greenproductivitytools: …...©2015...
TRANSCRIPT
© 2015 EcoLean Consultancy 1
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 1
GREEN PRODUCTIVITY TOOLS: ISO 14051 MATERIAL FLOW COST ACCOUNTING (MFCA) SUCCESS STORIES SHARING
Alex YAP
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 2
$ 450/M
$ 7678/M
$ 9815/M
$ 2338/M
MFCA
Overview of MFCA: Internal hidden profits
© 2015 EcoLean Consultancy 2
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 3
Overview of MFCA
• MFCA is a method of EMA (MFCA Case book, METI Japan)
• Tool for quan\fying the flows and stocks of materials in processes or produc\on lines in both physical and monetary units (ISO 14051)
• Tools aimed to simultaneously reduce both environmental impact and cost (MFCA Case book, METI Japan)
• Tool for systema\cally iden\fying and visualized the cost loss throughout the value added processes (Alex YAP, EcoLean)
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 4
General Framework
Generic application
Supplement ISO 14001
Not a mgmt system standard
Not for certification
ISO 14051:2011
© 2015 EcoLean Consultancy 3
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 5
Process Process Process
• What is WASTE ?
• What is Manufacturing cost ? • What is MFCA?
Overview of MFCA
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 6
Energy
Offcut, reject, repair
RM, Labour
$12
$44
$345
$55
$45
$34
$11 $88
$76
WM
$47
FG $789
TOTAL Resources /unit Positive (+) Product
Negative (-)
Overview of MFCA
© 2015 EcoLean Consultancy 4
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 7
Overview of MFCA
Material Stamping Spot
Welding Inspectio
n
Product
Waste
Supplier A Supplier A
0 2 4 Energy Labour Material
MFCA: Visualizing waste from each steps of selected process
Coating PRODUCT
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 8
Increasing transparency of material flow and energy use, the associated costs and environmental aspects
Suppor:ng org decisions in areas such as Eng., Produc:on planning, QC, etc.
Improving coordina:on and communica:on on material and energy use within an org
MFCA Objec:ves
Objec\ves of MFCA
© 2015 EcoLean Consultancy 5
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 9
Material efficiency
Cost reduc:on
Energy Efficiency For
U
For the Society
For Your kids
For Env For
Org
For Org
Org
Benefits of MFCA
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 10
Example 1: Lens manufacturing factory: Canon Inc.
A lens manufacturing company achieved significant environmental and financial improvements aeer implement MFCA. The company having more then 1000 employees and the selected process was the camera lens manufacturing process
MFCA Success stories
© 2015 EcoLean Consultancy 6
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 11
Source: MFCA case examples 2011MITI Japan
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 12
Source: MFCA case examples 2011MITI Japan
MFCA Success stories
© 2015 EcoLean Consultancy 7
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 13
Source: MFCA case examples 2011MITI Japan
• Raw material input reduce 85%
• Energy consump\on reduce 85%
• Waste volume reduce 92%
• Total achievement: US 11 Million as of 2008
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 14
Example 2 Brake lining manufacturing 40 Workers Annual sales: $ 18 Million MFCA Team: 3 Person Project Period: 2 Months
MFCA Success stories
© 2015 EcoLean Consultancy 8
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 15
Conventional Production Management
RM Mixing, Oven
Processing, Grinding
QC, Store
FG 99.7%
Reject: 0.3%
MFCA Production Management
RM Mixing, Oven
Processing, Grinding
QC, Store
FG 82 %
Set up waste, Process waste, reject, waste disposal cost,
Cost of Final Product
Waste 18%
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 16
Reduce material loss by reduce grinded % à Modify mould ($ 8,300)
à MFCA jus\fy mould investment cost
à Reduce grind thickness from 1.5mm to 0.8 mm
à 0.7 mm or 47% material loss reduce
MFCA Success stories
© 2015 EcoLean Consultancy 9
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 17
Waste disposal (Impact to Environment)
Processing time Use of raw material
(Sustaining Resources) Electricity (CO2
Emission) Man power
COST
47 % Material Loss Reduce/product
$ 130,500/Year
CO2 Emission Reduce : Result from Energy Usage Reduce = Electricity Grid (kwh) x Emission Coefficient Factor(KgCO2) x Emission Factor GWP = kg CO2 Equivalent
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 18
Example 3 Wooden door manufacturer 120 Workers Annual Sales: $ 45 Million MFCA Team: 2 Person Project Period: 3 Months
MFCA Success stories
© 2015 EcoLean Consultancy 10
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 19
Cross Cut & Moulding
Stage 1
Stage 2
Painting
Stage 3 RM FG Packin
g
4389
2564
5588
1942
13188
421 0
2000
4000
6000
8000
10000
12000
14000
Cross Cut Stage 1 Stage 2 Painting Stage 3 Packing
MFCA Cost Visualized
