gbi nrnc non-residential tool v1.0

Upload: liew-yoou-hang

Post on 09-Apr-2018

283 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    1/18

    FIRST EDITION | APRIL 2009 | VERSION 1.0

    GBI Assessment crIterIAor

    non-resIDentIAL neW constrUctIon (nrnc)

    www.gbuildigidx.g | [email protected] sDn BHD (845666-V) 4 & 6 Jalan Tangsi, 50480 Kuala Lumpur, Malaysia tl 603 2693 4182 ax603 2692 8782

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    2/18

    1 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    contents

    AcknoWLeDGement & copyrIGHt

    IntroDUctIon

    What is the Green Building Index (GBI)?

    Who can use the Green Building Index?

    project InormAtIon

    Assessment crIterIA

    Overall Points Score

    Summary Criteria Score

    InDIvIDUAL Item score

    PART 1: Energy Eciency (EE)

    PART 2: Indoor Environmental Quality (EQ)

    PART 3: Sustainable Site Planning & Management (SM)

    PART 4: Materials & Resources (MR)

    PART 5: Water Eciency (WE)

    PART 6: Innovation (IN)

    2

    3

    3

    4

    5

    6

    8

    10

    12

    15

    16

    17

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    3/18

    2FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    AcknoWLeDGement & copyrIGHt

    The Green Building Index (GBI) is developed by PAM and ACEM or the purposes as mentioned herein

    and may be subject to updating and/or modication in uture.

    While every care has been taken by PAM and ACEM in the development o the GBI to establish and

    acknowledge copyright o the inormation and materials used, and contact the copyright owners known

    to PAM/ACEM, PAM and ACEM tender their apologies or any accidental omissions.

    Green Building Index and GBI is a copyright o Greenbuildingindex Sdn Bhd (in short GSB) in which GSB

    reserves all rights. GSB is the custodian o all rights o PAM and ACEM in the GBI. No part o the GBI may

    be used, modied, reproduced, stored in a retrieval system or transmitted in any orm, or by any means,

    electronic, mechanical, photocopying, recording or otherwise, without the prior written permission o GSB.

    DIScLAImERS

    PAM and/or ACEM and/or GSB shall not be held liable or any improper or incorrect use o the GBI

    (inclusive o the materials and/or inormation contained therein) and assume no responsibility or any users

    use o it. In no event shall PAM and/or ACEM and/or GSB be liable or any damages whatsoever, whether

    direct, indirect, incidental, special, exemplary or consequential (including, but not limited to business

    interruption or loss o use, data or prots) regardless o cause, and on any basis o liability, whether in

    contract, strict liability or tort (including negligence, misrepresentation or otherwise) arising in any way out

    o the use o the GBI or the inormation and materials contained therein.

    The inormation and materials in the GBI are provided as is and without warranties o any kind

    expressed or implied. PAM, ACEM and GSB do not warrant or make representations as to the accuracy

    and completeness o any inormation and/or materials contained therein. While every eort has been

    made to check the accuracy and completeness o the inormation and materials given, the users should

    always make their own relevant checks. Accordingly, PAM, ACEM and GSB do not accept responsibility

    and liability or misstatements made in it or misunderstanding rom it.

    The GBI is no substitute or proessional advice. Users are advised to consult with appropriate and

    accredited proessional advisors or advice concerning specic matters pertaining to the GBI beore

    adopting or using it. PAM, ACEM and GSB disclaim any responsibility or positions taken by users in their

    individual cases or or any misunderstandings and losses, direct or indirectly, on the part o the users.

    PAM, ACEM and GSB do not endorse or otherwise acknowledge the GBI rating achieved by the use o

    the GBI. PAM, ACEM and GSB oer a ormal certication process or ratings; which service providesor independent third party review o points claimed to ensure that all credits can be demonstrated to

    be achieved by the provision o the necessary documentary evidence. Use o the GBI without ormal

    certication by GSB does not entitle the user or any other party to promote the achieved GBI rating.

    INDEmNIFIcATION

    To the extent permitted by applicable law, by using GSBs GBI, the user agrees to deend, indemniy,

    and hold harmless, PAM and/or ACEM and/or GSB, their ocers, employees, members, representatives

    and agents rom and against all claims and expenses o whatsoever kind and amount, arising out o the

    users use o the GBI or materials and inormation contained therein and not to pursue any cause o action

    whatsoever against PAM and/or ACEM and/or GSB under any conceivable circumstances.

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    4/18

    3 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    IntroDUctIon

    The Green Building Index is an environmental rating system or buildings developed by PAM

    (Pertubuhan Arkitek Malaysia / Malaysian Institute o Architects) and ACEM (the Association o

    Consulting Engineers Malaysia). The Green Building Index is Malaysias rst comprehensive rating

    system or evaluating the environmental design and perormance o Malaysian buildings based on

    the six (6) main criterias o Energy Eciency, Indoor Environment Quality, Sustainable Site Planning

    & Management, Materials & Resources, Water Eciency, and Innovation.

    The Green Building Index is developed specically or the Malaysian tropical weather, environmental

    and developmental context, cultural and social needs.

    The GBI initiative aims to assist the building industry in its march towards sustainable development.

