Date 23-05-13 ………………………………………. KILANG KELAPA SAWIT BATU LINTANG Progress Report For the month of APRIL 2013 (ARVIN A/L SANGGARIN) Acting Manager KUALA LUMPUR KEPONG BERHAD (No. Syarikat: 15043-V) KILANG KELAPA SAWIT BATU LINTANG

Upload: phamthuan

Post on 29-Apr-2019

359 views

Category:

Documents


3 download

TRANSCRIPT

Date 23-05-13

.

KILANG KELAPA SAWIT BATU LINTANG

Progress Report

For the month ofAPRIL 2013

(ARVIN A/L SANGGARIN)Acting Manager

KUALA LUMPUR KEPONG BERHAD(No. Syarikat: 15043-V)

KILANG KELAPA SAWIT BATU LINTANG

PAGE 1

HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading

PRODUCTION

RAINFALL RECORD (mm) Year 2013

Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FY 448.00 344.00 157.00 49.00 382.00 280.00 239.00 167.00 29.00 115.00 95.00 169.00This FY 300.00 305.00 310.00 180.00 270.00 140.00 250.00

OTHER HIGHLIGHTS

DESCRIPTION OF PROBLEMS / ACHIEVEMENTS

Comments :Both OER and KER have decreased by 0.09% and 0.37% respectively as compared to last month.The todate OER for the 2012/13 financial year has decreased by 0.18% while the KER todate has improved by 0.01% as compared to last year same period todate.

This Month TodateLast Month

20.70

ITEM

O.E.R %

K.E.R % 5.11

PROGRESS REPORT ON

(7TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF APRIL 2013

KILANG KELAPA SAWIT BATU LINTANG

4.754.97 4.964.74

20.84 20.7020.61

Current Financial Year Same Period Last Year

21.02

TodateThis Month

PAGE 2

1 PRODUCTION REPORT

1.1. FFB STATEMENT

1.1.1. FFB CONTRIBUTION

Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate

KLK Estates MT MT MT MT MT MT1,168.210 14,397.780 4,360.000 32,648.000 -73.21% -55.90%

347.940 5,145.620 - -358.040 5,488.720 - -329.580 4,028.990 - -347.120 4,192.450 - -224.410 2,529.980 1,442.000 11,898.000 -84.44% -78.74%299.540 4,161.170 - -

88.470 1,067.780 - -1,257.920 16,681.500 4,334.000 30,555.000 -70.98% -45.41%

- 22.110 - -- - - -

- -- -- -- -- -- -

Sub Total 4,421.230 57,716.100 10,136.000 75,101.000 -56.38% -23.15%

Non-KLK Estates- -

- 1,657.130 180.000 1076.000 -100.00% 54.01%- -- -- -- -- -- -- -- -- -

Sub Total - 1,657.130 180.000 1,076.000 -100.00% 54.01%

Outsiders- -- -- -- -- -- -- -- -- -- -- -- -

Sub Total - - - - - -

Grand Total 4,421.230 59,373.230 10,316.000 76,177.000 -57.14% -22.06%

Comment :

Pinji

Batu DuaMenglembu

FFB for the month was 5894.77mt or 57.14% lower than the estimate of 10316mt due to diversion of FFB during mill annual Inspection.

Pelam

Serapoh

KamparBukit Tebuan

NagalelaiSuburNorseman

Senggang

Sungai Pulau

Batu LintangKedahBuntarGhim Khoon

PAGE 31.1.2. FFB COMPOSITION

Composition of crop from various years of planting are :-

MT % MT %1980 - - - - 1981 - - - - 1982 - - - - 1983 - - 243.06 0.41 1984 47.52 1.07 335.55 0.57 1985 37.62 0.85 417.34 0.70 1986 20.71 0.47 938.59 1.58 1987 62.85 1.42 774.81 1.30 1988 - - 83.81 0.14 1989 81.73 1.85 728.40 1.23 1990 122.45 2.77 1,687.32 2.84 1991 120.08 2.72 1,294.98 2.18 1992 23.49 0.53 508.64 0.86 1993 - - - - 1994 141.55 3.20 1,618.98 2.73 1995 389.29 8.81 3,722.86 6.27 1996 171.89 3.89 1,857.58 3.13 1997 315.19 7.13 4,944.01 8.33 1998 534.42 12.09 8,290.90 13.96 1999 411.22 9.30 6,473.40 10.90 2000 293.18 6.63 5,302.84 8.93 2001 217.54 4.92 3,334.65 5.62 2002 179.97 4.07 2,260.12 3.81 2003 268.91 6.08 3,650.06 6.15 2004 351.05 7.94 4,671.25 7.87 2005 62.62 1.42 885.05 1.49 2006 49.76 1.13 487.81 0.82 2007 217.67 4.92 2,057.42 3.47 2008 144.53 3.27 1,458.52 2.46 2009/10 155.99 3.53 1,345.28 2.27

- - - - - - - - - - - - - - - - - - - -

Total 4,421.23 100.00 59,373.23 100.00

Append below the classification of Palms According to Age :-Category Palm Age (years) TM % TD %

Immature 1st - 3rd 0% 0%Young 4th - 9th 19% 16%Prime 10th - 18th 63% 67%Old 19th and above 18% 17%Comments :

This Month TodateYear of Planting

Remarks

FFB composition vary from the year 1983 to 2010 with most of the crop coming from the year 1998.

1.1.3. FFB QUALITY

CONTRIBUTING This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month

- -- -- -- -- -- -- -

Total/Average 0 0

1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

FFB INTAKE (MT) % %- -

Comments :

-4,421 WEIGHT (MT)

LOADING RAMPWEIGHT (MT)

FFB GRADING

4,421

PAGE 4

No. of Grading % Black % Underripe % Long Stalk % Pest Damaged % Empty Bunch% Overnight % Rotten

1.1.5. LOOSE FRUIT & TRASH CONTENT

This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month

123456789

101112

Average 0 0

NO Outsider Estate123

Average 0 0

1.1.6. LOOSE FRUITS TO FFB RATIO

NO ESTATES1 Batu Lintang2 Pelam3 Kedah45678

1.1.7. STONES & TRASH IN FFB

NO ESTATES12345678

Comments :

% to FFBStones (kgs) per 100 tn FFB Tonnage (mt)Trash

56.05 - 4.46 - 2.99 - 0.86 -

Last Month% to FFB

3.57 - 0.31 - This Month Last Month

Total TonnageThis Month

Fruit in Load Loose Fruit (%) FFB %

PAGE 4.1

No. of Grading % Loose Trash Content in Trash Content in

PAGE 5

1.2. PRODUCTION QUALITY

1.2.1. PRODUCTION OIL / DESPATCH OIL

X S.D. X S.D. X S.D. X S.D.

FFA %

Moisture (VM) %

Dirt %

Peroxide Value %

DOBI

ANALYSIS RESULT BY (KDC/TQCC)

TaikoSAMPLE Average StandardFFA 4.61 3.0 MaxVM 0.33 0.13 MaxDIRT 0.08 0.03 MaxPEROXIDE VALUE 1.03 0.60 MaxIODINE VALUE 52.13 50 - 54DOBI VALUE 2.83 3.0 MinCAROTENE 573.33 600 MinE233 (1% CORR.) 1.24 1.20 MaxE269 (1% CORR.) 0.28 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 18.20 20.0 MinQUALITY RATING NIL

Comments :

0.072.81 0.032.79

1.25

0.075

The production oil quality is maintain within Marketing Specifications

2nd week sample of high FFA is due to faulty sampling during recycling of oil after mill annual inspection.

0.60

0.170.0201.80

566.00

18.7821.34

52.202.86

0.250.30

---

-

579.00 575.001.37-

The quality of despatched CPO is maintained with Marketing Specifications.

