    FIRST EDITION | APRIL 2010 | VERSION 1.0

    GBI Assessment crIterIAor

    non-resIDentIAL eXIstInG BUILDInG (nreB)

    .gbuildigidx.g | [email protected] sDn BHD (845666-V) 4 & 6 Jalan Tangsi, 50480 Kuala Lumpur, Malaysia tl 603 2694 4182 ax603 2697 4182

  • 8/9/2019 GBI NREB V1.0

    2/18

    1FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    contents

    AcknowLeDGement & copyrIGHt

    IntroDUctIon

    What is the Green Building Index (GBI)?

    Who can use the Green Building Index?

    How to use the Green Building Index?

    project InormAtIon

    Assessment crIterIA

    Summar o Final Score

    Summar o Contents

    InDIvIDUAL Item score

    PART 1: Energ Ecienc (EE)

    PART 2: Indoor Environmental Qualit (EQ)

    PART 3: Sustainable Site Planning & Management (SM)

    PART 4: Materials & Resources (MR)

    PART 5: Water Ecienc (WE)

    PART 6: Innovation (IN)

    2

    3

    3

    3

    4

    5

    6

    8

    10

    13

    15

    16

    17

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

    PAGE

  • 8/9/2019 GBI NREB V1.0

    3/18

  • 8/9/2019 GBI NREB V1.0

    4/18

    3FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    IntroDUctIon

    The Green Building Index is an environmental rating sstem or buildings developed b PAM (Pertubuhan Arkitek

    Malasia / Malasian Institute o Architects) and ACEM (the Association o Consulting Engineers Malasia). The

    Green Building Index is Malasias rst comprehensive rating sstem or evaluating the environmental design and

    perormance o Malasian buildings based on the six (6) main criterias o Energ Ecienc, Indoor Environment

    Qualit, Sustainable Site Planning & Management, Materials & Resources, Water Ecienc, and Innovation.

    The Green Building Index is undamentall derived rom existing rating tools, including the Singapore Green

    Mark and the Australian Green Star sstem, but extensivel modied or relevance to the Malasian tropical

    weather, environmental context, cultural and social needs.

    This GBI initiative aims to assist the building industr in its march towards sustainable development. The GBI

    environmental rating sstem is created to:

    Defne reen uildin y estalisin a oon lanuae and standard o easureent;

    Proote interated, wole-uildin desin;

    Reonise and reward environental leadersip;

    Transor te uilt environent to redue te environental ipat o developent; and

    Ensure new uildins reain relevant in te uture and existin uildins are reurised and

    tereater sustained properly to reain relevant.

    GSB encourages all members o Project Teams, Building owners, Developers and other interested parties

    (including Contractors, Government and Design and Build Contractors) to use the Green Building Index to

    validate environmental initiatives o the design phase o new non-residential construction or base non-residential

    building reurbishment; or construction and procurement phase o non-residential buildings. Use o the Green

    Building Index is encouraged on all such projects to assess and improve their environmental attributes.

    Use o the Green Building Index (Non-Residential) tool without ormal certication b an independent accredited

    GBI Certier does not entitle the user or an other part to promote the Green Building Index rating achieved.

    No ee is paable to GSB or such use, however ormal recognition o the Green Building Index rating - and the

    right to promote same - requires undertaking the ormal certication process oered b GSB.

    All Green Building Index rating tools are reviewed annually; please forward any feedback to

    [email protected].

    wHo cAn Use tHe Green BUILDInG InDeX?

    wHAt Is tHe Green BUILDInG InDeX (GBI)?

    Complete the Building Input worksheet as the buildings tpe and location ma aect the predicted rating.

    Complete the remaining worksheets b reviewing each credit in each categor and entering the number o

    points ou predict the building will achieve in the No. o Points Achieved column. Calculators are provided

    or a number o the tools credits.

    Enter an points that ma be achieved but need to be conrmed in the Points to be Conrmed column.

    Enter an comments required in the Comments column.

    The predicted rating is shown in the Summar worksheet. More detail on point scores (both achieved and

    those to be conrmed) are shown in the Credit Summar and Graphical Summar worksheets at the end o

    the tool.

    How to Use tHe Green BUILDInG InDeX?