    The GBI environmental rating system is created to:

    Defne green bildings b establising a oon langage and standard o

    easreent;

    Proote integrated, wole-bilding design;

    Reognise and reward environental leadersip;

    Transor te bilt environent to rede its environental ipat; and

    Ensre new bildings reain relevant in te tre and eisting bildings are

    rerbised and pgraded properl to reain relevant.

    GSB encourages all members o Project Teams, Building owners, Developers and other interested

    parties (including Contractors, Government and Design & Build Contractors) to use the Green Building

    Index to validate environmental initiatives at the design phase o new construction or base building

    reurbishment; or construction and procurement phase o buildings. Use o the Green Building Index

    is encouraged on all such projects to assess and improve their environmental attributes.

    Use o the Green Building Index tool without ormal certication by an independent accredited GBI

    Certier does not entitle the user or any other party to promote the Green Building Index rating

    achieved. No ee is payable to GSB or such use, however ormal recognition o the Green Building

    Index rating - and the right to promote same - requires undertaking the ormal certication process

    oered by Greenbuildingindex Sdn Bhd.

    All Green Building Index rating tools are reviewed annually; please orward any eedback to [email protected]

    WHo cAn Use tHe Green BUILDInG InDeX?

    WHAt Is tHe Green BUILDInG InDeX (GBI)?

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    5/18

    4FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    project nAme

    project ADDress

    postcoDe

    stAte

    AppLIcAnt

    contAct person

    ArcHItect

    cIvIL enGIneer

    strUctUrAL enGIneer

    mecHAnIcAL enGIneer

    eLectrIcAL enGIneer

    QUAntIty sUrveyor

    LAnD sUrveyor

    LAnDscApe consULtAnt

    otHer specIALIst consULtAnt(s)

    mAIn contrActor

    LocAL AUtHorIty

    totAL Gross Loor AreA

    LAnD AreA or LAnDeD property

    BUILDInG DescrIptIon

    project InormAtIon

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    6/18

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    7/18

    6FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Assessment crIterIAscore sUmmAry

    pArt crIterIA Item poInts totAL

    1

    ee enerGy eIcIency

    Dig

    35

    EE1 Minimum EE Perormance 1

    EE2 Lighting Zoning 3

    EE3 Electrical Sub-metering 1

    EE4 Renewable Energy 5

    EE5 Advanced EE Perormance - BEI 15

    ciiig

    EE6 Enhanced Commissioning 3

    EE7 Post Occupancy Commissioning 2

    vifai & maia

    EE8 EE Verication 2

    EE9 Sustainable Maintenance 3

    2

    eQ InDoor envIronmentAL QUALIty

    Ai Quali

    21

    EQ1 Minimum IAQ Perormance 1

    EQ2 Environmental Tobacco Smoke (ETS) Control 1

    EQ3 Carbon Dioxide Monitoring and Control 1

    EQ4 Indoor Air Pollutants 2

    EQ5 Mould Prevention 1

    thal c

    EQ6 Thermal Comort: Design & Controllability o Systems 2

    EQ7 Air Change Eectiveness 1

    Lighig, viual & Aui c

    EQ8 Daylighting 2

    EQ9 Daylight Glare Control 1

    EQ10 Electric Lighting Levels 1

    EQ11 High Frequency Ballasts 1

    EQ12 External Views 2

    EQ13 Internal Noise Levels 1

    vifai

    EQ14 IAQ Beore & During Occupancy 2

    EQ15 Post Occupancy Comort Survey: Verication 2

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    8/18

    7 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    pArt crIterIA Item poInts totAL

    3

    sm sUstAInABLe sIte pLAnnInG & mAnAGement

    si plaig

    16

    SM1 Site Selection 1

    SM2 Browneld Redevelopment 1

    SM3 Development Density & Community Connectivity 2

    SM4 Environment Management 2

    cui maag

    SM5 Earthworks - Construction Activity Pollution Control 1

    SM6 QLASSIC 1

    SM7 Workers Site Amenities 1

    taai

    SM8 Public Transportation Access 1

    SM9 Green Vehicle Priority 1

    SM10 Parking Capacity 1

    Dig

    SM11 Stormwater Design Quantity & Quality Control 1

    SM12 Greenery & Roo 2

    SM13 Building User Manual 1

    4

    mr mAterIALs & resoUrces

    rud & rld maial

    11

    MR1 Materials reuse and selection 2

    MR2 Recycled content materials 2

    suaiabl ru

    MR3 Regional Materials 1

    MR4 Sustainable Timber 1

    Wa maag

    MR5 Storage & Collection o recyclables 1

    MR6 Construction waste management 2

    G pdu

    MR7 Rerigerants & Clean Agents 2

    5

    We WAter eIcIency

    Wa Haig & rlig

    10

    WE1 Rainwater Harvesting 2

    WE2 Water Recycling 2

    Iad efi

    WE3 Water Ecient - Irrigation/Landscaping 2

    WE4 Water Ecient Fittings 2

    WE5 Metering & Leak Detection System 2

    6

    In InnovAtIon

    IN1 Innovation in Design & Environmental Design Initiatives 67

    IN2 Green Building Index Accredited Facilitator 1

    totAL poInts 100

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    9/18

    8FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    enerGy eIcIency (ee)DESIGN | cOmmISSIONING | VERIFIcATION & mAINTENANcE

