potong baja

55
POTONG BESI D16 PJG JMLH BTG 11.56 3.8 4 LENGKAP 4 7.76 4 10.62 7.76 15 LENGKAP 15 2.86 15 10.12 2.86 5 LENGKAP 5 7.26 5 10.18 7.26 15 LENGKAP 15 2.92 15 11.68 2.92 1 1 2.92 1 2.92 1 2.92 1 2.92 2.92 1 LENGKAP 1 41 SISA 1.76 m BERAT 776.8539428571 20.7 m 9.4 m 27.3 m 0.32 m 9.08 m TOTAL SISA 68.56 m TOTAL BERAT 108.2543 kg

Upload: ockto-ferry-harahap-etsf

Post on 15-Apr-2016

61 views

Category:

Documents


1 download

DESCRIPTION

potong baja

TRANSCRIPT

Page 1: Potong Baja

POTONG BESI D16 PJG JMLH BTG

11.56 3.8 4 LENGKAP 47.76 4

10.62 7.76 15 LENGKAP 152.86 15

10.12 2.86 5 LENGKAP 57.26 5

10.18 7.26 15 LENGKAP 152.92 15

11.68 2.92 1 12.92 12.92 12.92 1

2.92 2.92 1 LENGKAP 141

SISA 1.76 m BERAT 776.853942857120.7 m

9.4 m27.3 m0.32 m9.08 m

TOTAL SISA 68.56 mTOTAL BERAT 108.2543 kg

Page 2: Potong Baja

POTONG BESI D16

BATANG

kg

Page 3: Potong Baja

BESI D19

TAPAK TEPI JUMLAH TAPAK TENGAH JUMLAH

2.15 286 2.4 247 1432.79 286 3.04 247 123

UTAMA / LAPIS 22.4 264 2.4 247 102

2.96 264 2.96 247 6621

BESI D16TAPAK KECIL

SENGKANG / LAPIS 11.3 4 12 2.12561.7 4

UTAMA / LAPIS 21.3 4 11.81.6 4

2.18 22 11.585.04 222.18 19 11.525.54 191.19 4 11.42.61 4

NO POTONGANTYPE PEMOTONGAN

A B C D E1 1.22 1.19 2.18 2.18 5.042 1.22 1.19 5.54 2.18 5.543 1.22 1.19 1.19 2.184 1.22 2.61 2.61 5.045 1.7 2.616 1.7 2.617 1.588 1.58

JMLH PJG 11.44 11.4 11.52 11.58 10.58JMLH BATANG 2 3 1 13 9

SISA BESI 1.12 1.8 0.48 5.46 12.78TOTAL BESI 24 36 12 156 108

WASTE 7.475%

SENGKANG / LAPIS 1

TUL BADAN TAPAK TEPI

TUL BADAN TAPAK TENGAH

TUL BADAN TAPAK KECIL

Page 4: Potong Baja

batang besi 12m dipotong 2,03 x 2 bh + 2,79 x 2bh + 2,28 1bh, diperoleh 286 batang besi 2,03; besi 2,79 dan 143 batang besi 2,28mbatang besi 12m di potong 3,04 X 2bh + 2,96 x 2bh, diperoleh 246 batang besi 3,04m dan 2,96batang besi 12m di potong 2,4 X 5 buah, diperoleh 510 batang besi 2,4mbatang besi 12m di potong 2,96 X 4 buah, diperoleh 264 batang besi 2,96mbatang besi 12m di potong 2,28 x 5bh, diperoleh 105 batang besi 2,28m

