Page 1: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 1 of 10

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG 30 DISEMBER 2018

1. LANJUTAN PENUTUPAN LORONG SUSUR MASUK KE JALAN KUALA SELANGOR DARI LEBUHRAYA

DAMANSARA PUCHONG (ARAH SUNGAI BULOH)

Tarikh 01 Januari 2019 - 31 Januari 2019 Masa 10:00 malam – 06:00 pagi Jangka masa 1 Bulan Tujuan Untuk kerja-kerja pelancaran kekotak Segmen (SBG) dan sebarang kerja berkaitan

Untuk makluman, penutupan lorong susur masuk ke Jalan Kuala Selangor dari Lebuhraya Damansara Puchong (LDP) akan dilanjutkan dari 01 Januari 2019 – 31 Januari 2019. Tempoh masa untuk kerja-kerja akan bermula dari 10:00 malam – 6:00 pagi, selama 1 bulan.

Pelan pengurusan lalu lintas adalah seperti berikut:

Pemandu dari LDP menghala ke Sungai Buloh akan dilencongkan ke kanan di lampu isyarat LDP/DUKE2 bagi meneruskan perjalanan di Jalan Kuala Selangor (Arah Kepong) dan membuat pusingan “U” selepas Stesen KTM Kepong Sentral di bawah jejambat MRR2 sebelum kembali di Jalan Kuala Selangor (Arah Sungai Buloh) (seperti yang ditunjukkan oleh anak panah UNGU dalam peta).

Pemandu dari Persiaran Jati menghala ke Sungai Buloh akan dilencongkan ke kiri di Jalan Kuala Selangor (Arah Kepong) dan membuat pusingan “U” selepas Stesen KTM Kepong Sentral di bawah jejambat MRR2 sebelum kembali di Jalan Kuala Selangor (Arah Sungai Buloh) (seperti yang ditunjukkan oleh anak panah BIRU dalam peta).

Pemandu dari Kepong menghala ke Sungai Buloh dinasihatkan menggunakan jejambat atas ke Jalan Kuala Selangor (Arah Sungai Buloh) (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Sila rujuk peta

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas.

1. CONTINUATION OF SLIP ROAD CLOSURE TO JALAN KUALA SELANGOR FROM LEBUHRAYA DAMANSARA PUCHONG (SUNGAI BULOH-BOUND)

Date 1 January 2019 – 31 January 2019 Time 10.00 pm – 6.00 am Duration 1 Month Reason To facilitate the Segmental Box Girder (SBG) launching and any other MRT related

works The long term lane closure will continue at the slip road closure to Jalan Kuala Selangor from Lebuhraya Damansara Puchong (LDP) from 01 January 2019 – 31 January 2019. The construction

Page 2: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 2 of 10

works will start from 10:00PM-6:00AM, for 1 month.

During this closure, the following diversions will take place:

Motorists from LDP heading to Sungai Buloh can turn right at the LDP/DUKE2 Interchange traffic light to connect to Jalan Kuala Selangor (Kepong-bound) and make a U-Turn after Kepong Sentral KTM Station underneath the MRR2 flyover before joining the ramp up to Jalan Kuala Selangor (Sungai Buloh-bound) (as indicated in PURPLE arrows in map).

Motorists from Persiaran Jati heading to Sungai Buloh will be diverted to turn left to Jalan Kuala Selangor (Kepong-bound) and then make a U-Turn after Kepong Sentral KTM Station underneath the MRR2 flyover before joining the ramp up to Jalan Kuala Selangor (Sungai Buloh-bound) (as indicated in BLUE arrows in map).

Motorists from Kepong heading to Sungai Buloh are advised to use the ramp up to Jalan Kuala Selangor (Sungai Buloh-bound) (as indicated in GREEN arrows in map).

See map appended

Motorists are advised to follow the traffic signage and flagman during road closure.

