KL-KEPONG COUNTRY HOMES SDN BHD CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, MUKIM IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN KL-KEPONG COUNTRY HOMES SDN BHD WATER RETICULATION DESIGN REPORT FALLING MAIN TO HIGH ZONE 1 AND 2; RETICULATION PIPE FOR HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D) JULY 2014 Developer: Consultant: KEMASEPAKAT SDN BHD (103997-P) 601, Block A, Glomac Business Centre, No. 10 Jalan SS6/1, Kelana Jaya, 47301 Petaling Jaya Tel: 03-78045282, Fax: 03-78046284 KL-KEPONG COUNTRY HOMES SDN BHD Suite 1A-1, Level 1, Menara KLK, No. 1 Jalan PJU 7/6, Mutiara Damansara 47801 PETALING JAYA Tel: 03-77261868, Fax: 03-77262868

Upload: others

Post on 02-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

KL-KEPONG COUNTRY HOMES SDN BHD

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851,

MUKIM IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN

KL-KEPONG COUNTRY HOMES SDN BHD

WATER RETICULATION DESIGN REPORT

FALLING MAIN TO HIGH ZONE 1 AND 2; RETICULATION PIPE FOR HIGH ZONE 1

(PRESINT 3A, 3B, 3B1, 3C & 3D)

JULY 2014

Developer: Consultant:

KEMASEPAKAT SDN BHD (103997-P) 601, Block A, Glomac Business Centre, No. 10 Jalan SS6/1, Kelana Jaya, 47301 Petaling Jaya Tel: 03-78045282, Fax: 03-78046284

KL-KEPONG COUNTRY HOMES SDN BHD Suite 1A-1, Level 1, Menara KLK, No. 1 Jalan PJU 7/6, Mutiara Damansara 47801 PETALING JAYA Tel: 03-77261868, Fax: 03-77262868

Page 2: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

TABLE OF CONTENT

INTRODUCTION ........................................................................................................ 1

OBJECTIVE ............................................................................................................... 2

OVERALL DEVELOPMENT WATER DEMAND ....................................................... 2

WATER SUPPLY SYSTEM ....................................................................................... 3

ELEVATED WATER TANK (2 NOS ROUND) ........................................................... 4

DESIGN CRITERIA .................................................................................................... 4

HYDRAULIC ANALYSIS ........................................................................................... 4

RESULTS ................................................................................................................... 5

DISCUSSION AND CONCLUSION............................................................................ 5

APPENDICES: -

Water Supply Demand Table by Precinct and by Zones

Key and Location Plan

Precinct Layout Plan

Schematic Layout of High Zone 1 (Precint 3)

Desgin Calculation and Analysis

Approved Letters

Page 3: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, UKIM

IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK

TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

- HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D)

1

INTRODUCTION

KL-Kepong Country Homes Sdn Bhd has embarked on development on CT 12606,

Lot 851, Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan with total area of

405.10 hectares / 1001.02 acres comprising of landed residential houses, apartments,

commercial lots, shops, petrol station, institution and community facilities such as

school, masjid, hall, police station, polyclinic, and etc. The site is bounded West and

South by Jalan Sg. Buloh – Kuala Selangor (FR 54); North and East Tuan Mee Estate

and Vmy Estate.

This development project is planned in few phases as shown in the phasing

demarcation plan attached in appendix. The water demand based on development

phasing is also tabulated in Section 3.

Application for water supply and tapping point was approved by SYABAS Selangor

Sdn Bhd via their letter reference SYA/DD/KSL/IJOK/LT851/10/04806 dated 2nd

June 2010 and low zone water reticulation for phase 1A1, 1A2, 1A3, 1B1, 1B2, 1C1,

1C2 & 1D1 was approved by SYABAS Selangor Sdn Bhd via their letter reference

SYA/NPD/DD/KSL/Ijok/LT851/12(04635). Subsequently the falling main to low

zone and the reticulation pipe to the above phases were completed and handed over to

SYABAS Kuala Selangor in phases.

The location of tapping point is at 2200 mm & 1700 mm diameter M.S pipes located in

SYABAS waterworks reserve at Taman Industri Alam Jaya about 0.2 km away from

Jalan Meru. The safe water pressure available is 69.0 m ODL. A copy of above letter

is attached.

The incoming main and ground tank for low zone supply cum suction tank have been

approved by SYABAS via their letter reference

SYA/NPD/DD/KSL/IJOK/LT851/11/11033 date 28 September 2011. The installation

is being constructed in the phase 1 development.

Page 4: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, UKIM

IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK

TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

- HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D)

2

OBJECTIVE

The objective of this report is to present the details network analysis for the Water

reticulation for precinct 3A, 3B, 3B1, 3C & 3D for Syarikat Bekalan Air Selangor Sdn

Bhd approval.

OVERALL DEVELOPMENT WATER DEMAND No Premises Unit / Demand / Demand Demand

Area (m2) Unit (LPD) ( LPD ) ( GPD )

Perumahan

1 Rumah Sesebuah (RBS) 450-800m2 845 2000 1,690,000 371,747.95

2 Rumah Berkembar (RBK) 300-375m2 1098 2000 2,196,000 483,052.36

3 Rumah Teres (RTA) 10m x 25m 57 1500 85,500 18,807.37

4 Rumah Teres (RTB) 8m x 25m 194 1500 291,000 64,011.04

5 Rumah Teres 2 Tkt (RTS1) 7.32m x 22.86m 289 1500 433,500 95,356.65

6 Rumah Teres 2 Tkt (RTS2) 6.71m x 22.86m 600 1500 900,000 197,972.28

7 Rumah Teres 2 Tkt (RTS3) 6.10m x 21.34m 261 1500 391,500 86,117.94

8 Rumah Teres 2 Tkt (RTS4) 5.48m x 18.29m 556 1500 834,000 183,454.31

9 Apartmen Kos Sederhan Rendah 5 Tingkat 556 1500 834,000 183,454.31

10 Apartmen Kos Rendah 5 Tingkat 1112 1000 1,112,000 244,605.75

Jumlah Kecil 5568 1,928,579.96

Perniagaan

11 Kedai Pejabat 3 Tkt (KD1) 7.31m x 22.86m 290 4500 1,305,000 287,059.81

12 Kedai Pejabat 2 Tkt (KD2) 6.71m x 22.86m 144 3000 432,000 95,026.69

13 Kedai Kos Rendah 1 Tkt. (KD3) 6.1m x

18.29m 104 2000 208,000 45,753.59

14 Plot Perniagaan ( 9.11 hek PR = 1 : 1.5 ) 136650 10 1,366,500 300,587.91

15 Rumah Kelab Swasta 1 50000 50,000 10,998.46

16 Stesyen Minyak 2 50000 100,000 21,996.92

17 Gerai 4 25000 100,000 21,996.92

18 Pasar 1 25000 25,000 5,499.23

Jumlah Kecil 788,919.54

19 Institusi Pendidikan Swasta 4.9 25000 122,500 26,946.23

Jumlah Kecil 26,946.23

Kemudahan Masyarakat

Page 5: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, UKIM

IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK

TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

- HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D)

3

No Premises Unit / Demand / Demand Demand

Area (m2) Unit (LPD) ( LPD ) ( GPD )

