TKS Contracting Company2, Jalan BW 3/1Bandar Wang47180 Puchong Selangor.

Tel : 03-80706219 Fax : 03-80706129

Page 3: Ici final  project 2013

TKS Contracting Company

COMPANY PROFILE

2, Jalan BW 3/1Bandar Wang47180 Puchong Selangor.Tel : 03-80706219 Fax : 03-80706129

Page 4: Ici final  project 2013

About :About :About :About :

TKS Contracting Company is a grade A contracting company established since 2002. TKS Contracting Company is accomplished to outpacing the expectations of our clients, subcontractors, and suppliers by developing relationships through professionalism, integrity, and service which produce the highest quality construction projects.We develop the most beneficial sequence of construction to meet the needs of the client. TKS Contracting Company performs a detailed review of the plans and specifications. Plan reviews done in cooperation with the Client and the Architect insures the construction documents will yield better Subcontractor pricing and minimize change order expense during the project. With our experience, we have a thorough understanding of the special needs of our clients for accuracy in planning, budgeting, and scheduling of the construction project. Our goal is excellence as well as our obligation to our clients. We will do our best in order to help our clients to achive their goals.

Address: TKS Contracting Company 2, Jalan BW 3/1 Bandar Wang 47180 Puchong Selangor.

Tel: 03-80706219 Fax: 03-80706129

Page 5: Ici final  project 2013

Vision :To be a globally recognized corporation that offer the excellent services with best industry practices by the elites of the industry.

Mission :We measure our success through the balance of achieving client contentment, project profitability and employee fulfillment. We promiss to provide the very best to our clients and establish lasting relationships with our customers.

Page 6: Ici final  project 2013

Org

aniz

atio

n C

hart

Page 7: Ici final  project 2013

Projects

TSK Cntracting Company has been completed over 1000 projects. Here is some of the examples :

• Awesome University's Hostel• One Direction Shopping Complex• The Moon Cafe• Kingstone Apartment

Page 8: Ici final  project 2013

Awards

Within this 10 years, TKS contracting company received many arwards.

•Named "Top Contracting Company", Property Real Estate News

•Named one of the top 50 organizations dedicated to developing multicultural business opportunities

•Top 100 Employer, Gold Metal Magazine

•Name the nation's safest contracting company

• SMART, special Award for National Contribution Malaysia Property Award 2011

•BCI Asia Top Ten 2009 Awards

•BCI Asia Top Ten 2010 Awards

Page 9: Ici final  project 2013

Financial Information

Registration Of Company NumberRegistration Of Company NumberRegistration Of Company NumberRegistration Of Company Number 132423 - X132423 - X132423 - X132423 - X

Authorized Capital RM 2,500,000.00

Paid Up Capital RM 500,000.00

Equity Participation 20% bumiputera

Registered Bank Maybank ( Puchong Branch ) Account No. 668-1475-342

Principal Business code 233320

Signing Principals/Director Tan Kai Sin

Page 10: Ici final  project 2013

TKS Contracting CompanyTKS Contracting CompanyTKS Contracting CompanyTKS Contracting Company

2, Jalan BW 3/1 Bandar Wang 47180 Puchong Selangor.

Tel : 03-80706219 Fax : 03-80706129

Page 11: Ici final  project 2013

Foundation of Natural and Built Environments 04/13

INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125]

Final Project – The Project Brief

Name : Tan Kai SinID Number : 0315213

Page 12: Ici final  project 2013

BUILDING AND PROCESS

-The role of Contractor

Bidding Phase

1. Receive the bid documents (plans, specifications, and R.F.Q. [Request for Quotation]). 2. Look through the bid documents for: A. Completeness, B. Special Equipment, C. Special Requirements3. List a comprehensive list comprising all items comprising labor, materials, equipment, and rentals4. Conduct a quantity survey for all items 5. Conduct a site inspection, check the site conditions for: A. An accurate representation of the conditions as shown on the plans, B. Access to the site, C. Utilities, D. Locations for: - Temporary Field Office, - Temporary Telephone(s), - Temporary Water, - Temporary Toilet(s), - Temporary Power, - Temporary Fences and Gates, - Materials’ Storage - Any unusual or potentially problematic conditions. 6. Complete all of the above and submit proposa l

Construction Contract has been awarded

Page 13: Ici final  project 2013

Pre-Construction Phase

1.Hire labour, gather all items such as tools, materials and equipment that listed at the bidding proposal.2.Apply the planning permission through OSC.

Page 14: Ici final  project 2013

3. Obtain the Development Order from the Planning Department and paste it at the construction site.4. Provide for all temporary facilities: A. Temporary Power, B. Temporary Water, C. Temporary Toilet(s), D. Temporary Field Office, E. Temporary Telephone, F. Temporary Fence, gates and barricades.6. Consult with all subcontractors and material suppliers for the availability of adequate work forces and materials.7. Create a construction schedule showing starting and ending dates for all phases of operations from project start through contract completion date 9. Conduct a pre-construction job site meeting10. Clear Site

Construction Phase

1.Coordinate, supervise, and inspect all work.2.Make sure the construction activities complete according to the schedule.3.Conduct weekly safety meetings.4.Conduct weekly progress meetings.5.Maintain complete records for all the activities during construction.

Completion Phase

1. Technical inspection on completion.2. Correction of errors, defects and shortcoming.3. Final technical inspection.

Page 15: Ici final  project 2013

Post Construction Phase

1.Investigate and inspect the hidden defects, errors and shortcomings.2.Inspection at the end of the guarantee period3.Calculate the final investment cost.4.Analyse technical and functional performance of the project.5.Analyse job records.6.Analyse costs.

Page 16: Ici final  project 2013

• http://www.fao.org/docrep/s1250e/S1250E0p.htm#Economic feasibility• http://www.rehdainstitute.com/research-a-resources/property-development/osc.html• http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealing-with-construction-

permits/• http://ocps.mpsj.gov.my/• http://www.google.com.my/search?q=name%20card%20design&psj=1&bav=on.2,or.r_qf.

&biw=1366&bih=643&bvm=pv.xjs.s.en_US.MpiVkF51mpA.O&um=1&ie=UTF-8&hl=en&tbm=isch&source=og&sa=N&tab=wi&ei=vc71UdOPCIOGrAf374CQBQ

• http://www.google.com.my/search?q=name%20card%20design&psj=1&bav=on.2,or.r_qf.&biw=1366&bih=643&bvm=pv.xjs.s.en_US.MpiVkF51mpA.O&um=1&ie=UTF-8&hl=en&tbm=isch&source=og&sa=N&tab=wi&ei=vc71UdOPCIOGrAf374CQBQ#um=1&hl=en&tbm=isch&sa=1&q=letterhead+design&oq=letter+hea&gs_l=img.1.2.0i10j0j0i10j0j0i10l4j0l2.148465.151828.0.153794.10.9.0.1.1.0.132.484.8j1.9.0....0.0..1c.1.20.img.oCBa68nRmdc&bav=on.2,or.r_qf.&bvm=bv.49784469%2Cd.bmk%2Cpv.xjs.s.en_US.MpiVkF51mpA.O&fp=6db54b3512407257&biw=1366&bih=643

Reference List

Page 17: Ici final  project 2013

SAMPLE DOCUMENT

- For Planning Permission Application

- Schedule for construction phase or activities

Page 18: Ici final  project 2013
Page 19: Ici final  project 2013
Page 20: Ici final  project 2013
Page 21: Ici final  project 2013
Page 22: Ici final  project 2013

Schedule