email mechanical

42
NO. 9 Jalan Anggerik 42, Taman Johor Jaya, 81100 Johor Bahru, Johor. T Email : [email protected] DATE : 19/3/2012 TO : PROFICIENT RESOURCES SDN BHD No.10-2, Jalan 3/1A, Taman Kepong Indah, 51200 Kuala L Attn : Muhammad Taufik Abdullah RE : MITC MELAKA PROJECT SUMMARY OF MECHANICAL SERVICES BIL DESCRIPTION 1 LIFT SERVICES RM 2 FIRE PROTECTION SERVICES RM 3 AIR CONDITIONING & VENTILATION SYSTEM RM AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM 4 AIR COOLED SPLIT UNIT SYSTEM RM 5 EXHAUST AND VENTILATION FANS & GENERAL WORKS RM 6 PRELIMINARIES RM 7 COLD WATER AND SANITARY PLUMBING WORKS RM GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM Taiko Mergers Sdn Bhd Acknow ------------------------------------------- ------ Joe Ho Chop & 016-7113877 Name : Dated TAIKO MERGERS SDN BHD CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BI RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL AYER KEROH MELAKA

Upload: zaharah-othman

Post on 23-Oct-2014

78 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Email Mechanical

NO. 9 Jalan Anggerik 42, Taman Johor Jaya, 81100 Johor Bahru, Johor. Tel/Fax : 07-3543617

Email : [email protected]

DATE : 19/3/2012

TO : PROFICIENT RESOURCES SDN BHD

No.10-2, Jalan 3/1A, Taman Kepong Indah, 51200 Kuala Lumpur.

Attn : Muhammad Taufik Abdullah

RE : MITC MELAKA PROJECT

SUMMARY OF MECHANICAL SERVICES

BIL DESCRIPTION AMOUNT ( RM )

1 LIFT SERVICES RM 618,744.00

2 FIRE PROTECTION SERVICES RM 1,189,263.00

3 AIR CONDITIONING & VENTILATION SYSTEM RM 1,284,700.00 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM

4 AIR COOLED SPLIT UNIT SYSTEM RM 367,775.00

5 EXHAUST AND VENTILATION FANS & GENERAL WORKS RM 423,500.00

6 PRELIMINARIES RM 36,000.00

7 COLD WATER AND SANITARY PLUMBING WORKS RM 1,289,010.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM 5,208,992.00

Taiko Mergers Sdn Bhd Acknowledgement :-

------------------------------------------- -------------------------------------------Joe Ho Chop & Signature 016-7113877 Name :

Dated :

TAIKO MERGERS SDN BHD-(974976-D)

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA

UNTUK TETUAN INTELEK EDARAN SDN BHD

Page 2: Email Mechanical

-------------------------------------------

Page 3: Email Mechanical

SUMMARY OF MECHANICAL SERVICES

BIL DESCRIPTION AMOUNT ( RM )

1 LIFT SERVICES RM 618,744.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM 618,744.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY,

MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA

UNTUK TETUAN INTELEK EDARAN SDN BHD

Page 4: Email Mechanical
Page 5: Email Mechanical

SUMMARY OF MECHANICAL SERVICES

BIL DESCRIPTION AMOUNT ( RM )

1 FIRE FIGHTING SYSTEM & RM 1,189,263.00 ADDRESSABLE FIRE ALARM SYSTEM

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM 1,189,263.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY,

MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA

UNTUK TETUAN INTELEK EDARAN SDN BHD

Page 6: Email Mechanical
Page 7: Email Mechanical

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments

should be given warranty period. The contractor also required to follow up submission with all the related authorities.

Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been

included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking,

cutting of structural hole openings, chases, and making good to original state.

The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of

government duties, sales tax, surtax administration costs and profits are broken down as follows:-

3.0 AIR CONDITIONING & VENTILATION SYSTEM

3.1 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM

DESCRIPTION UNIT QTY RATE (RM)AMOUNT (RM)

3.1.1 CONDENSER (OUTDOOR UNIT)

a) CU-BH1 Nos 1 88,400.00b) CU-BH2 Nos 1 88,400.00c) CU-1 Nos 1 90,000.00d) CU-2 Nos 1 100,500.00e) CU-3 Nos 1 65,800.00

