JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT DATE CURRENT STATUS Oct 4, 2016 - (Track Record Updated) 1. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI Sept 28, 2016 In Progress 2. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS Aug 22, 2016 In Progress 3. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI Aug 16, 2016 Completed 4. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT PETRONAS CARIGALI June 8, 2016 In Progress 5. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC SHELL Apr 1, 2016 In Progress 6. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL Mar 16, 2016 Completed 7. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT COASTAL ENERGY Jan 28, 2016 In Progress 8. PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT PETRONAS CARIGALI Nov 2, 2015 Completed 9. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT PETRONAS CARIGALI Oct 23, 2015 Completed 10. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000 KPOC Sept 18, 2015 Completed 11. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL Sept 10, 2015 Completed 12. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT HESS Sept 8, 2015 Completed

Upload: vankhue

Post on 29-Mar-2019

248 views

Category:

Documents


0 download

TRANSCRIPT

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

1. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI Sept 28, 2016 In Progress

2. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS Aug 22, 2016 In Progress

3. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI Aug 16, 2016 Completed

4. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

PETRONAS CARIGALI June 8, 2016 In Progress

5. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC SHELL Apr 1, 2016 In Progress

6. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL Mar 16, 2016 Completed

7. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT COASTAL ENERGY Jan 28, 2016 In Progress

8. PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT

PETRONAS CARIGALI Nov 2, 2015 Completed

9. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

PETRONAS CARIGALI Oct 23, 2015 Completed

10. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000 KPOC Sept 18, 2015 Completed

11. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL Sept 10, 2015 Completed

12. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT HESS Sept 8, 2015 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

13. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA ENERGY Sept 1, 2015 Completed

14. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT

PETRONAS CARIGALI Sept 1, 2015 Completed

15. PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000

CPM GROUP July 28, 2015 In Progress

16. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed

17. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed

18. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015

PETRONAS CARIGALI May 12, 2015 Completed

19. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)

PETRONAS CARIGALI May 6, 2015 Completed

20. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM

PETRONAS CARIGALI April 29, 2015 Completed

21. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed

22. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA Oct 1, 2014 Completed

23. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN BHD Oct 1, 2014 Completed

24. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A SCHLUMBERGER Sept 29, 2014 Completed

25. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES JX NIPPON Sept 17, 2014 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

26. SUPPLY OF SERVIWRAP PETRONAS CARIGALI Aug 8, 2014 Completed

27. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT LUNDIN PETROLEUM July 16, 2014 Completed

28. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI July 7, 2014 Completed

29. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL SAPURAKENCANA July 3, 2014 Completed

30. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304

KENCANA PETROLEUM May 28, 2014 Completed

31. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS

TALISMAN MALAYSIA May 1, 2014 In Progress

32. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM MMC OIL & GAS April 30, 2014 Completed

33. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL

PETRONAS PENAPISAN

(MELAKA) SDN BHD April 21, 2014 Completed

34. FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT

TL OFFSHORE SDN BHD April 16, 2014 Completed

35. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD

UMW OFFSHORE DRILLING April 1, 2014 In Progress

36. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION

GOM RESOURCES SDN BHD April 1, 2014 Completed

37. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1) SHELL February 12, 2014 Completed

38. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6 COASTAL ENERGY January 1, 2014 In Progress

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

39. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD TL OFFSHORE January 1, 2014 In Progress

40. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed

41. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE MURPHY November 28, 2013 Completed

42. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI November 13, 2013 Completed

43. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI November 13, 2013 Completed

44. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 28, 2013 Completed

45. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 28, 2013 Completed

46. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

EMEPMI October 25, 2013 Completed

47. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP) MMC OIL & GAS October 22, 2013 Completed

48. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB

SAPURA ACERGY SDN BHD September 12, 2013 Completed

49. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM EMEPMI September 6, 2013 Completed

50. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

51. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY ATWOOD August, 2013 Completed

52. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM EMEPMI July 29, 2013 Completed

53. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed

54. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed

55. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA PERISAI PETROLEUM June, 2013 In Progress

56. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE KPOC May 23, 2013 Completed

57. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE

SARAWAK SHELL BERHAD May 9, 2013 Completed

58. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD EMEPMI May 2, 2013 Completed

59. PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD

HESS EXPLORATION & PRODUCTION MALAYSIA B.V

April 29, 2013 Completed

60. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING EMEPMI April 2013 Completed

61. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS CARIGALI SDN BHD April 2013 Completed

62. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed

63. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

64. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD

EMEPMI April 2013 Completed

65. PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD

MURPHY SARAWAK OIL. CO. LTD April 2013 Completed

66. SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION

BROOKE DOCKYARD & ENGINEERING

WORKS CORPORATION

March 18, 2013 Completed

67.

ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE

EMEPMI March 13, 2013 Completed

68. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT MURPHY SNP March 11, 2013 Completed

69. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE EMEPMI March 8, 2013 Completed

70. SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

EMEPMI March 8, 2013 Completed

71. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013 EMEPMI March 7, 2013 Completed

72. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD

AQUATERRA ENERGY LIMITED March 7, 2013 Completed

73. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

74. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

75.

PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD

HESS EXPLORATION & PRODUCTION

MSIA B.V. March 2013 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

76. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES HESS February 26, 2013 Completed

77. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC PETRONAS January 29, 2013 Completed

78. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE KPOC January 21, 2013 Completed

79. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE CONOCO PHILIPS January 15, 2013 Completed

80. PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD

SHELL January 11, 2013 Completed

81. PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.

MURPHY January 10, 2013 Completed

82. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE EMEPMI January 08, 2013 Completed

83. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed

84. E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

SHELL December 17, 2012 Completed

85. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed

86. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD. KPOC October 18, 2012 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

87.

SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.

EMEPMI October 5, 2012 Completed

88. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT

UNIVERSITI TELNOLOGI

PETRONAS, TRONOH PERAK

October 2012 Completed

89. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

KPOC September 24, 2012 Completed

90. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD. KPOC September 24, 2012 Completed

91. PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 13, 2012 Completed

92. PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 12, 2012 Completed

93. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES SHELL September 11, 2012 Completed

94. PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 Completed

95.

PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL September 5, 2012 Completed

96. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000 SAPURAACERGY September, 2012 In Progress

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

97. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed

98. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD SPNB August 29, 2012 Completed

99. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD EMEPMI August 28, 2012 Completed

100. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES SHELL August 18, 2012 Completed

101. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD EMEPMI August 9, 2012 Completed

102. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD SAPURA ACERGY August 9, 2012 Completed

103. PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES

PETRONAS August 2, 2012 Completed

104. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY EMEPMI July 31, 2012 Completed

105. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED TALISMAN July 12, 2012 Completed

106. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD FUGRO GEODETIC July 12, 2012 Completed

107. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD EMEPMI July 10, 2012 Completed

108. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 07, 2012 Completed

109. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) July 04, 2012 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

110. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY EMEPMI July 04, 2012 Completed

111. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE KPOC July 02, 2012 Completed

112. TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

SHELL June 12, 2012 Completed

113. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES GOM RESOURCES June 11, 2012 Completed

114. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD. MISC May 21, 2012 Completed

115. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD TNK VIETNAM BV May 17, 2012 Completed

116. PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD

MURPHY OIL May 9, 2012 Completed

117. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD NEWFIELD April 9, 2012 Completed

118. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD IPERINTIS April 6, 2012 Completed

119. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP SCHLUMBERGER April 4, 2012 Completed

120. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD HALLIBURTON April 4, 2012 Completed

121. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000 L & T SAPURA April 1, 2012 In Progress

122. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD SHELL March 23, 2012 Completed

123. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS

OCEANTECH GEOMATIC March 14, 2012 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

124. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA

KPOC March 13, 2012 Completed

125.

SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES

PETRONAS March 12, 2012 Completed

126. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed

127. SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY

EMEPMI March 1, 2012 Completed

128. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed

129. PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD

EMEPMI February 24, 2012 Completed

130. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE PETRONAS February 22, 2012 Completed

131. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE MURPHY OIL February 14, 2012 Completed

132. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA GLOBAL OFFSHORE February 09, 2012 Completed

133. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD TNK VIETNAM BV January 20, 2012 Completed

134.

PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD

EMEPMI December 29, 2011 Completed

135. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD

ASIAN SUPPLY BINTULU December 21, 2011 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

136. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL SHELL December 21, 2011 Completed

137. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD NEWFIELD December 1, 2011 Completed

138. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD EMEPMI December, 2011 Completed

139. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD EMEPMI November, 2011 Completed

140. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD KPOC November 25, 2011 Completed

141. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed

142. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.

TALISMAN September 27, 2011 Completed

143. PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD

NEWFIELD September 15, 2011 Completed

144.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD

PETRONAS CARIGALI SDN BHD September 15, 2011 Completed

145.

PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.

SHELL September 15, 2011 Completed

146. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY

NIPPON OIL September 12, 2011 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

147.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD

NEWFIELD August 17, 2011 Completed

148. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB SHELL August 5, 2011 Completed

149. DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD

BP EXPLORATION OPERATING CO. LTD August 3, 2011 Completed

150.

PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.

PETRONAS CARIGALI SDN BHD July 25, 2011 Completed

151. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.

EMEPMI July 15, 2011 Completed

152. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD. EMEPMI July 3, 2011 Completed

153. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC SHELL June 17,2011 Completed

154. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD

SAPURA ACERGY/ SHELL April 14, 2011 Completed

155. PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD April 12, 2011 Completed

156.

PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

PETRONAS CARIGALI SDN BHD March 31, 2011 Completed

157. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD SHELL March 18, 2011 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

158.

FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) February 25, 2011 Completed

159. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD NEWFIELD February 24, 2011 Completed

160. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL NEWFIELD February 11, 2011 Completed

161. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD NEWFIELD February 11, 2011 Completed

162. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD

CARIGALI HESS February 1, 2011 Completed

163. PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD

SHELL January 17, 2011 Completed

164. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS

PETRONAS CARIGALI SDN BHD December 13, 2010 Completed

165. DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM

SARAWAK SHELL BERHAD November 24, 2010 Completed

166.

FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING

SHELL / MISC November 12, 2010 Completed

167. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING

OIL AND NATURAL GAS CORPORATION

LTD (ONGC) October 22, 2010 Completed

168. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE

PETRONAS CARIGALI SDN BHD October 21, 2010 Completed

169. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM

PETRONAS CARIGALI SDN BHD October 6, 2010 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

170. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING TALISMAN September 20, 2010 Completed

171. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL

NEWFIELD September 17, 2010 Completed

172. PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE

PETRONAS CARIGALI SDN BHD September 7, 2010 Completed

173. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY SHELL August 6, 2010 Completed

174. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL BERHAD August 3, 2010 Completed

175. PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)

PETROLIAM NASIONAL BERHAD July 28, 2010 Completed

176. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE

TALISMAN MALAYSIA LIMITED July 23, 2010 Completed

177. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE

SABAH SHELL PETROLUEM CO. LTD July 22, 2010 Completed

178. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT

RANHILL WORLEY PARSONS June 29, 2010 Completed

179. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE

OIL AND NATURAL GAS CORP. LTD

(ONGC) June 12, 2010 Completed

180. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT

RANHILL WORLEY PARSONS May 27, 2010 Completed

181. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1) SIME DARBY May 18, 2010 Completed

182. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT SAPURA ACERGY May 15, 2010 Completed

183. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed

184. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI

RANHILL WORLEY PARSONS May 4, 2010 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

185. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD TL OFFSHORE May 1, 2010 Completed

186. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE

TALISMAN MALAYSIA LIMITED April 29, 2010 Completed

187. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT MMHE April 21, 2010 Completed

188. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD

CAMERON INTERNATIONAL (M)

SDN BHD April 10, 2010 Completed

189. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed

190. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT

PETRONAS CARIGALI March 16, 2010 Completed

191. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT PFCE March 15, 2010 Completed

192. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed

193. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed

194. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed

195. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA March 9, 2010 Completed

196. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI March 3, 2010 Completed

197. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE

SARAWAK SHELL BERHAD February 28, 2010 Completed

198. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY SHELL / MISC February 25, 2010 Completed

199. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI February 5, 2010 Completed

200. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY SHELL/ MISC January 28 2010 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

201. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed

202. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS EMEMPI December 8, 2009 Completed

203. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY SHELL / MISC November 26, 2009 Completed

204. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE

PETRONAS CARIGALI November 3, 2009 Completed

205. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL) TALISMAN October 30, 2009 Completed

206. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed

207. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT ESSO AUSTRALIA August 25, 2009 Completed

208. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT SARAWAK SHELL August 24, 2009 Completed

209. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL NEWFIELD July 31, 2009 Completed

210. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI

PETRONAS CARIGALI July 15, 2009 Completed

211. ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B

EXXON MOBIL June 22, 2009 Completed

212. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI June 15, 2009 Completed

213. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI June 8, 2009 Completed

214. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI May 15 , 2009 Completed

215. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI April 17, 2009 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

216. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI March 6, 2009 Completed

217. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT

PETRONAS CARIGALI

February 12, 2009 Completed

218. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL BERHAD February 11, 2009 Completed

219. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE

PETRONAS CARIGALI January 19, 2009 Completed

220. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE

SARAWAK SHELL BERHAD January 5, 2009 Completed

221. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH TECHNIP January 2, 2009 Completed

222. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE SHELL AND MISC Dec 31, 2008 Completed

223. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI Dec 24, 2008 Completed

224. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL BERHAD Dec 19, 2008 Completed

225. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL BERHAD Dec 19, 2008 Completed

226. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL

PETRONAS CARIGALI November 4, 2008 Completed

227. SUPPLY OF TOTE TANKS PETRONAS CARIGALI October 29, 2008 Completed

228. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE

PETRONAS CARIGALI October 21, 2008 Completed

229. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed

230. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI October 13, 2008 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

231. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS

PETRONAS CARIGALI October 10, 2008 Completed

232. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE

PETRONAS CARIGALI Sept 27, 2008 Completed

233. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL BERHAD Sept 16, 2008 Completed

234. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL

MURPHY SARAWAK OIL CO. LTD Sept 15, 2008 Completed

235. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI Sept 10, 2008 Completed

236. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed

237. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD August 1, 2008 Completed

238. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

SARAWAK SHELL BERHAD July 22, 2008 Completed

239. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL BERHAD June 30, 2008 Completed

240. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI June 30, 2008 Completed

241. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI June 26, 2008 Completed

242. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE

PETRONAS CARIGALI June 11, 2008 Completed

243. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A

TALISMAN MALAYSIA LIMITED May 23, 2008 Completed

244. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK OIL CO. LTD May 8, 2008 Completed

245. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO

PETRONAS CARIGALI April 30, 2008 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

246. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM

PETRONAS CARIGALI April 24, 2008 Completed

247. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL BERHAD April 11, 2008 Completed

248. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK OIL CO. LTD April 10, 2008 Completed

249. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND) CO. LTD April 10, 2008 Completed

250. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA LIMITED April 10, 2008 Completed

251. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES

PETRONAS CARIGALI April 10, 2008 Completed

252. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS

TALIMAN MALAYSIA LIMITED April 8, 2008 Completed

253. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI April 5, 2008 Completed

254. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE

PETRONAS CARIGALI March 31, 2008 Completed

255. FIELD JOINT COATING FOR KEA- TIA @ PBJV

PETRONAS CARIGALI March 7, 2008 Completed

256. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE MMHE March 7, 2008 Completed

257. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed

258. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE

PETRONAS CARIGALI Feb 28, 2008 Completed

259. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI Jan 17, 2008 Completed

260. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT

MITCO JAPAN SDN BHD Jan 11, 2008 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

261. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN MALAYSIA LIMITED Jan 3, 2008 Completed

262. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed

263. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI SDN BHD Nov 30, 2007 Completed

264. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN MALAYSIA LIMITED October 23, 2007 Completed

265. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL Sept 30, 2007 Completed

266. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE

PETRONAS CARGALI SDN BHD July 26, 2007 Completed

267. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD

OIL & NATURAL GAS CORPORATION,

INDIA August 27, 2007 Completed

268. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD

TALISMAN MALAYSIA LIMITED

August 23, 2007

Completed

269. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed

270. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM

SAAG DRILLING & WELL SERVICES SDN

BHD August 7, 2007 Completed

271. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD

PETRONAS CARIGALI SDN BHD August 5, 2007 Completed

272. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI SDN BHD July 28, 2007 Completed

273. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES

TALISMAN MALAYSIA LIMITED July 16, 2007 Completed

274. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS CARIGALI SDN BHD June 25, 2007 Completed

275. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

276. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES

PETRONAS CARIGALI June 13, 2007 Completed

277. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL BERHAD June 6, 2007 Completed

278. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL BERHAD June 1, 2007 Completed

279. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM

PETRONAS DAGANGAN BERHAD May 28, 2007 Completed

280. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN MALAYSIA LIMITED May 22, 2007 Completed

281. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES

SARAWAK SHELL BERHAD May 4, 2007 Completed

282. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT M.D.F.T (KIKEH) LTD May 2, 2007

Completed

283. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE

PETRONAS CARIGALI

(PETRONAS CARIGALI)

April 6, 2007 Completed

284. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT

SARAWAK SHELL BERHAD March 27, 2007 Completed

285. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB

PETRONAS CARIGALI

(PETRONAS CARIGALI)