2.60

14.49

52.303.03

0.301.10

-

51.90

1st Week 2nd Week

0.09

3rd Week

0.513.23

-0.1390.70

0.19

0.018

0.170.02

0.017

7.19-

-

> 2.310.06

0.303.42

4th Week

2.76

0.02

3.07

0.031

-

0.130.02

0.022

2.83

0.12

0.031

2.93 0.36 2.77

0.029

< 0.25

0.01

0.010

Marketing DESPATCHSpecification

< 5.0

0.015

This Month Last Month PRODUCTION

This Month Last Month

0.32 0.253.00 0.14

PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL

MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION

5.16 0.36 5.19 0.33 5.43 0.26 5.56 0.13 6%4.56 0.47 4.32 0.91 4.69 0.03 4.51 0.18 7%0.21 0.03 0.21 0.03 0.00 0.00 0.00 0.00

10.85 0.87 10.99 1.25 0.00 0.00 0.00 0.000.28 0.17 0.22 0.14 0.14 0.01 0.31 0.28

1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -

NET NET ON MILLWEIGHT WEIGHT NET WEIGHT

tn tn tn1- 0.000 0.000 0.0002- 0.000 0.000 0.0003- 400.500 400.290 -0.2104- 0.000 0.000 0.0005- PK AGRO 0.000 0.000 0.0006- 201.700 200.910 -0.7907- 0.000

602.200 601.200 -1.000

1.2.4. PK DESPATCHBUYER MILL

NETWEIGHT

tn1- SANG KEE 18.1302- 51.070 3- 74.040 4-5-6-7-

Total : 143.240

1.2.5. CXC REPORT

Comments :

No. of Loads with high differences +/- 80kg)

WILMAR EDIBLE OILPGEO EDIBLE OILKLK (SABAH)TAIKO BLEACHING

CARGILL PALM

PRODUCTIONLAST MONTH

DESPATCHTHIS MONTH LAST MONTHTHIS MONTH

MOISTURE %

PANGKORSINN HWAT HENG

STONE CONTENT %

DIRT %FFA %TOTAL BROKEN KERNEL %

most of the load with high shortage is due to long distance dispatches to Port Klang.

28

The kernel quality is maintained within Marketing Specifications

THIS MONTH LAST MONTH

The difference in weight between the mill and the buyers was low at 0.16%

92-6

Total number of CPO tankers

PAGE 6.1

LOADS FROM MONTH: April 2013

Ticket No Driver Vehicle Date Mill Buyer G / Loss BuyerA041885 APPU A/L KRISHNAN ABU 3593 01-04-13 23.300 23.210 0.090 (KLK) Sabah (0.070)A042027 ASMIR BIN JAAFAR PAF 9860 15-04-13 24.220 24.120 0.100 Cargill (0.075)A042095 ASMIR BIN JAAFAR PAF 9860 17-04-13 24.270 24.140 0.130 Cargill (0.100)A042098 ZULKIFLI B YUSOF PHT 1444 17-04-13 29.870 29.770 0.100 Cargill (0.080)A042270 ASMIR BIN JAAFAR PAF 9860 22-04-13 24.290 23.980 0.310 Cargill (0.250)A042274 APPU A/L KRISHNAN ABU 3593 22-04-13 23.150 22.950 0.200 Cargill (0.170)

Total : 0.745 (Oil recovered)

Total 0.930Comments

EXTRACTED FROM CXC REPORT

Weight Details (MT)

CPO Despatch Loads With High Differences

PAGE 6.2

No. Tanker No. *Total

UsageMill Weight

+/-Other Mill Weight +/-

Total Weight +/-

No Go Zone

Excessive Idling

Power Disconnect

Zone Grid Exit Action Taken / Remarks

Total 0 0 0 0

* Represent (TMS) Outside Tankers

GPS PROGRESS REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON April 2013

Violation Report

PAGE 71.3. COST OF PRODUCTION

(Basis : Cost per tonne CPO)

ThisMonth Todate Year ' s

April 2013 7 mths EstimateRM / tn RM / tn RM / tn

Indirect Cost 152.32 83.89 74.42

Depreciation

Manufacturing Cost 596.21 192.65 170.53

Ex-Mill Cost 748.53 276.54 244.95

Cooking Oil Cess

Palm Oil Stabilisation Cess 2.00 2.00 2.00

CPO (Sabah) Sales Tax

Despatch & Selling 24.01 21.92 20.13

TOTAL EXPENDITURE 774.54 300.46 267.08

A/c This Month Estimate

Code RM/ton CPO RM/ton CPO Diff. (%)1 2.38 0.87 63.4%2 27.64 9.73 64.8%4 5.83 1.95 66.6%11 3.11 0.96 69.1%

12 5.45 1.29 76.3%

16 15.93 5.79 63.7%

19 7.79 2.58 66.9%41 6.18 2.41 61.0%42 49.10 17.49 64.4%

44 154.63 31.55 79.6%

45 22.85 6.88 69.9%

50 66.48 20.59 69.0%51 59.73 7.08 88.1%52 19.03 3.90 79.5%53 9.40 2.00 78.7%56 50.29 2.43 95.2%58 38.20 7.73 79.8%59 6.49 0.43 93.4%

Comments :

Higher due to low crop processed during the monthHigher executive salaries & EPFHigher employer socso contribution

Replaced Tsubaki conveyor chain and M.S flat barRenewed clamp spider arm plate

To hack 40'x25'x8' and concrete kernel bulk silo floor

Higher cost due to donation upon death for Ibrahim Che Rose Father

Reconcrete floor & extend floor for vehicle reverse & repair rail

Comments

Manufacturing cost was at RM 596.21/tonne oil against estimate of RM 170.53/tonne oil.

Replaced M.S.Plate and install body plate for kernel siloRenewed CBC ribbon & liner 40ft and end cover

Higher supervisor overtimeHigher labour wages due to new basic for c/roll

Renewed shell elevator bottom section & FIB conveyor ribbon,liner & bearingReplaced PVC nozzle for sand filter

Higher hospital / clinic charges

Shortfall of CPO production was 1,306.9860 tonnes against propn. estimate of 2,218 tonnes CPO.

High cost was due low crop processed and machinery repair during mill annual inspection

Higher electricity charges

Higher AP wages and OT levied by BLE

Renewed 70ft long shell liner & over head for S1 & install 35ft

PAGE 82 PROCESS PERFORMANCE

2.1. STERILIZATION

Summary of sterilisation cycle for the month is tabulated as follows :-Function X (min) S.D.Deaeration 21st. Peak (1.73 Bar / 25 psi) 101st. Peak exhaust 22nd. Peak (2 Bar / 29 psi) 132nd. Peak exhaust 43rd. Peak (2.7 Bar / 40 psi) 133rd. Peak exhaust 04th. Peak (2.7 Bar / 40 psi) 0Holding Time 41Final exhaust 2Steaming cycle 87 0Door Open to Door Shut Time

X S.D. X S.D.USB after 1st Threshing (%)USB after 2nd Threshing (%) 2.29 0.37 2.16 0.37Threshing Efficiency (%)

STERILIZER CONDENSATE

This Month Last MonthX S.D. X S.D.

0.93 0.26 0.95 0.26

Condensate / FFB Ratio

Absolute oil loss (kg/tn FFB)

Comments :

The percentage of USB has increased by 0.13% compared to last month.OLWB for sterilizer condensate has decreased by 0.02% compared to last month.

Last MonthThis Month

Steriliser condensate (Oil Content in Wet Basis)

PAGE 9.02.2. DIGESTING & PRESSING STATION

2.2.1. DIGESTER TEMPERATURE OC

This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 99.00 2.71 97.00 2.02 Digester No. 2 99.00 2.63 97.00 2.08 Digester No. 3 100.00 0.00 96.00 2.00 Digester No. 4 Digester No. 5 Digester No. 6 Digester No. 7 Digester No. 8 Digester No. 9

2.2.2. PRESSING

Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

X 5.24 5.03 5.06 5.11S.D. 0.39 0.26 0.00 0.22

X 4.90 4.84 4.75 4.83S.D. 0.36 0.32 0.21 0.30

X 7.76 7.54 7.35 7.55S.D. 0.22 0.23 0.00 0.15

X 7.58 7.48 7.83 7.63S.D. 0.61 0.52 0.09 0.41

X 18.95 22.27 26.50 22.57S.D. 1.98 3.67 0.00 1.88

X 23.08 23.72 19.17 21.99S.D. 6.59 6.10 2.11 4.93

X 148.12 142.12 9.30 99.85S.D. 0.00 0.00 0.00 0.00

X 283.02 229.41 54.67 189.03S.D. 0.00 0.00 0.00 0.00

Comments :

Average nut breakage has increased by 0.58% as compared to last month.Average % of OLWB for press losses has increased by 0.28% than last month.

Will strive reduce the nut breakage to below 18%.

This Month

Last Month

This Month

Last Month

OIL LOSS ON DRY BASIS (OLDB)

NUT BREAKAGE (%)

PRESS RUNNING HOURS

This Month

Last Month

This Month

Last Month

OIL LOSS ON WET BASIS (OLWB)

PAGE 9.12.2.3.