20 Kompleks Sekolah (2x4000) 8000 50 400,000 87,987.68

21 Sekolah Rendah (2000) 2000 50 100,000 21,996.92

22 Sekolah Rendah Agama (500) 500 50 25,000 5,499.23

23 Sekolah Rendah Tamil (500) 500 50 25,000 5,499.23

24 Masjid dan Sekolah Rendah Agama 1300 50 65,000 14,298.00

25 Surau (6x50) 6 2500 15,000 3,299.54

26 Tadika (75x4) 4 2250 9,000 1,979.72

27 Dewan Serbaguna 3 25,000 75,000 16,497.69

28 Balai Polis (2.5 hek) 2.5 25,000 62,500 13,748.08

29 Klinik Kesihatan (1.6 hek) 1.6 25,000 40,000 8,798.77

30 Stesyen Bas (0.41 hek) 0.41 25,000 10,250 2,254.68

31 Kuil Hindu (0.33 hek) 0.33 25,000 8,250 1,814.75

32 Gereja (0.4 hek) 0.4 25,000 10,000 2,199.69

Jumlah Kecil 185,873.97

Total 2,930,319.70

WATER SUPPLY SYSTEM

The water supply system within this development would be divided into 2 zones

namely Higher Zone and Lower Zone. The lower zone would be served by ground

reservoir and the Higher Zone would be served by two elevated reservoirs. The

ground tank would serve two functions namely as ground storage reservoir for Lower

Zone supply and as suction tank for elevated reservoir. The construction of ground

storage reservoir was completed and handed over in 4th June 2013 and the elevated

reservoir is in construction stage.

The total storage required for higher zone supply and lower zone supply are

1,768,415.00 gallons and 1,169,146.16 gallons respectively. The storage provided for

ground storage reservoir is 1,782,000 gallons. The storage for both elevated water

Page 6: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, UKIM

IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK

TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

- HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D)

4

tanks total to 1,188,000 gallons. The combined storage provided for the elevated tanks

and ground tank, 2,970,000 gallons are more than the total overall demand required.

The water from suction tank will be pumped to elevated tanks via 4 pumps. The

pumps are divided into 2 separate systems, each serving one elevated tank. The

elevated tanks are connected with balancing pipe.

Elevated Water Tank (2 nos Round)

Design Capacity = 1,188,000 gallon = 5400.00 m3.

Ground level = 51.00 m

Top Water Level = 90.50 m

Bottom Water Level = 85.00 m

Diameter = 25.20 m

Design Criteria

The design is based on the following criteria

a) Minimum pressure = 4.50m above required supply level

b) Maximum pressure = 30 m

c) Maximum head loss = 2 m per 1 km

d) All pipes, valves and appurtenances shall be in accordance with Syabas Sdn

Bhd requirement.

e) Proposed higher supply level is tabulated as below:

Floor Height Highest Supply Level (Included water tank Level)

Single Storey 3.5 + 2.0 (Water tank height ) = 5.5m

Double storey 7.0 + 2.0 (Water tank height) = 9.0m

Three Storey 10.5 + 2.0 (Water tank height) = 12.50m

Hydraulic Analysis

The reticulation of the water supply system is analyzed based on Hardy Cross method

of balancing flows by correcting the assumed pressures.

Page 7: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, UKIM

IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK

TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

- HIGH ZONE 1 (PRESINT 3A, 3B, 3B1, 3C & 3D)

5

The Hazen William equation is used in the design:

V = 0.35464C x D0.63 x I0.54

Where

V = Flow velocity in m/sec

D = internal diameter of pipes in m

C = friction coefficient

= 100 for DI/AB-3P pipe.

I = Loss of head per unit length

The analysis is carried out for peak flow of the water reticulation with factor of 2.5

and for fire flow with factor of 1.0

Results

The output data for the pipeline network analysis is show in appendix.

Discussion and Conclusion

The results from the calculation show the pressures are sufficient. In conclusion, the

design complies with the requirement.

Page 8: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

APPENDIX WATER SUPPLY DEMAND TABLE

FOR OVERALL DEVELOPMENT

Page 9: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 10: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 11: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 12: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

APPENDIX LAYOUT PLAN

1. Key and Location Plan 2. Precinct Layout Plan

3. Water Supply Zoning Plan 4. High Zone 1 Schematic Layout Plan

Page 13: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 14: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 15: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 16: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached
Page 17: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

APPENDIX HIGH ZONE 1 (PRECINCT 3)

ANALYSIS

Page 18: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Company Name: KEMASEPAKAT SDN BHD Job Description: CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851,

MUKIM IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

Designed by: YAU Date and Time: Wednesday, July 11, 2012 File Path: D:\Yau\KLK\Design\Water Reticulation\Water Reticulation (High Zone)\Overall High

Zone\Head loss 1km\Overall High Zone 2.doc General Setting

Title :

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS CT 12606, LOT 851, MUKIM IJOK, DAERAH KUALA SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN KL-KEPONG COUNTRY HOMES SDN BHD

No. of Pipes : 172 No. of Nodes : 173 Peak Factor : 2.5 Max Headloss/km) : 2.00 Max Unbal(LPS) : 0.002 Min Residue Pressure(m) : 4.5 Max Residue Pressure(m) : 30 Fire Factor : 1 Fire Flow Water Demand : 22.7 Low Velocity Limit : 0.3 High Velocity Limit : 2.6

Input Data Pipes

Pipe No From Node To Node Pipe Type Length(m) Diameter(mm) HWC 1 1 2 DI 11.133 700 100 2 2 3 DI 81.998 700 100 3 3 4 DI 4.482 600 100 4 4 5 DI 6.372 600 100 5 5 6 DI 24.577 500 100 6 6 7 DI 30.386 500 100 7 7 8 DI 104.33 500 100 8 8 9 DI 43.055 450 100 9 9 10 DI 5 450 100 10 10 11 DI 26.668 450 100 11 11 12 DI 40 450 100 12 12 13 DI 95.187 450 100 13 13 14 DI 61.237 450 100 14 14 15 DI 20.001 450 100 15 15 16 DI 40.032 450 100

Page 19: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No From Node To Node Pipe Type Length(m) Diameter(mm) HWC 16 16 17 DI 193.184 350 100 17 17 18 DI 60.707 350 100 18 18 19 DI 120.014 200 100 19 19 20 DI 83.164 200 100 20 20 21 DI 88.406 150 100 21 10 22 DI 17.812 150 100 22 22 23 DI 110.591 150 100 23 22 24 DI 92.023 150 100 24 8 25 DI 40.299 350 100 25 25 26 DI 20.006 150 100 26 26 27 DI 101.536 150 100 27 26 28 DI 90.303 150 100 28 25 30 DI 47.973 350 100 29 30 31 DI 11.549 150 100 30 31 32 DI 73.535 150 100 31 31 33 DI 70.564 150 100 32 30 34 DI 59.611 350 100