3.1.2 EVAPORATORS (INDOOR UNITS)

SUB_BASEMENT

a FCU-SB/1 & SB/2 Nos 2 1,300.00 2,600.00

b FCU-SB/3 Nos 1 920.00

c FCU-SB/4 Nos 1 920.00

d FCU-SB/5 Nos 1 920.00

e FCU-SB/6 Nos 1 2,400.00

f FCU-SB/7 Nos 3 800.00 2,400.00

g FCU-SB/8 To SB/11 Nos 4 1,300.00 5,200.00

h FCU-SB/12 Nos 1 1,850.00

i FCU-SB/13 Nos 1 1,850.00

GROUND

a FCU-G/1 To G/3 Nos 3 7,550.00 22,650.00

b FCU-G/4 Nos 1 2,400.00

c FCU-G/5 Nos 1 1,850.00

d FCU-G/6 Nos 1 1,050.00

e FCU-G/7 Nos 1 1,050.00

1ST FLOOR

a FCU-1/BH1 To BH4 Nos 4 7,550.00 30,200.00

b FCU-1/BH5 TO BH8 Nos 4 7,550.00 30,200.00

c FCU-1/K1 To 1/K2 Nos 2 1,800.00 3,600.00

d FCU-1/1 Nos 1 1,850.00 1,850.00

e FCU-1/2 & 1/3 Nos 2 7,550.00 15,100.00

f FCU-1/4 & 1/5 Nos 2 1,850.00 3,700.00

g FCU-1/6 & 1/7 Nos 2 1,850.00 3,700.00

h FCU-1/8 Nos 1 3,450.00

i FCU-1/9 Nos 1 2,400.00

j FCU-1/10 & 11 Nos 2 2,400.00 4,800.00

k FCU-1/12 Nos 1 1,850.00

l FCU-1/13 Nos 1 1,850.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

ITEM NO

Inverter Multi Split Complete Condenser Units c/w condensers coils, condenser fan motors, compressors, inverter(s), filter driers, slight glass, valves, heaters, accumulators, header refridgerant pipe, controller cards, concrete plinths, drier, accumulato

Complete indoor units including wired remote control for each indoor unit, power wiring to indoor unit, insulated drawin pipes, drain water pump for the cassette type indoor:

Page 8: Email Mechanical

CARRIED FORWARD 583,860.00

3.0AIR CONDITIONING & VENTILATION SYSTEM (CONTINUED)

3.1 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM

DESCRIPTION UNIT QTY RATE (RM)AMOUNT (RM)

Brought forward from 583,860.00

2ND FLOOR

a FCU-2/D1 to 2/D4 Nos 4 2,450.00 9,800.00

b FCU-2/D5 to 2/D6 Nos 2 2,400.00 4,800.00

c FCU-2/D7 Nos 1 1,050.00

d FCU-2/OF1 to 2/OF2 Nos 2 1,050.00 2,100.00

e FCU-2/OF3 to 2/OF4 Nos 2 920.00 1,840.00

f FCU-2/OF5 Nos 1 1,300.00

g FCU-2/OF6 Nos 1 1,300.00

3RD FLOOR TO 11TH FLOOR

a FCU-T/L2 Nos 9 1,850.00 16,650.00

3.1.3 VRF REFRIGERANT PIPING

i CU-BH1 Group piping Lot 85,000.00

ii CU-BH2 Group piping Lot 85,000.00

iii CU-1 Group piping Lot 90,000.00

iv CU-2 Group piping Lot 105,000.00

v CU-3 Group piping Lot 63,000.00

3.1.4 Power/Control Wiring of VRF Units

a) Lot20,000.00

b) Lot18,000.00

3.1.5 Power Wiring

a) Lot20,000.00

b) Lot2,000.00

3.1.6 Electrical works

a) Lot60,000.00

3.1.7 Ductwork system

a) Lot112,000.00

b) Fresh air supply ducting c/w all accessories for all ceiling cassette type Lot2,000.00

ITEM NO

Refrigerant piping of various sizes from outdoor units to indoor units lay in GI Trunking c;/w special elbow recommend by manufacturer and 1" insulation

Control wiring in GI conduit from various indoor units to outdoor controller card including installation of remote central start for all units

Power wiring only from socket outlets furnished by electrical contractors to indoor units

PVC/SWA/PVC power cable from air conditioning distribution board to compressor units c/w cable tray conduit etc.