    35 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    DesIGn

    ee1 mInImUm ee perormAnce

    Establish minimum energy eciency (EE) perormance to reduce energy consumption in buildings, thusreducing CO2 emission to the atmosphere. Meet the ollowing minimum EE requirements as stipulated inMS 1525:2007:

    1) OTTV 50, RTTV 25. Submit calculations using the BEIT sotware or other GBI approved sotware(s),

    AND

    2) Provision o Energy Management Control system where Air-conditioned space 4000m2

    1 1

    ee2 LIGHtInG ZonInGProvide fexible lighting controls to optimise energy savings:

    3

    All individual or enclosed spaces to be individually switched; and the size o individually switched lightingzones shall not exceed 100m or 90% o the NLA; with switching clearly labelled and easily accessible bybuilding occupants.

    1

    Provide auto-sensor controlled lighting in conjunction with daylighting strategy or all perimeter zones anddaylit areas, i any.

    1

    Provide motion sensors or equivalent to complement lighting zoning or at least 25% NLA. 1

    ee3 eLectrIcAL sUB-meterInG & tenAnt sUB-meterInG

    Monitor energy consumption o key building services as well as all tenancy areas:

    Provide sub-metering or all energy uses o 100kVA; with separate sub-metering or lighting and

    separately or power at each foor or tenancy, whichever is smaller.

    1 1

    ee4 reneWABLe enerGy

    Encourage use o renewable energy:

    5

    Where 0.5 % or 5 kWp whichever is the greater, o the total electricity consumption is generated byrenewable energy, OR

    2

    Where 1.0 % or 10 kWp whichever is the greater, o the total electricity consumption is generated byrenewable energy, OR

    3

    Where 1.5 % or 20 kWp whichever is the greater, o the total electricity consumption is generated byrenewable energy, OR

    4

    Where 2.0 % or 40 kWp whichever is the greater, o the total electricity consumption is generated byrenewable energy

    5

    ee5 ADvAnceD ee perormAnce

    Exceed Energy Eciency (EE) perormance better than the baseline minimum to reduce energyconsumption in the building. Achieve Building Energy Intensity (BEI) 150 kWh/m2yr as dened under GBIreerence (using BEIT Sotware or other GBI approved sotware(s)), OR

    2

    15

    BEI 140, OR 3

    BEI 130, OR 5

    BEI 120, OR 8

    BEI 110, OR 10

    BEI 100, OR 12

    BEI 90 15

    Continued on next page >>

    1

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    10/18

    9 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    commIssIonInG

    ee6 enHAnceD commIssIonInG o BUILDInG enerGy systems

    Ensure buildings energy related systems are designed and installed to achieve proper commissioningso as to realise their ull potential and intent. Appoint an independent GBI recognised Commissioning

    Specialist (CxS) at the onset o the design process to veriy that comprehensive pre-commissioning andcommissioning is perormed or all the building's energy related systems in accordance with ASHRAECommissioning Guideline or other GBI approved equivalent standard/s by:

    Conducting at least one commissioning design review during the detail design stage and back-check1.the review comments during the tender documentation stage.

    Developing and incorporating commissioning requirements into the tender documents.2.

    Developing and implementing a commissioning plan.3.

    Veriying the installation and perormance o the systems to be commissioned.4.

    Reviewing contractor submittals applicable to systems being commissioned or compliance.5.

    Developing a systems manual that provides uture operating sta the inormation needed to6.understand and optimally operate the commissioned systems.

    Veriying that the requirements or training operating personnel and building occupants are7. completed.

    3 3

    ee7 post occUpAncy commIssIonInG

    Carry out post occupancy commissioning or all tenancy areas ater t-out changes are completed:

    2

    1) Design engineer shall review all tenancy t-out plans to ensure original design intent is not compromisedand upon completion o the t-out works, veriy and ne-tune the installations to suit.

    1

    2) Within 12 months o practical completion (or earlier i there is at least 50% occupancy), the CxS shall carryout a ull post/re-commissioning o the building's energy related systems to veriy that their perormance issustained in conjunction with the completed tenancy t-outs.

    1

    verIIcAtIon & mAIntenAnce

    ee8 ee verIIcAtIon

    Veriy predicted energy use o key building services:

    1) Use Energy Management System to monitor and analyse energy consumption including reading o sub-meters,

    AND

    2) Fully commission EMS including Maximum Demand Limiting programme within 12 months o practicalcompletion (or earlier i there is at least 50% occupancy).

    2 2

    ee9 sUstAInABLe mAIntenAnce

    Ensure the buildings energy related systems will continue to perorm as intended beyond the 12 monthsDeects & Liability Period:

    3

    1) At least 50% o permanent building maintenance team to be on-board one (1) to three (3) monthsbeore practical completion and to ully participate (to be specied in contract conditions) in the Testing &Commissioning o all building energy services.

    1

    2) Provide or a designated building maintenance oce that is ully equipped with acilities (including toolsand instrumentation) and inventory storage.

    3) Provide evidence o documented plan or at least 3-year acility maintenance and preventive maintenancebudget (inclusive o stang and outsourced contracts).