PETA 1: LANJUTAN PENUTUPAN LORONG SUSUR MASUK KE JALAN KUALA SELANGOR DARI

LEBUHRAYA DAMANSARA PUCHONG (ARAH SUNGAI BULOH)

Page 3: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 3 of 10

2. LANJUTAN PENUTUPAN LORONG DARI KM47 HINGGA KM52 DI SEPANJANG JALAN KUALA SELANGOR (ARAH SUNGAI BULOH DAN ARAH KEPONG)

Tarikh 01 Januari 2019 - 30 Jun 2019 Masa 10:00 malam - 6:00 pagi; 10:00 malam - 8:00 pagi Jangka masa 6 Bulan

Tujuan Menjalankan kerja-kerja pelancaran kekotak Segmen (SBG) dan sebarang kerja berkaitan

Untuk makluman, lanjutan penutupan satu (1) lorong secara berkala dan berperingkat akan ditutup sepanjang 500 meter di sepanjang Jalan Kuala Selangor (Arah Sungai Buloh dan Arah Kepong) bermula dari 01 Januari 2019 – 30 Jun 2019, berikut adalah jadual masa penutupan:

• Ahad hingga Jumaat (10:00 malam – 6:00 pagi) • Sabtu dan Cuti Umum (10:00 malam – 8:00 pagi)

Penutupan Lorong Pelan Pengurusan Trafik adalah seperti berikut:

Penutupan A: Penutupan lorong paling kiri di sepanjang Jalan Kuala Selangor (Arah Sungai Buloh).

Penutupan B: Penutupan lorong paling kanan di sepanjang Jalan Kuala Selangor (Arah Sungai Buloh dan Arah Kepong).

Penutupan C: Penutupan lorong paling kiri di sepanjang Jalan Kuala Selangor (Arah Kepong).

Penutupan lorong ini adalah berperingkat dan dua (2) lorong akan dibuka pada setiap masa untuk pengguna jalan.

Setiap penutupan berikut adalah secara bekala. Sila rujuk peta di bawah untuk maklumat lanjut

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas.

2. CONTINUATION OF LANE CLOSURES FROM KM47 TO KM52 ALONG JALAN KUALA SELANGOR (SUNGAI BULOH-BOUND AND KEPONG-BOUND)

Date 01 January 2019 - 30 June 2019 Time 10:00 pm – 06:00 am ; 10:00 pm – 8:00am Duration 6 Months

Reason To facilitate the Segmental Box Girder (SBG) launching and any other related works for MRT construction.

There will be a continuation of one (1) lane closure by stages and intermittently for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound) from 01 January 2019 – 30 June 2019, as per the following time:

• Sunday to Friday (10:00pm – 6:00am) • Saturday and public holidays (10:00pm – 8:00am)

The traffic management plan involves the following closures:

Closure A: Left-most lane closure along Jalan Kuala Selangor (Sungai Buloh-bound).

Page 4: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 4 of 10

Closure B: Right-most lane closure along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).

Closure C: Left-most lane closure along Jalan Kuala Selangor (Kepong-bound).

The closures are in stages and at any one time there will be two (2) lanes available for motorists on both bounds. Motorists are advised to adhere to safety signage and flagmen at all time.

PETA 2: LANJUTAN PENUTUPAN LORONG DARI KM47 HINGGA KM52 DI SEPANJANG JALAN KUALA

SELANGOR (ARAH SUNGAI BULOH DAN ARAH KEPONG)

3. LANJUTAN PENUTUPAN PENUH LORONG SECARA BERPERINGKAT DI AKSES MASUK DAN KELUAR BANDAR SRI DAMANSARA (ARAH SUNGAI BULOH DAN ARAH KEPONG)

Tarikh 01 Januari 2019 - 17 April 2019 Masa 10.00 malam – 6.00 pagi Jangka masa 3 Bulan

Tujuan Menjalankan kerja-kerja pelancaran kekotak Segmen (SBG) dan sebarang kerja berkaitan

Untuk makluman, lanjutan penutupan penuh lorong secara berperingkat dan berkala akses masuk dan keluar Bandar Sri Damansara, Jalan Kuala Selangor (Arah Sungai Buloh Dan Arah Kepong) akan bermula dari 1 Januari 2019 sehingga 17 April 2019. Tempoh masa untuk kerja-kerja adalah dari 10:00 malam – 6:00 pagi selama 3 bulan.

Pelan Pengurusan Trafik adalah seperti berikut:

Penutupan A: Penutupan penuh lorong akses masuk sepanjang 30 meter ke Bandar Sri Damansara. Pemandu dari Jalan Kuala Selangor (Arah Sungai Buloh) menghala ke Bandar Sri Damansara akan dilencongkan ke kanan bagi meneruskan perjalanan di Jalan Kuala Selangor (Arah Sungai Buloh) dan membuat pusingan “U” di persimpangan Damansara Damai sebelum kembali di Jalan Kuala Selangor (Arah Kepong) untuk ke Bandar Sri Damansara (seperti yang ditunjukkan oleh anak panah BIRU dalam peta).

