Urban Stormwater Management Manual for Malaysia (Manual Saliran Mesra Alam ) By : Ir. AZMI BIN AMAT Stormwater Management Division Drainage and Irrigation Department of Malaysia

Upload: others

Post on 02-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Urban Stormwater Management Manual

for Malaysia(Manual Saliran Mesra Alam)

By :Ir. AZMI BIN AMAT

Stormwater Management DivisionDrainage and Irrigation Department of Malaysia

Page 2: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Introduction1

ISSUES2

PAST DRAINAGE PRACTICE3

CONCLUSION 5

OUTLINE

WHY WE NEEDS STORMWATER MANAGEMENT4

URBAN STORMWATER MANAGEMENT MANUAL5

Page 3: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

INTRODUCTION

3

Page 4: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

❑ Malaysian economy has gone through rapid structural change since 1957.

❑ Urban growth is dynamic in accordance with the rapid economic growth and

industrialization.

❑ This will change the hydrologic cycle and influence on the runoff pattern.

❑ In 1971, Malaysia suffered serious damage over the whole country due to the

flood.

❑ Government gave the Department of Irrigation and drainage (DID) the task of

planning Implementation of Urban Drainage work as part of overall flood mitigation

programs.

INTRODUCTION

Page 5: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Flood

• Major problem in Malaysia

Landuse For Urbanization

• Forest to agriculture

• Agriculture to urban areas

Increase Flood prone areas• 29,800 sq.km

(about the size of Selangor + Perak)

ISSUES - FLOOD

Page 6: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

TYPES OF FLOOD

Major Flooding the main river overtop and cause widespread flooding of long duration

Flash Flood a short duration flood that is very localized

• Flood condition varies from state to state. • Flood level varies from 0.2m up to 5m(extreme cases). • Size of flood <100 ha. to a few thousand ha.

TYPES OF FLOOD

Page 7: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

7

• Usually occur in urban areas

• Caused by short, intense, localized thunderstorms that occurs < 3 hours

– Flood water rise almost immediately during the storm and water will recede within 6 hours after the rain

FLASH FLOOD DEFINITION

Page 8: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

▪ Short, intense localised thunderstorms, the type of storm usually

experienced in the evening

▪ Rapid and Uncontrolled Development in catchment areas resulting in Heavy

Siltation

▪ Obstructions in River Flow System that Reduce in River Flow Capacity

▪ Limited available space for River Improvement works to handle the ever

increasing flood flow due to escalating urbanisation process

▪ Insufficient internal drainage systems within the town area → undercapacity

CAUSES OF FLOODING

Page 9: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

PAST DRAINAGE PRACTICE

9

Page 10: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

PAST DRAINAGE PRACTICE

Page 11: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

CONVEYANCE ORIENTED – HARD STRUCTURE

Page 12: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Widening of The River Channel

CONVEYANCE ORIENTED – WIDENING RIVER

Page 13: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Widening and deepening at the town city center is not

applicable due to land accusation too high.

CONVEYANCE ORIENTED – LAND PROBLEM

Page 14: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Allocation for Flood Mitigation Programmed

CONVEYANCE ORIENTED – HIGH COST

ALLOCATION FOR FLOOD MITIGATION PROJECTS

5 YEARS MALAYSIAN PLAN

Page 15: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

WHY WE NEEDS STORMWATER MANAGEMENT

15

Page 16: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

WHY WE NEEDS STORMWATER MANAGEMENT

• a) Urbanisation – Land use Change

• b) Flash Flood locations the whole nations Increasing

• c) Government allocation to mitigate flood increase

• d) Water Pollution

• e) Water Scarcity

Page 17: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Jalan Bukit Bintang, 1950

Jalan Bukit Bintang, 2017

Ampang Park, 1970

Ampang Park, 2017

URBANIZATION – LANDUSE CHANGE

Page 18: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

CHANGES IN HYDROLOGY AND RUNOFF DUE TO DEVELOPMENT

Page 19: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

19

IMPACT OF UNCONTROLLED DEVELOPMENT

Page 20: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Flow

Time

Flow Characteristics

Rural and Urbanised Catchment

UrbanisedDeveloped

RuralUndeveloped

Page 21: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

URBAN STORMWATER MANAGEMENT MANUAL for MALAYSIA

21

Page 22: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

DID MANUAL

Page 23: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent
Page 24: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent
Page 25: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA

• Ensure the safety of the public

•Control nuisance flooding and provide the safe passage

of less frequent and larger flood events

• Stabilize the land form and control erosion

•Optimize the land available for urban development

• Minimize the environmental impact of urban runoff on

water quality

• Enhance the Urban Landscape

Page 26: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

K Quantity Control

Quality Control

Erosion and Sediment Control

Operation and Maintenance

Esthetical Value

1

2

3

4

5

MSMA COMPONENT

Page 27: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

3

Stormwater QuantityControl

Erosion and SedimentControl

Stormwater QualityControl

Mud Flood Polluted RiversFlash Flood

1 2

3 PHASES

Page 28: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Conveyance Storage Oriented Oriented

• conveyance systems must be sizedfor the total increase in flowsresulting from urbanisation

• downstream conveyance systemsoften have insufficient capacity

• traditional hard lined openconveyance systems can be a hazardto the public during and after raindue to high flow velocities

• urban pollutants are transported todownstream areas

• In addition to the traditionalconveyance-oriented approach,a potentially effective andpreferable approach tostormwater management is thestorage-oriented approach

• The principal elements andtechniques used in a storage-oriented system are stormwaterdetention facilities andretention facilities.

28

Page 29: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

QUANTITY CONTROL – New Concepts

Storage

Conveyance Facilities

Peak Discharge

Control

• Onsite Detention (OSD)• Detention Pond

- dry pond- Wet pond

• Surface flow• Property Drainage• Pavement drainage• Open Drain / Swale• Pipe drain• Engineered / Bio-

engineered Waterways

Page 30: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

On-site

Regional

Community30

QUANTITY CONTROL –Control At Source

“control at source” METHODIN THE NEW DEVELOPMENTWILL PROVIDE THE COUNTRYAS ZERO (FLASH) FLOODCOUNTRY IN THE NEARFUTURE (preventive)

Page 31: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Time

Discharg

e

Post DevelopmentUncontrolled Runoff

Pre-DevelopmentUncontrolled Runoff

Post-DevelopmentControlled Runoff byDetention

Q post development ≤ Q pre-development“

Page 32: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

32

Storage - OSD

Page 33: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Storage - Pond

Detention PondDry Pond

Recommended : Dry Pond 5-0 haRecommended : Wet Pond > 10 ha

Page 34: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Storage - Pond

Page 35: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

SECTION

PERSPECTIVE

GrateWalkway

Pavement

Access Cover

Walkway

Pavement

GrateWalkway

Pavement

a) Grate b) Curb Opening c) Combination

CurbCurb Curb

GrateCurb

Opening

Grate

Gulter

Opening

Page 36: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Conveyance Facilities :Drains and Swales

(a) Uncovered Open Drain (b) Covered Open Drain

0.5 m minimum1.2 m maximum

Varies

0.6

m m

inim

um

1.2

m m

axim

um

Var

ies

Grate orsolid cover

Varies0.5 m minimum1.2 m maximum

0.6

m

max

imu

m

Lined Drains

(b) Drainage Modular

2%

500

Closed Turfing

12

2%

500

12

Swale

41

(a) Underground Pipeline

Varie

s(M

in. 2m

)

11

11

1 : 301 : 301 : 50 1 : 50

41

F.G.L

500 500Swale

Top Soil

Clean River Sand Suround

2 Nos Single Module Enclosedin Geotextile

Top Soil

Full Removal of UnsuitableMaterial Minimum 2m Depthfrom Culvert Invert LevelLand Replacement with Sand Fill

Closed Turfing

Backfilled withApproved Material

F.G.LF.G.L F.G.L

Composite Swale

(b) Drainage Modular

2%

500

Closed Turfing

12

2%

500

12

Swale

41

(a) Underground Pipeline

Vari

es

(Min

. 2m

)

11

11

1 : 301 : 301 : 50 1 : 50

41

F.G.L

500 500Swale

Top Soil

Clean River Sand Suround

2 Nos Single Module Enclosedin Geotextile

Top Soil

Full Removal of UnsuitableMaterial Minimum 2m Depthfrom Culvert Invert LevelLand Replacement with Sand Fill

Closed Turfing

Backfilled withApproved Material

F.G.LF.G.L F.G.L

Remain

Page 37: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Conveyance Facilities: Engineered Waterways

Page 38: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Wetpond

Grassed ChannelEngineered Channel

Conveyance Facilities: Engineered Waterways

Page 39: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

TRM Technique Sand Filled Mattress Reinforced Grass

Gabion Mattress Reinforced Grass

Page 40: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

BIOENGINEERED CHANNEL

Page 41: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

QUALITY CONTROL

Temporary BMPs

ESCP

Sediment Control

• Sediment Basin

• Sediment Trap

Permanent BMPs

Treatment Measures

• Infiltration

• Bioretention System

• Swales

• GPT

• Water quality ponds/Wetlands

Treatment Trains

For Water Pollution

Page 42: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

What it is ESCP ?An ESCP is a plan that details temporary

measures that will be implemented during the construction phase

Page 43: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Submission ESCP

• The Erosion Sedimentation Control Plan (ESCP) shallbe submitted for project area more than 1 ha.