    2

    enerGy eIcIency (ee) totAL 35

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    11/18

    10FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    InDoor envIronmentAL QUALIty (eQ)AIR QuALITy | ThERmAL cOmFORT | LIGhTING, VISuAL & AcOuSTIc cOmFORT | VERIFIcATION

    21 poInts

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    AIr QUALIty

    eQ1 mInImUm IAQ perormAnce

    Establish minimum indoor air quality (IAQ) perormance to enhance indoor air quality in building, thuscontributing to the comort and well-being o the occupants:

    Meet the minimum requirements o ventilation rate in ASHRAE 62.1:2007 or the local building codewhichever is the more stringent.

    1 1

    eQ2 envIronmentAL toBAcco smoke (ets) controL

    Minimize exposure o building occupants, indoor suraces, and ventilation air distribution systems toEnvironmental Tobacco Smoke (ETS):

    Prohibit smoking in the building,AND

    Locate any exterior designated smoking areas at least 10m away rom entries, outdoor air intakes andoperable windows

    1 1

    eQ3 cArBon DIoXIDe monItorInG AnD controL

    Provide response monitoring o carbon dioxide levels to ensure delivery o minimum outside airrequirements:

    Install carbon dioxide (CO2) monitoring and control system with at least one (1) CO2 sensor at all main returnpoints on each foor to acilitate continuous monitoring and adjustment o outside air ventilation rates toeach foor, and ensure independent control o ventilation rates to maintain CO

    2level 1,000ppm

    1 1

    eQ4 InDoor AIr poLLUtAnts

    Reduce detrimental impact on occupant health rom nishes that emit internal air pollutants:

    2

    Use low VOC paint and coating throughout the building. Paints and Coatings to comply with requirementsspecied in international labelling schemes recognized by GBI,AND

    Use low VOC carpet or fooring throughout the building. Carpets to comply with requirements speciedin international labelling schemes recognized by GBI. Other types o fooring to comply with requirementsunder FloorScore developed by Science Certication System or equivalent,AND

    Use low VOC adhesive and sealant or no adhesive or sealant used.

    1

    Use products with no added urea ormaldehyde. These include:

    1) Composite wood and agriber products dened as: particleboard, medium density berboard (MDF),plywood, wheatboard, strawboard, panel substrates and door cores,AND

    2) Laminating adhesives used to abricate on-site and shop-applied composite wood and agriberassemblies,AND

    3) Insulation oam,AND

    4) Draperies

    1

    eQ5 moULD preventIon

    Design system(s) which reduce the risk o mould growth and its associated detrimental impact on occupanthealth:

    Where it is demonstrated that the mechanical air-conditioned ventilation system will maintain a positiveindoor air pressure relative to the exterior and can actively control indoor air humidity to be no more than70% RH without the use o active control that will consume additional energy.

    Ensure that excessive moisture in building is controlled during the Design, Construction and Operationstages by the consideration and the control o the ollowing:

    1) Rainwater leakage through roo and walls2) Inltration o moist air3) Diusion o moisture through walls, roo and foors4) Groundwater intrusion into basements and crawl spaces through walls and foors5) Leaking or burst pipes

    6) Indoor moisture sources7) Construction moistureOR

    The building is ully naturally ventilated

    1 1

    Continued on next page >>

    2

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    12/18

    11 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    tHermAL comort

    eQ6 tHermAL comort: DesIGn & controLLABILIty o systems

    Provide a high level o thermal comort system control by individual occupants or by specic groups in multi-occupant spaces to promote the productivity, comort and well-being o building occupants:

    2

    Design to ASHRAE 55 in conjunction with the relevant localised parameters as listed in MS1525:2007. 1

    Provide individual comort controls or 50% o the building occupants to enable adjustments to suitindividual task needs and preerences.AND

    Provide comort system controls or all shared multi-occupant spaces to enable adjustments to suit groupneeds and preerences.

    Conditions or thermal comort include the primary actors o air temperature, radiant temperature, air speedand humidity. Comort system control or this purpose is dened as the provision o control over at least oneo these primary actors in the occupants local environment.

    1

    eQ7 AIr cHAnGe eectIveness

    Provide eective delivery o clean air through reduced mixing with indoor pollutants in order to promotea healthy indoor environment. Demonstrate that the Air Change Eectiveness (ACE) meets the ollowingcriteria or at least 90% o the NLA:

    The ventilation systems are designed to achieve an ACE o 0.95 when measured in accordance with

    ASHRAE 129-1997: Measuring air change eectiveness where ACE is to be measured in the breathing zone(nominally 1.0m rom nished foor level)

    1 1

    LIGHtInG, vIsUAL & AcoUstIc comort

    eQ8 DAyLIGHtInG

    Provide good levels o daylighting or building occupants:

    2Demonstrate that 30% o the NLA has a daylight actor in the range o 1.0 3.5% as measured at theworking plane, 800mm rom foor level, OR

    1

    Demonstrate that 50% o the NLA has a daylight actor in the range o 1.0 3.5% as measured at theworking plane, 800mm rom foor level

    2

    eQ9 DAyLIGHt GLAre controL

    Reduce discomort o glare rom natural light. Where blinds or screens are tted on all glazing and atrium asa base building, incorporate provisions to meet the ollowing criteria:

    1) Eliminate glare rom all direct sun penetration and keep horizontal workspace lux level below 2,000;2) Eliminate glare rom diuse sky radiation or occupant workspace at viewing angles o 15 to 60 romthe horizontal at eye level (typically 1.2m rom foor level)3) Control with an automatic monitoring system (or atrium and windows with incident direct sun light only -not applicable or xed blinds/screens);AND

    4) Equip with a manual override unction accessible by occupants (not applicable or xed blinds/screens)

    1 1

    eQ10 eLectrIc LIGHtInG LeveLs

    Baseline building oce lighting not to be over designed:

    Demonstrate that oce lighting design maintains a luminance level o no more than specied inMS1525:2007 or 90% o NLA as measured at the working plane (800mm above the foor level).