Page 5: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 5 of 10

Penutupan B : Penutupan penuh lorong akses keluar sepanjang 30 meter ke Jalan Kuala Selangor (Arah Sungai Buloh). Pemandu dari Bandar Sri Damansara menghala ke Jalan Kuala Selangor (Arah Sungai Buloh) akan dilencongkan ke kanan bagi meneruskan perjalanan di Jalan Kuala Selangor (Arah Kepong) dan membuat pusingan “U” di persimpangan LDP/DUKE2 sebelum kembali untuk ke Jalan Kuala Selangor (Arah Sungai Buloh) (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Penutupan C : Penutupan penuh lorong akses keluar sepanjang 30 meter ke Jalan Kuala Selangor (Arah Kepong). Pemandu dari Bandar Sri Damansara menghala ke Jalan Kuala Selangor (Arah Kepong) akan dilencongkan ke kiri bagi meneruskan perjalanan di Jalan Kuala Selangor (Arah Sungai Buloh) dan membuat pusingan “U” di persimpangan Damansara Damai sebelum kembali untuk ke Jalan Kuala Selangor (Arah Kepong) (seperti yang ditunjukkan oleh anak panah UNGU dalam peta).

Penutupan D: Penutupan penuh lorong akses masuk sepanjang 80 meter ke Bandar Sri Damansara. Pemandu dari Jalan Kuala Selangor (Arah Kepong) menghala ke Bandar Sri Damansara akan dilencongkan ke kanan bagi meneruskan perjalanan di Jalan Kuala Selangor (Arah Kepong) dan membuat pusingan “U” di persimpangan LDP/DUKE2 sebelum kembali di Jalan Kuala Selangor (Arah Sungai Buloh) untuk ke Bandar Sri Damansara (seperti yang ditunjukkan oleh anak panah MAGENTA dalam peta)..

Setiap penutupan berikut adalah secara berkala.

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

3. CONTINUATION OF FULL LANE CLOSURES BY STAGES AT ACCESS IN AND OUT OF BANDAR SRI DAMANSARA, JALAN KUALA SELANGOR (SUNGAI BULOH-BOUND AND KEPONG-BOUND)

Date 1 January 2019 – 17 April 2019 Time 10:00 pm – 06:00 am Duration 3 Months Reason To facilitate the Segmental Box Girder (SBG) launching and any other related works for

MRT construction. There will be a continuation of full lane closures by stages and intermittently at the access in and out of Bandar Sri Damansara, Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-Bound) from 1st January 2019 to 17 April 2019. Construction works will start from 10:00 pm – 6:00 am for duration of 3 months.

Closure A : Full lane closure of access in to Bandar Sri Damansara for a stretch 30 metres. Motorists from Jalan Kuala Selangor (Sungai Buloh-bound) heading to Bandar Sri Damansara will diverted to the right onto Jalan Kuala Selangor (Sungai Buloh-bound), continue straight and make a U-Turn at Damansara Damai interchange before joining Jalan Kuala Selangor (Kepong-bound) and turn left into Bandar Sri Damansara exit (as indicated in BLUE arrows in map).

Closure B : Full lane closure of access out to Jalan Kuala Selangor (Sungai Buloh-bound) for a stretch 30 metres. Motorists from Bandar Sri Damansara heading to Jalan Kuala Selangor (Sungai Buloh-bound) will diverted to the right onto Jalan Kuala Selangor (Kepong-bound), continue straight and make a U-Turn at LDP/DUKE2 interchange before joining into Jalan Kuala Selangor (Sungai-bound) (as indicated in GREEN arrows in map).

Closure C : Full lane closure of access out to Jalan Kuala Selangor (Kepong-bound) for a stretch 30 metres. Motorists from Bandar Sri Damansara heading to Jalan Kuala Selangor (Kepong-bound) will diverted to the left onto Jalan Kuala Selangor (Sungai Buloh-bound), continue straight and make a U-Turn at Damansara Damai interchange before joining into Jalan Kuala Selangor (Kepong-bound) (as indicated in PURPLE arrows in map).

Page 6: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 6 of 10

Closure D: Full lane closure of access in to Bandar Sri Damansara for a stretch 80 metres. Motorists from Jalan Kuala Selangor (Kepong-bound) heading to Bandar Sri Damansara will diverted to the right onto Jalan Kuala Selangor (Kepong-bound), continue straight and make a U-Turn at LDP/DUKE2 interchange before joining into Bandar Sri Damansara (as indicated in MAGENTA arrows in map).

All the above closures will be implemented intermittently only.

Motorists are advised to follow the traffic signage and flagmen during road closure. For further information, please refer to the map below.