  • 8/9/2019 GBI NREB V1.0

    5/18

    4FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    nAme o BUILDInG

    ADDress o BUILDInG

    postcoDe

    stAte

    AppLIcAnt

    contAct person

    ArcHItect

    cIvIL enGIneer

    strUctUrAL enGIneer

    mecHAnIcAL enGIneer

    eLectrIcAL enGIneer

    QUAntIty sUrveyor

    LAnDscApe consULtAnt

    otHer specIALIst consULtAnt(s)

    mAIn contrActor

    LocAL AUtHorIty

    totAL Gross Loor AreA

    LAnD AreA or LAnDeD property

    BUILDInG DescrIptIon

    project InormAtIon

  • 8/9/2019 GBI NREB V1.0

    6/18

    5FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    pArt Item mAXImUm poInts score

    1 Enery Efieny 38

    2 Indoor Environental Quality 21

    3 Sustainale Site Plannin & manaeent 10

    4 material & Resoures 9

    5 Water Efieny 12

    6 Innovation 10

    totAL score 100

    poInts GBI rAtInG

    86 points Platinum

    76 to 85 points Gold

    66 to 75 points Silver

    50 to 65 points Certied

    DetAIL Assessment crIterIASUmmARY OF FINAL ScORE

    Green BUILDInG InDeX cLAssIIcAtIon

  • 8/9/2019 GBI NREB V1.0

    7/18

    6FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    DetAIL Assessment crIterIASUmmARY OF cONTENTS

    pArt crIterIA Item poInts totAL

    1

    ee enerGy eIcIency

    Dig & pa

    38

    EE1 Minimum EE Perormance 2

    EE2 Lighting Zoning 3

    EE3 Electrical Sub-metering 2

    EE4 Renewable Energ 5

    EE5 Advanced or Improved EE Perormance - BEI 15

    ciiig

    EE6 Enhanced or Re-commissioning 4

    EE7 On-going Post Occupanc Commissioning 2

    miig, I & maia

    EE8 EE Monitoring & Improvement 2

    EE9 Sustainable Maintenance 3

    2

    eQ InDoor envIronmentAL QUALIty

    Ai Quali

    21

    EQ1 Minimum IAQ Perormance 1

    EQ2 Environmental Tobacco Smoke (ETS) Control 1

    EQ3 Carbon Dioxide Monitoring and Control 1

    EQ4 Indoor Air Pollutants 2

    EQ5 Mould Prevention 1

    thal c

    EQ6 Thermal Comort: Controllabilit o Sstems 2

    EQ7 Air Change Eectiveness 1

    Lighig, viual & Aui c

    EQ8 Dalighting 2

    EQ9 Dalight Glare Control 1

    EQ10 Electric Lighting Levels 1

    EQ11 High Frequenc Ballasts 1

    EQ12 External Views 2

    EQ13 Internal Noise Levels 1

    vifai

    EQ14 IAQ Beore/During Occupanc 2

    EQ15 Occupanc Comort Surve: Verication 2

  • 8/9/2019 GBI NREB V1.0

    8/18

  • 8/9/2019 GBI NREB V1.0

    9/18

    8FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    enerGy eIcIency (ee)DESIgN & PERFORmANcE | cOmmISSIONINg | mONITORINg, ImPROVEmENT & mAINTENANcE

    38 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    DesIGn & perormAnce

    ee1 mInImUm ee perormAnce

    Building envelope and installations to achieve minimum energ ecienc (EE) perormance so as to reduceenerg consumption in buildings, thus reducing CO2 emission to the atmosphere. Building Envelope tomeet the ollowing minimum EE requirements as stipulated in MS 1525:2007:

    21) OTTV 50, RTTV 25. Submit calculations (use o BEIT sotware or other GBI approved sotware isacceptable)

    1

    2) Install Energ Management Control sstem. 1

    ee2 LIGHtInG ZonInG

    Provide fexible lighting controls to optimise energ savings:

    3

    All individual or enclosed spaces to be individuall switched; and the size o individuall switched lightingzones shall not exceed 100m or 90% o the NLA; with switching clearl labelled and easil accessible bbuilding occupants.

    1

    Provide auto-sensor controlled lighting in conjunction with dalighting strateg or all perimeter zones anddalit areas, i an

    1

    Provide motion sensors or equivalent to complement lighting zoning or at least 25% NLA 1

    ee3 eLectrIcAL sUB-meterInG & tenAnt sUB-meterInG

    Monitor energ consumption o ke building services as well as all tenanc areas:

    2

    Provide sub-metering or all energ use 100kVa 1

    Provide separate sub-metering or

    1) Lighting, AND

    2) Powerat each foor or tenanc.