32A 34 35 DI 11.445 150 100 33 35 36 DI 59.027 150 100 34 35 37 DI 47.498 150 100 35 34 38 DI 51.562 350 100 36 38 39 DI 17.031 150 100 37 39 40 DI 62.225 150 100 39 38 42 DI 80.718 350 100 40 42 43 DI 17.256 150 100 41 43 44 DI 52.352 150 100 42 44 45 DI 82.697 150 100 43 44 46 DI 71.1 150 100 44 42 47 DI 73.919 350 100 45 47 48 DI 15.957 250 100 46 48 49 DI 8.096 150 100 47 49 50 DI 215.287 150 100 48 49 51 DI 196.963 150 100 51 53 54 DI 232.196 250 100 53 55 56 DI 270.556 150 100 54 55 57 DI 265.759 150 100 55 47 58 DI 47.438 200 100 56 58 59 DI 67.675 200 100 57 59 60 DI 80.468 200 100 58 60 61 DI 51.99 150 100 59 61 62 DI 7 150 100 60 61 63 DI 215.171 150 100 61 60 69 DI 74.54 150 100 62 69 64 DI 140.125 150 100 63 69 29 DI 180.84 150 100 64 59 65 DI 59.491 150 100

Page 20: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No From Node To Node Pipe Type Length(m) Diameter(mm) HWC 65 65 66 DI 174.441 150 100 66 65 67 DI 156.594 150 100 67 58 68 DI 133.44 150 100 68 5 70 DI 18.552 350 100 69 70 71 DI 12.884 350 100 70 71 72 DI 104.975 350 100 71 72 73 DI 106.154 350 100 72 73 74 DI 211.45 350 100 73 74 75 DI 51.308 200 100 74 75 76 DI 50.903 150 100 75 76 77 DI 59.681 150 100 76 77 78 DI 52.965 150 100 77 78 79 DI 45.871 150 100 78 79 80 DI 13.742 150 100 79 80 81 DI 81.052 150 100 80 80 82 DI 66.897 150 100 81 78 83 DI 84.302 150 100 82 77 84 DI 66.418 150 100 83 76 85 DI 12.748 150 100 84 85 86 DI 82.107 150 100 85 85 87 DI 82.287 150 100 86 75 88 DI 16.425 150 100 87 88 89 DI 48.817 150 100 88 89 90 DI 30 150 100 89 89 91 DI 98.438 150 100 90 88 92 DI 178.058 150 100 91 74 93 DI 67.801 200 100 92 93 94 DI 52.829 200 100 93 94 95 DI 10.922 150 100 94 94 96 DI 239.904 150 100 95 96 97 DI 18.006 150 100 96 96 98 DI 118.639 150 100 97 97 99 DI 72.644 150 100 98 99 100 DI 60.605 150 100 99 99 101 DI 86.672 150 100

100 97 102 DI 102.799 150 100 101 93 103 DI 204.835 150 100 102 73 104 DI 128.155 200 100 103 104 105 DI 61.737 150 100 104 105 106 DI 24.499 150 100 105 105 107 DI 24.955 150 100 106 107 108 DI 142.5 150 100 107 107 109 DI 139.032 150 100 108 104 110 DI 99.261 150 100 109 110 111A DI 79.999 150 100 110 110 111 DI 101.567 150 100

Page 21: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No From Node To Node Pipe Type Length(m) Diameter(mm) HWC 111 72 112 DI 11.329 150 100 112 112 113 DI 54.061 150 100 113 113 114 DI 90.666 150 100 114 112 115 DI 88.494 150 100 116 116 117 DI 11.239 150 100 117 117 118 DI 97.232 150 100 118 116 119 DI 180.5 150 100 115 71 116 DI 60.55 150 100 119 54 120 DI 93.41 200 100 120 120 121 DI 41.538 200 100 121 121 122 DI 38 200 100 122 122 123 DI 45 200 100 123 123 124 DI 433.044 200 100 124 124 125 DI 43.45 150 100 125 3 126 DI 60.914 600 100 126 126 127 DI 381.367 600 100 337 127 337 DI 32.134 350 100 38 39 41 DI 68.709 150 100 49 48 52 DI 43.069 250 100 50 52 53 DI 14.416 250 100 52 52 55 DI 28.001 150 100

Nodes

Node No Water Demand(LPS) Highest Supply Level(m) 1 0.00000 52.00 2 0.00000 46.75 3 0.00000 49.62 4 0.00000 49.62 5 0.00000 49.62 6 0.00000 51.08 7 0.00000 51.92 8 0.00000 50.05 9 -0.28900 68.44

10 0.00000 50.88 11 -0.02600 69.23 12 -0.03000 69.85 13 0.00000 53.53 14 -0.29000 72.36 15 -2.32000 77.48 16 -9.65500 77.40 17 -7.35100 74.41 18 -5.53000 73.90 19 0.00000 49.45 20 -0.75200 66.51 21 -1.16000 62.03 22 0.00000 50.65

Page 22: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Water Demand(LPS) Highest Supply Level(m) 23 -0.29500 61.40 24 -0.27800 61.40 25 0.00000 47.98 26 0.00000 49.00 27 -0.27800 57.80 28 -0.26000 57.80 29 -0.41700 60.03 30 0.00000 46.18 31 0.00000 46.77 32 -0.22600 59.74 33 -0.20800 59.74 34 0.00000 44.03 35 0.00000 43.72 36 -0.19100 54.50 37 -0.17400 54.50 38 0.00000 43.45 39 0.00000 42.96 40 -0.15600 53.50 42 0.00000 43.36 43 0.00000 42.47 44 -0.15600 53.00 45 -0.24300 51.30 46 -0.19100 51.30 47 0.00000 44.01 48 0.00000 44.05 49 0.00000 43.46 50 -0.59000 49.80 51 -0.45100 49.80 53 0.00000 44.29 54 -0.74100 49.57 55 0.00000 44.64 56 -0.60800 61.05 57 -0.71200 61.05 58 0.00000 44.61 59 0.00000 45.84 60 0.00000 47.46 61 0.00000 48.44 62 -0.59000 60.44 63 -0.46900 58.75 64 -0.52100 60.06 65 0.00000 45.99 66 -0.43400 57.91 67 -0.45100 57.91 68 -0.33000 56.55 69 0.00000 48.03 70 0.00000 50.64

Page 23: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Water Demand(LPS) Highest Supply Level(m) 71 0.00000 49.78 72 0.00000 46.03 73 -0.43400 54.49 74 0.00000 40.22 75 0.00000 38.70 76 0.00000 39.42 77 0.00000 39.39 78 0.00000 37.24 79 0.00000 35.32 80 0.00000 34.70 81 -0.17400 44.50 82 -0.20800 44.50 83 -0.22600 46.00 84 -0.19100 48.83 85 0.00000 39.00 86 -0.22600 47.56 87 -0.24300 47.56 88 0.00000 38.29 89 0.00000 36.10 90 -0.26000 47.38 91 -0.24300 44.93 92 -0.34700 44.79 93 0.00000 41.03 94 0.00000 42.46 95 -0.57300 55.00 96 -0.46900 46.59 97 0.00000 34.27 98 -0.26000 50.56 99 0.00000 34.56 100 -0.29500 47.14 101 -0.17400 48.27 102 -0.24300 46.29 103 -0.45100 46.04 104 0.00000 41.31 105 0.00000 42.46 106 -0.53800 55.01 107 0.00000 42.92 108 -0.38200 59.82 109 -0.27800 59.82 110 0.00000 21.66 111 -0.22600 59.06