    1 1

    eQ11 HIGH reQUency BALLAsts

    Increase workplace amenity by avoiding low requency ficker that may be associated with fuorescent

    lighting:

    Install high requency ballasts in fuorescent luminaaires over a minimum o 90% o NLA.

    1 1

    eQ12 eXternAL vIeWs

    Reduce eyestrain or building occupants by allowing long distance views and provision o visual connectionto the outdoor.

    2Demonstrate that 60% o the NLA has a direct line o sight through vision glazing at a height o 1.2m romfoor level.

    1

    Demonstrate that 75% o the NLA has a direct line o sight through vision glazing at a height o 1.2m romfoor level.

    2

    eQ13 InternAL noIse LeveLs

    Maintain internal noise levels at an appropriate level. Demonstrate that 90% o the NLA do not exceed theollowing ambient internal noise levels:

    Within the entire baseline building general oce, space noise rom the building services does not exceed40dBAeq.OR

    Within the baseline building oce space, the sound level does not exceed 45dBAeq or open plan and notexceed 40dBAeq or closed oces

    1 1

    Continued on next page >>

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    13/18

    12FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    sUstAInABLe sIte pLAnnInG & mAnAGement (sm)SITE PLANNING | cONSTRucTION mANAGEmENT | TRANSPORTATION | DESIGN

    16 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    verIIcAtIon

    eQ14 IAQ Beore & DUrInG occUpAncy

    Reduce indoor air quality problems resulting rom the construction process in order to help sustain thecomort and well-being o building occupants. Develop and implement an Indoor Air Quality (IAQ)Management Plan or the Pre-Occupancy phase as ollows:

    1) Perorm a building fush out by supplying outdoor air to provide not less than 10 airchanges/hour or atleast 30 minutes operation beore occupancy and continuous minimum 1 ACH during the initial 14 daysoccupancy o the completed buildingOR2) I low VOC materials and low ormaldehyde composite wood are used, then building fush out can beperormed by supplying outdoor air to provide not less than 10 airchanges/hour or at least 15 minutesoperation or not less than 6 airchanges/hour or at least 30 minutes operation and continuous 1ACH duringthe initial 7 days occupancy o the completed buildingOR

    3) Within 12 months o occupancy, conduct IAQ testing to demonstrate maximum concentrations orpollutants are not exceeded according to the Indoor Air Quality Code o Malaysia.

    1

    2

    Dring Opan Stage:

    Where a permanent air fushing system o at least 10 airchanges/hour operation is installed or use duringoccupancy stage

    1

    eQ15 post occUpAncy comort sUrvey: verIIcAtIon

    Provide or the assessment o comort o the building occupants:

    Conduct a post-occupancy comort survey o building occupants within 12 months ater occupancy/building completion. This survey should collect anonymous responses about thermal comort, visual comortand acoustic comort in a building. It should include an assessment o overall satisaction with thermal,visual and acoustic perormance and identication o thermal-related, visual-related and acoustic-relatedproblems.AND

    Develop a plan or corrective action i the survey results indicate that more than 20% o occupants aredissatised with the overall comort in the building. This plan should include measurement o relevantenvironmental variables in problem areas.

    The relevant environmental variables include 1) Temperature, relative humidity, air speed and mean radianttemperature, 2) Lighting level and glare problem, 3) Background noise level, 4) Odour problem, CO

    2level,

    VOCs, and particulate concentration

    2 2

    InDoor envIronmentAL QUALIty (eQ) totAL 21

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    sIte pLAnnInG

    sm1 sIte seLectIon

    Do not develop building, hardscape, road or parking area on a site or part o a site that meet any one o theollowing criteria:

    Prime armland as dened by the Structure Plan o the area or the National Physical Plan.1.Forest reserve or State Environmental Protection Zones that is specically identied as habitat or any2.species ound on the endangered lists.Within 30m o any wetlands as dened by the Structure Plan o the area3. ORwithin setback distancesrom wetlands prescribed in state or local regulations, as dened by local or state rule or law,whichever is more stringent.Previously undeveloped land that is within 30m o Mean High Water Spring (MHWS) sea level which4.supports or could support wildlie or recreational use, or statutory requirements whichever is the morestringent.Previously undeveloped land that is within 20m o lake, river, stream and tributary which support or5.could support wildlie or recreational use.Land which prior to acquisition or the project was public parkland, unless land o equal or greater6.value as parkland is provided.

    1 1

    sm2 BroWnIeLD reDeveLopment

    Reduce pressure on undeveloped land by rehabilitating damaged sites where development is complicatedby environmental contamination, thereby reducing pressure on undeveloped land. This would typicallyinvolve old rubbish tips, ormer mining land, old actory sites, etc.