March 19, 2007 Completed

286. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE WOODSIDE ENERGY March 15, 2007 Completed

287. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE

PETRONAS CARIGALI

(PETRONAS CARIGALI)

March 1, 2007 Completed

288. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE SARAWAK SHELL March 1, 2007 Completed

289. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE SARAWAK SHELL February 14, 2007 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

290. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE SARAWAK SHELL February 6, 2007 Completed

291. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE

TALISMAN MALAYSIA LIMITED January 29, 2007 Completed

292. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed

293. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS SARAWAK SHELL January 23, 2007

Completed

294. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING

CLOUGH PROJECT INTERNATIONAL PTY

LTD, AUSTRALIA January 17, 2007 Completed

295. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE

WOODSIDE ENERGY LTD, AUSTRALIA January 15, 2007 Completed

296. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN MALAYSIA LIMITED January 4, 2007 Completed

297. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE SARAWAK SHELL Dec 27, 2006 Completed

298. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN MALAYSIA LIMITED Nov 15, 2006 Completed

299. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT

PETRONAS CARIGALI Nov 11, 2006 Completed

300. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS

PERCON BABENA JOINT VENTURE October 15, 2006 Completed

301. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST

PETRONAS CARIGALI Sept 27, 2006 Completed

302. FJ COATING FOR TLO PETRONAS

CARIGALI AND SHELL

August 10, 2006 Completed

303. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed

304. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

305. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed

306. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL May 3, 2006 Completed

307. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN MALAYSIA LIMITED March 14, 2006 Completed

308. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed

309. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA PTTEP and KBR February 27, 2006 Completed

310. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed

311. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE PETROBRAS December 1, 2005 Completed

312. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS CARIGALI – TLO Nov 30, 2005 Completed

313. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE PETROBRAS November 1, 2005 Completed

314. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed

315. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed

316. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING ROC OIL, AUSTRALIA August 6, 2005 Completed

317. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed

318. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS CARIGALI SDN BHD August 3, 2005 Completed

319. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

320. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS CARIGALI SDN BHD April 2005 Completed

321. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC

PETRONAS CARIGALI SDN BHD April 2005 Completed

322. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed

323. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL BERHAD March 2005 Completed

324. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL BERHAD March 2005 Completed

325. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed

326. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed

327. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed

328. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL

EXPLORATION & PRODUCTION INC

January 2005 Completed

329. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL BERHAD October 2004 Completed

330. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL

EXPLORATION & PRODUCTION INC

July 2004 Completed

331. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed

332. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed

333. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL

EXPLORATION & PRODUCTION INC

June 26, 2004 Completed

334. VE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @ NIGERIA June 2004 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

335. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/

PETRONAS CARIGALI / NIPPON

June 23, 2004 Completed

336. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed

337. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL NIGERIA March 2004 Completed

338. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed

339. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed

340. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL BERHAD July 2003 Completed

341. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI May 8, 2003 Completed

342. YOHO PLATFORM ELECTRODE EXXON MOBIL NIGERIA February 2003 Completed

343. BUNGA RAYA 24” Riser PFP PETRONAS CARIGALI/TALISMAN February 2003 Completed

344. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed

345. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL EXPLORATION January 2003 Completed

346. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed

347. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed

348. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG SINGAPORE September 6, 2002 Completed

349. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL BERHAD September 2002 Completed

JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT

DATE CURRENT STATUS

Oct 4, 2016 - (Track Record Updated)

350. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL (HELANG) AT MSE July 15, 2002 Completed

351. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL BERHAD Nov 18, 2001 Completed

352. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI October 29, 2001 Completed

353. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG SDN BHD October 20, 2001 Completed

354. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI October 15, 2001 Completed

355. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL BERHAD August 20, 2001 Completed

356. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION MALAYSIA INC. July 6, 2001 Completed

357. SUPPLY OF ELECTRODES DOTANAH ENGRG & CONSTRUCTORS July 2, 2001 Completed

358. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA SHIPYARD (MSE) June 15, 2001 Completed

359. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP ENGINEERING June 15, 2001 Completed

360. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed

361. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP ENGINEERING July 6, 2000 Completed

362. SUPPLY OF ELECTRODES PETRONAS FERTILIZER TENDER Completed

363. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS AMMONIA SDN BHD TENDER TENDER

364. SUPPLY OF CONSUMABLES FOR PETRONAS CARIGALI PETRONAS CARIGALI TENDER TENDER