111A -0.39900 59.06 112 0.00000 46.03 113 0.00000 46.89 114 -0.20800 55.84 115 -0.20800 54.78

Page 24: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Water Demand(LPS) Highest Supply Level(m) 116 0.00000 48.69 117 0.00000 48.39 118 -0.24300 57.68 119 -0.43400 54.64 120 -0.02000 41.80 121 -0.02600 41.19 122 -0.28900 51.18 123 -0.02900 41.38 124 -0.57900 58.10 125 -1.41800 58.10 126 0.00000 51.08 127 0.00000 52.91 41 -0.19100 53.50 52 0.00000 44.28

Pipes Peak Output

Pipe No

From Node

To Node Pipe Type Length

(m) Diameter

(mm) HWC Flow (LPS)

Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

1 1 2 DI 11.13 700 100 231.22 0.60 0.81 0.0090 2 2 3 DI 82.00 700 100 231.22 0.60 0.81 0.0660 3 3 4 DI 4.48 600 100 117.15 0.41 0.48 0.0022 4 4 5 DI 6.37 600 100 117.15 0.41 0.48 0.0031 5 5 6 DI 24.58 500 100 97.31 0.50 0.84 0.0206 6 6 7 DI 30.39 500 100 97.31 0.50 0.84 0.0254 7 7 8 DI 104.33 500 100 97.31 0.50 0.84 0.0872 8 8 9 DI 43.05 450 100 69.94 0.44 0.76 0.0326 9 9 10 DI 5.00 450 100 69.22 0.44 0.74 0.0037

10 10 11 DI 26.67 450 100 67.79 0.43 0.72 0.0191 11 11 12 DI 40.00 450 100 67.72 0.43 0.71 0.0286 12 12 13 DI 95.19 450 100 67.65 0.43 0.71 0.0678 13 13 14 DI 61.24 450 100 67.65 0.43 0.71 0.0436 14 14 15 DI 20.00 450 100 66.92 0.42 0.70 0.0140 15 15 16 DI 40.03 450 100 61.12 0.38 0.59 0.0237 16 16 17 DI 193.18 350 100 36.98 0.38 0.79 0.1532 17 17 18 DI 60.71 350 100 18.61 0.19LO 0.22 0.0135 18 18 19 DI 120.01 200 100 4.78 0.15LO 0.27 0.0330 19 19 20 DI 83.16 200 100 4.78 0.15LO 0.27 0.0229 20 20 21 DI 88.41 150 100 2.90 0.16LO 0.44 0.0391 21 10 22 DI 17.81 150 100 1.43 0.08LO 0.12 0.0021 22 22 23 DI 110.59 150 100 0.74 0.04LO 0.04 0.0039 23 22 24 DI 92.02 150 100 0.70 0.04LO 0.03 0.0029 24 8 25 DI 40.30 350 100 27.37 0.28LO 0.45 0.0183 25 25 26 DI 20.01 150 100 1.35 0.08LO 0.11 0.0021 26 26 27 DI 101.54 150 100 0.70 0.04LO 0.03 0.0032 27 26 28 DI 90.30 150 100 0.65 0.04LO 0.03 0.0025

Page 25: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node Pipe Type Length

(m) Diameter

(mm) HWC Flow (LPS)

Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

28 25 30 DI 47.97 350 100 26.03 0.27LO 0.41 0.0199 29 30 31 DI 11.55 150 100 1.09 0.06LO 0.07 0.0008 30 31 32 DI 73.53 150 100 0.57 0.03LO 0.02 0.0016 31 31 33 DI 70.56 150 100 0.52 0.03LO 0.02 0.0013 32 30 34 DI 59.61 350 100 24.94 0.26LO 0.38 0.0228

32A 34 35 DI 11.44 150 100 0.91 0.05LO 0.05 0.0006 33 35 36 DI 59.03 150 100 0.48 0.03LO 0.02 0.0009 34 35 37 DI 47.50 150 100 0.44 0.02LO 0.01 0.0006 35 34 38 DI 51.56 350 100 24.03 0.25LO 0.36 0.0184 36 38 39 DI 17.03 150 100 0.87 0.05LO 0.05 0.0008 37 39 40 DI 62.22 150 100 0.39 0.02LO 0.01 0.0007 38 39 41 DI 68.71 150 100 0.48 0.03LO 0.02 0.0011 39 38 42 DI 80.72 350 100 23.16 0.24LO 0.33 0.0269 40 42 43 DI 17.26 150 100 1.48 0.08LO 0.13 0.0022 41 43 44 DI 52.35 150 100 1.48 0.08LO 0.13 0.0066 42 44 45 DI 82.70 150 100 0.61 0.03LO 0.02 0.0020 43 44 46 DI 71.10 150 100 0.48 0.03LO 0.02 0.0011 44 42 47 DI 73.92 350 100 21.69 0.23LO 0.30 0.0218 45 47 48 DI 15.96 250 100 13.66 0.28LO 0.65 0.0103 46 48 49 DI 8.10 150 100 2.60 0.15LO 0.36 0.0029 47 49 50 DI 215.29 150 100 1.48 0.08LO 0.13 0.0273 48 49 51 DI 196.96 150 100 1.13 0.06LO 0.08 0.0152 49 48 52 DI 43.07 250 100 11.06 0.23LO 0.44 0.0188 50 52 53 DI 14.42 250 100 7.76 0.16LO 0.23 0.0033 51 53 54 DI 232.20 250 100 7.76 0.16LO 0.23 0.0527 52 52 55 DI 28.00 150 100 3.30 0.19LO 0.56 0.0157 53 55 56 DI 270.56 150 100 1.52 0.09LO 0.13 0.0362 54 55 57 DI 265.76 150 100 1.78 0.10LO 0.18 0.0477 55 47 58 DI 47.44 200 100 8.03 0.26LO 0.72 0.0340 56 58 59 DI 67.68 200 100 7.21 0.23LO 0.59 0.0397 57 59 60 DI 80.47 200 100 4.99 0.16LO 0.30 0.0240 58 60 61 DI 51.99 150 100 2.65 0.15LO 0.37 0.0194 59 61 62 DI 7.00 150 100 1.48 0.08LO 0.13 0.0009 60 61 63 DI 215.17 150 100 1.17 0.07LO 0.08 0.0178 61 60 69 DI 74.54 150 100 2.35 0.13LO 0.30 0.0223 62 69 64 DI 140.13 150 100 1.30 0.07LO 0.10 0.0141 63 69 29 DI 180.84 150 100 1.04 0.06LO 0.07 0.0121 64 59 65 DI 59.49 150 100 2.21 0.13LO 0.27 0.0160 65 65 66 DI 174.44 150 100 1.09 0.06LO 0.07 0.0125 66 65 67 DI 156.59 150 100 1.13 0.06LO 0.08 0.0121 67 58 68 DI 133.44 150 100 0.83 0.05LO 0.04 0.0058 68 5 70 DI 18.55 350 100 19.83 0.21LO 0.25 0.0046 69 70 71 DI 12.88 350 100 19.83 0.21LO 0.25 0.0032 70 71 72 DI 104.97 350 100 18.14 0.19LO 0.21 0.0223 71 72 73 DI 106.15 350 100 17.10 0.18LO 0.19 0.0202

Page 26: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node Pipe Type Length

(m) Diameter

(mm) HWC Flow (LPS)

Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

72 73 74 DI 211.45 350 100 11.46 0.12LO 0.09 0.0192 73 74 75 DI 51.31 200 100 5.30 0.17LO 0.33 0.0170 74 75 76 DI 50.90 150 100 3.17 0.18LO 0.52 0.0266 75 76 77 DI 59.68 150 100 2.00 0.11LO 0.22 0.0133 76 77 78 DI 52.97 150 100 1.52 0.09LO 0.13 0.0071 77 78 79 DI 45.87 150 100 0.96 0.05LO 0.06 0.0026 78 79 80 DI 13.74 150 100 0.96 0.05LO 0.06 0.0008 79 80 81 DI 81.05 150 100 0.44 0.02LO 0.01 0.0011 80 80 82 DI 66.90 150 100 0.52 0.03LO 0.02 0.0012 81 78 83 DI 84.30 150 100 0.57 0.03LO 0.02 0.0018 82 77 84 DI 66.42 150 100 0.48 0.03LO 0.02 0.0010 83 76 85 DI 12.75 150 100 1.17 0.07LO 0.08 0.0011 84 85 86 DI 82.11 150 100 0.57 0.03LO 0.02 0.0018 85 85 87 DI 82.29 150 100 0.61 0.03LO 0.02 0.0020 86 75 88 DI 16.42 150 100 2.13 0.12LO 0.25 0.0041 87 88 89 DI 48.82 150 100 1.26 0.07LO 0.09 0.0046 88 89 90 DI 30.00 150 100 0.65 0.04LO 0.03 0.0008 89 89 91 DI 98.44 150 100 0.61 0.03LO 0.02 0.0024 90 88 92 DI 178.06 150 100 0.87 0.05LO 0.05 0.0085 91 74 93 DI 67.80 200 100 6.16 0.20LO 0.44 0.0298 92 93 94 DI 52.83 200 100 5.04 0.16LO 0.30 0.0160 93 94 95 DI 10.92 150 100 1.43 0.08LO 0.12 0.0013 94 94 96 DI 239.90 150 100 3.60 0.20LO 0.66 0.1586 95 96 97 DI 18.01 150 100 1.78 0.10LO 0.18 0.0032 96 96 98 DI 118.64 150 100 0.65 0.04LO 0.03 0.0033 97 97 99 DI 72.64 150 100 1.17 0.07LO 0.08 0.0060 98 99 100 DI 60.60 150 100 0.74 0.04LO 0.04 0.0021 99 99 101 DI 86.67 150 100 0.44 0.02LO 0.01 0.0011 100 97 102 DI 102.80 150 100 0.61 0.03LO 0.02 0.0025 101 93 103 DI 204.84 150 100 1.13 0.06LO 0.08 0.0158 102 73 104 DI 128.15 200 100 4.56 0.15LO 0.25 0.0322 103 104 105 DI 61.74 150 100 3.00 0.17LO 0.47 0.0290 104 105 106 DI 24.50 150 100 1.35 0.08LO 0.11 0.0026 105 105 107 DI 24.95 150 100 1.65 0.09LO 0.16 0.0039 106 107 108 DI 142.50 150 100 0.96 0.05LO 0.06 0.0081 107 107 109 DI 139.03 150 100 0.70 0.04LO 0.03 0.0044 108 104 110 DI 99.26 150 100 1.56 0.09LO 0.14 0.0140 109 110 111A DI 80.00 150 100 1.00 0.06LO 0.06 0.0049 110 110 111 DI 101.57 150 100 0.57 0.03LO 0.02 0.0022 111 72 112 DI 11.33 150 100 1.04 0.06LO 0.07 0.0008 112 112 113 DI 54.06 150 100 0.52 0.03LO 0.02 0.0010 113 113 114 DI 90.67 150 100 0.52 0.03LO 0.02 0.0017 114 112 115 DI 88.49 150 100 0.52 0.03LO 0.02 0.0016 115 71 116 DI 60.55 150 100 1.69 0.10LO 0.16 0.0099 116 116 117 DI 11.24 150 100 0.61 0.03LO 0.02 0.0003

Page 27: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node Pipe Type Length

(m) Diameter

(mm) HWC Flow (LPS)

Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

117 117 118 DI 97.23 150 100 0.61 0.03LO 0.02 0.0024 118 116 119 DI 180.50 150 100 1.09 0.06LO 0.07 0.0130 119 54 120 DI 93.41 200 100 5.90 0.19LO 0.41 0.0379 120 120 121 DI 41.54 200 100 5.85 0.19LO 0.40 0.0166 121 121 122 DI 38.00 200 100 5.79 0.18LO 0.39 0.0149 122 122 123 DI 45.00 200 100 5.07 0.16LO 0.31 0.0138 123 123 124 DI 433.04 200 100 4.99 0.16LO 0.30 0.1290 124 124 125 DI 43.45 150 100 3.55 0.20LO 0.64 0.0279 125 3 126 DI 60.91 600 100 114.07 0.40 0.46 0.0281 126 126 127 DI 381.37 600 100 114.07 0.40 0.46 0.1761 127 127 128 DI 262.33 600 100 93.87 0.33 0.32 0.0844 337 127 337 DI 32.13 350 100 20.20 0.21LO 0.26 0.0083

Nodes Peak Output

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 1 R 231.215 52.00 87.20 35.20 2 0.000 46.75 87.19 40.44 3 0.000 49.62 87.13 37.51 4 0.000 49.62 87.12 37.51 5 0.000 49.62 87.12 37.50 6 0.000 51.08 87.10 36.02 7 0.000 51.92 87.07 35.16 8 0.000 50.05 86.99 36.94 9 -0.723 68.44 86.95 18.51 10 0.000 50.88 86.95 36.07 11 -0.065 69.23 86.93 17.71 12 -0.075 69.85 86.90 17.06 13 0.000 53.53 86.83 33.31 14 -0.725 72.36 86.79 14.44 15 -5.800 77.48 86.78 9.29 16 -24.138 77.40 86.75 9.35 17 -18.378 74.41 86.60 12.19 18 -13.825 73.90 86.59 12.69 19 0.000 49.45 86.55 37.10 20 -1.880 66.51 86.53 20.02 21 -2.900 62.03 86.49 24.46 22 0.000 50.65 86.95 36.30 23 -0.738 61.40 86.94 25.54 24 -0.695 61.40 86.95 25.54 25 0.000 47.98 86.97 38.99 26 0.000 49.00 86.97 37.97 27 -0.695 57.80 86.96 29.16 28 -0.650 57.80 86.96 29.16 29 -1.043 60.03 86.73 26.69