    1

    ee4 renewABLe enerGy

    Encourage use o renewable energ:

    5

    Where 0.25 % o the maximum electricit demand (M.D.) is supplied b Renewable Energ (RE) or 2 kWpRE is installed, whichever is the greater, OR

    1

    Where 0.5 % o the maximum electricit demand (M.D.) is supplied b Renewable Energ (RE) or 5 kWpRE is installed, whichever is the greater, OR

    2

    Where 1.0 % o the maximum electricit demand (M.D.) is supplied b Renewable Energ (RE) or 10 kWpRE is installed, whichever is the greater, OR

    3

    Where 1.5 % o the maximum electricit demand (M.D.) is supplied b Renewable Energ (RE) or 20 kWpRE is installed, whichever is the greater, OR

    4

    Where 2.0 % o the maximum electricit demand (M.D.) is supplied b Renewable Energ (RE) or 40 kWpRE is installed, whichever is the greater.

    5

    Continued on next page >>

    1

  • 8/9/2019 GBI NREB V1.0

    10/18

    9FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    DesIGn & perormAnce (contInUeD)

    ee5 ADvAnceD or ImproveD ee perormAnce - BeI

    1) Exceed Energ Ecienc (EE) perormance better than the baseline minimum to reduce energconsumption in the building. Achieve Building Energ Intensit (BEI) 150 kWh/m 2.r (reer to GBI ordierent building tpes) as dened under GBI reerence (use o BEIT Sotware or other GBI approvedsotware is acceptable). Higher points with improving BEI as ollows:

    2

    15

    BEI 140 3

    BEI 130 5

    BEI 120 8

    BEI 110 10

    BEI 100 12

    BEI 90 15

    OR

    2) Demonstrate Energ savings over the last 3 ears rom Existing Building historical BEI baseline, to improve b:

    20% AND with resultant BEI 200 2

    25% AND with resultant BEI 180 3

    30% AND with resultant BEI 150 5

    40% AND with resultant BEI 140 8

    50% AND with resultant BEI 130 10

    60% AND with resultant BEI 120 12

    70% AND with resultant BEI 110 15

    commIssIonInG

    ee6 enHAnceD commIssIonInG/re-commIssIonInG/retro commIssIonInG o BUILDInG enerGy systems

    Enhanced Commissioning/Re-Commissioning/Retro Commissioning o Building Energ Sstems

    4

    Ensure buildings energ related sstems are properl commissioned so as to realise their ull potential.Appoint a GBI recognised Commissioning Specialist (CxS) to perorm the commissioning or all thebuildings energ related sstems in accordance with ASHRAE Commissioning Guideline or other GBIapproved equivalent standard b:-

    Implement improvements to ensure buildings major energ using sstems are repaired, operatedand maintained eectivel to optimize energ perormance.

    Develop a commissioning or ongoing commissioning plan or the buildings major energ-usingsstems.

    Provide training or management sta to build awareness and skills in a broad range o sustainable

    building operations topics, including energ ecienc and building, equipment and sstemsoperations and maintenance.

    Update the building operating plan as necessar to refect an changes in the occupanc schedule,equipment runtime schedule, design set points and lighting levels.

    4

    ee7 on-GoInG post occUpAncy commIssIonInG

    Carr out up-to-date on-going post occupanc commissioning or all tenanc areas ater t-out changesare completed, i an.

    21) Proessional Engineer shall review all tenanc t-out plans to ensure original design intent is notcompromised and sign o the completed works.

    1

    2) CxS shall carr out re-commissioning o the building's energ related sstems or the aected tenancareas.

    1

    Continued on next page >>

  • 8/9/2019 GBI NREB V1.0

    11/18

    10FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Continued on next page >>

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    monItorInG, Improvement & mAIntenAnce

    ee8 ee monItorInG & Improvement

    1) Use Energ Management Sstem to monitor and trend log building sstem perormance or HVACsstem ecienc including parameters or plant sequencing, etc.,

    AND

    Monitor sub-metering o building sstems to track energ consumption o major building uses and otherend use applications e.g. b categorising into building sstems or foors.