• The plans must be prepared based on constructionactivities staging which covers land grading &earthworks (pre-bulk grading plan) and constructionstage (post-bulk grading plan).

• For project area less than 1 ha, the developer shallsubmitted Best Management Practices Plan tocontrol soil erosion and siltation onsite.

• The plan must prepared by PE and CPESC holder

• And the consultant responsible to make sure all theBMPs constructed and well maintained.

Page 44: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

ESCP

• Temporary BMPs Facilities• To minimize erosion and sail delivery away from

construction site.• No land clearing shall be allowed for the

construction site before the installation of sediment control facilities onsite

Erosion and Sediment Control Principles

DID, 2010GUIDELIONES FOR

EROSION AND SEDIMENT CONTROL IN MLAYSIA

GENERAL PRINCIPLES FOR ESCP

Minimizing Soil

ErosionPreserving Top Soil &

Other Assets

Access Routes &

Site Managem

ent

Drainage Control &

Runoff Manageme

nt

Earthwork & Erosion

Control

Sediment Preventi

on & Control

Slope Stabilizati

on

Site Maintena

nce

Page 45: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Sediment Control

QUALITY CONTROL : Temporary BMPs

Silt Fence Silt Pond

Check Dam

Page 46: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Type Group Description and Function Catchment Area Range

Purpose-built or Proprietary

GPT Type 1 Floating Debris Traps (booms)

Litter capture on permanent waterbodies

> 200 ha Proprietary and purposebuilt (on-line installation)

Trash Racks & Litter Control Devices

Hard or soft litter capture devices on drains

2 – 400 ha usually purpose built from modular components (on-

line installation)

GPT Type 2 Sediment Basin and Trash Rack Traps (SBTR)

Sediment and litter capture for drains or pipes

5 – 2000 ha Proprietary and purposebuilt (on-line or off-line

installation)

GPT Type 3 Litter Control, Sediment Basin, Oil and Grease Trap

Litter, sediment and oil and grease, capture for drains or pipes

2 – 40 ha Proprietary (on-line installation)

1 2 3

QUALITY CONTROL : Permanent BMPs

Page 47: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Infiltration Trench

QUALITY CONTROL : Permanent BMPs

Page 48: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

QUALITY CONTROL : Permanent BMPs

BIORENTATION

Page 49: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

Water Quality Pond / Constructed Wetlands

Page 50: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

CONSTRUCTED - WETLAND

UPPER NORTH 6

UPPER NORTH 7

UPPER NORTH 5

Page 51: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

PutrajayaDam

Page 52: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

The outflow of PutrajayaLake into Sungai Langat

Page 53: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

• Stormwater Management Manual for Malaysia (MSMA)

is a solution to flood, water resources and river

pollution to Malaysia as a long term measure

• Reduced government expenditure on flood mitigation

project

• As a basic of the development of “town in the garden

concept” to become livable cities.

Conclusion

Page 54: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

http://www.water.gov.my

54

Download

MSMA 2nd Edition

Page 55: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

THANKS YOU terima kasih

Page 56: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

56

Rainwater detention & Vertical Green at

Display Center

• SP Setia is one of the few developers conversant with Green Roof and

Vertical Green Technology (Greenery on the walls of

buildings).

• .

Page 57: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

57

•Pond and infiltration Trench

Desa Park City, Kuala Lumpur

CONTOH PERLAKSANAAN MSMA

Page 58: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

58

• CONTOH PERLAKSANAAN MSMA

•Structural Measure

Senawang, Negeri Sembilan

Page 59: for Malaysia - IGES Urban... · OBJECTIVE STORM WATER MANAGEMENT IN MALAYSIA •Ensure the safety of the public •Control nuisance flooding and provide the safe passage of less frequent

59

• Pemilihan kolam sebagaikawalan kuantiti dan pada

masa yang sama bolehdijadikan alternatif kepada

sumber air

•Kolam Takungan

CONTOH PERLAKSANAAN MSMA

SLIDE NO. 11

Kolam Metropolitan Kuala Lumpur