Inverter multi split unit system DB as per specification c/w MCCBs, ELCBs, ELR, indication light, power factor meter, ammeter and volt meter

Air Conditioning main switchboard c/w test certificate, control wiring, starter, trunking, cable tray and conduit for the complete operation of the system

Whole ductwork system c/w diffusers and grilles including the supply and installation of the return air duct and grilles for the required area

Page 9: Email Mechanical

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY 1,284,700.00

Page 10: Email Mechanical

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments

should be given warranty period. The contractor also required to follow up submission with all the related authorities.

Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been

included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking,

cutting of structural hole openings, chases, and making good to original state.

The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of

government duties, sales tax, surtax administration costs and profits are broken down as follows:-

3.0 AIR CONDITIONING & VENTILATION SYSTEM

3.2 AIR COOLED SPLIT UNIT SYSTEM

DESCRIPTION UNIT QTY RATE (RM)

3.2.1 WALL MOUNTED AIR COOLED SPLIT UNIT

(all pipes to be concealed/laid in trunking)

a) 9,000 Btu/h Nos 1 1,550.00

b) 12,000 Btu/h Nos 1 2,250.00

c) 13,000 Btu/h Nos 159 2,025.00 321,975.00

d) 16,000 Btu/h Nos 12 3,334.00 40,000.00

3.2.2 ELECTRICAL WORKS

Lot 173

2,000.00

3.2.3 OTHER ITEMS

a)

b) ………………………………………………………………………

c) ………………………………………………………………………

d) ………………………………………………………………………

e) ………………………………………………………………………

TOTAL CARRIED FORWARD TO SUMMARY OF TENDER AT SUMMARY PAGE 367,775.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

ITEM NO

AMOUNT (RM)

Supply and install Complete set of DX-Wall Mounted Air cooled split unit air conditioner c/w refrigerent pipings, pipe insulation, wiring, trunking, drainpipe, wired controllers, DOL starters c/w interface to AC control panel and all accessories as per dr

Air Conditioning main switchboard c/w test certificate, control wiring, starter, trunking, cable tray and conduit for the complete operation of the system

Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify:

Page 11: Email Mechanical

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments

should be given warranty period. The contractor also required to follow up submission with all the related authorities.

Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been

included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking,

cutting of structural hole openings, chases, and making good to original state.

The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of

government duties, sales tax, surtax administration costs and profits are broken down as follow:-

AIR CONDITIONING & VENTILATION SYSTEM

4.0 PRELIMINARIES

DESCRIPTION UNIT QTY RATE (RM)AMOUNT (RM)

4.1 Preparation of 6 copies of Contract Documents c/w hard cover binding LS3,000.00

4.2 LS3,000.00

4.3 Mobilization supervision coordination LS30,000.00

TOTAL CARRIED FORWARD TO SUMMARY OF TENDER AT SUMMARY PAGE 36,000.00

ITEM NO

6 sets of Handing Over Documents (inluding Operation Manuals) which includes as-built drawings (hardcopy and softcopy in CD autocad version)

Page 12: Email Mechanical

3.0 AIR CONDITIONING & VENTILATION SYSTEM

3.3 EXHAUST AND VENTILATION FANS & GENERAL WORKS

DESCRIPTION UNIT QTY RATE (RM)

3.3.1 TOILET EXHAUST FAN (COMMON AREAS)

a 400CFM, 1"wg, 1kW Cabinet in-line c/w automatic louvres Nos 10 3,000.00

3.3.2 TOILET EXHAUST FAN (CENTRALISED SYSTEM FOR ROOMS)

a TEF-9/1 Set 11,600 CFM, 2"wg, 2kW Axial fan

b TEF-R/1 & R/2 c/w ducting and weatherproof grill Set 2 25,000.001,800 CFM, 2"wg, 2kW Axial fan

c TEF-10/1, 10/2 & R/3 c/w ducting and weatherproof grill Set 3 25,000.00

2,000 CFM, 2"wg, 2kW Axial fan

d TEF-10/3 & 10/4 c/w ducting and weatherproof grill Set 2 2,000.00

100 CFM, 0.5"wg, 0.2kW Axial fan

3.3.3 EXHAUST FAN (TNB SUBSTATION)

a EF-TNB Set 1

2,200 CFM, FAD, 0.8kW Propeller fan

3.3.4 CARPARK EXHAUST FAN SYSTEM

a EF-SB/1 Set 1

b FAF-SB/1 at Gridline 9-10/L Set 1

c JF-SB/1 to SB/6 Sets 6

3.3.5 OTHER ITEMS

a) ………………………………………………………………………

b) ………………………………………………………………………

c) ………………………………………………………………………

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

ITEM NO

Supply and install Complete set Toilet Exhaust Fan inclusive wiring and controls as per drawing and specifications. (TEF SB/1-SB/4, G/1-G/2, 1/1-1/4)

Supply and install centralised toilet exhaust fan system inclusive of all ducting, weatherproof grille, support, wiring and controls as per drawings and specifications and all other necessary assessories:-

Supply and install Complete set TNB Exhaust Fan inclusive wiring and controls as per drawing and specifications.