    1 1

    Continued on next page >>

    3

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    14/18

    13 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    sm3 DeveLopment DensIty & commUnIty connectIvIty

    Channel development to urban area with existing inrastructure, protect greeneld and preserve habitat andnatural resources:

    2

    A) DEVELOPmENT DENSITy

    Construct a new building or renovate an existing building on a previously developed siteAND

    in acommunity with a minimum density o 20,300m2 per hectare net (87,000 sqt per acre net) 1

    B) cOmmuNITy cONNEcTIVITyConstruct a new building or renovate an existing building on a previously developed site ANDwithin 1km oa residential zone or neighbourhood with an average density o 25 units per hectare net (10 units per acrenet) ANDwithin 1km o at least 10 Basic Services ANDwith pedestrian access between the building and theservices.

    Basic Services include, but are not limited to:

    1) Bank; 2) Place o Worship; 3) Convenience / Grocery; 4) Day Care; 5) Police Station; 6) Fire Station; 7)Beauty; 8) Hardware; 9) Laundry; 10) Library; 11) Medical / Dental; 12) Senior Care Facility; 13) Park; 14)Pharmacy; 15) Post Ofce; 16) Restaurant; 17) School; 18) Supermarket; 19) Theatre; 20) Community Centre;21) Fitness Centre.

    Proximity is determined by drawing a 1km radius around the main building entrance on a site map andcounting the services ound within that radius.

    1

    sm4 envIronment mAnAGement

    A) Conserve existing natural area and restore damaged area to provide habitat and promote biodiversity& B) Maximize Open Space by providing a high ratio o open space to development ootprint to promotebiodiversity:

    2

    A) cONSERVATIONOn previously developed or graded site, restore or protect a minimum o 50% o the site area (excludingthe building ootprint) with native or adaptive vegetation. Native or adaptive plants are plants indigenous toa locality or cultivars o native plants that are adapted to the local climate and are not considered invasivespecies or noxious weeds. Applicable also to landscaping on rootops and roo gardens so long as theplants meet the denition o native or adaptive vegetation.OR

    On greeneld sites, limit all site disturbance to within 12m beyond the building perimeter; 3m beyondsurace walkway, patio, surace parking and utilities less than 300mm in diameter; 4.5m beyond primaryroadway curb and main utility branch trench; and 7.5m beyond constructed area with permeable surace(such as pervious paving area, storm water detention acility and playing eld) that require additionalstaging area in order to limit compaction in the constructed area.

    1

    B) OPEN SPAcE:Reduce by 25%, the development ootprint (dened as the total area o the building ootprint, hardscape,access road and parking) and/or provide vegetated open space within the project boundary to exceed the

    local zonings open space requirement or the site by 25%.OR

    For areas with no local zoning requirement (e.g. university campus, military bases), provide vegetated openspace adjacent to the building whose area is equal to that o the building ootprint.OR

    Where a zoning ordinance exists, but there is no requirement or open space (zero), provide vegetated openspace equal to 20% o the projects site area.

    1

    constrUctIon mAnAGement

    sm5 eArtHWorks - constrUctIon ActIvIty poLLUtIon controL

    Reduce pollution rom construction activities by controlling soil erosion, waterway sedimentation andairborne dust generation.

    Create and implement an Erosion and Sedimentation Control (ESC) Plan or all construction activitiesassociated with the project. The ESC Plan shall conorm to the erosion and sedimentation requirements othe approved Earthworks Plans OR Local erosion and sedimentation control standards and codes, whicheveris the more stringent.

    The plan shall describe the measures implemented to accomplish the ollowing objectives:Prevent loss o soil during construction by storm water runo and/or wind erosion, including1.protecting topsoil by stockpiling or reuse.Prevent sedimentation o storm sewer or receiving stream.2.Prevent polluting the air with dust and particulate matter.3.

    1 1

    sm6 QLAssIc - QUALIty Assessment system or BUILDInG constrUctIon Work

    Achieve quality o workmanship in construction works:

    Subscribe to independent method to assess and evaluate quality o workmanship o building project basedon CIDBs CIS 7: Quality Assessment System or Building Construction Work (QLASSIC). Must achieve aminimum score o 70%

    1 1

    sm7 Workers sIte AmenItIes

    Reduce pollution rom construction activities by controlling pollution rom waste and rubbish rom workers.Create and implement a Site Amenities Plan or all construction workers associated with the project.

    The plan shall describe the measures implemented to accomplish the ollowing objectives:

    Proper accommodation or construction workers at the site or at temporary rented accommodation1.nearby.Prevent pollution o storm sewer or receiving stream by having proper septic tank.2.Prevent polluting the surrounding area rom open burning and proper disposal o domestic waste.3.Provide adequate health and hygiene acilities or workers on site.4.

    1 1

    Continued on next page >>

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    15/18

    14FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    trAnsportAtIon

    sm8 pUBLIc trAnsportAtIon Access

    Reduce pollution and land development impacts rom automobile use:

    Locate project within 1km o an existing, or planned and unded, commuter rail, light rail or subway station.OR

    Locate project within 500m o at least one bus stop.