NO POTONGANTYPE PEMOTONGAN

A B C1 2.15 3.04 2.42 2.15 3.04 2.43 2.15 2.96 2.44 2.79 2.96 2.45 2.79 2.4

JMLH PJG 12.03 12 12JMLH BATANG 143 123.5 123

SISA BESI -4.29 0 0TOTAL BESI 1716 1482 1476

WASTE 0.115%

TYPE PEMOTONGANF G

5.54 5.545.54 2.18

0.05971430.01492860.0447857

11.08 7.724 1 33

3.68 4.2848 12

7.475% 190

57 57

Page 5: Potong Baja

batang besi 12m dipotong 2,03 x 2 bh + 2,79 x 2bh + 2,28 1bh, diperoleh 286 batang besi 2,03; besi 2,79 dan 143 batang besi 2,28mbatang besi 12m di potong 3,04 X 2bh + 2,96 x 2bh, diperoleh 246 batang besi 3,04m dan 2,96

batang besi 12m di potong 2,96 X 4 buah, diperoleh 264 batang besi 2,96m

TYPE PEMOTONGANNO POTONGAN

TYPE PEMOTONGAND A B C D

2.96 1 2.15 3.04 2.4 2.962.96 2 0 3.04 2.4 2.962.96 3 0 2.96 2.4 2.962.96 4 2.79 2.96 2.4 2.96