Supply and install Carpark exhaust fan system inclusive of all ducting, weatherproof grille, support, wiring and controls, control panels as per drawings and specifications and all other necessary assessories:-

30,000CFM/15,000CFM, 3/0.75"wg, 25HP/6.25HP Smoke Spill Van Axial fan located in the Fan Room c/w ducting, fire dampers, exhaust air grilles, control panels, electrical wiring and all other necessary assessories.

10,500CFM, 2.2"wg, 5.5HP Fresh air fan c/w ducting, fire dampers, weatherproof fresh air grilles, control panels, electrical wiring and all other necessary assessories.

3,800CFM/1,900CFM, 1HP/0.25HP Jet fan located at the subbasement ceiling c/w electrical wiring and all other necessary assessories.

Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify:

Page 13: Email Mechanical

CARRIED FORWARD

3.3 EXHAUST AND VENTILATION FANS & GENERAL WORKS

DESCRIPTION UNIT QTY RATE (RM)

Brought forward from

3.3.6 TESTING AND COMMISSIONING

Testing and commissioning of the whole ACMV System Set 1

3.3.7 MAINTENANCE WORK

L.Sum

3.3.8 TRAINING

a To provide training for the ACMV systems L.Sum

b Performance witness test at factory. LS

c LS

d Painting of the complete installation system LS

e Piping schematic diagram c/w frame (A1 size) LS

3.3.9 OTHER ITEMS

a) ……………………………………………………………………...

b) ………………………………………………………………………

c) ………………………………………………………………………

d) ………………………………………………………………………

e) ………………………………………………………………………

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY

ITEM NO

Maintenance for the works as mentioned in this Bill for a period of 18 months from the date of Certificate of Practical Completion.

The tenderer shall provide training for the end users to ensure the end users are competent enough to use the systems and all fetures provided. This shall include field training with demonstration on operation, maintenance and trouble shooting. Instructor

Installation inclusive of coring, hacking, punching of holes in walls and floors, etc and making good, etc.

Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify:

Page 14: Email Mechanical

AMOUNT (RM)

30,000.00

25,000.00

50,000.00

75,000.00

4,000.00

5,500.00

65,000.00

34,000.00

56,000.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

Page 15: Email Mechanical

344,500.00

344,500.00

20,000.00

27,000.00

3,000.00

included

3,000.00

25,000.00

1,000.00

423,500.00

AMOUNT (RM)

Page 16: Email Mechanical

SUMMARY OF MECHANICAL SERVICES

BIL DESCRIPTION AMOUNT ( RM )

1 AIR CONDITIONING & VENTILATION SYSTEM RM 1,284,700.00 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM

2 AIR COOLED SPLIT UNIT SYSTEM RM 367,775.00

3 EXHAUST AND VENTILATION FANS & GENERAL WORKS RM 423,500.00

4 PRELIMINARIES RM 36,000.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM 2,111,975.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY,

MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA

UNTUK TETUAN INTELEK EDARAN SDN BHD

Page 17: Email Mechanical
Page 18: Email Mechanical

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipmentsshould be given warranty period. The contractor also required to follow up submission with all the related authorities.

Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have beenincluded is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking,cutting of structural hole openings, chases, and making good to original state.

