, Sonar, Broadband

Electromagnetic, Remote Field Eddy Current

• Destructive Level (remove material from pipeline)

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Criteria For Investigation and Rehabilitation

• Asset profiling of critical sewers based on:

Age Materials Operational problems Location & diameter

used to categorise and prioritise sewers with structural problems

for rehabilitation.

• Investigation classified under Critical Sewers prior to rehabilitation works.

• works or packages were called to assess the condition of sewers

• Currently sewers recorded with defects in category 3 and above (WRc MSCC 4th Ed)

will be scheduled for rehabilitation works. However, other factors such as location,

depth and diameters will also be taken into consideration for rehabilitation purposes.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

INSPECTION/INVESTIGATIONDIAGNOSTIC TOOLS

CONDITION ASSESSMENT

ASSET MANAGEMENT

DATAEXPERT ANALYSIS

ACTIONABLE INFORMATION

Assessment methods:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment methods:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment methods:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Condition & Performance Assessment

• Take the field inspection data along with the desk study

information and assess the condition of the pipelines and

the effect of this on their performance.

• Develop rehabilitation/renovation solutions, asset

management plans and budgets.

Assessment methods:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

The Condition Assessment Process

transforms data into actionable information

✓ Understand the Existing System

✓ Determine What Information and Where Investigation is

needed

✓ Investigate/Inspect

✓ Assess the System Condition and Performance

✓ Make Asset Management Decisions

Assesment methods:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Inspection:

Gravity Pipe Lines- e.g. Sewers/storm

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Inspection:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Assesment:

CCTV Surveys

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Inspection – Gravity Mains

• What information is needed?

• Find infiltration/exfiltration

• Identify structural condition

• Establish gradient & sags

• Find roots & blockages

• What is pipe material ?

• Concrete

• Clay

• Plastic

• Other?

• External

• Not applicable to sewers

• Internal

• Full length therefore 100%

coverage

• May disrupt operations

• Visual survey often sufficient

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Electro Scan

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Laser Survey

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Inspection – Pressure Mains

• What information is needed?• Find leaks• Identify corrosion• Establish wall stiffness/thickness• Establish coating condition

• What is pipe material & failure mode?• DI & CI - localised corrosion• AC – uniform loss of stiffness• PE – deformation, fusion joints• GRP – deformation• PCCP – wire corrosion

• External• May be small sample only• Needs thoughtful planning

to target high risk locations

• No disruption to operation

• Internal• Full length therefore 100%

coverage• Higher cost• May disrupt operations

Inspection:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Gyroscopic Mapping

Travels through pipe & gives

continuous XYZ co-ordinates –

downloaded, processed and loaded to

GIS

DN90 – 1500, up to 200m length of run

Needs access at both ends

Water main needs to be depressurised

but not emptied

0.5m long

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Soil Chemistry Soil resistivity (corrosivity)

pH

Redox potential

Chlorides & Sulphates

Relevant to metallic & cement-based pipes

Identifies hotspots for further

investigation

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main InspectionAcoustic Wave - Measures average wall thickness over intervals

- Best suited to AC pipe

Utrasonic - Establish wall thickness in metallic (ferrous) pipes

- Internal or external

- Needs direct contact with pipe

- Measures thickness under sensor

- Can detect cracks

Pit Depth

Measurement - Direct measurement of the depth of surface corrosion pits

- Expose section of pipe by local excavation

- Remove corrosion products to reveal pits

- Mark grid pattern on pipe surface

- Record 5 deepest pits in each grid square

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main InspectionElectromagnetic - Applicable to metallic pipes

Smart Ball - Free flowing inspection tool for long distance

Sahara - Acoustic- Leak pinpointing and quantification location

Leakage - Sensors detect displaced flux due to defects (metal loss)

- Direct data transfer to trench-side laptop

- Software gives immediate results

- Detects general corrosion, pitting, circumferential cracks (not

longitudinal)

Broadband - Derivative of the pulse eddy current system

Electromagnetic - Established geophysical exploration technology

- Modified for NDT inspections of metallic pipes: CI; DI; Steel

- Ability to scan through thick coating/lining (>25mm)

- Direct contact with metallic surface not required

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main Inspection

Remote Field - Developed for ferrous water main evaluation

Eddy Current (RFEC) - Train of sealed modules contains excitation, detection,

processing and data transmission equipment

- DN50-200; 90° bends; 1-2km/hour

- Data transmitted to surface for analysis

- No surface contact required

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main Inspection

Pure Technologies

Survey & Inspection

Techniques:

Smart Ball

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main Inspection

Pure Technologies

Survey & Inspection

Techniques:

Sahara

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Water Main Inspection – PCCP

Pre-stressed concrete cylinder pipes

Internal, external, live in service

Detects breaks in pre-stressing wires

FEA software calculates risk levels

based on number and concentration of

wire breaks and operating pressure

Survey & Inspection

Techniques:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Risk Assessment

DO NOTHING

MONITOR

INVESTIGATE& ASSESS

ACT NOW!