Page 28: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 30 0.000 46.18 86.95 40.77 31 0.000 46.77 86.95 40.18 32 -0.565 59.74 86.95 27.21 33 -0.520 59.74 86.95 27.21 34 0.000 44.03 86.93 42.90 35 0.000 43.72 86.92 43.21 36 -0.478 54.50 86.92 32.42 37 -0.435 54.50 86.92 32.42 38 0.000 43.45 86.91 43.45 39 0.000 42.96 86.91 43.94 40 -0.390 53.50 86.91 33.41 41 -0.478 53.50 86.91 33.41 42 0.000 43.36 86.88 43.52 43 0.000 42.47 86.88 44.41 44 -0.390 53.00 86.87 33.87 45 -0.608 51.30 86.87 35.57 46 -0.478 51.30 86.87 35.57 47 0.000 44.01 86.86 42.85 48 0.000 44.05 86.85 42.80 49 0.000 43.46 86.85 43.39 50 -1.475 49.80 86.82 37.02 51 -1.128 49.80 86.83 37.03 52 0.000 44.28 86.83 42.55 53 0.000 44.29 86.83 42.54 54 -1.853 49.57 86.77 37.20 55 0.000 44.64 86.81 42.18 56 -1.520 61.05 86.78 25.73 57 -1.780 61.05 86.77 25.72 58 0.000 44.61 86.82 42.22 59 0.000 45.84 86.78 40.95 60 0.000 47.46 86.76 39.30 61 0.000 48.44 86.74 38.30 62 -1.475 60.44 86.74 26.30 63 -1.173 58.75 86.72 27.97 64 -1.303 60.06 86.72 26.67 65 0.000 45.99 86.77 40.78 66 -1.085 57.91 86.76 28.85 67 -1.128 57.91 86.76 28.85 68 -0.825 56.55 86.82 30.27 69 0.000 48.03 86.74 38.70 70 0.000 50.64 87.12 36.48 71 0.000 49.78 87.11 37.33 72 0.000 46.03 87.09 41.06 73 -1.085 54.49 87.07 32.58 74 0.000 40.22 87.05 46.83 75 0.000 38.70 87.03 48.33

Page 29: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 76 0.000 39.42 87.01 47.59 77 0.000 39.39 86.99 47.60 78 0.000 37.24 86.99 49.75 79 0.000 35.32 86.98 51.66 80 0.000 34.70 86.98 52.28 81 -0.435 44.50 86.98 42.48 82 -0.520 44.50 86.98 42.48 83 -0.565 46.00 86.98 40.98 84 -0.478 48.83 86.99 38.17 85 0.000 39.00 87.01 48.01 86 -0.565 47.56 87.00 39.45 87 -0.608 47.56 87.00 39.45 88 0.000 38.29 87.03 48.74 89 0.000 36.10 87.02 50.92 90 -0.650 47.38 87.02 39.64 91 -0.608 44.93 87.02 42.09 92 -0.868 44.79 87.02 42.23 93 0.000 41.03 87.02 45.99 94 0.000 42.46 87.00 44.54 95 -1.433 55.00 87.00 32.00 96 -1.173 46.59 86.85 40.25 97 0.000 34.27 86.84 52.57 98 -0.650 50.56 86.84 36.29 99 0.000 34.56 86.84 52.27

100 -0.738 47.14 86.83 39.70 101 -0.435 48.27 86.84 38.57 102 -0.608 46.29 86.84 40.55 103 -1.128 46.04 87.00 40.97 104 0.000 41.31 87.04 45.73 105 0.000 42.46 87.01 44.54 106 -1.345 55.01 87.01 32.00 107 0.000 42.92 87.00 44.09 108 -0.955 59.82 87.00 27.18 109 -0.695 59.82 87.00 27.18 110 0.000 21.66 87.02 65.37 111 -0.565 59.06 87.02 27.96

111A -0.998 59.06 87.02 27.96 112 0.000 46.03 87.09 41.06 113 0.000 46.89 87.09 40.19 114 -0.520 55.84 87.09 31.25 115 -0.520 54.78 87.09 32.31 116 0.000 48.69 87.10 38.42 117 0.000 48.39 87.10 38.72 118 -0.608 57.68 87.10 29.42 119 -1.085 54.64 87.09 32.45 120 -0.050 41.80 86.74 44.94

Page 30: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 121 -0.065 41.19 86.72 45.53 122 -0.723 51.18 86.70 35.52 123 -0.073 41.38 86.69 45.31 124 -1.448 58.10 86.56 28.46 125 -3.545 58.10 86.53 28.43 126 0.000 51.08 87.10 36.01 127 0.000 52.91 86.92 34.01

Pipes Fire Output Pipe No

From Node

To Node

Pipe Type

Length(m)

Diameter (mm) HWC Flow

(LPS) Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

1 1 2 DI 11.13 700 100 137.89 0.36 0.31 0.0034 2 2 3 DI 82.00 700 100 137.89 0.36 0.31 0.0254 3 3 4 DI 4.48 600 100 69.56 0.25LO 0.18 0.0008 4 4 5 DI 6.37 600 100 69.56 0.25LO 0.18 0.0012 5 5 6 DI 24.58 500 100 61.63 0.31 0.36 0.0088 6 6 7 DI 30.39 500 100 61.63 0.31 0.36 0.0109 7 7 8 DI 104.33 500 100 61.63 0.31 0.36 0.0375 8 8 9 DI 43.05 450 100 50.68 0.32 0.42 0.0180 9 9 10 DI 5.00 450 100 50.39 0.32 0.41 0.0021 10 10 11 DI 26.67 450 100 49.81 0.31 0.40 0.0108 11 11 12 DI 40.00 450 100 49.79 0.31 0.40 0.0162 12 12 13 DI 95.19 450 100 49.76 0.31 0.40 0.0384 13 13 14 DI 61.24 450 100 49.76 0.31 0.40 0.0247 14 14 15 DI 20.00 450 100 49.47 0.31 0.40 0.0080 15 15 16 DI 40.03 450 100 47.15 0.30LO 0.37 0.0146 16 16 17 DI 193.18 350 100 37.49 0.39 0.81 0.1572 17 17 18 DI 60.71 350 100 30.14 0.31 0.54 0.0330 18 18 19 DI 120.01 200 100 24.61 0.78 5.70HI 0.6839 19 19 20 DI 83.16 200 100 24.61 0.78 5.70HI 0.4739 20 20 21 DI 88.41 150 100 23.86 1.35 21.84HI 1.9309 21 10 22 DI 17.81 150 100 0.57 0.03LO 0.02 0.0004 22 22 23 DI 110.59 150 100 0.30 0.02LO 0.01 0.0007 23 22 24 DI 92.02 150 100 0.28 0.02LO 0.01 0.0005 24 8 25 DI 40.30 350 100 10.95 0.11LO 0.08 0.0034 25 25 26 DI 20.01 150 100 0.54 0.03LO 0.02 0.0004 26 26 27 DI 101.54 150 100 0.28 0.02LO 0.01 0.0006 27 26 28 DI 90.30 150 100 0.26 0.01LO 0.01 0.0005 28 25 30 DI 47.97 350 100 10.41 0.11LO 0.08 0.0036 29 30 31 DI 11.55 150 100 0.43 0.02LO 0.01 0.0002 30 31 32 DI 73.53 150 100 0.23 0.01LO 0.00 0.0003 31 31 33 DI 70.56 150 100 0.21 0.01LO 0.00 0.0002 32 30 34 DI 59.61 350 100 9.98 0.10LO 0.07 0.0042

32A 34 35 DI 11.44 150 100 0.37 0.02LO 0.01 0.0001 33 35 36 DI 59.03 150 100 0.19 0.01LO 0.00 0.0002 34 35 37 DI 47.50 150 100 0.17 0.01LO 0.00 0.0001

Page 31: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node

Pipe Type

Length(m)