    1 1

    sm9 Green veHIcLe prIorIty - LoW emIttInG & UeL eIcIent veHIcLes

    Encourage use o green vehicles:

    Provide low-emitting and uel-ecient vehicles or 5% o Full-Time Equivalent (FTE) occupants ANDprovidepreerred parking or these vehicles.

    Preerred parking reers to the parking spots that are closest to the main entrance o the project (exclusiveo spaces designated or handicapped or parking passes provided at a discounted price).

    1 1

    sm10 pArkInG cApAcIty

    Discourage over-provision o car parking capacity:

    Size parking capacity to meet, but not to exceed the minimum local zoning requirements, ANDprovidepreerred parking or carpools or vanpools or 5% o the total provided parking spaces.

    1 1

    DesIGn

    sm11 stormWAter DesIGn QUAntIty & QUALIty controL

    Limit disruption o natural hydrology by reducing impervious cover, increasing on-site inltration, andmanaging storm water runo. Reduce or eliminate water pollution by reducing impervious cover, increasingonsite inltration, eliminating sources o contaminants, and removing pollutants rom storm water runo:

    CONDitiON 1:

    IF ExISTING ImPERVIOuSNESS IS 50%:Implement a storm water management plan that prevents the post development peak discharge rate andquantity rom exceeding the pre-development peak discharge rate and quantity in conormance to theStorm Water Management Manual or Malaysia (MASMA).

    CONDitiON 2:

    IF ExISTING ImPERVIOuSNESS IS > 50%:Implement a storm water management plan that results in a 25% decrease in the volume o storm water

    runo required under MASMA.

    For either Condition, implement a storm water management plan that reduces impervious cover, promotesinltration, and captures and treats the storm water runo rom 90% o the average annual rainall usingacceptable best management practices (BMPs).

    1 1

    sm12 Greenery & roo

    Reduce heat island (thermal gradient dierence between developed and undeveloped areas) to minimizeimpact on microclimate and human and wildlie habitat:

    2

    A) hARDScAPE & GREENERy APPLIcATIONProvide any combination o the ollowing strategies or 50% o the site hardscape (including sidewalks,courtyards, plazas and parking lots):

    1) Shade (within 5 years o occupancy);2) Paving materials with a Solar Refectance Index (SRI) o at least 29;3) Open grid pavement system;

    1

    B) ROOF APPLIcATION1) Use roong material with a Solar Refectance Index (SRI) equal to or greater than the value in the tablebelow or a minimum o 75% o the roo surace;OR

    2) Install a vegetated roo or at least 50% o the roo area;OR

    3) Install high albedo and vegetated roo suraces that, in combination, meet the ollowing criteria:

    (Area o SRI Roo / 0.75) + (Area o vegetated roo / 0.5) Total Roo Area

    Roo Type Slope SRILow-Sloped Roo < 2:12 78Steep-Sloped Roo > 2:12 29

    1

    sm13 BUILDInG User mAnUAL

    Document Green building design eatures and strategies or user inormation and guide to sustainperormance during occupancy:

    Provide a Building User Manual which documents passive and active eatures that should not bedowngraded.

    1 1

    sUstAInABLe sIte pLAnnInG & mAnAGement (sm) totAL 16

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    16/18

    15 GREENBUILDINGINDEX SDN BHD (845666-V)FIRST EDITION | APRIL 2009 |VERSION 1.0

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    reUseD AnD recycLeD mAterIALs

    mr1 mAterIALs reUse AnD seLectIon

    Reuse building materials and products to reduce demand or virgin materials and reduce creation o waste.This serves to reduce environmental impact associated with extraction and processing o virgin resources.Integrate building design and its buildability with selection o reused building materials, taking into accounttheir embodied energy, durability, carbon content and lie cycle costs:

    2Where reused products/materials constitutes 2% o the projects total material cost value, OR 1

    Where reused products/materials constitutes 5% o the projects total material cost value 2

    mr2 recycLeD content mAterIALs

    Increase demand or building products that incorporate recycled content materials in their production:(Recycled content shall be dened in accordance with the International Organization o Standards Document)

    2

    Where use o materials with recycled content is such that the sum o post-consumer recycled plus one-halo the pre-consumer content constitutes 10% (based on cost) o the total value o the materials in theproject, OR

    1

    Where use o materials with recycled content is such that the sum o post-consumer recycled plus one-halo the pre-consumer content constitutes at least 30% (based on cost) o the total value o the materials inthe project.

    2

    sUstAInABLe resoUrces

    mr3 reGIonAL mAterIALs

    Use building materials and products that are extracted and manuactured within the region, thereby

    supporting the use o indigenous resources and reducing the environmental impacts resulting romtransportation:

    Use building materials or products that have been extracted, harvested or recovered, as well asmanuactured, within 500km o the project site or 20% (based on cost) o the total material value.

    Mechanical, electrical and plumbing components shall not be included. Only include materials permanentlyinstalled in the project.

    1 1

    mr4 sUstAInABLe tImBer

    Encourage environmentally responsible orest management:

    Where 50% o wood-based materials and products used are certied.

    These components include, but are not limited to, structural raming and general dimensional raming,fooring, sub-fooring, wood doors and nishes. To include wood materials permanently installed and alsotemporarily purchased or the project. Compliance with Forest Stewardship Council and Malaysian TimberCertication Council requirements.