5 0 2.411.84 JMLH PJG 4.94 12 12 11.84

66 JMLH BATANG 143 123.5 123 66

10.56 SISA BESI 1009.58 0 0 10.56792 TOTAL BESI 1716 1482 1476 792

0.115% WASTE 18.663%

190

57 57

Page 6: Potong Baja

90

3416

34

286D19

286D19

264D19

264D19

247D19

190

535319 19

190

19 19

190

190

5357

57

190

57

190

190

19 19

90

90

19

53

247D19

247D19

247D19

286D19

286D19

40

16 16

90

16

4040

190

535319

165

57 5719

190

1919

57

19

190

19 19

190

190

53

19

53

90

90

34

16 16

90

16

165

60

1919

57

165

19

165

Page 7: Potong Baja

90

3416

34

286D19

286D19

264D19

264D19

247D19

190

535319 19

190

19 19

190

190

5357

57

190

57

190

190

19 19

90

9019

53

247D19

247D19

247D19

286D19

286D19

40

16 16

90

16

4040

190

535319

165

57 5719

190

1919

57

19

190

19 19

190

190

53

19

53

90

9034

16 16

90

16

165

60

1919

57

165

19

165

Page 8: Potong Baja

90

3416

34

286D19

286D19

264D19

264D19

247D19

190

535319 19

190

19 19

190

190

5357

57

190

57

190

190

19 19

90

90

19

53

247D19

247D19

247D19

286D19

286D19

40

16 16

90

16

4040

190

535319

165

57 5719

190

1919

57

19

190

19 19

190

190

53

19

53

90

90

34

16 16

90

16

165

60

1919

57

165

19

165

Page 9: Potong Baja

## ## ## 3182 2 2

1.8430.307167

D 19 D 16 D19 12448.922.22557 1.57824 D16 715.4478

13164.3711782.1412497.59

157153.5833

DIA PJG JUMLAH

19 4.88 28616 7.26 2219 5.3 264

19 5.38 23416 7.76 1819 5.3 234

16 2.92 2016 3.8 4

Page 10: Potong Baja

16 2.86 20

POTONG BESI D16 10.68 7.76 18 LENGKAP 18

2.92 1810.18 2.92 2 LENGKAP 2

7.26 210.12 7.26 20 LENGKAP 20

2.86 20 LENGKAP11.4 3.8 1 LENGKAP 1

3.8 13.8 1

3.8 3.8 1 1

42BERAT 795.8016

SISA

23.76 m3.64 m37.6 m

0.6 m8.2 m

TOTAL SISA 73.8 mTOTAL BERAT 116.5281 kgPERSEN WASTE 14.64286 %

POTONG BESI D1910.18 5.38 234 LENGKAP 234

4.80 23410.1 4.80 52 LENGKAP 52

5.30 5210.6 5.30 223 223

5.30 223 LENGKAP509

BERAT 13600.05

SISA425.88 m 1.82

98.8 m 1.9312.2 m 1.4

TOTAL SISA 836.88 mTOTAL BERAT 1321.41 kgPERSEN WASTE 9.716211 %

Page 11: Potong Baja
Page 12: Potong Baja

3141.1875

1.1428571429

368.6

376.8

144.81820.213

0.5714290.102667

10.189.76

10.76

Page 13: Potong Baja

POTONG BESI D16 11.56 3.8 4 LENGKAP 4

7.76 410.62 7.76 14 LENGKAP 14

2.86 1410.12 2.86 6 LENGKAP 6

7.26 610.18 7.26 16 LENGKAP 16

2.92 1611.68 2.92 1 1

2.92 12.92 1

BTG 2.92 1 LENGKAPkg 41

SISA 1.76 m BERAT 776.853919.32 m11.28 m29.12 m

0.32 mTOTAL SISA 61.8 mTOTAL BERAT 97.58043 kgPERSEN WASTE 12.56098 %

POTONG BESI D1911.56 3.8 4 LENGKAP 4

7.76 410.62 7.76 14 LENGKAP 14

2.86 1410.12 2.86 6 LENGKAP 6

7.26 6BTG 10.18 7.26 16 LENGKAP 16kg 2.92 16

11.68 2.92 1 12.92 12.92 12.92 1 LENGKAP

41SISA 1.76 m BERAT 776.8539

19.32 m11.28 m29.12 m

0.32 mTOTAL SISA 61.8 m

PEMBESIAN TAPAK TEPI (TP)

4,88m

7,26m

5,30m

286D19

22D16

264D19

PEMBESIAN TAPAK TENGAH (TN)

5,38m

7,76m

5,30m

234D19

18D16

234D19

PEMBESIAN TAPAK KECIL (TK)

2,92m

3,80m

20D16

4D16

2,86m 20D16

ATAS(LAPIS KE 1)

TENGAH/PINGGANG

BAWAH(LAPIS KE 2)

TENGAH/PINGGANG

TENGAH/PINGGANG

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

REV URAIAN KET

SKALA :

KODE GAMBAR :

TGL

PEMBANGUNAN GEDUNG SEKOLAH TINGGITEKNOLOGI PELALAWAN (STTP)

PEMERINTAH KABUPATEN PELALAWAN

DINAS PEKERJAAN UMUMJALAN PAMONG PRAJA KAWASAN BHAKTI PRAJA NO.05

PANGKALAN KERINCI

POTONG PEMBESIAN TAPAK

Page 14: Potong Baja

TOTAL BERAT 97.58043 kgPERSEN WASTE 12.56098 %

Page 15: Potong Baja
Page 16: Potong Baja

POTONG BESI D16

0.0061678571

BATANGkg

POTONG BESI D19

0.0061678571

BATANGkg

FAKTOR PENGALI BERAT BETON

FAKTOR PENGALI BERAT BETON

PEMBESIAN TAPAK TEPI (TP)

4,88m

7,26m

5,30m

286D19

22D16

264D19

PEMBESIAN TAPAK TENGAH (TN)

5,38m

7,76m

5,30m

234D19

18D16

234D19

PEMBESIAN TAPAK KECIL (TK)

2,92m

3,80m

20D16

4D16

2,86m 20D16

ATAS(LAPIS KE 1)

TENGAH/PINGGANG

BAWAH(LAPIS KE 2)

TENGAH/PINGGANG

TENGAH/PINGGANG

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

REV URAIAN KET

SKALA :

KODE GAMBAR :

TGL

PEMBANGUNAN GEDUNG SEKOLAH TINGGITEKNOLOGI PELALAWAN (STTP)

PEMERINTAH KABUPATEN PELALAWAN

DINAS PEKERJAAN UMUMJALAN PAMONG PRAJA KAWASAN BHAKTI PRAJA NO.05

PANGKALAN KERINCI

POTONG PEMBESIAN TAPAK

Page 17: Potong Baja
Page 18: Potong Baja
Page 19: Potong Baja

PEMBESIAN TAPAK TEPI (TP)

4,88m

7,26m

5,30m

286D19

22D16

264D19

PEMBESIAN TAPAK TENGAH (TN)