    1

    2

    2) Full commission and activate Maximum Demand Limiting programme,

    AND

    Compile, summarise and submit BEI, Fuel and Water Consumption o the building to GBI on an annualbasis during the 3-ears validit period or earlier whenever requested b GBI. Submissions shall includemonthl energ and water bills.

    1

    ee9 sUstAInABLe mAIntenAnce

    Ensure the buildings energ related sstems will continue to perorm as intended with proper andsustainable maintenance:-

    3

    1) At least 75% o permanent building maintenance team to participate in the commissioning o allbuilding energ services.

    1

    2) Provide or a designated building maintenance oce that is ull equipped with acilities (including toolsand instrumentation) and inventor storage.

    1

    3) Provide evidence o documented plan or at least 3-ear acilit maintenance and preventivemaintenance budget (inclusive o stang and outsourced contracts).

    1

    enerGy eIcIency (ee) totAL 38

    InDoor envIronmentAL QUALIty (eQ)AIR QUALITY | ThERmAL cOmFORT | LIghTINg, VISUAL & AcOUSTIc cOmFORT | VERIFIcATION

    21 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts score

    AIr QUALIty

    eQ1 mInImUm IAQ perormAnce

    Establish minimum indoor air qualit (IAQ) perormance to enhance indoor air qualit in building, thuscontributing to the comort and well-being o the occupants:

    Meet the minimum requirements o ventilation rate in ASHRAE 62.1:2007 or the local building codewhichever is the more stringent.

    1 1

    eQ2 envIronmentAL toBAcco smoke (ets) controL

    Minimize exposure o building occupants, indoor suraces, and ventilation air distribution sstems toEnvironmental Tobacco Smoke (ETS):

    1

    1) Prohibit smoking in the building and locate an exterior designated smoking areas awa rom entries,

    outdoor air intakes and operable windows, OR 1

    2) Prohibit smoking in the building except in designated smoking rooms and establish negative pressurein the smoking rooms together with provision o eective air ltration sstem.

    1

    2

  • 8/9/2019 GBI NREB V1.0

    12/18

    11FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    AIr QUALIty (contInUeD)

    eQ3 cArBon DIoXIDe monItorInG AnD controL

    Provide response monitoring o carbon dioxide levels to ensure deliver o minimum outside airrequirements:

    Install carbon dioxide (CO2) monitoring and control sstem with at least one (1) CO 2 sensor at allmain return points on each foor to acilitate continuous monitoring and adjustment o outside airventilation rates to each foor, and ensure independent control o ventilation rates to maintain CO2 level 1,000 ppm

    1 1

    eQ4 InDoor AIr poLLUtAnts

    Reduce detrimental impact on occupant health rom nishes that emit internal air pollutants:

    2

    1) Use low VOC paint and coating throughout the building. Paints and Coatings to complwith requirements specied in international labelling schemes recognized b GBI, AND

    2) Use low VOC carpet or fooring throughout the building. Carpets to compl with requirementsspecied in international labelling schemes recognized b GBI. Other tpes o fooring to complwith requirements under FloorScore developed b Science Certication Sstem or equivalent, AND

    3) Use low VOC adhesive and sealant or no adhesive or sealant used.

    1

    Use products with no added urea ormaldehde. These include:

    1) Composite wood and agriber products dened as: particleboard, medium densit berboard (MDF),plwood, wheatboard, strawboard, panel substrates and door cores, AND

    2) Laminating adhesives used to abricate on-site and shop-applied composite wood and agriberassemblies, AND

    3) Insulation oam, AND

    4) Draperies.

    1

    eQ5 moULD preventIon

    Design sstem(s) which reduce the risk o mould growth and its associated detrimental impact on occupanthealth:

    Where it is demonstrated that the mechanical air-conditioned ventilation sstem will maintain a positiveindoor air pressure relative to the exterior and can activel control indoor air humidit to be no more than70% RH without the use o active control that will consume additional energ.

    Ensure that excessive moisture in building is controlled during the retrot Design, Construction andOperation stages b the consideration and the control o the ollowing:

    1) Rainwater leakage through roo and walls

    2) Inltration o moist air

    3) Diusion o moisture through walls, roo and foors

    4) Groundwater intrusion into basements and crawl spaces through walls and foors

    5) Leaking or burst pipes

    6) Indoor moisture sources

    7) Construction moisture

    OR

    The building is ull naturall ventilated

    1 1

    tHermAL comort

    eQ6 tHermAL comort: controLLABILIty o systems

    Provide a high level o thermal comort sstem control b individual occupants or b specic groups inmulti-occupant spaces to promote the productivit, comort and well-being o building occupants:

    2 2

    1) Provide individual comort controls or 50% o the building occupants to enable adjustments to suitindividual task needs and preerences, AND

    2) Provide comort sstem controls or all shared multi-occupant spaces to enable adjustments to suitgroup needs and preerences.

