Download - Adtec Pre No.21 Mei 09
LAPORAN KEMAJUAN PROJEK NO.22
‘APRIL 2009’
PROJEK ADTEC TAIPING
KEMENTERIAN SUMBER MANUSIA
JABATAN KERJA RAYA MALAYSIA
KAMALBINA SDN. BHD
PEMILIK
PEGARAH PROJEK
KONTRAKTOR R&B
ADTEC TAIPING
LOKASI PROJEK
BANGUNAN PENTADBIRAN
BENGKEL TEK. MAKLUMAT& JAMIN KUALITI
DEWAN BESAR
PUSAT SUMBER
DEWAN KULIAH
LOBI UTAMA
KAFETERIA
MIKRO ELEKTRONIK
KOMPOSIT PLASTIK
M&E PLANT ROOM
1
TNB SUB
STATION
SERAMIK
M&E PLANT ROOM
2
GARAJ KENDERAAN
ASRAMA LELAKIASRAMA PEREMPUAN
DEWANMAKAN
SURAU
KELAS F
KELAS G
KUARTERSB, C, C&D
PELAN TAPAK ADTEC TAIPING
KEMAJUAN KERJA FIZIKAL
JADUAL : 85.16 %SEBENAR : 87.59 %KESELURUHAN : 2.43 %
TARIKH LAPORAN : 12 JUN 2009
KEMAJUAN KERJA KEWANGAN
JADUAL : 85.09 %SEBENAR : 86.12 %KESELURUHAN : 1.03 %
TARIKH LAPORAN : 12 JUN 2009
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 88.35% 92.38% 4.03%
JUN 09’ 94.21% 96.74% 2.53%
MECHANICAL PLANNED
ACTUAL
AIR COND 94.85% 95.50%
FIRE FIGHTING 81.61% 95.74%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - DEWAN BESAR
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 90.00%
MAIN S/BOARD 100.00% 95.00%
LPS NA NA
PA 94.88% 67.17%
SMATV 83.38% 86.79%
CCTV NA NA
ICT 3.31% 74.25%
DEWAN BESAR
DEWAN BESAR
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 98.92% 94.90% -4.02%
JUN 09’ 99.68% 99.72% 0.04%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – LOBI
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 95.90% 100.00%
SUBMAIN CABLE 94.17% 100.00%
DB 75.00% 100.00%
LUMINAIRE 87.89% 100.00%
MAIN S/BOARD NA NA
LPS NA NA
PA NA NA
SMATV NA NA
CCTV 88.68% 92.58%
ICT NA NA
LOBI UTAMA
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 92.24% 91.71% -0.52%
JUN 09’ 98.54% 98.19% -0.35%
MECHANICAL PLANNED
ACTUAL
AIR COND 96.19% 95.00%
FIRE FIGHTING 81.51% 86.04%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMABANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 75.00% 100.00%
LUMINAIRE 91.65% 95.00%
MAIN S/BOARD 75.00% 95.00%
LPS 90.51% 92.01%
PA 37.88% 65.71%
SMATV NA NA
CCTV NA NA
ICT 0.91% 74.48%
DEWAN KULIAH UTAMA
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 95.30% 95.38% 0.09%
JUN 09’ 97.50% 98.54% 1.04%
MECHANICAL PLANNED
ACTUAL
AIR COND 93.54% 85.18%
FIRE FIGHTING 39.81% 81.59%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 97.53% 97.00%
SUBMAIN CABLE 93.31% 98.00%
DB 85.00% 100.00%
LUMINAIRE 92.27% 98.00%
MAIN S/BOARD 85.00% 95.00%
LPS 91.25% 96.92%
PA 44.70% 69.69%
SMATV 94.54% 88.33%
CCTV NA NA
ICT 18.16% 23.36%
PUSAT SUMBER / PERPUSTAKAAN
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 92.72% 92.73% 0.01%
JUN 09’ 96.42% 96.51% 0.09%
MECHANICAL PLANNED
ACTUAL
AIR COND 91.09% 94.96%
FIRE FIGHTING 47.94% 74.24%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBERBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 99.48% 97.00%
SUBMAIN CABLE 97.32% 98.00%
DB 85.00% 100.00%
LUMINAIRE 82.78% 95.00%
MAIN S/BOARD 75.00% 95.00%
LPS 87.80% 90.85%
PA 63.70% 58.92%
SMATV 95.99% 88.07%
CCTV 73.69% 70.43%
ICT 24.87% 51.37%
BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 98.36% 98.71% 0.08%
JUN 09’ 99.58% 99.23% -0.35%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 100.00%
FIRE FIGHTING 90.22% 74.56%
KITCHEN EQUIP. 65.55% 69.00%
LPG INSTALL. 40.84% 48.50%
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - KAFETARIA
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD NA NA
LPS 100.00% 88.81%
PA 94.53% 62.91%
SMATV 92.47% 87.44%
CCTV NA NA
ICT 0.00% 75.00%
KAFETERIA
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 93.95% 95.49% 1.54%
JUN 09’ 98.05% 98.01% -0.05%
MECHANICAL PLANNED
ACTUAL
AIR COND 86.90% 91.36%
FIRE FIGHTING 31.85% 63.60%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMATBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 99.23% 96.00%
SUBMAIN CABLE 98.21% 100.00%
DB 97.27% 100.00%
LUMINAIRE 92.51% 100.00%
MAIN S/BOARD 75.00% 95.00%
LPS 100.00% 96.80%
PA 100.00% 73.49%
SMATV 95.09% 89.00%
CCTV 79.13% 291.22%
ICT 8.53% 19.28%
BENGKEL TEKNOLOGI MAKLUMAT
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 96.82% 95.67% -1.14%
JUN 09’ 98.42% 98.30% -0.12%
MECHANICAL PLANNED
ACTUAL
AIR COND 93.36% 93.41%