5,38m

7,76m

5,30m

234D19

18D16

234D19

PEMBESIAN TAPAK KECIL (TK)

2,92m

3,80m

20D16

4D16

2,86m 20D16

ATAS(LAPIS KE 1)

TENGAH/PINGGANG

BAWAH(LAPIS KE 2)

TENGAH/PINGGANG

TENGAH/PINGGANG

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

ATAS(LAPIS KE 1)

BAWAH(LAPIS KE 2)

REV URAIAN KET

SKALA :

KODE GAMBAR :

TGL

PEMBANGUNAN GEDUNG SEKOLAH TINGGITEKNOLOGI PELALAWAN (STTP)

PEMERINTAH KABUPATEN PELALAWAN

DINAS PEKERJAAN UMUMJALAN PAMONG PRAJA KAWASAN BHAKTI PRAJA NO.05

PANGKALAN KERINCI

POTONG PEMBESIAN TAPAK

Page 20: Potong Baja
Page 21: Potong Baja
Page 22: Potong Baja
Page 23: Potong Baja
Page 24: Potong Baja

218 DIA PJG

504 19 4.88554 16 7.26

19 5.3

19 5.3816 7.7619 5.3

16 2.9216 3.816 2.86

GAMBAR POTONGANPANJANG TYPE

JUMLAH POTONGAN KETERANGANm A

3.5

3.5

80

3.5

5 5 40

JUMLAH PANJANG 12JUMLAH BATANG 40

GAMBAR POTONGANPANJANG TYPE

JUMLAH POTONGAN KETERANGANm A

5

5

247

5

JUMLAH PANJANG 10JUMLAH BATANG 123.5

GAMBAR POTONGANPANJANG TYPE

JUMLAH POTONGAN KETERANGANm B

2.96

2.96

264

2.96

2.96

2.96

2.96

JUMLAH PANJANG 11.84JUMLAH BATANG 66

GAMBAR POTONGANPANJANG TYPE

JUMLAH POTONGAN KETERANGANm B

2.96

2.96

264

2.96

2.96

2.96

2.96

JUMLAH PANJANG 11.84JUMLAH BATANG 66

190

53 53

190

53 53

Page 25: Potong Baja

0.1026667 PJG 3,5 PJG 12 PJG 6,7

ATAS

PJG 2,7

JUMLAH DIA PJG JUMLAH 58 EXTRA SUDUT 203 SUDUTATAS

7 SUDUT 21 SUDUT

286 10.18 19 3.5 79 SISA 72, OKE POTONG 3,5X2 + 0 21 LURUS 56 TENGAH PJG 11,5 PJG 10,722 9.76 19 5 226 SISA 190 2 PJG 5 105 SUDUT

BAWAH42 LURUS 42 SUDUT

264 19 12 532 OKE 0 99 EXTRA TUMP 168 TENGAH PJG 8,3 PJG 7,719 2.7 21 OKE POTONG 2,7 X 3 + 3,5 M 0.4 127 EXTRA LAP 14 LURUS 14 SUDUT

247 10.76 19 10.7 42 OKE POTONG 1.3 PJG 5,1 PJG 4,719 19 7.7 14 4.3 7 LURUS 7 SUDUT

247 19 4.7 7 OKE POTONG 4,7 + 6,7 0.6 PJG 3,1 PJG 1,719 1.7 14 OKE 2 0.1 14 LURUS 14 SUDUT

20 1.612 19 11.5 42 OKE 0.5 PJG 5,74 19 8.3 14 OKE POTONG 8,3 DAN 3,1 0.6 7 SUDUT

20 19 5.1 7 1.819 3.1 14 OKE POTONG 8,3 DAN 3,1 019 5.7 1 6.319 5.7 6 OKE POTONG 5,7X6 0.6 4.042934984819 6.7 7 OKE POTONG 4,7 + 6,7 0