Diameter (mm) HWC Flow

(LPS) Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

35 34 38 DI 51.56 350 100 9.61 0.10LO 0.07 0.0034 36 38 39 DI 17.03 150 100 0.35 0.02LO 0.01 0.0001 37 39 40 DI 62.22 150 100 0.16 0.01LO 0.00 0.0001 38 39 41 DI 68.71 150 100 0.19 0.01LO 0.00 0.0002 39 38 42 DI 80.72 350 100 9.27 0.10LO 0.06 0.0049 40 42 43 DI 17.26 150 100 0.59 0.03LO 0.02 0.0004 41 43 44 DI 52.35 150 100 0.59 0.03LO 0.02 0.0012 42 44 45 DI 82.70 150 100 0.24 0.01LO 0.00 0.0004 43 44 46 DI 71.10 150 100 0.19 0.01LO 0.00 0.0002 44 42 47 DI 73.92 350 100 8.68 0.09LO 0.05 0.0040 45 47 48 DI 15.96 250 100 5.46 0.11LO 0.12 0.0019 46 48 49 DI 8.10 150 100 1.04 0.06LO 0.07 0.0005 47 49 50 DI 215.29 150 100 0.59 0.03LO 0.02 0.0050 48 49 51 DI 196.96 150 100 0.45 0.03LO 0.01 0.0028 49 48 52 DI 43.07 250 100 4.42 0.09LO 0.08 0.0035 50 52 53 DI 14.42 250 100 3.10 0.06LO 0.04 0.0006 51 53 54 DI 232.20 250 100 3.10 0.06LO 0.04 0.0097 52 52 55 DI 28.00 150 100 1.32 0.07LO 0.10 0.0029 53 55 56 DI 270.56 150 100 0.61 0.03LO 0.02 0.0067 54 55 57 DI 265.76 150 100 0.71 0.04LO 0.03 0.0088 55 47 58 DI 47.44 200 100 3.21 0.10LO 0.13 0.0062 56 58 59 DI 67.68 200 100 2.88 0.09LO 0.11 0.0073 57 59 60 DI 80.47 200 100 2.00 0.06LO 0.05 0.0044 58 60 61 DI 51.99 150 100 1.06 0.06LO 0.07 0.0036 59 61 62 DI 7.00 150 100 0.59 0.03LO 0.02 0.0002 60 61 63 DI 215.17 150 100 0.47 0.03LO 0.02 0.0033 61 60 69 DI 74.54 150 100 0.94 0.05LO 0.05 0.0041 62 69 64 DI 140.13 150 100 0.52 0.03LO 0.02 0.0026 63 69 29 DI 180.84 150 100 0.42 0.02LO 0.01 0.0022 64 59 65 DI 59.49 150 100 0.89 0.05LO 0.05 0.0029 65 65 66 DI 174.44 150 100 0.43 0.02LO 0.01 0.0023 66 65 67 DI 156.59 150 100 0.45 0.03LO 0.01 0.0022 67 58 68 DI 133.44 150 100 0.33 0.02LO 0.01 0.0011 68 5 70 DI 18.55 350 100 7.93 0.08LO 0.05 0.0009 69 70 71 DI 12.88 350 100 7.93 0.08LO 0.05 0.0006 70 71 72 DI 104.97 350 100 7.26 0.08LO 0.04 0.0041 71 72 73 DI 106.15 350 100 6.84 0.07LO 0.03 0.0037 72 73 74 DI 211.45 350 100 4.58 0.05LO 0.02 0.0035 73 74 75 DI 51.31 200 100 2.12 0.07LO 0.06 0.0031 74 75 76 DI 50.90 150 100 1.27 0.07LO 0.10 0.0049 75 76 77 DI 59.68 150 100 0.80 0.05LO 0.04 0.0024 76 77 78 DI 52.97 150 100 0.61 0.03LO 0.02 0.0013 77 78 79 DI 45.87 150 100 0.38 0.02LO 0.01 0.0005 78 79 80 DI 13.74 150 100 0.38 0.02LO 0.01 0.0001 79 80 81 DI 81.05 150 100 0.17 0.01LO 0.00 0.0002

Page 32: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node

Pipe Type

Length(m)

Diameter (mm) HWC Flow

(LPS) Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

80 80 82 DI 66.90 150 100 0.21 0.01LO 0.00 0.0002 81 78 83 DI 84.30 150 100 0.23 0.01LO 0.00 0.0003 82 77 84 DI 66.42 150 100 0.19 0.01LO 0.00 0.0002 83 76 85 DI 12.75 150 100 0.47 0.03LO 0.02 0.0002 84 85 86 DI 82.11 150 100 0.23 0.01LO 0.00 0.0003 85 85 87 DI 82.29 150 100 0.24 0.01LO 0.00 0.0004 86 75 88 DI 16.42 150 100 0.85 0.05LO 0.05 0.0008 87 88 89 DI 48.82 150 100 0.50 0.03LO 0.02 0.0008 88 89 90 DI 30.00 150 100 0.26 0.01LO 0.01 0.0002 89 89 91 DI 98.44 150 100 0.24 0.01LO 0.00 0.0004 90 88 92 DI 178.06 150 100 0.35 0.02LO 0.01 0.0016 91 74 93 DI 67.80 200 100 2.47 0.08LO 0.08 0.0055 92 93 94 DI 52.83 200 100 2.01 0.06LO 0.06 0.0029 93 94 95 DI 10.92 150 100 0.57 0.03LO 0.02 0.0002 94 94 96 DI 239.90 150 100 1.44 0.08LO 0.12 0.0291 95 96 97 DI 18.01 150 100 0.71 0.04LO 0.03 0.0006 96 96 98 DI 118.64 150 100 0.26 0.01LO 0.01 0.0006 97 97 99 DI 72.64 150 100 0.47 0.03LO 0.02 0.0011 98 99 100 DI 60.60 150 100 0.30 0.02LO 0.01 0.0004 99 99 101 DI 86.67 150 100 0.17 0.01LO 0.00 0.0002

100 97 102 DI 102.80 150 100 0.24 0.01LO 0.00 0.0005 101 93 103 DI 204.84 150 100 0.45 0.03LO 0.01 0.0029 102 73 104 DI 128.15 200 100 1.82 0.06LO 0.05 0.0059 103 104 105 DI 61.74 150 100 1.20 0.07LO 0.09 0.0053 104 105 106 DI 24.50 150 100 0.54 0.03LO 0.02 0.0005 105 105 107 DI 24.95 150 100 0.66 0.04LO 0.03 0.0007 106 107 108 DI 142.50 150 100 0.38 0.02LO 0.01 0.0015 107 107 109 DI 139.03 150 100 0.28 0.02LO 0.01 0.0008 108 104 110 DI 99.26 150 100 0.63 0.04LO 0.03 0.0026 109 110 111A DI 80.00 150 100 0.40 0.02LO 0.01 0.0009 110 110 111 DI 101.57 150 100 0.23 0.01LO 0.00 0.0004 111 72 112 DI 11.33 150 100 0.42 0.02LO 0.01 0.0001 112 112 113 DI 54.06 150 100 0.21 0.01LO 0.00 0.0002 113 113 114 DI 90.67 150 100 0.21 0.01LO 0.00 0.0003 114 112 115 DI 88.49 150 100 0.21 0.01LO 0.00 0.0003 115 71 116 DI 60.55 150 100 0.68 0.04LO 0.03 0.0018 116 116 117 DI 11.24 150 100 0.24 0.01LO 0.00 0.0001 117 117 118 DI 97.23 150 100 0.24 0.01LO 0.00 0.0004 118 116 119 DI 180.50 150 100 0.43 0.02LO 0.01 0.0024 119 54 120 DI 93.41 200 100 2.36 0.08LO 0.07 0.0070 120 120 121 DI 41.54 200 100 2.34 0.07LO 0.07 0.0030 121 121 122 DI 38.00 200 100 2.32 0.07LO 0.07 0.0027 122 122 123 DI 45.00 200 100 2.03 0.06LO 0.06 0.0025 123 123 124 DI 433.04 200 100 2.00 0.06LO 0.05 0.0237 124 124 125 DI 43.45 150 100 1.42 0.08LO 0.12 0.0051

