laporan gps

Click here to load reader

Post on 30-Sep-2015

41 views

Category:

Documents

8 download

Embed Size (px)

DESCRIPTION

Laporan GPS

TRANSCRIPT

  • TIM GPS GEODETIKDesa Sukosari, Kecamatan TrawasKabupaten Mojokerto

    Nama Anggota :1. Irmaatus Sholihah (3512 100 004)2. Dedy Kurniawan (3512 100 017)3. Nurul Aini (3512 100 020)4. Roni Kurniawan (3512 100 021)5. Akhmad Sigit Arisandy (3512 100 026)6. Awalina Lukmana C.R. (3512 100 051)

    Dosem Pembimbing Desa :Noorlaila Hayati, ST., MT.

  • i

    KEMAH KERJA RG141328

    TIM GPS GEODETIKDESA SUKOSARI

    IRMAATUS SHOLIHAH 3512 100 004DEDY KURNIAWAN 3512 100 017NURUL AINI 3512 100 020RONI KURNIAWAN 3512 100 021AKHMAD SIGIT ARISANDY 3512 100 026AWALINA LUKMANA C.R. 3512 100 051

    JURUSAN TEKNIK GEOMATIKAFakultas Teknik Sipil dan PerencanaanInstitut Teknologi Sepuluh NopemberSurabaya2015

  • ii

    LAPORAN KEMAH KERJADesa Sukosari

    TIM GPS GEODETIK

    HALAMAN PENGESAHAN

    KEMAH KERJA 2014/2015 TEKNIK GEOMATIKATim GPS Desa Sukosari

    Kecamatan Trawas , Kabupaten Mojokerto, Jawa Timur

    Surabaya, 30 Januari 2015

    Ketua PelaksanaKemah Kerja 2015

    Koordinator Desa SukosariKemah Kerja 2015

    Arief KurniawanNRP. 3512100061

    Ari Zainal FananiNRP. 3512100031

    Mengetahui,

    Koordinator Kemah Kerja 2015Teknik Geomatika FTSP ITS

    Dosen Pembimbing Kemah Kerja 2015Teknik Geomatika FTSP ITS

    Yanto Budisusanto, S.T., M.EngNIP. 19720613 200604 1 001

    Noorlaila Hayati, S.T., M.TNIP. 19900603 201404 2 001

    Menyetujui,

    Ketua Program Studi S1Teknik Geomatika FTSP ITS

    Khomsin, S.T., M.T.NIP. 19750705 200012 1 001

  • iii

    LAPORAN KEMAH KERJADesa Sukosari

    TIM GPS GEODETIK

    KATA PENGANTAR

    Puji syukur kami panjatkan kepada Allah Yang Maha Esa atas segala karunia yangdiberikan sehingga Laporan Kemah Kerja Tim GPS Geodetik Desa Sukosari dapat kamiselesaikan dengan lancar.

    Laporan Kemah Kerja ini disusun sebagai hasil dari pelaksanaan Kemah Kerja yangmerupakan investasi hubungan antara instansi pemerintah dengan dunia pendidikan dalam halini adalah Institut Teknologi Sepuluh Nopember Surabaya.Kegiatan Kemah Kerja memberikanbanyak manfaat kepada mahasiswa, diantaranya mahasiswa dapat belajar langsung mengenaikondisi dunia kerja dengan penerapan ilmu di lapangan yang diperoleh selamadiperkuliahan.Manfaat lainnya yaitu bahwa Kemah Kerja menjadi salah satu prasyaratakademik untuk memperoleh gelar sarjana di Jurusan Teknik Geomatika FTSP ITS.

    Selama proses pelaksanaan Kemah Kerja hingga penyusunan laporan ini dibuat tentunyatidak lepas dari dukungan dan bantuan banyak pihak. Oleh karena itu, pada kesempatan iniperkenankan penulis menyampaikan ucapan terima kasih, berkat bantuan dari berbagai pihakbaik menyangkut perijinan, pelaksanaan, bimbingan serta dukungan moral dan spiritual bagipenulis.Untuk itu penulis ucapkan terima kasih kepada :

    1. Bapak Purnaji, selaku Kepala Desa Sukosari Kecamatan Trawas Kabupaten Mojokerto2. Bapak DR. Ir. Muhammad Taufik, selaku Ketua Jurusan Teknik Geomatika FTSP ITS3. Bapak Khomsin, ST., MT., selaku ketua program studi S1 Teknik Geomatika FTSP ITS4. Bapak Yanto Budisusanto, S.T, M.Eng, selaku koordinator Kemah Kerja 20155. Ibu Noorlaila Hayati, S.T, M.T, selaku dosen pembimbing Kemah Kerja desa Sukosari6. Bapak Mukhamad Nur Cahyadi, S.T, MSc, D.Sc, selaku dosen pembimbing Tim GPS