SISA 369.5 mJUMLAH 9139.4 m 11.4

90

3416

34

286D19

286D19

264D19

264D19

247D19

190

535319 19

190

19 19

190

190

5357

57

190

57

190

190

19 19

90

90

19

53

247D19

247D19

247D19

286D19

286D19

40

16 16

90

16

4040

190

535319

165

57 5719

190

1919

57

19

190

19 19

190

190

53

19

53

90

90

34

16 16

90

16

165

60

1919

57

165

19

165

Page 26: Potong Baja

GAMBAR POTONGANPANJANG TYPE

m A

3

1 3

2 3

3 3

4 3

JUMLAH PANJANG 12JUMLAH BATANG 205

GAMBAR POTONGANPANJANG TYPE

m B

6

1 6

2 6

JUMLAH PANJANG 12JUMLAH BATANG 410

NO POTONGAN

30

27010

0

600

100

Page 27: Potong Baja

JUMLAH POTONGAN KETERANGAN

820

JUMLAH POTONGAN KETERANGAN

820

Page 28: Potong Baja

GAMBAR POTONGANPANJANG

m

3.04

2.96

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

2.96

2.96

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

2.29

190

57 57

190

53 53

190

53 53

30

169

30

165

57 57

Page 29: Potong Baja

2.29

2.79

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

2.54

2.79

JUMLAH PANJANGJUMLAH BATANG

3030

194

165

57 57

165

57 57

Page 30: Potong Baja

GAMBAR POTONGANPANJANG

m

2.54

JUMLAH PANJANGJUMLAH BATANG

3030

194

Page 31: Potong Baja

TYPEJUMLAH POTONGAN KETERANGAN

A

1 3.04

247

2 3.04

3 2.96

247

4 2.96

JUMLAH PANJANG 12JUMLAH BATANG 123.5

TYPEJUMLAH POTONGAN KETERANGAN

B

1 2.96

264

2 2.96

3 2.96

4 2.96

JUMLAH PANJANG 11.84JUMLAH BATANG 66

TYPEJUMLAH POTONGAN KETERANGAN

B

1 2.29

288

2 2.29

3 2.29

NO POTONGAN

NO POTONGAN

NO POTONGAN

Page 32: Potong Baja

3 2.29

288

4 2.29

5 2.79 72

JUMLAH PANJANG 11.95JUMLAH BATANG 72

TYPEJUMLAH POTONGAN KETERANGAN

B

1 2.54

6422 2.54

3 2.54

4 2.79 214

JUMLAH PANJANG 10.41JUMLAH BATANG 214

NO POTONGAN

Page 33: Potong Baja

TYPEJUMLAH POTONGAN KETERANGAN

B

1 2.54

116

2 2.54

3 2.54

4 2.54

JUMLAH PANJANG 10.16JUMLAH BATANG 29

NO POTONGAN

Page 34: Potong Baja

GAMBAR POTONGANPANJANG

m

5.04

5.54

1.4

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

159

186

159

186

184

184

90

25 25

Page 35: Potong Baja

GAMBAR POTONGANm

5.54

1.43

1.66

1.43

1.6

JUMLAH PANJANGJUMLAH BATANG

186

184

184

93

25 25

90

38 38

90

35 35

93

25 25

Page 36: Potong Baja

GAMBAR POTONGANPANJANG

m

5.04

1.43

1.66

1.43

1.6

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

5.04

93

25 25

90

38 38

90

35 35

93

25 25

159

186

159

159

186

159

Page 37: Potong Baja

5.04

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

5.04

2.57

JUMLAH PANJANGJUMLAH BATANG

159

186

159

159

186

159

85 85

87

Page 38: Potong Baja

GAMBAR POTONGANPANJANG

m

2.57

2.39

JUMLAH PANJANGJUMLAH BATANG

GAMBAR POTONGANPANJANG

m

2.39

JUMLAH PANJANGJUMLAH BATANG