PETA 3: LANJUTAN PENUTUPAN PENUH LORONG SECARA BERPERINGKAT DI AKSES MASUK DAN

KELUAR BANDAR SRI DAMANSARA (ARAH SUNGAI BULOH DAN ARAH KEPONG)

4. LANJUTAN PENUTUPAN LORONG AKSES MASUK DAN KELUAR BANDAR SRI DAMANSARA, JALAN KUALA SELANGOR (ARAH SUNGAI BULOH)

Tarikh 01 Januari 2019 - 17 April 2019 Masa 24 Jam Jangka masa 3 Bulan

Tujuan Menjalankan kerja-kerja pembinaan tiang, pelancaran kekotak Segmen (SBG) dan sebarang kerja berkaitan

Untuk makluman, terdapat penutupan secara berperingkat dan berkala di lorong akses masuk dan keluar Bandar Sri Damansara, Jalan Kuala Selangor (Arah Sungai Buloh) akan dilanjutkan dari 1 Januari 2019 hingga 17 April 2019. Tempoh masa kerja-kerja adalah 24 jam selama 3 bulan.

Pelan pengurusan trafik adalah seperti berikut:

Penutupan A: Penutupan lorong kiri akses keluar dari Bandar Sri Damansara ke Jalan Kuala Selangor (Arah

Page 7: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 7 of 10

Sungai Buloh) sepanjang 100 meter.

Penutupan B: Penutupan lorong kanan akses keluar dari Bandar Sri Damansara ke Jalan Kuala Selangor (Arah Sungai Buloh) sepanjang 100 meter.

Penutupan C: Penutupan separa lorong akses masuk ke Bandar Sri Damansara dari Jalan Kuala Selangor (Arah Sungai Buloh) sepanjang 80 meter.

Hanya satu (1) penutupan yang akan dilaksanakan pada setiap masa.

Penutupan D: Penutupan tetap lorong ini telah diumumkan sejak Ogos, 2016.

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut sila rujuk peta di bawah.

4. CONTINUATION OF LANE CLOSURES AT ACCESS IN AND OUT OF BANDAR SRI DAMANSARA, JALAN KUALA

SELANGOR (SUNGAI BULOH-BOUND)

Date 1 January 2019 – 17 April 2019 Time 24 Hours Duration 3 Months

Reason To facilitate the piers works, SBG launching and any other related works for MRT construction.

There will be a continuation of lane closures by stages and intermittently at access in and out of Bandar Sri Damansara, Jalan Kuala Selangor (Sungai Buloh-bound) from 1 January 2019 to 17 April 2019. Construction works will be 24 hours for 3 months.

The traffic management plan involves the following closures:

Closure A: Left lane closure at access out from Bandar Sri Damansara towards Jalan Kuala Selangor (Sungai Buloh-bound) for a stretch of 100 metres.

Closure B: Right lane closure at access out from Bandar Sri Damansara towards Jalan Kuala Selangor (Sungai Buloh-bound) for a stretch of 100 metres.

Closure C: Partial lane closure at access in to Bandar Sri Damansara from Jalan Kuala Selangor (Sungai Buloh-bound) for a stretch of 80 metres.

There will be only one (1) closure that will be implemented at any one time.

Closure D: This permanent closure was announced in August 2016.

Motorists are advised to follow the traffic signage and flagmen during closure. For further information, please refer to the map below.

Page 8: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 8 of 10

PETA 4: LANJUTAN PENUTUPAN LORONG AKSES MASUK DAN KELUAR BANDAR SRI DAMANSARA,

JALAN KUALA SELANGOR (ARAH SUNGAI BULOH)

5. LANJUTAN PENUTUPAN LORONG SECARA BERKALA WAKTU MALAM DI JALAN JINJANG PERMAI 2, JALAN JAMBU GAJUS, JALAN KEPONG (JINJANG SELATAN) AND JALAN KEPONG (ARAH KL DAN ARAH KEPONG)

Tarikh 01 Januari 2019 - 01 April 2019 Masa 10:00malam – 6:00pagi Jangka masa 3 bulan

Tujuan Untuk kerja- kerja pemunggahan barang, kekotak segmen (SBG), pemindahan utiliti dan sebarang kerja berkaitan.