This Month

Last Month

This Month

Last Month

This Month

Last Month

This Month

Last Month

This Month

Last Month

This Month

Last Month

This Month

Last Month

This Month

Last Month

X 13.94 16.94 37.43 36.00 56.32 63.73 11.67 13.23 11.65 9.14 19.68 21.12 8.92 12.35S.D. 2.43 2.58 4.34 4.70 5.01 3.36 1.72 3.67 1.04 1.10 1.26 3.22 0.26 1.41N

True Nut TrashTrue Mesocarp (ripe) True Mesocarp (unripe)

Oil in Mesocarp OLWB Normal Parthenocarp

Abnormal Partnenocarp

PAGE 9.2

2.2.4. EFB PRESSING

Press Press Press PressNo. 1 No. 2 No. 3 No. 4

PRESS RUNNING This Month HOURS Last Month DOWN TIME This Month

Last Month

2.2.5. OIL RECOVERED

This Month F F A (%) DOBI

VM (%)OLWB (%)

Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)

2.2.6. SPLITTER

RUNNING HOURSThis Month Last Month

No. 1 No. 2

Comments :

Last Month

PAGE 10

2.3. CLARIFICATION STATION

2.3.1. CLARIFICATION TANK

This Month Last MonthTank 1 Tank 2 Tank 3 Tank 1 Tank 2 Tank 3

X 94.00 95.00S.D 4.13 1.41

% Oil in underflow X 5.16 5.28 (% OLWB) S.D 0.19 0.19

2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

S1 S2 S3 C1 C2 C3 C4 C5 C6 C7 C8X 0.74 0.89 0.81

S.D 0.20 0.22 0.22X 0.74 0.84 0.79

S.D. 0.20 0.18 0.17T Mth X 132.00 70.00 113.00L Mth X 174.00 210.00 245.00T Mth X 1.60 1.60 1.60L Mth X 1.60 1.60 1.60T Mth X 594.11 325.11 531.22L Mth X 706.00 903.00 1053.00T Mth X 0.99 0.65 0.97L Mth X 0.65 0.96 1.04

Comments :

Separate Waste Basculator (mt)

Oil losses on Absolute Terms (Kg/tn FFB)

% OLWB for underflow has decreased by 0.12%.All separator losses were within in-house target.

Nozzle size (mm)

Temperature OC

This MonthLast

Month

% Oil loss on wet basis (x)

Operating Hours (hrs)

PAGE 11

2.3.2. DECANTER (D)

Inlet

D1 D2 D1 D2 D1 D2X

S.DX

S.D.X

S.DX

S.D.X

S.DX

S.D.T Mth XL Mth X

Comments :

Heavy Phase

This MonthLast

Month

This Month

This Month

This MonthLast

Month

Last MonthTemperature (oC)

Last Month

Solid Phase

VM % (x)

Light Phase

Oil % (x)

Operating Hours

NOS % (x)

PAGE 12

2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS

X S.D. X S.DDILUTION RATE % 32.00 2.40 32.00 1.41Separator Waste to FFB ratio 32.81 33.60Decanter cake to FFB ratioAbsolute Oil loss in Separator/Centrifuge kg/mt FFB 2.61 2.65Absolute Oil loss in Decanter Cake kg/mt FFBTotal Oil loss kg/MT FFB 2.61 0.00 2.65 0.00

2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

DescriptionAfter Deoiling tank (OLWB)After Cooling pond

Comments :

0.76 0.58

This Month Last Month

This Month Last Month

Absolute oil loss in kg/mt FFB decreased by 0.04kg/mt FFB than last month.

0.82 0.78

PAGE 13

2.3.5. PURIFIER & VACUUM DRYER

No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X

S.DX

S.D.X

S.DX

S.D.X

S.DX

S.D.X

S.DX

S.D.

2.3.6. VACUUM DRYER

X S.D X S.D X S.DThis Month 70.00 0.25 0.04 0.12 0.02 52.00Last Month 70.00 0.25 3.00 0.13 0.02 48.00This MonthLast MonthThis MonthLast Month

Comments :

% Dirt

This MonthLast

Month

PURIFIER After PurifierBefore Purifier

% VM

This MonthLast

Month

VM Rem. Eff

This MonthLast

Month

Dirt Rem. Eff

This MonthLast

Month

Vacuum dryer efficiency is satisfactory.

VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM % Before DryerVM.

Removal Eff.

No: 1

No: 2

No: 3

2.4. NUT & KERNEL STATION PAGE 13.1

2.4.1. NUT SILO & KERNEL SILOS

DESCRIPTION No: 1 No: 2 No: 3 No: 4X 18.86 18.58

S.D 0.11 0.11X 18.96 18.70

S.D. 0.71 0.13X 14.20 14.20

S.D 1.10 1.10X 14.66 14.89

S.D. 1.15 0.58X 24.71 23.98

S.DX 22.68 20.37

S.D.

2.4.2. KERNEL SILO

1 2 3 4 5 1 2 3 4 5Top

Middle 74.00 44.00 67.00 42.00Bottom 79.00 70.00 80.00 70.00

% VM Fresh Kernel X 20.50 19.33 20.06 19.49S.D 0.64 0.14 0.77 0.15X 5.12 5.38 5.22 5.48

S.D 0.38 0.42 0.31 0.28% Drying Efficiency 75.02 72.17 73.98 71.88

Comments :

This MonthLast

Month

This Month Last Month

% Drying Efficiency

% Dried Kernel

Temperature oC

Kernel drying efficiency is satisfactory.

% VM Fresh Nut

This MonthLast

Month

% Dried Nut

This MonthLast

Month

2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2

X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%) 85.78 3.80 83.76 2.02Broken Nut (%) 9.10 1.97 10.83 0.74Whole Kernel (%) 1.10 0.29 0.84 0.10Brokern Kernel (%) 0.32 0.33 1.28 0.08

X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 33.73 6.34 34.19 0.06Broken Kernel (%) 12.10 4.26 13.82 1.35Uncracked Nut (%) 0.55 0.15 0.58 0.12Half cracked Nut (%) 0.84 0.29 0.78 0.21

X SD X SDRipple Mill No: 1 97.19 0.68 98.61 0.82Ripple Mill No: 2 97.20 0.26 98.59 0.38Ripple Mill No: 3 Ripple Mill No: 4Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9

Comments :

R I P P L E M I L L

R I P P L E M I L L

No: 1 No: 2 No: 3 No: 4 No: 7

Nut Cracking Eff.

Kernel Recovery Eff.

All ripple mills performed well.

No: 6No: 5

No: 9No: 5

No: 8

No: 6 No: 8No: 7

No: 9Nut Composition before Cracker (INPUT)

No: 3Mixture Composition after Cracker

No: 4No: 2No: 1

PAGE 142.4.4. KERNEL LOSSES / COST

X SD X SD X SD X SD X SD X SD

0.89 0.19 0.90 0.16

1st Stage2nd

Stage 1st Stage2nd

Stage 1st Stage2nd

Stage 1st Stage2nd

Stage 1st Stage2nd

Stage 1st Stage2nd

Stage

0.83 0.12 0.94 0.19

Claybath 0.82 0.13 0.85 0.20

2.4.5. RUNNING COST

Comments :

0.224 0.227

4.732

0.200

The cost for calcium carbonate has decreased by 0.3 cents/mt FFB as compared to last month.All kernel losses were within in-house target.

4.443 3.679

Line 3Line 1 Line 2 Line 3 Line 1 Line 2

2951.674

Last MonthThis Month

This Month Last Month Todate

209.632 404.653

Cyclone Fibre

LTDS

Hydrocyclone (PK in wet shell)

Total Kaolin or Calcium Carbonate Cost (RM)

Kernel Produced (mt)

1798.000 11851.300992.000

Cost / MT of PK (RM)

Cost / MT of FFB (RM)

Other Cost e.g Sodium Silicate (RM)

PAGE 152.5. BOILER / POWER HOUSE

2.5.1. BOILER HOUSE

Description This Month Last Month TodateBoiler Chemical Cost (RM) 663.18 1188.41 8905.99 Cost / MT FFB (RM) 0.15 0.15 0.15

2.5.2. POWER HOUSE

DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month

Turbines > Dresser RandNo. 1 (700 KW) 168.5 307.1 65480.0 127150.0No. 2 (400 KW)Diesel Gen Set > CumminsNo. 1 (300 KW) 280.3 174.6 13069.0 10774.0 6394.0 4413.0 2.04 2.44No. 2 (30 KW) - 0.0 0.0 - 0.00No. 3 (0 KW)KwHr / mt FFB (Turbine + Genset)

2.5.3. TNB POWER SUPPLY

KwHr RM KwHr RM KwHr RMPalm Oil Mill 13082.00 4997.45 15790.00 6012.95Rubber FactoryEcomat PlantTotal 13082.00 4997.45 15790.00 6012.95 0.00 0.00

Comments :

Steam Consumption per KwHr (Turbine)

Last Month Todate

We are looking into extending TNB supply to all stations.