    Conditions or thermal comort include the primary actors o air temperature, radiant temperature, airspeed and humidity. Comort system control or this purpose is dened as the provision o control over atleast one o these primary actors in the occupants local environment.

    Continued on next page >>

  • 8/9/2019 GBI NREB V1.0

    13/18

    12FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    tHermAL comort (contInUeD)

    eQ7 AIr cHAnGe eectIveness

    Provide eective deliver o clean air through reduced mixing with indoor pollutants in order to promote

    a health indoor environment. Demonstrate that the Air Change Eectiveness (ACE) meets the ollowingcriteria or at least 90% o the NLA:

    The ventilation sstems are designed to achieve an ACE o 0.95 when measured in accordance withASHRAE 129-1997: Measuring air change eectiveness where ACE is to be measured in the breathingzone (nominall 1.0 m rom nished foor level).

    1 1

    LIGHtInG, vIsUAL & AcoUstIc comort

    eQ8 DAyLIGHtInG

    Provide good levels o dalighting or building occupants:-

    2

    Demonstrate that 30% o the NLA has a dalight actor in the range o 1.0 3.5% as measured at theworking plane, 800mm rom foor level, OR

    1

    Demonstrate that 50% o the NLA has a dalight actor in the range o 1.0 3.5% as measured at theworking plane, 800mm rom foor level

    2

    (Reer to GBI on requirement variance or applications other than Oce Buildings)

    eQ9 DAyLIGHt GLAre controL

    Reduce discomort o glare rom natural light. Where blinds or screens are tted on all glazing and atriumas a base building, incorporate provisions to meet the ollowing criteria:

    1) Eliminate glare rom all direct sun penetration and keep horizontal workspace lux level below 2000,AND

    2) Eliminate glare rom diuse sk radiation or occupant workspace at viewing angles o 15 to 60 romthe horizontal at ee level (tpicall 1.2m rom foor level), AND

    3) Control with an automatic monitoring sstem (or atrium and windows with incident direct sun light onl- not applicable or xed blinds/screens),AND

    4) Equip with a manual override unction accessible b occupants (not applicable or xed blinds/screens).

    1 1

    eQ10 eLectrIc LIGHtInG LeveLs

    Increase workplace amenit b avoiding low requenc ficker that ma be associated with fuorescentlighting:

    Install high requenc ballasts in fuorescent luminaaires over a minimum o 90% o NLA.

    1 1

    eQ11 HIGH reQUency BALLAsts

    Increase workplace amenit b avoiding low requenc ficker that ma be associated with fuorescentlighting:

    Install high requenc ballasts in fuorescent luminaaires over a minimum o 90% o NLA.

    1 1

    eQ12 eXternAL vIews

    Reduce eestrain or building occupants b allowing long distance views and provision o visual connection

    to the outdoor.

    2Demonstrate that 60% o the NLA has a direct line o sight through vision glazing at a height o 1.2mrom foor level.

    1

    Demonstrate that 75% o the NLA has a direct line o sight through vision glazing at a height o 1.2mrom foor level.

    2

    eQ13 InternAL noIse LeveLs

    Maintain internal noise levels at an appropriate level. Demonstrate that 90% o the NLA do not exceed theollowing ambient internal noise levels:

    1) Within the entire baseline building general oce, space noise rom the building services does notexceed 40dBAeq, OR

    2) Within the baseline building oce space, the sound level does not exceed 45dBAeq or open plan and

    not exceed 40dBAeq or closed oces

    1 1

    Continued on next page >>

  • 8/9/2019 GBI NREB V1.0

    14/18

    13FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    sUstAInABLe sIte pLAnnInG & mAnAGement (sm)FAcILITY mANAgEmENT | TRANSPORTATION | REDUcE hEAT ISLAND EFFEcT