The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive ofgovernment duties, sales tax, surtax administration costs and profits are broken down as follows:-

1.0 LIFT SERVICES

DESCRIPTION UNIT QTY

1 LIFT SERVICES

1.1 11 person bomba/passenger lift, speed 105mpm, motor-roomless type

ACVV 13 stops / 13 Opening with duplex full collective. No. 1 199,752.00

1.2 11 person passenger lift, speed 105mpm, motor-roomless typeACVV 13 stops / 13 Opening with duplex full collective. No. 1 166,460.00

1.3

ACVV 11 stops / 11 Opening with simplex full collective. No. 1 199,752.00

1.4 Nos 3 10000 30,000.00

1.5 Nos 3 600 1,800.00

1.6 Supply, delivery and installation of angle iron sill support. Nos 3 1600 2,560.00

1.7 Nos 3 INCLUDED

1.8 Signages as per authority requirements.a. LIFT BOMBA No 1 30.00 b. Nos 13 30 390.00

1.9 Sets 3 5000 15,000.00

1.10

a) Intercom Cable To Keyphone…. 3,000.00 b) ………………………………………………………………………c) ………………………………………………………………………d) ………………………………………………………………………

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

ITEM NO

RATE (RM)

AMOUNT (RM)

Supply, delivery, installation testing and commissioning, 1 year maintenance and training of complete passenger/bomba lift systems as per specification & drawings.

1025 kg (15 passenger) Service lift, speed 105 mpm, motor-roomless type

Supply, delivery and installation of control panels c/w surge suppressor device and other accessories as per drawing and specification at lift car panel

Supply, delivery and installation of lift pit cat ladders, lift shaft lighting and lift shaft ventilation fan c/w all necessary accessories

Supply, delivery and installation of separator beams c/w L brackets, anchor bolts, etc.

TIDAK DIBENARKAN MENGGUNAKAN LIF APABILA BERLAKU KEBAKARAN SILA GUNAKAN TANGGA.

Supply, delivery and installation of surge protection devices for incoming electricity supply of lift switchboard c/w 3-way visual indication of protection status as per drawings and specification.

Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify:

Page 19: Email Mechanical

CARRIED FORWARD TO MECHANICAL SUMMARY 618,744.00

Page 20: Email Mechanical

SUMMARY OF COLD WATER SERVICES

BIL DESCRIPTION AMOUNT ( RM )

1 PAGE J/5/1/10 RM 103,100.00

2 PAGE J/5/2/10 RM 192,990.00

3 PAGE J/5/3/10 RM 294,600.00

4 PAGE J/5/4/10 RM 268,300.00

5 PAGE J/5/5/10 RM 71,570.00

6 PAGE J/5/6/10 RM 40,900.00

7 PAGE J/5/7/10 RM 12,000.00

8 PAGE J/5/8/10 RM 233,950.00

9 PAGE J/5/9/10 RM 58,600.00

10 PAGE J/5/10/10 RM 13,000.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT RM 1,289,010.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY,

MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA

UNTUK TETUAN INTELEK EDARAN SDN BHD

Page 21: Email Mechanical
Page 22: Email Mechanical

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipmentsshould be given warranty period. The contractor also required to follow up submission with all the related authorities.

Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have beenincluded is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking,cutting of structural hole openings, chases, and making good to original state.

The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive ofgovernment duties, sales tax, surtax administration costs and profits are broken down as follows:-

2.0 FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

2.1 HOSE REEL SYSTEM

2.1.1 Set 2 13,800.00

2.1.2 Set 1 6,000.00

2.1.3 Lot 1 4,000.00

2.1.4 Lot 1 28,280.00

2.1.5 LS 1 21,600.00

2.1.6 Lot 1 2,500.00

2.1.7 Alarm bell outside pumproom Lot 1 600.00

2.1.8 Automatic air release valve LS 1 600.00

2.1.9 Hose reel steel cabinet and lockset LS 1 9,600.00

CARRIED FORWARD 86,980.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER

KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

ITEM NO

RATE (RM)

AMOUNT (RM)

Hose Reel electric end suction centrifugal inlined pumpset (duty/standby) c/w motor mounted on a based plate, valve, strainer, flexible connection, vibration isolater, label and all accessories as per drawings and specifications

Hose Reel control panel c/w wiring using underground cable to the nearest main switchboard.

Piping and all fittings on suction and discharge side of pumps up to the RC Hose Reel Tank c/w header, strainer, flexible joints, valves, fittings and necessary accessories

Piping and all fittings from pump discharge to hose reels at each floor c/w pressure reducing valve, brackets, fittings, pressure gauge, pressure switch, painting and accessories.

Hose Reel, Hose Drum (Swing Type) c/w 30m length, 25mm dia. hose, nozzle box, ball valves and all necessary accessories etc and painted to Bomba approval

For the RC tank, all accessories including overflow pipe, warning scour pipe, access manholes, valves, level indicator c/w steel rope, ball valve, no-float electrodes, internal and external access ladders, vent pipe, mosquito net, tank labelling to bomba approval.