    Geodetik Kemah Kerja 20157. Kedua orang tua kami yang dengan penuh ketulusan memberikan dukungan dan

    semangat8. Anggota team GPS yang begitu semangat dan kompak melakukan pengukuran GPS9. Serta teman-teman anggatan 2012 yang saling membantu dan berdiskusi bersama dalam

    Kemah Kerja

    Semoga Allah Yang Maha Esa melimpahkan pahala kepada semuanya. Kami menyadaribahwa laporan Kemah Kerja ini belum sempurna, maka kritik dan saran yang bersifatmembangun sangat kami harapkan.Akhir kata kami berharap semoga laporan ini bermanfaatbagi banyak pihak.

    Surabaya, 30 Januari 2015

    Penulis

  • iv

    LAPORAN KEMAH KERJADesa Sukosari

    TIM GPS GEODETIK

    Abstract

    Field Camp 2015 was held in Sukosari Village, Trawas District, Mojokerto. Field Camp usesimage data as a main component for making spatial data information. Image data should be processedfirst by determining the point of reference, then called as GCP (Ground Control Point). Coordinates ofGCP can be determined by doing GPS measurements. GCP points spread in the village, is BMSukosari Sukosari (SK2), SK1, SK3, SK4, SK5, SK6, BM Jatijejer (SK7). GPS measurementsperformed using the radial method where its base point is BM Sukosari (SK2). Data processing isdone by downloading GPS data both base and rover data first using the PC software -CDU.Furthermore, the observational data have been processed in scientific software (GPS tools) andcommercial software (Topcon tools). GPS observation data processing is done to get the coordinatesof the points of GCP then used as a tie point of TS measurement and image rectification. The outputof the GPS measurements is a map with the distribution of GCP in Sukosari village. From GPSmeasurements, the average of RMS value is 0371 pixels and the average of standard deviation is0.004 m.

    Keywords : GPS, Ground Control Point, Rectification

  • v

    LAPORAN KEMAH KERJADesa Sukosari

    TIM GPS GEODETIK

    DAFTAR ISI

    HALAMAN SAMPUL........................................................................................................................iLEMBAR PENGESAHAN ................................................................................................................iiKATA PENGANTAR.........................................................................................................................iiiABSTRAK ...........................................................................................................................................ivDAFTAR ISI........................................................................................................................................vDAFTAR GAMBAR...........................................................................................................................viiDAFTAR TABEL ...............................................................................................................................ixDAFTAR LAMPIRAN.......................................................................................................................xDAFTAR ISTILAH ............................................................................................................................xiBAB I PENDAHULUAN

    1.1. Latar Belakang.......................................................................................................................11.2. Tujuan....................................................................................................................................11.3. Manfaat..................................................................................................................................1

    BAB II MANAJEMEN PEKERJAAN2.1. Waktu Pelaksanaan dan Volume Pekerjaan ...........................................................................3

    2.1.1. Waktu Pelaksanaan dan Lokasi Pengukuran ...............................................................32.1.2. Volume Pekerjaan .......................................................................................................3

    2.2. Lingkup Pekerjaan..................................................................................................................62.3. Tahap Pelaksanaan Pekerjaan ................................................................................................7

    2.3.1 Diagram Alir Pelaksanaan Pekerjaan ...........................................................................72.3.2 Tahap Pelaksanaan Pengukuran ...................................................................................8

    2.4. Struktur Tim...........................................................................................................................92.5. Tugas dan Tanggung Jawab Elemen dan Unit Tim ...............................................................10

    BAB III TINJAUAN PUSTAKA3.1. Pengertian...............................................................................................................................14

    3.1.1. Global Positioning System (GPS) ...............................................................................143.1.2. Segmen GPS................................................................................................................153.1.3. Sinyal GPS...................................................................................................................163.1.4. Ground Control Point (GCP).......................................................................................183.1.5. WGS 84 .......................................................................................................................183.1.6. Kesalahan dan Bias GPS ............................................................................................20

    3.2. Dasar Teori.............................................................................................................................213.2.1. Dilution of Precision (DOP) ........................................................................................213.2.2. Faktor Pengaruh Ketelitian Penentuan Posisi dengan GPS.........................................223.2.3. Cara Kerja GPS ...........................................................................................................223.2.4. Metode Penentuan Posisi dengan GPS........................................................................233.2.5. Geometrik Jaring .........................................................................................................28

    3.3. Proses ............................................................