    1 1

    WAste mAnAGement

    mr5 storAGe & coLLectIon o recycLABLes

    Facilitate reduction o waste generated during construction and during building occupancy that is hauledand disposed o in landlls:

    During Construction, provide dedicated area/s and storage or collection o non-hazardous materials orrecycling, AND

    During Building Occupancy, provide permanent recycle bins.

    1 1

    mr6 constrUctIon WAste mAnAGement

    Develop and implement a construction waste management plan that, as a minimum identies the materialsto be diverted rom disposal regardless o whether the materials will be sorted on site or co-mingled.Quantiy by measuring total truck loads o waste sent or disposal:

    2Recycle and/or salvage 50% volume o non-hazardous construction debris, OR 1

    Recycle and/or salvage 75% volume o non-hazardous construction debris. 2

    mAterIALs & resoUrces (mr)REuSED AND REcycLED mATERIALS | SuSTAINABLE RESOuRcES | cONSTRucTION mANAGEmENT | GREEN PRODucTS

    11 poInts

    Continued on next page >>

    4

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    17/18

    16FIRST EDITION | APRIL 2009 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    WAter eIcIency (We)WATER hARVESTING & REcycLING | INcREASED EFFIcIENcy

    10 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    WAter HArvestInG & recycLInG

    We1 rAInWAter HArvestInG

    Encourage rainwater harvesting that will lead to reduction in potable water consumption:

    2Rainwater harvesting that leads to 15% reduction in potable water consumption, OR 1

    Rainwater harvesting that leads to 30% reduction in potable water consumption 2

    We2 WAter recycLInG

    Encourage water recycling that will lead to reduction in potable water consumption:

    2Treat and recycle 10% wastewater leading to reduction in potable water consumption, OR 1

    Treat and recycle 30% wastewater leading to reduction in potable water consumption 2

    IncreAseD eIcIency

    We3 WAter eIcIent - IrrIGAtIon/LAnDscApInG

    Encourage the design o system that does not require the use o potable water supply rom the local waterauthority:

    2Reduce potable water consumption or landscape irrigation by 50% (e.g. through use o native oradaptive plants to reduce or eliminate irrigation requirement, OR 1

    Do not use potable water at all or landscape irrigation 2

    We4 WAter eIcIent IttInGs

    Encourage reduction in potable water consumption through use o ecient devices:

    2Reduce annual potable water consumption by 30%, OR 1

    Reduce annual potable water consumption by 50% 2

    We5 meterInG & LeAk DetectIon system

    Encourage the design o systems that monitors and manages water consumption:

    2Use o sub-meters to monitor and manage major water usage or cooling towers, irrigation, kitchens andtenancy use

    1

    Link all water sub-meters to EMS to acilitate early detection o water leakage 1

    WAter eIcIency (We) totAL 10

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    Green proDUcts

    mr7 rerIGerAnts & cLeAn AGents

    Use environmentally-riendly Rerigerants and Clean Agents exceeding Malaysias commitment to theMontreal & Kyoto protocols:

    2Use zero Ozone Depleting Potential (ODP) products: non-CFC and non-HCFC rerigerants/clean agents; 1

    Use non-synthetic (natural) rerigerants/clean agents with zero ODP and negligible Global WarmingPotential.

    1

    mAterIALs & resoUrces (mr) totAL 11

    5

  • 8/8/2019 GBI NRNC Non-Residential Tool V1.0

    18/18

    Green BUILDInG InDeX Assessment crIterIA or nrnc

    InnovAtIon (In)INNOVATION INITIATIVES & GBI FAcILITATOR

    7 poInts

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    In1 InnovAtIon In DesIGn & envIronmentAL DesIGn InItIAtIves

    Provide design team and project the opportunity to be awarded points or exceptional perormance abovethe requirements set by GBI rating system:

    1 pon for each approved nnovaon and envronmenal desgn nave up o a maxmum of 6

    pons, such as:

    Condensate water recovery (accounting or at least 50% o total AHUs/FCUs) or use as cooling towermake-up water etc;Co-generation / Tri-generation system;Thermal / PCM / Thermal Mass storage system (accounting or at least 25% o total required capacity);Solar thermal technology / Solar Airconditioners (generating at least 10% o total required capacity);Heat recovery system (contributing to at least 10% o total required capacity);Heat pipe technology;

    Light pipes;

    Auto-condenser tube cleaning system (tted to plant equipment serving at least 50% o total capacity);Non-chemical water treatment system (serving at least 50% o total capacity);Mixed mode / low energy ventilation system;Advanced air ltration technology (serving at least 50% o the NLA);Waterless urinals (tted to all male toilets);Central vacuum system (serving at least 50% o NLA);Central Pneumatic Waste Collection system;Sel-cleaning aade;Electrochromic glazed aade;Rerigerant leakage detection and recycling acilities;Recycling o all re system water during regular testing;

    6 6

    In2 Green BUILDInG InDeX AcILItAtor

    To support and encourage the design integration required or Green Building Index rated buildings and tostreamline the application and certication process:

    At least one principal participant o the project team shall be a Green Building Index Facilitator who isengaged at the onset o the design process until completion o construction and Green Building Indexcertication is obtained.

    1 1

    InnovAtIon (In) totAL 7