Page 23: Email Mechanical

2.0 - FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

Brought forward from 86,980.00

2.2 SPRINKLER SYSTEM

2.2.1 Set 1

22,500.00

2.2.2 Set 1

22,500.00

2.2.3 Set 1

7,600.00

2.2.4 Set 1

23,000.00

2.2.5 Set 1

2,500.00

2.2.6 4 way breeching inlet c/w box and related pipings to sprinkler tank Set 1 3,600.00

2.2.7 L.Sum 1

452,380.00

2.2.8 Sprinkler installation valves c/w header and accessories L.Sum 1 29,000.00

2.2.9 Automatic Air Release Valve L.Sum 1 17,500.00

2.2.10 Sprinkler heads upright and pendant L.Sum 1 70,953.00

2.2.11 Earthing and Transient Overvoltage Protection L.Sum 1 4,000.00

ITEM NO

RATE (RM)

AMOUNT (RM)

To supply and install main electrical booster sprinkler pump (duty) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications.

To supply and install main electrical booster sprinkler pump (duty) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications.

To supply and install electrical sprinkler jockey pump vertical multistage pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications.

Sprinkler Pumps control panel c/w wiring using underground cable to the nearest main switchboard, surge arrestors, conduits, automatic controls, alarms, etc.

For the RC tank, all accessories including overflow pipe, warning scour pipe, access manholes, valves, level indicator c/w steel rope, ball valve, no-float electrodes, internal and external access ladders, vent pipe, mosquito net, tank labelling to bomba approval.

Sprinkler distribution and range pipes and fittings from RC tank to sprinklers c/w fittings, hangers, air vent, breeching inlet, control valves, flow switches, pressure switches, pressure gauges, pressure reducing valves and all accessories to complete the system in accordance with requirement of Jabatan Bomba Malaysia as per specification and drawing.

Page 24: Email Mechanical

CARRIED FORWARD 742,513.00

2.0 - FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

Brought forward from 742,513.00

2.3 WET RISER SYSTEM

2.3.1 Set 2

35,600.00

2.3.2 Pipework, fittings and accessories for wet riser system LS 1 72,000.00

2.3.3 LS 1

12,350.00

2.3.4 Set 1

18,000.00

2.4 CLEAN AGENT SYSTEM FOR MSB & GENSET ROOM

2.4.1 NAP-S125 alarm panel c/w battery and charger Set 2 2,500.00

2.4.2 Manual key switch, flashing light, fire curtain, alarm bell. Set 2 4,000.00

2.4.3 Set 2 4,200.00

2.4.4Nos 1 26,000.00

2.4.5

Nos 1 25,300.00

2.4.6 1/2" discharge Nozzle Nos 5 600.00

2.4.7 Schedule 40 pipes c/w elbows, tees, bush and other accessories Set 2 5,600.00

2.4.8 Smoke Detectors Set 1 450.00

2.4.9 Heat Detectors Set 1 300.00

ITEM NO

RATE (RM)

AMOUNT (RM)

To supply and install main electrical wet riser pumps (duty & standby) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications.

Landing valves, canvas hoses, nozzles, cradle, piping and all accessories

Wet riser control panel including all wiring and surge protector and all accessories.

Supply and install all NAP-S125 system including panel, NAP-S125 cylinder alarm bell, heat/smoke detectors, wiring and accessories as per specifications and drawings.

Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit.

84 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and accessories for MSB room

78 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and accessories for Genset room.

Page 25: Email Mechanical

CARRIED FORWARD 949,413.00

2.0 - FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

Brought forward from 949,413.00

2.5 CLEAN AGENT SYSTEM FOR TNB SUBSTATION

2.5.1 NAP-S125 alarm panel c/w battery and charger Set 1 1,250.00

2.5.2 Manual key switch, flashing light, fire curtain, alarm bell. Set 1 2,000.00

2.5.3 Set 1 4,500.00

2.5.4 Nos 2 32,850.00

2.5.6 1/2" discharge Nozzle Nos 2 200.00

2.5.7 Schedule 40 pipes c/w elbows, tees, bush and other accessories Set 1 4,000.00

2.5.8 Smoke Detectors Set 1 450.00

2.5.9 Heat Detectors Set 1 300.00

2.6 WET CHEMICAL SYSTEM FOR KITCHEN AREAS

2.6.1Alarm panel c/w battery and charger as per drawing and specification LS 1

2.6.2 Manual key switch, flashing light, fire curtain, flashing light, alarm bell. LS 1

2.6.3 LS 1

2.6.4 Wet Chemical Cylinder c/w solenoid, cage and accessories. LS 1

2.6.5 Gas discharge Nozzle LS 1

2.6.6 Schedule 40 pipes c/w elbows, tees, bush and other accessories. LS 1

2.6.7 LS 1

2.7 FIRE EXTINGUISHER

ITEM NO

RATE

(RM)