Untuk makluman, penutupan lorong secara berkala waktu malam di Jalan Jinjang Permai 2, Jalan Jambu Gajus, Jalan Kepong (Jinjang Selatan), Jalan Kepong (Arah KL dan Arah Kepong) akan dilanjutkan dari 01 Januari 2019 sehingga 01 April 2019, 10:00malam – 6:00pagi. Pelan pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan A:

• Lorong dalam sepanjang Jalan Jinjang Permai 2, dari Balai Bomba Jinjang ke Wisma TNB Kepong. • Lorong dalam sepanjang Jalan Jambu Gajus, dari Sogud Machinery ke Secondhand Car Dealer. • Lorong dalam sepanjang Jalan Kepong (Jinjang Selatan), dari CIMB ke Jinjang Funeral Parlor. • Pengawal bendera akan mengawal trafik dengan menggunakan kaedah “Berhenti dan Jalan”.

Penutupan B: Penutupan lorong kiri secara berkala di Jalan Kepong (Arah KL) sepanjang 250 meter. Penutupan C:

• Penutupan lorong kiri dan lorong tengah secara berkala di Jalan Kepong (Arah KL) sepanjang 200 meter. • Penutupan lorong kiri dan lorong tengah secara berkala di Jalan Kepong (Arah Kepong) sepanjang 80

meter.

Page 9: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 9 of 10

Penutupan D: • Penutupan lorong tengah dah lorong kanan di Jalan Kepong (Arah KL dan Arah Kepong) sepanjang 80

meter. • • Penutupan lorong akan dilaksanakan secara berkala dan satu (1) lorong boleh diguna oleh pemandu

pada kedua - dua hala pada setiap masa. Sila rujuk peta di bawah. Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas.

5. CONTINUATION OF NIGHT LANE CLOSURES BY STAGES ALONG JALAN JINJANG PERMAI 2, JALAN

JAMBU GAJUS, JALAN KEPONG (JINJANG SELATAN) AND JALAN KEPONG (KL-BOUND & KEPONG BOUND)

Date 01 January 2019 - 01 April 2019 Time 10:00pm – 6:00am Duration 3 months

Reason To facilitate loading/unloading material, Segmental Box Girder (SBG) launching, utilities relocation and any other related works.

The long-term night lane closure by stages along Jalan Jinjang Permai 2, Jalan Jambu Gajus, Jalan Kepong (Jinjang Selatan), Jalan Kepong (KL-bound & Kepong bound) will continue from 01 January 2019 to 01 April 2018, 10:00pm to 6:00am. The traffic management plan involves the following closures: Closure A:

• Internal road of Jalan Jinjang Permai 2 starting from Balai Bomba Jinjang to Wisma TNB Kepong. • Internal road of Jalan Jambu Gajus starting from Sogud Machinery to Secondhand Car Dealer. • Internal road of Jalan Kepong (Jinjang Selatan) starting from CIMB to Jinjang Funeral Parlor.

Flagman will be in place using "STOP" and "GO" method to indicate the traffic flow. Closure B: Left lane closure by stages along Jalan Kepong (KL-bound) for a stretch of 250 meters. Closure C:

• Left lane and middle lane closures by stages along Jalan Kepong (KL-bound) for a stretch of 200 meters. • Left lane and middle lane closures along Jalan Kepong (Kepong-bound) for a stretch of 80 meters.

Closure D:

• Middle and fast lane closures along Jalan Kepong (KL-bound & Kepong-bound) for a stretch of 80 meters. The closures will be implemented intermittently and at any one time there will be one (1) lane made available for motorists on both bounds. See map appended. Motorists are advised to follow the traffic signage and flagman during road closure.

Page 10: PENGUMUMAN TRAFIK MAKLUMAN TERKINI …...Page 1 of 10 PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG

Page 10 of 10

PETA 5: LANJUTAN PENUTUPAN LORONG SECARA BERKALA WAKTU MALAM DI JALAN JINJANG PERMAI 2, JALAN JAMBU GAJUS, JALAN KEPONG (JINJANG SELATAN) AND JALAN KEPONG (ARAH KL

DAN ARAH KEPONG)

For media enquiries, please contact:

Mohd Sofie Hassan (Peta 1 – 4) Tel: +6019 228 3004 [email protected] Ong Kien Lien (Peta 5) Tel: +6016 9382 289 [email protected] Mohar Zainal Abidin (Peta 1 – 5) Tel: +603 7493 3961 [email protected]

MMC GAMUDA KVMRT (PDP SSP) SDN BHD (1117100-V) Block A, Level 17, Menara Mustapha Kamal, PJ Trade Centre No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya Selangor Darul Ehsan, Malaysia T: +603-7494 2222 F: +603-7727 0222 http://www.mymrt.com.my