This Month

Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption

(Litres)

PAGE 16

2.6. WATER TREATMENT PLANT

2.6.1. WATER CONSUMPTION

Description This Month Last Month This Month Last Month m3/mt FFBOwnEstate

Mill 6810.00 10720.00 1.54 FCTOTAL 6810.00 10720.00 0.00 0.00 1.54

2.6.2. WATER TREATMENT COST

This Month Last Month TodateChemical Cost (RM) 938.73 1578.55 10954.97Cost /m3 water (cts / m3) 0.14 0.15Cost /mt FFB (cts / mt FFB) 0.21 0.20Water Consumption (m3 / mt FFB) 1.54 1.35

2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER

This Month Last Month TodateTotal Volume of water (m3) consumed 6810.00 10720.00 74051.00Total Cost (RM)

Comments :

Domestic

Water consumed%

Water consumption has increased by 0.19 m3/mt FFB as compared to last month.Water treatment cost has decreased by 1 cent/mt FFB as compared to last month.

PAGE 17

2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)

2.7.1. Visitation

Date10&29/4/13

10-04-1323-04-13

2.7.2. Training

Date

2.7.3. Security

Date24-04-13

2.7.4. OSH Matter

Date10-04-13

2.7.5. RSPO Matter

Date

2.7.6. Amenities

Date

2.7.7. Water Supply

Date

2.7.8. EFB DISPOSAL

2.7.9. DECANTER CAKE DISPOSAL

Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

1,827.14 10.56 Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

15.48 1,822.23

Remarks

Remarks

Remarks

JKKP (OFFICER) Inspection Visit

RemarksPersonEn.Hadzri (CCPOM) Visiting Eng

RemarksASA (En.Jamil)

V.E.E Mill Visit

Remarks

OSH department Mr.Lawrence and Mr.Kumar - Mill InspectorRemarks

PAGE 17.1

2.8.0. Effluent Treatment

Date

2.8.1 Mill Downtime

Date Hours Date Hours13-04-13 1.523-04-13 228-04-13 0.5

Total 4 0

2.8.2 Housekeeping / Beautification / Linesite / Compound

Date

2.8.3. Others

Date

Comments

Remarks

Details DetailsLine 1 Line 2

Remarks

Remarks

Boiler feed (A2B) motor burnedFibre air lock & G.Box repairFibre cyclone air lock repair

PAGE 17.2

2.8.4. Effluent Result For April 2013

abcdefgh

2.8.5 Trailing Report

Total Solids (mg / l)

N/A126

N/ATotal Nitrogen (mg / l)COD (mg / l)

N/AAmmonical Nitrogen (mg / l)

180

143942

N/A

No Trailing conducted for this month

3809

DOE LimitpH N/ABOD (mg / l) 5000 MAX

TQCC Result8.6

Oil & Grease (mg / l) N/AN/A

13Suspended Solids (mg / l) 364

PAGE 183.0 MANPOWER

3.1. EMPLOYEES

MALAYS CHINESE INDIANS OTHERS TOTAL Executives 1 0 3 0 4 Subordinate Staff 5 0 12 0 17 TOTAL 6 0 15 0 21

3.2. SUBORDINATE STAFF LEAVE STATUS

Leave Leave Leave B/F From Entitlement Taken Leave LeaveYear '11 for Year '12 This Taken Earned

No. Position (Days) (Days) Total Month Todate Todate Bal1 C/CLERK 4 21 25 2 9 7 232 2ND CLERK -4 24 20 1 7 8 2134 CHARGEMAN -2 8 6 3 14 8 05 SUPERVISOR 15 21 36 1 6 8 386 SUPERVISOR 16 21 37 2 6 7 387 E/DRIVER 3 18 21 3 9 6 188 BOILERMAN 6 15 21 1 2 5 249 BOILERMAN 9 17 26 3 8 6 24

10 LAB OPER 0 0 0 -2 7 6 -111 MECHANIC -4 17 13 4 10 6 912 MECHANIC 4 18 22 1 7 6 2113 MECHANIC 6 18 24 2 4 6 2614 W/B OPER -18 18 0 -1 6 6 015 MECHANIC -25 18 -7 -1 3 5 -516 FOREMAN -21 24 3 -1 5 8 617 E/DRIVER -18 18 0 -3 6 6 018 MECHANIC -14 15 1 1 6 5 019202122232425262728

Comments :

SYED MOHD ADNAN

AB RAHMAN CHE HATS.PADMANATHANSAMSUDDIN BIN ISHAKS.SUBRAMANIAM

G.LOGANATHAN

P.SANKARAN

A.MOHANATHAS

A.PUGALENTHY

R.RAJOO

R.BALAN

S.JAMESONG.KRISHNASAMY

S.MUNIANDY

NAMEALIZA BINTI MAT ISA

AV.MOGANAKRISHNAN

MAHD HANIFFAH

PAGE 18.13.3 EMPLOYEE (MILL WORKERS)

(A) CHECKROLL

(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 23 3 26 - 26 Chinese - - - - Indian 27 4 31 - 31 Grand Total 50 7 57 - - - 57

(2) NON-MALAYSIAN Sri Lanka - - - India 12 - 12 - 12 Indonesia 5 - 5 - 5 Bangladeshi - - - Thai - - - Filipino - - - Grand Total 17 - 17 - - - 17 Total Checkroll 67 7 74 - - - 74

(B) CONTRACT / TEMPORARY

(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 1 1 - 1 Chinese - - - Indian 1 1 - 1 Grand Total 2 - 2 - - - 2

Employees Dependants (Resident)Total

Employees Dependants (Resident)Total

PAGE 19Appendix 1

Unit This Month Last Month Todate1.0 FFB

1.1.1 Weight of FFB processed MT 4,421.230 7,922.730 59,373.230 1.1.2 Estimate MT 10,316.000 11,146.000 76,177.000 1.1.3 Shift Hours Hrs -

2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 911.014 1,640.213 12,373.871 2.1.2 Estimate MT 2,218.000 2,397.000 16,327.000 2.1.3 Oil Extraction Rate % 20.61 20.70 20.84 2.1.4 Estimate % 21.50 21.51 21.43 2.1.5 Press Running Hours Hrs. 300.27 567.10 4,017.73 2.1.6 Production Hours Hrs. 159.50 293.50 2,122.75 2.1.7 Downtime (Line 1) Hrs. 4.00 4.50 17.50 2.1.8 Downtime (Line 2) Hrs. - - 2.1.9 Press Capacity per unit MT / hr 14.72 13.97 14.78 2.2.0 F.F.B. Manufactured / Hours MT / hr 27.72 26.99 27.97 2.2.1 Oil Recovered / Hours MT / hr 5.71 5.59 11.55

3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 209.632 404.653 2,951.674 3.1.2 Estimate MT 536.000 579.000 3,882.000 3.1.3 Kernel Extraction Rate % 4.74 5.11 4.97

;3.1.4 Estimate % 5.20 5.19 5.10 3.1.5 Production Hours Hrs. 159.50 293.50 2,122.75 3.1.6 Kernel Recovered / Hr MT / hr 1.31 1.41 1.39

4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 601.200 2,222.870 12,462.200 4.1.2 Oil in Stock MT 1,090.106 780.292 1,090.106 4.1.3 Kernels Despatched MT 143.240 616.980 3,532.566 4.1.4 Kernels in stock MT 99.349 32.957 99.349

- Packed / Bulk Silo MT 99.349 32.957 99.349 - Kernel in Bag MT -

Remarks :

PROGRESS REPORT FOR THE MONTHOF APRIL 2013

PAGE 20

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION

Reconcreted part of loading ramp apron floor and extended floor for reversing of lorries.

Replaced thresher No.1 spider arm clamp

Replaced 70ft of wear liner for sterilizer No.1.

Installed 35ft of 2 o'clock and 10 o'clock side liner for sterilizer No.3

Replaced 200ft of 4" conveyor chain for inclined efb conveyor

PAGE 21

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION

Replaced 40ft of CBC liner ribbon and hanger bearing

Replaced worn out plates of kernel silo No.1 and kernel silo No.2

PAGE 22

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION

Serviced pneumatic system and replaced FD and ID fan positioner for vickers boiler

Replaced fuel feeder chute for vickers boiler

Replaced ID fan damper plates for vickers boiler

Replaced FD fan dusting for vickers boiler

Replaced inclined fuel conveyor ribbon liner and hanger bearing

Replaced shell elevator bottom booth.