Condition assessment Identifies thisand enables decisions on theseto be made

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Rehabilitation

Assessment

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pre- Rehabilitation Assessment:

Pipe Condition

Assessment

Technology

Selection

Pre-installation Training

Identification

of Problem

1st Site

Inspection

Pipe

Inspection &

Coding

Key phases:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Installation

&

Assessment

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Identification

of Problem

Blockages/Infiltration

Structural conditions

Disrupted flow

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

1st Site Inspection

Site location – urban, residential , rural

Access

Type of pipe(s)

Other environmental issues

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pipe Inspection &

Coding

Methods of inspection and calibration

Cleaning

Inspection & Coding

Interpretation & Accuracy

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Pipe Condition

Assessment

Interpretation of inspection data

Assessment of pipe conditions

Pre- Rehabilitation Assessment:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Pipe Condition

Assessment

Sewer Condition classifications

• Use of codes v. remarks e.g Clock references

• Manhole referencing system

• Structural conditions

• Service Conditions

• Construction features

• Miscellaneous

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Assessment:

Pipe Condition

Assessment

Sewer Condition classifications

• Quality Control Procedures – accuracy of reporting!

• Number of faults not recorded (omissions)

• Accuracy of use of classification and coding of recorded faults

e.g. Accuracy = (actual number. of entries – number of actual errors & omissions) x 100

total number of entries

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Selection of

Technology

Technology Selection:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Technology Selection:

Which Technology?

CIPP?

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Technology Selection:

Condition & Performance Assessment:

Problem

Definition

System

Problems

Non –Compliance

Condition & Performance

Failure Consequence

Capacity Related

Structural Related

Other issues

System

Causes

Internal Causes

External Causes

Others

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Technology Selection:

Evaluate Rehabilitation Technologies:

Renewal

Methods

Available

Technology

Capabilities

Limitations

Renewal Cost

Repair

Rehabilitation

Replacement

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Technology Selection:

International Standards

Included in the specification of International and

National Standards are requirements at the

MANUFACTURING stage:

Examples:

• Materials

• General Characteristics

• Material Characteristics

• Geometric Characteristics

• Jointing & Marking

Which Technology?

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

DO NOTHING

ACT NOW!

REHABILITATION

Non-structural Structural On-line

Open Cut TrenchlessCement

Motar Lining

Epoxy /PU Lining

Close-fitSliplining

PRP

CIPP

Woven HoseLining

Sliplining

PipeBursting

Pipe Splitting

Pipe Eating / Reaming

DirectionalDrilling

Pipejacking & Microtunnelling

Earth Piercing

Auger Boring

Trench

NarrowTrench

Mole Plough

Pipe Ramming

Pipe Extraction

Joint Sealing

MechanicalJoint Sealing

Open Trench(e.g.

Emergency repairs)

REHABILITATIONUse exiting pipe structure

REPLACEMENTNo use exiting pipe structure

repairUse exiting pipe structure

Off-line

Technology Selection:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Approvals and Certifications:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

TRAINING &

STANDARDS

Training programs need to

be structured and delivered

to match the various needs

and technical requirements

in sync with the phasing of

projects utilising trenchless

solutions.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Training

• Effective training is an essential ingredient to the process.

• Underestimating its importance will result in costly mistakes and

perhaps worse.

• Importance of training considering the variables involved and

economic impacts.

• Essential to have a systematic approach to credible certification of

the training.

• Ensure that stakeholders across the industry can have

transparency and confidence.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Pre-assessmentTraining

Assessment Interpretation

Certification

TechnologiesTraining

Certification

Certification

1.

2.

3.

Training phases:

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Pre-installation Training

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Assessment Interpretation

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Technology

Training

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Certification

•Independent certification of trainees successfully completed

relevant training.

•Offered and delivered through licensed and certified trainers.

•Stakeholders can have confidence in the credibility and quality

of certified training.

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Certification

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Training:

Accreditation

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Thank You for Your Attention!

JBP Group of Companies

: KD3, Lot 4023, Batu 7, Jalan Kebun, Seksyen 30, 40460 Shah Alam, Selangor Darul Ehsan,Malaysia

: +60 11-2306 7228 (International): +34 96 131 1400

: +60 (0)1 2348 1336 (International):+34 96 390 1454

@ : [email protected] or [email protected]

: www.jbptrenchless.com

www.jbptrenchless.com

Exhibition Hall 5Kuala Lumpur Convention Centre , Malaysia7-8 May, 2018

TRENCHLESS ASIA 2018

Organised by Platinum SponsorsEvent Partner Partner

Special Thank to

External sourses used for this presentation;

- Tom Sangster, CEO @ Downley Consultants- UKSTT