    10 poInts

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    verIIcAtIon

    eQ14 IAQ Beore / DUrInG occUpAncy

    Reduce indoor air qualit problems resulting rom the construction process (or inherent conditions) inorder to improve and sustain the comort and well-being o building occupants. Develop and implementan Indoor Air Qualit (IAQ) Management Plan to eect this requirement as ollows:

    2

    1) Perorm a building fush out b suppling outdoor air to provide not less than 10 airchanges/hour or atleast 30 minutes operation and continuous minimum 1 ACH or the next 14 das, OR

    2) I low VOC materials and low ormaldehde composite wood are used, then building fush out can beperormed b suppling outdoor air to provide not less than 10 airchanges/hour or at least 15 minutes,OR

    3) Conduct IAQ testing to demonstrate maximum concentrations or pollutants are not exceededaccording to the Indoor Air Qualit Code o Malasia.

    1

    Permanent Air Purging Sstem:

    Where a permanent air fushing sstem o at least 10 airchanges/hour operation is installed and operatedat least once a ear during occupanc stage

    1

    eQ15 occUpAncy comort sUrvey: verIIcAtIon

    Provide or the assessment o comort o the building occupants:

    1) Conduct an occupanc comort surve o building occupants. This surve should collect anonmousresponses about thermal comort, visual comort and acoustic comort in a building. It should includean assessment o overall satisaction with thermal, visual and acoustic perormance and identication othermal-related, visual-related and acoustic-related problems, AND

    2) Develop a plan or corrective action i the surve results indicate that more than 20% o occupants aredissatised with the overall comort in the building. This plan should include measurement o relevantenvironmental variables in problem areas.

    The relevant environmental variables include:

    Temperature, relative humidity, air speed and mean radiant temperature,Lighting level and glare problem,Background noise level,Odour problem, CO

    2level, VOCs, and particulate concentration

    2 2

    InDoor envIronmentAL QUALIty (eQ) totAL 21

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    AcILIty mAnAGement

    sm1 GBI rAteD DesIGn & constrUctIon

    I the building has been previousl GBI (or other GBI approved Green Rating sstem) rated under ancategor, OR within the last 12 months a comprehensive Energ Ecienc Audit has been conducted.

    1 1

    sm2 BUILDInG eXterIor mAnAGement

    Emplo environmentall sensitive building exterior management plan to reduce pollution.

    Use environmentall non-polluting methods and chemicals or cleaning o building exterior includingmaintenance equipment, chemicals, paint and sealants.

    1 1

    Continued on next page >>

    3

  • 8/9/2019 GBI NREB V1.0

    15/18

    14FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Item AreA o AssessmentDetAILpoInts

    mAXpoInts

    score

    AcILIty mAnAGement (contInUeD)

    sm3 InteGrAteD pest mAnAGement, erosIon controL & LAnDscApe mAnAGement

    Emplo environmentall sensitive management to preserve the sites natural components. Minimiseharmul chemical use, energ waste, water waste, air pollution, solid waste and/or chemical runo such as

    gasoline and oil. The ollowing operational elements must be addressed:

    1) Use o least toxic chemical pesticides, minimum use o chemicals and use onl in targeted locations andonl or targeted species. Conduct routine inspection and monitoring, AND

    2) Erosion and sedimentation control or ongoing landscape operations including measures that preventerosion and sedimentation, prevent air pollution rom dust or particulate matter and restore erodedareas.

    1 1

    trAnsportAtIon

    sm4 Green veHIcLe prIorIty - Low emIttInG & UeL eIcIent veHIcLes

    Encourage use o green vehicles:

    Provide preerred parking or low-emitting and uel-ecient vehicles or 5% o the total car parking lots.

    Preerred parking reers to the parking spots that are closest to the main entrance o the project (exclusive

    o spaces designated or handicapped or parking passes provided at a discounted price)

    1 1

    sm5 pArkInG cApAcIty

    Discourage over-provision o car parking capacit:

    1) Size parking capacit not to exceed the minimum local zoning requirements, AND

    2) Provide preerred parking or carpools or vanpools or 5% o the total provided parking spaces.

    1 1

    reDUce HeAt IsLAnD eect

    sm6 Greenery & roo

    Reduce heat island (thermal gradient dierence between developed and undeveloped areas) to minimizeimpact on microclimate and human and wildlie habitat:

    4

    A) HARDSCAPE & GREENERy APPLICATION:

    1) Provide an combination o the ollowing strategies or 50% o the site hardscape (including sidewalks,courtards, plazas and parking lots):

    Shade (within 5 ears o occupanc),

    Paving materials with a Solar Refectance Index (SRI) o at least 29,

    Open grid pavement sstem.