PAGE 23

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

Purchased 1 unit of 1mt electric chain block

Replaced 2 set of brake group c/w disc for shovel cat 950

CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4

Main

KKS Progress Report version 1.33 for April 2013

Please select your desire section by a mouse click

Section ASection B

Print

3

Save

Information for the Progress Report

Co NameKUALA LUMPUR KEPONG BERHAD

Co Reg No.15043-VSetup

OC Code024

OC NameKILANG KELAPA SAWIT BATU LINTANG

Co Start of Fin Mth10

Current Year2013Reset

Current Month4April

Current Month, YrApril 2013

Current Fin Mth #7th

Current Fin Mth7th

Current Fin Yr2013

Current Period2012/13

Asst/Manager NameARVIN A/L SANGGARINTitleActing Manager

By: Chan Kok LeongInstalled to:C:\eProgressRep\version 1.33

Sys last updated:30-Mar-2012Set:12-Jul-2012

Title ListYearMonthYesNo

Assistant20111No

Senior Assistant20122Yes

Acting Manager20133

Manager20144

Senior Manager20155

20166

20177

20188

20199

202010

202111

202212

Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out

Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size

++ means click tab for more pages

11. Process Performance

1. Highlights

2. Production Report

4. FFB Quality

5. LF and Trash Content

6. Production Quality

7. Production and Despatch Kernel

8. High Differences CPO Despatch Loads

9. GPS Progress Report

10. Cost of Production

12. Digesting & Pressing Station ++

13. EFB Pressing

1. Clarification Station

2. Decanter

3. Dilution Rate & Absolute Oil Loss

4. Purifier & Vacuum Dryer

5. Nut & Kernel Station

6. Nut Cracking Efficiency

7. Kernel Losses / Cost

8. Boiler / Power House

9. Water Treatment Plant

10. General (Visitors/Security/Breakdown, etc.) ++

11. Man Power

12. Appendix 1

3. FFB Composition

13. Major Maintenance Report ++

CoverPage

KILANG KELAPA SAWIT BATU LINTANG

Progress Report

For the month of

APRIL 2013

Date5/23/13KUALA LUMPUR KEPONG BERHAD

(No. Syarikat: 15043-V)

KILANG KELAPA SAWIT BATU LINTANG

.

(ARVIN A/L SANGGARIN)

Acting Manager

Highlights

PROGRESS REPORT ONPAGE 1

KILANG KELAPA SAWIT BATU LINTANG

FOR THE MONTH OF APRIL 2013

(7TH MONTH OF FINANCIAL YEAR)

HIGHLIGHTS

Estimated percentage of FFB pushed by shovel

Percentage FFB pushed due to grading

PRODUCTION

Current Financial YearSame Period Last Year

This MonthLast MonthTodateThis MonthTodate

O.E.R %20.6120.7020.8420.7021.02

K.E.R %4.745.114.974.754.96

RAINFALL RECORD (mm)Year2013

Fin YearOctNovDecJanFebMarAprMayJunJulAugSep

Last FY448.00344.00157.0049.00382.00280.00239.00167.0029.00115.0095.00169.00

This FY300.00305.00310.00180.00270.00140.00250.00

OTHER HIGHLIGHTS

ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS

Comments :

Both OER and KER have decreased by 0.09% and 0.37% respectively as compared to last month.

The todate OER for the 2012/13 financial year has decreased by 0.18% while the KER todate has improved by 0.01% as

compared to last year same period todate.

Main Menu

ProductionReport

PAGE 2

1PRODUCTION REPORT

1.1.FFB STATEMENT

1.1.1.FFB CONTRIBUTION

Estimate forEstimate+/- Estimate+/- Estimate

This MonthTodateThis MonthTodateThis MonthTodate

KLK EstatesMTMTMTMTMTMT

Batu Lintang1,168.21014,397.7804,360.00032,648.000-73.21%-55.90%

Kedah347.9405,145.620--

Buntar358.0405,488.720--

Ghim Khoon329.5804,028.990--

Nagalelai347.1204,192.450--

Subur224.4102,529.9801,442.00011,898.000-84.44%-78.74%

Norseman299.5404,161.170--

Sungai Pulau88.4701,067.780--

Pelam1,257.92016,681.5004,334.00030,555.000-70.98%-45.41%

Senggang- 022.110--

Serapoh- 0- 0--

--

--

--

--

--

--

Sub Total4,421.23057,716.10010,136.00075,101.000-56.38%-23.15%

Non-KLK Estates

--

Bukit Tebuan- 01,657.130180.0001076.000-100.00%54.01%

Kampar--

Pinji--

Menglembu--

Batu Dua--

--

--

--

--

--

Sub Total- 01,657.130180.0001,076.000-100.00%54.01%

Outsiders

--

--

--

--

--

--

--

--

--

--

--

--

Sub Total- 0- 0- 0- 0--

Grand Total4,421.23059,373.23010,316.00076,177.000-57.14%-22.06%

Comment :

FFB for the month was 5894.77mt or 57.14% lower than the estimate of 10316mt due to diversion of FFB during mill annual Inspection.

Main Menu

FFBComposition

PAGE 3

1.1.2.FFB COMPOSITION

Composition of crop from various years of planting are :-

Year of PlantingThis MonthTodate

MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above

1980- 0- 0- 0- 0330825.632781.61813.99

1981- 0- 0- 0- 03209560.0539836.429976.76

1982- 0- 0- 0- 031

1983- 0- 0243.060.4130

198447.521.07335.550.5729

198537.620.85417.340.7028

198620.710.47938.591.5827

198762.851.42774.811.3026

1988- 0- 083.810.1425

198981.731.85728.401.2324

1990122.452.771,687.322.8423

1991120.082.721,294.982.1822

199223.490.53508.640.8621

1993- 0- 0- 0- 020

1994141.553.201,618.982.7319

1995389.298.813,722.866.2718

1996171.893.891,857.583.1317

1997315.197.134,944.018.3316

1998534.4212.098,290.9013.9615

1999411.229.306,473.4010.9014

2000293.186.635,302.848.9313

2001217.544.923,334.655.6212

2002179.974.072,260.123.8111

2003268.916.083,650.066.1510

2004351.057.944,671.257.879

200562.621.42885.051.498

200649.761.13487.810.827

2007217.674.922,057.423.476

2008144.533.271,458.522.465

2009/10155.993.531,345.282.2799

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

- 0- 00

Total4,421.23100.0059,373.23100.00

Append below the classification of Palms According to Age :-

CategoryPalm Age (years)TM %RemarksTD %

Immature1st - 3rd0%0%

Young4th - 9th19%16%

Prime10th - 18th63%67%

Old19th and above18%17%

Comments :

FFB composition vary from the year 1983 to 2010 with most of the crop

coming from the year 1998.

Main Menu

FFBQuality

PAGE 4

1.1.3.FFB QUALITY

No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch

CONTRIBUTINGThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast

ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth

--

--

--

--

--

--

--

Total/Average00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0

1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

LOADING RAMPFFB GRADING

FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%

4,4214,421- 0-- 0

Comments :

Main Menu

LF_TrashContent

PAGE 4.1

1.1.5.LOOSE FRUIT & TRASH CONTENT

No. of Grading% LooseTrash Content inTrash Content in

Fruit in LoadLoose Fruit (%)FFB %

ThisLastThisLastThisLastThisLast

NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth

1

2

3

4

5

6

7

8

9

10

11

12

Average00- 0- 0- 0- 0- 0- 0

NOOutsider Estate

1

2

3

Average00- 0- 0- 0- 0- 0- 0

1.1.6.LOOSE FRUITS TO FFB RATIO

Total Tonnage% to FFB

NOESTATESThis MonthLast MonthThis MonthLast Month

1Batu Lintang3.57- 00.31- 0

2Pelam56.05- 04.46- 0

3Kedah2.99- 00.86- 0

4

5

6

7

8

1.1.7.STONES & TRASH IN FFB

Trash

NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB

1

2

3

4

5

6

7

8

Comments :

Main Menu

ProductionQuality

PAGE 5

1.2.PRODUCTION QUALITY

1.2.1.PRODUCTION OIL / DESPATCH OIL

PRODUCTIONDESPATCHMarketing

This MonthLast MonthThis MonthLast MonthSpecification

XS.D.XS.D.XS.D.XS.D.

2.930.362.770.323.000.143.070.25

FFA %< 5.0

0.120.020.130.020.190.020.170.01< 0.25

Moisture (VM) %

0.0310.0220.0290.0310.0170.0150.0180.010

Dirt %

Peroxide Value %

2.830.062.790.092.810.032.760.07

DOBI> 2.31

ANALYSIS RESULT BY (KDC/TQCC)

1st Week2nd Week3rd Week4th WeekTaiko

SAMPLEAverageStandard

FFA-7.193.233.424.613.0 Max

VM-0.510.300.170.330.13 Max

DIRT-0.1390.0750.0200.080.03 Max

PEROXIDE VALUE-0.700.601.801.030.60 Max

IODINE VALUE-52.3051.9052.2052.1350 - 54

DOBI VALUE-2.603.032.862.833.0 Min

CAROTENE-579.00575.00566.00573.33600 Min

E233 (1% CORR.)-1.371.101.251.241.20 Max

E269 (1% CORR.)-0.300.300.250.280.20 Max

IRON0.005.0 - 3.0

PHOSPHORUS0.008.0 - 5.0

D.F. (Delta Y)-14.4921.3418.7818.2020.0 Min

QUALITY RATING0.00NIL

Comments :

The production oil quality is maintain within Marketing Specifications

The quality of despatched CPO is maintained with Marketing Specifications.