AMOUNT (RM)

Supply and install all NAP-S125 system including panel, NAP-S125 cylinder alarm bell, heat/smoke detectors, wiring and accessories as per specifications and drawings.

Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit.

60 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and accessories for MSB room

Supply & install WET CHEMICAL system including panel, alarm bell, heat & smoke detectors, wiring, piping and accessories as per drawings.

Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit.

Complete wiring in concealed G.I. conduit from Wet Chemical Panel at Kitchen to Main Fire Alarm Panel (MFAP)

Portable fire extinguisher complete with mounting accessories as specified:-

Page 26: Email Mechanical

2.7.1 9kg ABC dry powder portable fire extinguisher c/w bracket LS 1 5,600.00

2.7.2 LS 1 720.00

CARRIED FORWARD 1,001,283.00

2.0 FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

Brought forward from 1,001,283.00

2.8 ADDRESSABLE FIRE ALARM SYSTEM

2.8.1 Set 1 32,800.00

2.8.2 LS 1

92,220.00

2.8.3 Back-up Ni-Cd battery (min 20AH) c/w battery chargers LS 1 960.00

2.8.4 Manual Call Points (Break glass) incl. 30 spare glass for maintenance. LS 1 10,800.00

2.8.5 Alarm Bells LS 1 1,800.00

2.8.6 Addressable Smoke Detectors LS 1 20,100.00

2.8.7 Addressable Heat Detectors LS 1

2.8.8 Glass framed circuit diagram and valve indicator LS 1 3,500.00

2.8.9 Earthing and Transient Overvoltage Protection LS 1 8,000.00

2.8.10 LS 1 4,800.00

2.9 SIGNAGES

2.9.1 LS 1 1,000.00

2.10 GENERAL WORKS

2kg CO2 fire extinguisher c/w bracket.

ITEM NO

RATE (RM)

AMOUNT (RM)

Supply and install addressable type of main fire alarm panel c/w mimic diagram, lightning surge arrestor, relays, wiring, hose reel and lift indication as per drawing and specifications. All incoming underground cable shall be protected by Electronic system protection.

All electrical wiring c/w concealed conduit and from main fire alarm panel to various mechanical equipment panels inclusive digital input and output modules.

Connection from the Main Fire Alarm Panel at Bilik Kawalan to BOMBA (CMS)

"Bilik ini mengandungi Sistem CO2. Sila kosongkan bilik ini jika Sistem CO2 diaktifkan." - located at Main switch room and Generator set room.

Page 27: Email Mechanical

2.10.1 LS 1

1,000.00

2.10.2 Painting and labelling LS 1 1,000.00

CARRIED FORWARD 1,179,263.00

2.0 FIRE FIGHTING SYSTEM

DESCRIPTION UNIT QTY

Brought forward from 1,179,263.00

2.11 TESTING AND COMMISSIONING

2.11.1 Set 1 2000

2.12 MAINTENANCE WORK

2.12.1 L.Sum 3000

2.13 TRAINING

2.13.1 To provide training for the systems mentioned in this Bill. L.Sum 5000

2.14 OTHER ITEMS

2.14.1

a) ……………………………………………………………………...

b) ………………………………………………………………………

c) ………………………………………………………………………

d) ………………………………………………………………………

e) ………………………………………………………………………

Installation inclusive of hacking, punching, coring of holes in RC walls, walls and floors, hacking wall and column for concealed conduit all electrical wiring etc. and making good

ITEM NO

RATE (RM)

AMOUNT (RM)

Testing and commissioning of the whole system inclusive of any acceptance test required by the BOMBA.

Maintenance for the works as mentioned in this Bill for a period of 18 months from the date of Certificate of Practical Completion.

The tenderer shall provide training for the end users to ensure the end users are competent enough to use the systems and all fetures provided. This shall include field training with demonstration on operation, maintenance and trouble shooting. Instructor

Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify:

Page 28: Email Mechanical

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY 1,189,263.00