    2

    B) ROOF APPLICATION:

    1) Use roong material with a Solar Refectance Index (SRI) equal to or greater than the value in the tablebelow or a minimum o 75% o the roo surace; OR

    2) Install a vegetated roo or at least 50% o the roo area; OR

    3) Install high albedo and vegetated roo suraces that, in combination, meet the ollowing criteria:

    (Area o SRI Roo / 0.75) + (Area o vegetated roo / 0.5) Total Roo Area

    Roo Tpe Slope SRI

    Low-Sloped Roo < 2:12 78

    Steep-Sloped Roo > 2:12 29

    2

    sm7 BUILDInG User mAnUAL

    Document Green building design eatures and strategies or user inormation and guide to sustainperormance during occupanc:

    Provide (include updating) a Building User Manual which documents passive and active eatures thatshould not be downgraded.

    1 1

    sUstAInABLe sIte pLAnnInG & mAnAGement (sm) totAL 10

  • 8/9/2019 GBI NREB V1.0

    16/18

    15FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    reUseD AnD recycLeD mAterIALs

    mr1 mAterIAL reUse AnD seLectIon

    Reuse building materials and products to reduce demand or virgin materials and reduce creation owaste. This serves to reduce environmental impact associated with extraction and processing o virginresources. Integrate building design and its buildabilit with selection o reused building materials, takinginto account their embodied energ, durabilit, carbon content and lie ccle costs:

    Where reused products/materials constitutes 20% o the projects total retrot material cost value

    1 1

    mr2 recycLeD content mAterIALs

    Increase demand or building products that incorporate reccled content materials in their production:

    (Recycled content shall be dened in accordance with the International Organization o StandardsDocument)

    Where use o materials with reccled content is such that the sum o post-consumer reccled plus one-hal o the pre-consumer content constitutes 20% (based on cost) o projects total retrot material costvalue.

    1 1

    sUstAInABLe mAterIALs & resoUrces AnD poLIcy

    mr3 sUstAInABLe tImBer

    Encourage environmentall responsible orest management:

    Where 75% o wood-based materials and products used in the retrot works are certied.

    These components include, but are not limited to, structural raming and general dimensional raming,fooring, sub-fooring, wood doors and nishes. To include wood materials permanently installed and alsotemporarily purchased or the project. Compliant with Forest Stewardship Council and Malaysian TimberCertication Council requirements.

    1 1

    mr4 sUstAInABLe pUrcHAsInG poLIcy

    Develop a Sustainable Purchasing polic that must cover product purchases within the building andmanagements control.

    1 1

    wAste mAnAGement

    mr5 storAGe, coLLectIon & DIsposAL o recycLABLes

    Facilitate reduction o waste generated during retrot construction and during building occupanc that ishauled and disposed o in landlls:

    3

    Provide reccling acilities/inrastructure or sorting and separate collection o recclable waste or reccling(consumables - glass, paper, metal, equipment, addition & alteration construction wastes),

    1

    Promote and encourage waste minimization and reccling among occupants, tenants and visitors through

    various avenues,1

    Promote waste sorting, collecting, quantiing, monitoring and reccling o a large range o wastegenerated in-house.

    1

    Green proDUcts

    mr6 rerIGerAnts & cLeAn AGents

    Use environmentall-riendl Rerigerants and Clean Agents exceeding Malasias commitment to theMontreal & Koto protocols:

    2Use zero Ozone Depleting Potential (ODP) products: non-CFC and non-HCFC rerigerants AND cleanagents,

    1

    Use non-snthetic (natural) rerigerants AND clean agents with zero ODP and negligible Global WarmingPotential.