2nd week sample of high FFA is due to faulty sampling during recycling of oil after mill annual inspection.

Main Menu

ProdDesKernel

PAGE 6

1.2.2.PRODUCTION / DESPATCH KERNEL

PRODUCTIONDESPATCH

THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING

XS.D.XS.D.XS.D.XS.D.SPECIFICATION

MOISTURE %5.160.365.190.335.430.265.560.136%

DIRT %4.560.474.320.914.690.034.510.187%

FFA %0.210.030.210.030.000.000.000.00

TOTAL BROKEN KERNEL %10.850.8710.991.250.000.000.000.00

STONE CONTENT %0.280.170.220.140.140.010.310.28

1.2.3.CPO DESPATCH

BUYERMILLBUYER'S+ / -

NETNETON MILL

WEIGHTWEIGHTNET WEIGHT

tntntn

1-WILMAR EDIBLE OIL0.0000.0000.000

2-PGEO EDIBLE OIL0.0000.0000.000

3-KLK (SABAH)400.500400.290-0.210

4-TAIKO BLEACHING0.0000.0000.000

5-PK AGRO0.0000.0000.000

6-CARGILL PALM201.700200.910-0.790

7-0.000

602.200601.200-1.000

1.2.4.PK DESPATCH

BUYERMILL

NET

WEIGHT

tn

1-SANG KEE18.130

2-SINN HWAT HENG51.070

3-PANGKOR74.040

4-

5-

6-

7-

Total :143.240

1.2.5.CXC REPORT

THIS MONTHLAST MONTH

Total number of CPO tankers2892

No. of Loads with high differences +/- 80kg)6-

Comments :

The kernel quality is maintained within Marketing Specifications

The difference in weight between the mill and the buyers was low at 0.16%

most of the load with high shortage is due to long distance dispatches to Port Klang.

Main Menu

CPODes

PAGE 6.1

EXTRACTED FROM CXC REPORT

CPO Despatch Loads With High Differences

LOADS FROM MONTH: April 2013

Weight Details (MT)

Ticket NoDriverVehicleDateMillBuyerG / LossBuyer

A041885APPU A/L KRISHNANABU 35934/1/1323.30023.2100.090(KLK) Sabah (0.070)

A042027ASMIR BIN JAAFARPAF 98604/15/1324.22024.1200.100Cargill (0.075)

A042095ASMIR BIN JAAFARPAF 98604/17/1324.27024.1400.130Cargill (0.100)

A042098ZULKIFLI B YUSOFPHT 14444/17/1329.87029.7700.100Cargill (0.080)

A042270ASMIR BIN JAAFARPAF 98604/22/1324.29023.9800.310Cargill (0.250)

A042274APPU A/L KRISHNANABU 35934/22/1323.15022.9500.200Cargill (0.170)

0.000

0.000Total : 0.745 (Oil recovered)

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Total0.930

Comments

Main Menu

GPSRep

PAGE 6.2

GPS PROGRESS REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON April 2013

Violation Report

No.Tanker No.*Total UsageMill Weight +/-Other Mill Weight +/-Total Weight +/-No Go ZoneExcessive IdlingPower DisconnectZone Grid ExitAction Taken / Remarks

Total0000

* Represent (TMS) Outside Tankers

Main Menu

COP

PAGE 7

1.3.COST OF PRODUCTION

(Basis : Cost per tonne CPO)

This

MonthTodateYear ' s

April 20137 mthsEstimate

RM / tnRM / tnRM / tn

Indirect Cost152.3283.8974.42

Depreciation

Manufacturing Cost596.21192.65170.53

Ex-Mill Cost748.53276.54244.95

Cooking Oil Cess

Palm Oil Stabilisation Cess2.002.002.00

CPO (Sabah) Sales Tax

Despatch & Selling24.0121.9220.13

TOTAL EXPENDITURE774.54300.46267.08

A/cThis MonthEstimateComments

CodeRM/ton CPORM/ton CPODiff. (%)

12.380.8763.4%Higher due to low crop processed during the month

227.649.7364.8%Higher executive salaries & EPF

45.831.9566.6%Higher employer socso contribution

113.110.9669.1%Higher hospital / clinic charges

125.451.2976.3%Higher cost due to donation upon death for Ibrahim Che Rose Father

1615.935.7963.7%Higher electricity charges

197.792.5866.9%Higher AP wages and OT levied by BLE

416.182.4161.0%Higher supervisor overtime

4249.1017.4964.4%Higher labour wages due to new basic for c/roll

44154.6331.5579.6%Renewed shell elevator bottom section & FIB conveyor ribbon,liner & bearing

4522.856.8869.9%Replaced PVC nozzle for sand filter

5066.4820.5969.0%Reconcrete floor & extend floor for vehicle reverse & repair rail track

5159.737.0888.1%Renewed 70ft long shell liner & over head for S1 & install 35ft long liner S3

5219.033.9079.5%Renewed clamp spider arm plate

539.402.0078.7%Replaced Tsubaki conveyor chain and M.S flat bar

5650.292.4395.2%Renewed CBC ribbon & liner 40ft and end cover

5838.207.7379.8%Replaced M.S.Plate and install body plate for kernel silo

596.490.4393.4%To hack 40'x25'x8' and concrete kernel bulk silo floor

Comments :

Manufacturing cost was at RM 596.21/tonne oil against estimate of RM 170.53/tonne oil.

Shortfall of CPO production was 1,306.9860 tonnes against propn. estimate of 2,218 tonnes CPO.

High cost was due low crop processed and machinery repair during mill annual inspection

Main Menu

ProcPerf

PAGE 8

2PROCESS PERFORMANCE

2.1.STERILIZATION

Summary of sterilisation cycle for the month is tabulated as follows :-

FunctionX (min)S.D.

Deaeration2BarPsi

1st. Peak(1.73 Bar / 25 psi)101.7325

1st. Peak exhaust2

2nd. Peak(2 Bar / 29 psi)13229

2nd. Peak exhaust4

3rd. Peak(2.7 Bar / 40 psi)132.740

3rd. Peak exhaust0

4th. Peak(2.7 Bar / 40 psi)02.740

Holding Time41

Final exhaust2

Steaming cycle870

Door Open to Door Shut Time

This MonthLast Month

XS.D.XS.D.

USB after 1st Threshing (%)

USB after 2nd Threshing (%)2.290.372.160.37

Threshing Efficiency (%)

STERILIZER CONDENSATE

This MonthLast Month

XS.D.XS.D.

Steriliser condensate (Oil Content in Wet Basis)0.930.260.950.26

Condensate / FFB Ratio

Absolute oil loss (kg/tn FFB)

Comments :

OLWB for sterilizer condensate has decreased by 0.02% compared to last month.

The percentage of USB has increased by 0.13% compared to last month.

Main Menu

DigPressStation

PAGE 9.0

2.2.DIGESTING & PRESSING STATION

2.2.1.DIGESTER TEMPERATURE OC

ThisMonthLastMonth

DIGESTERXS.D.XS.D.

Digester No. 199.002.7197.002.02

Digester No. 299.002.6397.002.08

Digester No. 3100.000.0096.002.00

Digester No. 4

Digester No. 5

Digester No. 6

Digester No. 7

Digester No. 8

Digester No. 9

2.2.2.PRESSING

PressPressPressPressPressPressPressPressPressAverage

No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9

OIL LOSS ON WET BASIS (OLWB)This MonthX5.245.035.065.11

S.D.0.390.260.000.22

Last MonthX4.904.844.754.83

S.D.0.360.320.210.30

OIL LOSS ON DRY BASIS (OLDB)This MonthX7.767.547.357.55

S.D.0.220.230.000.15

Last MonthX7.587.487.837.63

S.D.0.610.520.090.41

NUT BREAKAGE (%)This MonthX18.9522.2726.5022.57

S.D.1.983.670.001.88

Last MonthX23.0823.7219.1721.99

S.D.6.596.102.114.93

PRESS RUNNING HOURSThis MonthX148.12142.129.3099.85

S.D.0.000.000.000.00

Last MonthX283.02229.4154.67189.03

S.D.0.000.000.000.00

Comments :

Average % of OLWB for press losses has increased by 0.28% than last month.