85 85

87189

25 25

189

25 25

Page 39: Potong Baja

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGANA

1 5.04 4

2 5.54 4

3 1.4 4

JUMLAH PANJANG 11.98JUMLAH BATANG 4

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGAN

Page 40: Potong Baja

NO POTONGANB

JUMLAH POTONGAN KETERANGAN

1 5.54 15

2 1.43 15

3 1.66 15

4 1.43 15

5 1.6 15

JUMLAH PANJANG 11.66JUMLAH BATANG 15

Page 41: Potong Baja

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGANC

1 5.04 13

2 1.43 13

3 1.66 13

4 1.43 13

5 1.6 13

JUMLAH PANJANG 11.16JUMLAH BATANG 13

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGAND

1 5.04

4

Page 42: Potong Baja

1 5.04

4

2 5.04

JUMLAH PANJANG 10.08JUMLAH BATANG 2

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGANE

1 5.04 1

2 2.57

2

3 2.57

JUMLAH PANJANG 10.18JUMLAH BATANG 1

Page 43: Potong Baja

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGANF

1 2.57

2

2 2.57

3 2.39 1

JUMLAH PANJANG 7.53JUMLAH BATANG 1

NO POTONGANTYPE

JUMLAH POTONGAN KETERANGANG

1 2.39

40

2 2.39

3 2.39

4 2.39

5 2.39

JUMLAH PANJANG 11.95JUMLAH BATANG 8

Page 44: Potong Baja

TABEL KEBUTUHAN BESI D16 UNTUK PILE CAP

GAMBAR POTONGAN

9325 25

90

38 38

90

35 35

93

25 25

189

25 25159

186

159

Page 45: Potong Baja

159

186

159

186

184

184

90

25 25

Page 46: Potong Baja

85 85

87

90

25 25

Page 47: Potong Baja

TABEL KEBUTUHAN BESI D16 UNTUK PILE CAP

NAMA POTONGANPANJANG

m

1.43

1.66

1.43

1.6

2.39

5.04

TULANGAN ATAS TAPAK KECIL LAPIS KE 1

TULANGAN BAWAH TAPAK KECIL LAPIS KE 1

TULANGAN ATAS TAPAK KECIL LAPIS KE 2

TULANGAN BAWAH TAPAK KECIL LAPIS KE 2

TULANGAN BADAN (ATAS) TAPAK TEPI & TAPAK

TENGAH

TULANGAN BADAN (BAWAH) TAPAK TEPI

Page 48: Potong Baja

5.04

5.54

3

TULANGAN BADAN (BAWAH) TAPAK TEPI

TULANGAN BADAN (BAWAH) TAPAK TENGAH

TULANGAN BADAN (ATAS) TAPAK KECIL

Page 49: Potong Baja

3

2.57

TULANGAN BADAN (ATAS) TAPAK KECIL

TULANGAN BADAN (BAWAH) TAPAK KECIL

Page 50: Potong Baja

TABEL KEBUTUHAN BESI D16 UNTUK PILE CAP

JUMLAH KEBUTUHAN KETERANGAN

28

28

28

28

41

22

Page 51: Potong Baja

22

19

4

Page 52: Potong Baja

4

4

Page 53: Potong Baja

TABEL KEBUTUHAN BESI D19 UNTUK PILE CAP

GAMBAR POTONGAN

190

57 57

190

53 53

30169

303030

194

165

57 57

Page 54: Potong Baja

TABEL KEBUTUHAN BESI D19 UNTUK PILE CAP

NAMA POTONGANPANJANG

m

2.29

2.79

2.54

2.96

3.04

TULANGAN ATAS LAPIS KE 1 TAPAK TEPI

TULANGAN BAWAH LAPIS KE 1 TAPAK TEPI

TULANGAN ATAS LAPIS KE 2 TAPAK TEPI & TULANGAN ATAS LAPIS KE 1

DAN KE 2 TAPAK TENGAH

TULANGAN BAWAH LAPIS KE 2 TAPAK TEPI & TAPAK TENGAH

TULANGAN BAWAH LAPIS KE 1 TAPAK TENGAH

Page 55: Potong Baja

TABEL KEBUTUHAN BESI D19 UNTUK PILE CAP

JUMLAH KEBUTUHAN KETERANGAN

286

286

758

511

247