    1

    mAterIALs & resoUrces (mr) totAL 9

    mAterIALs & resoUrces (mr)REUSED AND REcYcLED mATERIALS | SUSTAINAbLE mATERIALS & RESOURcES AND POLIcY | WASTE mANAgEmENT | gREEN PRODUcTS

    9 poInts4

  • 8/9/2019 GBI NREB V1.0

    17/18

    16FIRST EDITION | APRIL 2010 |VERSION 1.0 GREENBUILDINGINDEX SDN BHD (845666-V)

    Green BUILDInG InDeX Assessment crIterIA or nreB

    wAter eIcIency (we)WATER hARVESTINg & REcYcLINg | INcREASED EFFIcIENcY

    12 poInts

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    wAter HArvestInG & recycLInG

    we1 rAInwAter HArvestInG

    Encourage rainwater harvesting that will lead to reduction in potable water consumption:

    3

    Rainwater harvesting that leads to 5% reduction in potable water consumption, OR 1

    Rainwater harvesting that leads to 15% reduction in potable water consumption, OR 2

    Rainwater harvesting that leads to 30% reduction in potable water consumption 3

    we2 wAter recycLInG

    Encourage water reccling that will lead to reduction in potable water consumption:-

    2Treat and reccle 10% wastewater leading to reduction in potable water consumption, OR 1

    Treat and reccle 30% wastewater leading to reduction in potable water consumption 2

    IncreAseD eIcIency

    we3 wAter eIcIent - IrrIGAtIon/LAnDscApInG

    Reduce potable water consumption or landscape irrigation b:

    21) 50% 1

    2) 100% 2

    we4 wAter eIcIent IttInGs

    Encourage reduction in potable water consumption through use o ecient devices:

    3

    1) With reerence to Utilit calculations;

    Reduce annual potable water consumption b 20% , OR 1

    Reduce annual potable water consumption b 30%, OR 2

    Reduce annual potable water consumption b 50% 3

    OR

    2) From existing 3-ear average water consumption record, reduce annual potable water use b:

    20% 1

    30%

    2

    50% 3

    we5 meterInG & LeAk DetectIon system

    Encourage the design o sstems that monitors and manages water consumption:

    2Use o sub-meters to monitor and manage major water usage or cooling towers, irrigation, kitchens andtenanc use

    1

    Link all water sub-meters to EMS to acilitate earl detection o water leakage 1

    wAter eIcIency (we) totAL 12

    5

  • 8/9/2019 GBI NREB V1.0

    18/18

    Green BUILDInG InDeX Assessment crIterIA or nreB

    InnovAtIon (In)INNOVATION & ENVIRONmENTAL INITIATIVES | gbI FAcILITATOR

    10 poInts

    Item AreA o Assessment DetAILpoInts

    mAXpoInts

    score

    In1 InnovAtIon & envIronmentAL InItIAtIves

    Provide Existing Buildings the opportunit to be awarded points or exceptional perormance above therequirements set b GBI rating sstem:

    9

    1 point or each approved innovation and environmental initiative up to a maximum o 9 points, such as:

    Use o IBS - Industrialized Building Sstem or the retrot component (must achieve a minimum CIDBIBS score o 30)

    Condensate water recover (accounting or at least 50% o total AHUs/FCUs) or use as cooling towermake-up water etc,

    Co-generation / Tri-generation sstem,

    Thermal / PCM / Thermal Mass storage sstem (accounting or at least 25% o total required

    capacit),

    Solar thermal technolog / Solar Thermal Cooling (generating at least 10% o total required capacit),

    Heat recover sstem (contributing to at least 10% o total required capacit),

    Heat pipe technolog (or at least 50% o relevant applications),

    Light pipes accounting or at least 1% o NLA,

    Auto-condenser tube cleaning sstem (tted to plant equipment serving at least 50% o totalcapacit),

    Non-chemical water treatment sstem (serving at least 50% o total capacities o plants or HVAC,Boilers, Pools, etc.),

    Mixed mode / low energ ventilation sstem,

    Advanced air ltration technolog (serving at least 50% o the GFA),

    Waterless urinals (tted to all male toilets),

    Central vacuum sstem (serving at least 50% o NLA),

    Central Pneumatic Waste Collection sstem (serving at least 50% o NLA);

    Sel-cleaning aade (or at least 10% o aade),

    Electrochromic glazed aade (or at least 10% o aade),

    Rerigerant leakage detection and reccling acilities (or at least 90% o HVAC plant),

    Car park mechanical ventilation ans provided with VSD and controlled b CO 2/CO sensors,

    Reccling o all re sstem water during regular testing.

    9

    In2 Green BUILDInG InDeX AcILItAtor

    To support and encourage the integration required or Green Building Index rated buildings and tostreamline the application and certication process:

    Engage the services o a Green Building Index Facilitator to assist in obtaining Green Building Indexcertication

    1 1

    InnovAtIon (In) totAL 10

    6