Average nut breakage has increased by 0.58% as compared to last month.

Will strive reduce the nut breakage to below 18%.

Main Menu

DigPressStation2

PAGE 9.1

2.2.3.

True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash

This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

X13.9416.9437.4336.0056.3263.7311.6713.2311.659.1419.6821.128.9212.35

S.D.2.432.584.344.705.013.361.723.671.041.101.263.220.261.41

N

Main Menu

EFBPressing

PAGE 9.2

2.2.4.EFB PRESSING

PressPressPressPress

No. 1No. 2No. 3No. 4

PRESS RUNNINGThis Month

HOURSLast Month

DOWN TIMEThis Month

Last Month

2.2.5.

OIL RECOVERED

This MonthLast Month

F F A(%)

DOBI

VM(%)

OLWB(%)

Press Fibre (OLDB)

Ratio EFB Liquor to FFB (%)

2.2.6.SPLITTER

Running HoursRUNNING HOURS

This MonthLast Month

No. 1

No. 2

Comments :

Main Menu

ClarificationStation

PAGE 10

2.3.CLARIFICATION STATION

2.3.1.CLARIFICATION TANK

This MonthLast Month

Tank 1Tank 2Tank 3Tank 1Tank 2Tank 3

Temperature OCX94.0095.00

S.D4.131.41

% Oil in underflowX5.165.28

(% OLWB)S.D0.190.19

2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

S1S2S3C1C2C3C4C5C6C7C8

% Oil loss on wet basis (x)This MonthX0.740.890.81

S.D0.200.220.22

Last MonthX0.740.840.79

S.D.0.200.180.17

Operating Hours (hrs)T MthX132.0070.00113.00

L MthX174.00210.00245.00

Nozzle size (mm)T MthX1.601.601.60

L MthX1.601.601.60

Separate Waste Basculator (mt)T MthX594.11325.11531.22

L MthX706.00903.001053.00

Oil losses on Absolute Terms (Kg/tn FFB)T MthX0.990.650.97

L MthX0.650.961.04

Comments :

% OLWB for underflow has decreased by 0.12%.

All separator losses were within in-house target.

Main Menu

Decanter

PAGE 11

2.3.2.DECANTER (D)

InletSolid PhaseLight PhaseHeavy Phase

Temperature (oC)This Month

Last MonthD1D2D1D2D1D2

Oil % (x)This MonthX

S.D

Last MonthX

S.D.

VM % (x)This MonthX

S.D

Last MonthX

S.D.

NOS % (x)This MonthX

S.D

Last MonthX

S.D.

Operating HoursT MthX

L MthX

Comments :

Main Menu

Dilution

PAGE 12

2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS

This MonthLast Month

XS.D.XS.D

DILUTION RATE %32.002.4032.001.41

Separator Waste to FFB ratio32.8133.60

Decanter cake to FFB ratio

Absolute Oil loss in Separator/Centrifuge kg/mt FFB2.612.65

Absolute Oil loss in Decanter Cake kg/mt FFB

Total Oil loss kg/MT FFB2.610.002.650.00

2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

DescriptionThis MonthLast Month

After Deoiling tank (OLWB)0.820.78

After Cooling pond0.760.58

Comments :

Absolute oil loss in kg/mt FFB decreased by 0.04kg/mt FFB than last month.

Main Menu

Purifier

PAGE 13

2.3.5.PURIFIER & VACUUM DRYER

PURIFIERBefore PurifierAfter Purifier

No: 1No: 2No: 1No: 2No: 3No: 4No: 5

% VMThis MonthX

S.D

Last MonthX

S.D.

% DirtThis MonthX

S.D

Last MonthX

S.D.

VM Rem. EffThis MonthX

S.D

Last MonthX

S.D.

Dirt Rem. EffThis MonthX

S.D

Last MonthX

S.D.

2.3.6.VACUUM DRYER

VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.

XS.DXS.DXS.D

No: 1This Month70.000.250.040.120.0252.00

Last Month70.000.253.000.130.0248.00

No: 2This Month

Last Month

No: 3This Month

Last Month

Comments :

Vacuum dryer efficiency is satisfactory.

Main Menu

NutKernelStation

2.4.NUT & KERNEL STATIONPAGE 13.1

2.4.1.NUT SILO & KERNEL SILOS

DESCRIPTIONNo: 1No: 2No: 3No: 4

% VM Fresh NutThis MonthX18.8618.58

S.D0.110.11

Last MonthX18.9618.70

S.D.0.710.13

% Dried NutThis MonthX14.2014.20

S.D1.101.10

Last MonthX14.6614.89

S.D.1.150.58

% Drying EfficiencyThis MonthX24.7123.98

S.D

Last MonthX22.6820.37

S.D.

2.4.2.KERNEL SILO

This MonthLast Month

1234512345

Temperature oCTop

Middle74.0044.0067.0042.00

Bottom79.0070.0080.0070.00

% VM Fresh KernelX20.5019.3320.0619.49

S.D0.640.140.770.15

% Dried KernelX5.125.385.225.48

S.D0.380.420.310.28

% Drying Efficiency75.0272.1773.9871.88

Comments :

Kernel drying efficiency is satisfactory.

Main Menu

NutCrackingEff

2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2

R I P P L E M I L L

Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

XSDXSDXSDXSDXSDXSDXSDXSDXSD

Whole Nut (%)85.783.8083.762.02

Broken Nut (%)9.101.9710.830.74

Whole Kernel (%)1.100.290.840.10

Brokern Kernel (%)0.320.331.280.08

R I P P L E M I L L

Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

XSDXSDXSDXSDXSDXSDXSDXSDXSD

Whole Kernel (%)33.736.3434.190.06

Broken Kernel (%)12.104.2613.821.35

Uncracked Nut (%)0.550.150.580.12

Half cracked Nut (%)0.840.290.780.21

Nut Cracking Eff.Kernel Recovery Eff.

XSDXSD

Ripple Mill No: 197.190.6898.610.82

Ripple Mill No: 297.200.2698.590.38

Ripple Mill No: 3

Ripple Mill No: 4

Ripple Mill No: 5

Ripple Mill No: 6

Ripple Mill No: 7

Ripple Mill No: 8

Ripple Mill No: 9

Comments :

All ripple mills performed well.

Main Menu

KernelLosses

PAGE 14

2.4.4.KERNEL LOSSES / COST

This MonthLast Month

Line 1Line 2Line 3Line 1Line 2Line 3

XSDXSDXSDXSDXSDXSD

Cyclone Fibre0.890.190.900.16

LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage

0.830.120.940.19

Hydrocyclone (PK in wet shell)

Claybath0.820.130.850.20

2.4.5.RUNNING COST

This MonthLast MonthTodate

Kernel Produced (mt)209.632404.6532951.674

Total Kaolin or Calcium Carbonate Cost (RM)992.0001798.00011851.300

Other Cost e.g Sodium Silicate (RM)

Cost / MT of PK (RM)4.7324.4433.679

Cost / MT of FFB (RM)0.2240.2270.200

Comments :

The cost for calcium carbonate has decreased by 0.3 cents/mt FFB as compared to last month.

All kernel losses were within in-house target.

Main Menu

BoilerPowerHouse

PAGE 15

2.5.BOILER / POWER HOUSE

2.5.1.BOILER HOUSE

DescriptionThis MonthLast MonthTodate

Boiler Chemical Cost (RM)663.181188.418905.99

Cost / MT FFB (RM)0.150.150.15

2.5.2.POWER HOUSE

DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw

This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

Turbines>Dresser RandAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers

No. 1 (700 KW)168.5307.165480.0127150.0700

No. 2 (400 KW)400

Diesel Gen Set >CumminsCaterpillarCumminsListerOthers

No. 1 (300 KW)280.3174.613069.010774.06394.04413.02.042.44300

No. 2 (30 KW)-0.00.0-0.0030

No. 3 (0 KW)0

KwHr / mt FFB (Turbine + Genset)Steam Consumption per KwHr (Turbine)

2.5.3.TNB POWER SUPPLY

This MonthLast MonthTodate

KwHrRMKwHrRMKwHrRM

Palm Oil Mill13082.004997.4515790.006012.95

Rubber Factory

Ecomat Plant

Total13082.004997.4515790.006012.950.000.00

Comments :

We are looking into extending TNB supply to all stations.

