  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    1/21

    PURPOSE OF

    SUBMISSION

    PERMOHONAN KELULUSAN PELAN KERJA JALAN DANPERPARITAN

    AUTHORITY PERBADANAN PUTRAJAYA

    JABATAN PEMBANGUNAN BANDAR

    KOMPLEKS PERBADANAN PUTRAJAYA

    PRESINT 3

    62675 PUTRAJAYA

    DEVELOPER /

    CLIENT

    PUTRAJAYA HOLDINGS SDN BHD

    BLOCK 1, MENARA PjH, PRECINCT 2

    PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN

    62675 PUTRAJAYA

    PROJECT

    TITLETHE PROPOSED CONSTRUCTION AND COMPLETION OFROADWORKS PACKAGE R11D PUSAT PENTADBIRANKERAJAAN PERSEKUTUAN PUTRAJAYA

    DOCUMENT

    TITLEPERKIRAAN REKABENTUK PERPARITAN

    CONSULTING

    ENGINEER

    NAME :

    DESIGNATION :

    DATE NOVEMBER 2010

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    2/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    3/21

    8.0 Design Flow of Drain (Peak Surface Runoff)

    The design flows of the drains determination basically derived from the Modified RationalMethod formula as follows:-

    Q = C x i x A360

    Where, Q = peak surface runoff (m/s)C = surface runoff coefficienti = rainfall intensity (mm/hr)A = catchments area (ha)

    The runoff coefficient is as follows:-

    Land Use Runoff Coefficient

    Pavement 0.95

    Verges 0.30

    9.0 Drain Sizes Computation

    The drain size computation is calculated based on the Mannings Formula. The procedures areas outlined in Volume 10 of Urban Stormwater Management Manual for Malaysia by theDepartment of Irrigation and Drainage, Malaysia (2000).Based on the procedures, the design flow computation and sizes determination are based onthe following formula and the design chart 26.4

    .Q x N .

    S1/2

    x B8/3

    Where, Q = design flow (m/s)C = Manning roughness coefficientS = drain longitudinal average slope (%)

    B = desirable drains base width (m)

    The Manning roughness Coefficient is as follows:-

    Surface Finishes n

    Pavement 0.011

    Concrete 0.013

    Turf 0.15

    10.0 Design Calculation

    The drain flow computation and drain sizes determination are shown in the attached tabulationsheets for each sub-catchment of pavement areas.

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    4/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    5/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    6/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    7/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    8/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    9/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    10/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    11/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    12/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    13/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    14/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    15/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    16/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    17/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    18/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    19/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    20/21

  • 8/10/2019 Drainage Design Report for Perbadanan Putrajaya

    21/21