Page 33: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Pipe No

From Node

To Node

Pipe Type

Length(m)

Diameter (mm) HWC Flow

(LPS) Velocity (MPS)

Head Loss(m/km)

Head Loss(m)

125 3 126 DI 60.91 600 100 68.33 0.24LO 0.18 0.0109 126 126 127 DI 381.37 600 100 68.33 0.24LO 0.18 0.0682 337 127 337 DI 32.13 350 100 8.08 0.08LO 0.05 0.0015

Nodes Fire Output

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 1 R 137.886 52.00 87.20 35.20 2 0.000 46.75 87.20 40.45 3 0.000 49.62 87.17 37.56 4 0.000 49.62 87.17 37.55 5 0.000 49.62 87.17 37.55 6 0.000 51.08 87.16 36.08 7 0.000 51.92 87.15 35.23 8 0.000 50.05 87.11 37.07 9 -0.289 68.44 87.09 18.65

10 0.000 50.88 87.09 36.21 11 -0.026 69.23 87.08 17.86 12 -0.030 69.85 87.06 17.22 13 0.000 53.53 87.03 33.50 14 -0.290 72.36 87.00 14.65 15 -2.320 77.48 86.99 9.51 16 -9.655 77.40 86.98 9.58 17 -7.351 74.41 86.82 12.41 18 -5.530 73.90 86.79 12.89 19 0.000 49.45 86.11 36.66 20 -0.752 66.51 85.63 19.12 21 -23.860 62.03 83.70 21.67 22 0.000 50.65 87.09 36.44 23 -0.295 61.40 87.09 25.69 24 -0.278 61.40 87.09 25.69 25 0.000 47.98 87.11 39.13 26 0.000 49.00 87.11 38.11 27 -0.278 57.80 87.11 29.31 28 -0.260 57.80 87.11 29.31 29 -0.417 60.03 87.06 27.03 30 0.000 46.18 87.10 40.93 31 0.000 46.77 87.10 40.34 32 -0.226 59.74 87.10 27.37 33 -0.208 59.74 87.10 27.37 34 0.000 44.03 87.10 43.07 35 0.000 43.72 87.10 43.38 36 -0.191 54.50 87.10 32.60 37 -0.174 54.50 87.10 32.60 38 0.000 43.45 87.10 43.64

Page 34: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 39 0.000 42.96 87.10 44.13 40 -0.156 53.50 87.10 33.60 41 -0.191 53.50 87.10 33.60 42 0.000 43.36 87.09 43.73 43 0.000 42.47 87.09 44.62 44 -0.156 53.00 87.09 34.09 45 -0.243 51.30 87.09 35.79 46 -0.191 51.30 87.09 35.79 47 0.000 44.01 87.09 43.08 48 0.000 44.05 87.09 43.04 49 0.000 43.46 87.09 43.63 50 -0.590 49.80 87.08 37.28 51 -0.451 49.80 87.08 37.28 52 0.000 44.28 87.08 42.81 53 0.000 44.29 87.08 42.80 54 -0.741 49.57 87.07 37.50 55 0.000 44.64 87.08 42.44 56 -0.608 61.05 87.07 26.03 57 -0.712 61.05 87.07 26.02 58 0.000 44.61 87.08 42.47 59 0.000 45.84 87.07 41.24 60 0.000 47.46 87.07 39.61 61 0.000 48.44 87.07 38.63 62 -0.590 60.44 87.07 26.63 63 -0.469 58.75 87.06 28.31 64 -0.521 60.06 87.06 27.00 65 0.000 45.99 87.07 41.09 66 -0.434 57.91 87.07 29.16 67 -0.451 57.91 87.07 29.16 68 -0.330 56.55 87.08 30.53 69 0.000 48.03 87.07 39.03 70 0.000 50.64 87.17 36.53 71 0.000 49.78 87.17 37.39 72 0.000 46.03 87.16 41.14 73 -0.434 54.49 87.16 32.67 74 0.000 40.22 87.16 46.94 75 0.000 38.70 87.15 48.45 76 0.000 39.42 87.15 47.73 77 0.000 39.39 87.15 47.75 78 0.000 37.24 87.14 49.91 79 0.000 35.32 87.14 51.82 80 0.000 34.70 87.14 52.44 81 -0.174 44.50 87.14 42.64 82 -0.208 44.50 87.14 42.64 83 -0.226 46.00 87.14 41.14 84 -0.191 48.83 87.15 38.32

Page 35: KL-KEPONG COUNTRY HOMES SDN BHDeser.syabas.com.my/edplasv2/.../13012015_145927.pdf · This development project is planned in few phases as shown in the phasing demarcation plan attached

Node No Flow(LPS) Highest Supply Level(m) HGL(m) Pressure(m) 85 0.000 39.00 87.15 48.15 86 -0.226 47.56 87.15 39.59 87 -0.243 47.56 87.15 39.59 88 0.000 38.29 87.15 48.86 89 0.000 36.10 87.15 51.05 90 -0.260 47.38 87.15 39.77 91 -0.243 44.93 87.15 42.22 92 -0.347 44.79 87.15 42.36 93 0.000 41.03 87.15 46.12 94 0.000 42.46 87.15 44.69 95 -0.573 55.00 87.15 32.15 96 -0.469 46.59 87.12 40.53 97 0.000 34.27 87.12 52.85 98 -0.260 50.56 87.12 36.56 99 0.000 34.56 87.12 52.55 100 -0.295 47.14 87.12 39.98 101 -0.174 48.27 87.12 38.85 102 -0.243 46.29 87.12 40.83 103 -0.451 46.04 87.15 41.11 104 0.000 41.31 87.15 45.84 105 0.000 42.46 87.15 44.68 106 -0.538 55.01 87.15 32.14 107 0.000 42.92 87.15 44.23 108 -0.382 59.82 87.15 27.33 109 -0.278 59.82 87.15 27.33 110 0.000 21.66 87.15 65.49 111 -0.226 59.06 87.15 28.10

111A -0.399 59.06 87.15 28.09 112 0.000 46.03 87.16 41.14 113 0.000 46.89 87.16 40.27 114 -0.208 55.84 87.16 31.33 115 -0.208 54.78 87.16 32.39 116 0.000 48.69 87.17 38.48 117 0.000 48.39 87.17 38.78 118 -0.243 57.68 87.17 29.48 119 -0.434 54.64 87.16 32.52 120 -0.020 41.80 87.07 45.27 121 -0.026 41.19 87.06 45.87 122 -0.289 51.18 87.06 35.88 123 -0.029 41.38 87.06 45.68 124 -0.579 58.10 87.03 28.93 125 -1.418 58.10 87.03 28.93 126 0.000 51.08 87.16 36.08 127 0.000 52.91 87.09 34.18 337 0.000 53.85 87.09 33.24