Main Menu

WaterTreatment

PAGE 16

2.6.WATER TREATMENT PLANT

2.6.1.WATER CONSUMPTION

Water consumed

%

DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB

DomesticOwn

Estate

Mill6810.0010720.001.54

FC

TOTAL6810.0010720.000.000.001.54

2.6.2.WATER TREATMENT COST

This MonthLast MonthTodate

Chemical Cost (RM)938.731578.5510954.97

Cost /m3 water (cts / m3)0.140.15

Cost /mt FFB (cts / mt FFB)0.210.20

Water Consumption (m3 / mt FFB)1.541.35

2.6.3.MONTHLY LICENCE COST

PUMPING RAW WATER FROM RIVER

This MonthLast MonthTodate

Total Volume of water (m3) consumed6810.0010720.0074051.00

Total Cost (RM)

Comments :

Water consumption has increased by 0.19 m3/mt FFB as compared to last month.

Water treatment cost has decreased by 1 cent/mt FFB as compared to last month.

Main Menu

General

PAGE 17

2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)

2.7.1.Visitation

DatePersonRemarks

10&29/4/13En.Hadzri (CCPOM)Visiting Eng

4/10/13JKKP (OFFICER)Inspection Visit

4/23/13V.E.EMill Visit

2.7.2.Training

DateRemarks

2.7.3.Security

DateRemarks

4/24/13ASA (En.Jamil)

2.7.4.OSH Matter

DateRemarks

4/10/13OSH department Mr.Lawrence and Mr.Kumar - Mill Inspector

2.7.5.RSPO Matter

DateRemarks

2.7.6.Amenities

DateRemarks

2.7.7.Water Supply

DateRemarks

2.7.8.EFB DISPOSAL

Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

15.481,822.231,827.1410.56

2.7.9.DECANTER CAKE DISPOSAL

Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

Main Menu

General2

PAGE 17.1

2.8.0.Effluent Treatment

DateRemarks

2.8.1Mill Downtime

Line 1Line 2

DateHoursDetailsDateHoursDetails

4/13/131.5Boiler feed (A2B) motor burned

4/23/132Fibre air lock & G.Box repair

4/28/130.5Fibre cyclone air lock repair

Total40

2.8.2Housekeeping / Beautification / Linesite / Compound

DateRemarks

2.8.3.Others

DateRemarks

Comments

Main Menu

General3

PAGE 17.2

2.8.4.Effluent Result For April 2013

DOE LimitTQCC Result

apHN/A8.6

bBOD (mg / l)5000 MAX180

cCOD (mg / l)N/A942

dTotal Nitrogen (mg / l)N/A143

eAmmonical Nitrogen (mg / l)N/A126

fTotal Solids (mg / l)N/A3809

gSuspended Solids (mg / l)N/A364

hOil & Grease (mg / l)N/A13

2.8.5Trailing Report

No Trailing conducted for this month

Main Menu

ManPower

PAGE 18

3.0MANPOWER

3.1.EMPLOYEES

MALAYSCHINESEINDIANSOTHERSTOTAL

Executives10304

Subordinate Staff5012017

TOTAL6015021

3.2.SUBORDINATE STAFF LEAVE STATUS

LeaveLeaveLeave

B/F FromEntitlementTakenLeaveLeave

Year '11for Year '12ThisTakenEarned

No.NAMEPosition(Days)(Days)TotalMonthTodateTodateBal

1ALIZA BINTI MAT ISAC/CLERK4212529723

2SYED MOHD ADNAN2ND CLERK-4242017821

300

4A.MOHANATHASCHARGEMAN-28631480

5G.LOGANATHANSUPERVISOR15213616838

6A.PUGALENTHYSUPERVISOR16213726738

7R.BALANE/DRIVER3182139618

8S.MUNIANDYBOILERMAN6152112524

9R.RAJOOBOILERMAN9172638624

10AV.MOGANAKRISHNANLAB OPER000-276-1

11P.SANKARANMECHANIC-4171341069

12S.SUBRAMANIAMMECHANIC4182217621

13SAMSUDDIN BIN ISHAKMECHANIC6182424626

14S.PADMANATHANW/B OPER-18180-1660

15AB RAHMAN CHE HATMECHANIC-2518-7-135-5

16MAHD HANIFFAHFOREMAN-21243-1586

17G.KRISHNASAMYE/DRIVER-18180-3660

18S.JAMESONMECHANIC-141511650

1900

2000

2100

2200

2300

2400

2500

2600

2700

2800

Comments :

Main Menu

Employee

PAGE 18.1

3.3EMPLOYEE (MILL WORKERS)

(A)CHECKROLL

EmployeesDependants (Resident)Total

(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

Bumiputera23326- 026

Chinese-- 0- 0- 0

Indian27431- 031

Grand Total50757- 0- 0- 057

(2) NON-MALAYSIAN

Sri Lanka- 0- 0- 0

India12-12- 012

Indonesia5-5- 05

Bangladeshi- 0- 0- 0

Thai- 0- 0- 0

Filipino- 0- 0- 0

Grand Total17- 017- 0- 0- 017

Total Checkroll67774- 0- 0- 074

(B)CONTRACT / TEMPORARY

EmployeesDependants (Resident)Total

(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

Bumiputera11- 01

Chinese- 0- 0- 0

Indian11- 01

Grand Total2- 02- 0- 0- 02

Main Menu

Appendix1

PAGE 19

Appendix 1

PROGRESS REPORT FOR THE MONTH

OF APRIL 2013

UnitThis MonthLast MonthTodatePrevious Todate

1.0FFB

1.1.1Weight of FFB processedMT4,421.2307,922.73059,373.23054,952.000

1.1.2EstimateMT10,316.00011,146.00076,177.00065,861.000

1.1.3Shift HoursHrs- 0- 0

2.0OIL MANUFACTURE

2.1.1Weight of Oil ProducedMT911.0141,640.21312,373.87111,462.857

2.1.2EstimateMT2,218.0002,397.00016,327.00014,109.000

2.1.3Oil Extraction Rate%20.6120.7020.84

2.1.4Estimate%21.5021.5121.43

2.1.5Press Running HoursHrs.300.27567.104,017.733,717.46

2.1.6Production HoursHrs.159.50293.502,122.751,963.25

2.1.7Downtime (Line 1)Hrs.4.004.5017.5013.50

2.1.8Downtime (Line 2)Hrs.- 0- 0- 0

2.1.9Press Capacity per unitMT / hr14.7213.9714.78

2.2.0F.F.B. Manufactured / HoursMT / hr27.7226.9927.97

2.2.1Oil Recovered / HoursMT / hr5.715.5911.555.84

3.0KERNEL MANUFACTURE

3.1.1Weight of kernel ProducedMT209.632404.6532,951.6742,742.042

3.1.2EstimateMT536.000579.0003,882.0003,346.000

3.1.3Kernel Extraction Rate%4.745.114.97

;3.1.4Estimate%5.205.195.10

3.1.5Production HoursHrs.159.50293.502,122.751,963.25

3.1.6Kernel Recovered / HrMT / hr1.311.411.39

4.0DESPATCH AND STOCK

4.1.1Oil DespatchedMT601.2002,222.87012,462.20011,861.000

4.1.2Oil in StockMT1,090.106780.2921,090.106- 0

4.1.3Kernels DespatchedMT143.240616.9803,532.5663,389.326

4.1.4Kernels in stockMT99.34932.95799.349- 0

- Packed / Bulk SiloMT99.34932.95799.349- 0

- Kernel in BagMT- 0- 0

Remarks :

Main Menu

MajorMaintRep1

PAGE 20

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION

(4) HOISTING / TIPPER AND THRESHING STATION

Reconcreted part of loading ramp apron floor and extended floor for reversing of lorries.

Replaced 70ft of wear liner for sterilizer No.1.

Installed 35ft of 2 o'clock and 10 o'clock side liner for sterilizer No.3

Replaced thresher No.1 spider arm clamp

Replaced 200ft of 4" conveyor chain for inclined efb conveyor

Main Menu

MajorMaintRep2

PAGE 21

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION

(8) CLARIFICATION STATION

Replaced 40ft of CBC liner ribbon and hanger bearing

Replaced worn out plates of kernel silo No.1 and kernel silo No.2

Main Menu

MajorMaintRep3

PAGE 22

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION

(12) EFFLUENT STATION

Serviced pneumatic system and replaced FD and ID fan positioner for vickers boiler

Replaced ID fan damper plates for vickers boiler

Replaced FD fan dusting for vickers boiler

Replaced fuel feeder chute for vickers boiler

Replaced inclined fuel conveyor ribbon liner and hanger bearing

Replaced shell elevator bottom booth.

Main Menu

MajorMaintRep4

PAGE 23

MAJOR MAINTENANCE REPORT FOR THE MONTH OF APRIL 2013

(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

Purchased 1 unit of 1mt electric chain block

Replaced 2 set of brake group c/w disc for shovel cat 950