open day slide show

of 37 /37
WELCOME TO VIS MECHATRONIC

Author: sidiq-mohamad

Post on 18-Jul-2015

652 views

Category:

Documents


2 download

Embed Size (px)

TRANSCRIPT

  • WELCOME TO VIS MECHATRONIC

  • VOCATIONAL INSTITUTE OF STUDIES KURSUS KELOLAAN KEMENTERIAN SUMBER MANUSIA

  • DIIKTIRAF OLEH KEMENTERIAN SUMBER MANUSIA : KSM

    BEROPERASI SELAMA 12 TAHUN ( DARI 2001).TELAH MELAHIRKAN SERAMAI 1000 PELATIH SISWAZAHVIS MECHATRONIC SDN BHD

  • MENJAMIN MASA DEPAN ANDA DALAM INDUSTRI TEKNOLOGI TINGGI.

    BERPELUANG UNTUK BERKHIDMAT DALAM INDUSTRI (MULTI-NATIONAL)

    VIS MECHATRONIC SDN BHD

  • PESAT DIGUNAKAN DAN DIPERLUKAN DI INDUSTRI PERKILANGAN & AUTOMASI VIS MECHATRONIC SDN BHD MENINGKATKAN PRODUKTIVITI. MENGATASI MASALAH KEKURANGAN TENAGA KERJA TIDAK MAHIR

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONIC SDN BHD

  • 0615186 Bulan12 BulanJANGKAMASA KURSUS15 BULAN DI KOLEJ ,3 BULAN PRAKTIKAL

    BELAJAR DI KOLEJ VISTAHAP 2BELAJAR DI KOLEJ VISTAHAP 3PRAKTIKAL3 BULAN

  • CARA PEMBAYARAN KURSUSPINJAMAN 100%PTPK(DI URUS OLEH VIS)BIASISWADARI AGENSI SWASTA ATAU KERAJAAN(DI URUSKAN DGN SENDIRI)TUNAI(DISKAUN DARIPADA KOLEJ)

  • YURANELAUN0180618PINJAMAN 100%JUMLAH PINJAMANCARA PINJAMAN PENUH

    TAHAP 2 = RM 5,000TAHAP 3 = RM 8,000JUMLAHRM 13,000

    RM 300 X 18 BULAN = RM 5400PINJAMAN

    YURAN RM 13,000 + ELAUN RM 5,400 = RM 18,400PINJAMAN 100% DARI PTPK

  • YURANELAUN0180618BIASISWA PENUH / SEPARUHJUMLAH PINJAMANCARA BIASISWABIASISWA PENUH / SEPARUH

    TAHAP 2 = RM 5,000TAHAP 2 = RM 8,000JUMLAHRM 13,000

    RM 300 X 18 BULAN = RM 5400

    YURAN RM 13,000 + ELAUN RM 5,400 = RM 18,400BIASISWA (DIURUS SENDIRI IBUBAPA)

  • YURANELAUN0180618JUMLAH BAYARANCARA TUNAI

    TAHAP 2 = RM 5,000DISKAUN RM 500TAHAP 3 = RM 8,000DISKAUN RM 500JUMLAHRM 12,000

    DITANGGUNG SENDIRI

    JUMLAH YURAN = RM13000 DISKAUN RM1000 = RM12000 SAHAJA

  • PEMULAAN BAYARANBERMULA SELEPAS ENAM (6) BULAN TAMAT PELAJARAN. (DIGALAKKAN UNTUK MULA BAYARAN SEMASA BELAJAR : MINIMA RM50).BAYARAN DIBUAT TERUS PADA KERAJAAN MELALUI

    BAYARAN BALIK PINJAMAN

  • TEMPOH & KADAR BAYARANPINJAMAN TAHAP 2 & 3 = RM18400.KADAR BAYARAN = RM177.40 sebln.JUMLAH BAYARAN = RM21288.TEMPOH BAYARAN = 10 TAHUN.

    BAYARAN BALIK PINJAMAN

  • PinjamanPerlu 2 orang penjamin.Perlu kelulusan pihak PTPK.Menandatangai borang perjanjian.Kemuka borang-borang.Atas pertimbangan quota PTPK.Jumlah bayarbalik RM 21288

    TunaiTiadaTiadaTiada

    TiadaTiada

    Jumlah bayaran RM 12000JIMAT RM 3888Perbezaan Pinjaman & Tunai

  • BERUMURAKADEMIKKESIHATAN

    15 HINGGA 29LEPASANPMRSPM

    SIHAT & BERSEMANGAT TINGGIBERMINAT DALAM KEMAHIRANCARA PINJAMAN PENUH

  • DRIVEROBOTIKDETECTION (SENSOR)TPM5 S

    ELEKTRIKALELEKTRONIKPNEUMITIKELECTRO-PNEUMATIKHIDRAULIKPLC MEKANIKAL

    TEKNOLOGI DARIPADA NEGARA JEPUN

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONIC SDN BHD

  • VIS MECHATRONICTEAM BULDING (KEM MOTIVASI)JAMUAN BUKA PUASASAMBUTAN DEEPARAYACERAMAH ANTI-DADAHPERTANGINGAN FUTSALLAWATAN KE INDUSTRI

  • KEM MOTIVASI ANJURAN VIS MECHATRONIC

  • KEM ANTI DADAH DI VIS MECHATRONIC

  • SAMBUTAN DEEPARAYA BERSAMA DI VIS

  • PERTANDINGAN FUTSAL PIALA PUSINGAN MANICKAVASAGAM 2008

  • SAMBUTAN HARI GURU 2011

  • SAMBUTAN HARI GURU 2011

  • KONVOKASI AKAN DIADAKAN UNTUK PELAJAR YANG LAYAK (LULUS EXAM).(BAYARAN DIKENAKAN)

  • KETUA ESKUTIF PTPKEN. ALI BAHARUDINYB DATO. NILWAN KABANGADUN KUNAK SABAH

  • ***