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 20
4389
2564
5588
1942
13,188
421 0
2000
4000
6000
8000
10000
12000
14000
Cross Cut Stage 1 Stage 2 Painting Stage 3 Packing
Labour Cost
Energy Cost Material Cost
Others Cost
Time Motion Study: Stage 3 80% Patching RM Quality
MFCA Success stories
© 2015 EcoLean Consultancy 11
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 21
13188
8900
Before After
Stage 3 Cost
L
E M
L E M
Reduce assembly time 98 Min/Door
Reduce chemical usage 70 %/Door
Reduce waste disposal cost 50%
Reduce MFG cost 15%/Door
Annual saving $ 290,000/ Product
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 22
Example 4 Tiles manufacturer 250 Workers Annual Sales: $ 90 Million MFCA Team: 3 Teams (Total 10 Persons) Project Period: 2 Months
MFCA Success stories
© 2015 EcoLean Consultancy 12
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 23
MFCA Boundary
SORT 1st grade 2nd grade
Reject Down grade depreciation
QA
PASS (To Wrap)
FAIL (To Re select) Reject
Re-Select
1st grade 2nd grade
Reject Down grade depreciation
WRAP
Packing Lost (Compare to Std)
QA
PASS (To Wrap)
FAIL (To Re select) Reject
FG (Total of 1st and 2nd grade)
From Prod
Packing 1st grade
Packaging lost (Compared to
Std)
QC Pass (To warp)
Fail (To Re-select) Reject
Packing 2nd grade
Packaging lost (Compared to
Std)
QC Pass (To wrap)
Fail (To Re-select) Reject
Re- Select 1st Grade 2nd Grade
Reject Down grade depreciation
Wrap FG
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 24
SORT $ 371, 964
$ 6,563
QA
PASS (To Wrap)
FAIL (To Re select) Reject
Re-Select
1st grade 2nd grade
Reject Down grade depreciation
WRAP
Packing Lost (Compare to Std)
QA
PASS (To Wrap)
FAIL (To Re select) Reject
FG (Total of 1st and 2nd grade) From
Prod
Packing (1st) $ 354,459
$ 34
QC $ 200
NA
Packing (2nd) $ 17, 590
RM 0
QC $ 150
NA
Re- Select $ 9,260
$ 390
Wrap FG
QC Report & Sampling
plan Review
Prod (Defect)
CTC Program Sorting PIC
training program
$ 90, 000/Y (Product)
QCC Project
MFCA Success stories
© 2015 EcoLean Consultancy 13
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 25
Example 5 Steel Furniture manufacturer 170 Workers Annual Sales: $ 80 Million MFCA Team: 3 person (Using theore\cal data only) Project Period: 2 Months
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 26
Shearing Press Bending SW Paint
line RM FG Assy
MFCA Success stories
© 2015 EcoLean Consultancy 14
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 27
Review material thickness
Reduce thickness for top / bottom and
divider
20% Material reduce ($)
8% Energy reduce ($)
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 28
Review product design & welding
point / distance
Reduce welding spot
20% Energy reduce ($)
MFCA Success stories
© 2015 EcoLean Consultancy 15
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 29
Review shearing spec & SOP
Reduce off cut / maximized material
usage
13% Material reduce ($)
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 30
Example 6 Healthcare product manufacturing 200 Workers Packaging material supply chain applica\on MFCA Team (3, include representa\ve from supplier/team)
MFCA Success stories
© 2015 EcoLean Consultancy 16
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 31
Material Blowing Printing QC Storage
Supplier A
Supplier B
Supplier C
88 : 12
82 : 18
86 : 14
MFCA Success stories
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 32
Example 7 Tea processing plant 40 Workers MFCA Team (5)
MFCA Success stories
© 2015 EcoLean Consultancy 17
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 33
MFCA Success stories Fan 2pm – 6am 17 hours
Alternate labor force to reduce energy cost
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 34
Source: MPC MFCA wrap up presentation, 2012
MFCA Success stories
© 2015 EcoLean Consultancy 18
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 35
MFCA Applica\on
MFCA
Pre-Improvement
Environmental CSR
LEAN TE/ICC
KAIZEN Cost Down
EMS ISO 14001
CO2 Emission
EnMS ISO 50001
SR ISO 26000
Material Efficiency
Industry Benchmark
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 36
Impact
ISO 9001/ 14001/ 50001
Integration
ISO 14051
MFCA
Sustainable Continuous Improvement Initiatives
Supply chain application
R&D application
Sustaining MFCA
© 2015 EcoLean Consultancy 19
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 37
Application
ISO 14001
ISO 14051
MFCA
Convert Environment Impact into monetary value
Environmental Objectives
Mgmt. Review
Sustaining MFCA
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 38
Application
ISO 9001
ISO 14051
MFCA
Continual improvement
Quality Objectives
Mgmt. Review
Sustaining MFCA
© 2015 EcoLean Consultancy 20
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 39
Application
Key factors
ISO 14051
MFCA
Top Management
Systematic approach
PLWS
Sustaining MFCA
© 2015 EcoLean Consultancy Sdn. Bhd. Slide 40
QUESTION & ANSWER
Contact us at [email protected] www.CentrexConsultancy.com www.EcoLeanConsultancy.com