FIRE FIGHTING 45.37% 72.69%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 87.25% 85.00%
DUST CONTROL NA NA
PROCESS COOLING
41.53% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 75.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 75.00% 95.00%
LPS 92.90% 96.80%
PA 62.47% 75.48%
SMATV 75.18% 74.39%
CCTV 83.97% 93.08%
ICT 26.23% 23.86%
BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 97.05% 95.65% -1.40%
JUN 09’ 98.46% 98.41% -0.05%
MECHANICAL PLANNED
ACTUAL
AIR COND 80.73% 78.34%
FIRE FIGHTING 43.93% 69.10%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 87.25% 85.00%
DUST CONTROL 31.69% 77.29%
PROCESS COOLING
38.45% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 95.00%
LPS 97.29% 93.25%
PA 92.78% 72.21%
SMATV 75.26% 75.20%
CCTV 86.10% 92.75%
ICT 21.23% 18.81%
BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 95.12% 94.67% -0.46%
JUN 09’ 97.15% 97.14% -0.02%
MECHANICAL PLANNED
ACTUAL
AIR COND 91.33% 92.19%
FIRE FIGHTING 44.40% 69.54%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 87.25% 85.00%
DUST CONTROL 11.65% 72.95%
PROCESS COOLING
21.79% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 99.29% 100.00%
DB 78.00% 100.00%
LUMINAIRE 96.30% 100.00%
MAIN S/BOARD 85.00% 95.00%
LPS 90.20% 96.49%
PA 96.64% 72.96%
SMATV 73.29% 74.70%
CCTV 90.23% 93.97%
ICT 33.22% 27.44%
BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 94.30% 95.17% -0.87%
JUN 09’ 96.50% 96.99% 0.48%
MECHANICAL PLANNED
ACTUAL
AIR COND 82.68% 59.54%
FIRE FIGHTING 26.16% 63.17%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 87.25% 85.00%
DUST CONTROL 38.25% 80.74%
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITIBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 97.67% 96.00%
SUBMAIN CABLE 95.02% 97.00%
DB 95.02% 95.00%
LUMINAIRE 77.98% 90.00%
MAIN S/BOARD 57.17% 95.00%
LPS 86.74% 96.20%
PA 42.25% 68.68%
SMATV 87.59% 85.36%
CCTV 80.71% 90.90%
ICT 7.17% 18.61%
BENGKEL KEJ. JAMINAN KUALITI
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 92.86% 94.80% 1.94%
JUN 09’ 95.58% 95.59% 0.01%
MECHANICAL PLANNED
ACTUAL
AIR COND 93.43% 91.50%
FIRE FIGHTING 22.33% 59.71%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 87.25% 85.00%
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIKBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 96.00%
SUBMAIN CABLE 96.67% 95.00%
DB 72.68% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 95.00%
LPS 92.34% 96.70%
PA 52.92% 72.02%
SMATV 91.26% 86.86%
CCTV 84.11% 91.21%
ICT 6.84% 22.94%
BENGKEL MIKRO ELEKTRONIK
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 100.00% 100.00% 0.00%
JUN 09’ 100.00% 100.00% 0.00%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 100.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 100.00%
LPS 100.00% 95.68%
PA NA NA
SMATV 84.58% 68.14%
CCTV 79.71% 93.15%
ICT 100.00% 90.00%
KUARTERS KELAS ‘B’
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 100.00% 100.00% 0.00%
JUN 09’ 100.00% 100.00% 100.00%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 100.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 90.00%
LPS 100.00% 95.78%
PA NA NA
SMATV 82.56% 46.09%
CCTV NA NA
ICT 100.00% 84.06%
KUARTERS KELAS ‘C’
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 100.00% 100.00% 0.00%
JUN 09’ 100.00% 100.00% 0.00%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 100.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 90.00%
LPS 100.00% 96.33%
PA NA NA
SMATV 84.58% 86.14%
CCTV NA NA
ICT 100.00% 90.00%
KUARTERS KELAS ‘C’ + ‘D’
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 97.14% 98.49% 1.36%
JUN 09’ 98.63% 98.85% 0.12%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 90.00%
LPS 93.30% 96.98%
PA NA NA
SMATV 95.77% 93.31%
CCTV NA NA
ICT 96.04% 92.34%
KUARTERS KELAS ‘F’ ( 4 TINGKAT )
KUARTERS KELAS ‘F’ ( 5 TINGKAT )
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 97.58% 98.48% 0.90%
JUN 09’ 99.57% 99.58% 0.01%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G
(1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 90.00%
LPS 100.00% 96.98%
PA NA NA
SMATV 95.77% 93.31%
CCTV NA NA
ICT 100.00% 98.37%
KUARTERS KELAS ‘G’ ( 5 TINGKAT )
KUARTERS KELAS ‘G’ ( 4 TINGKAT )
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 99.42% 99.60% 0.18%
JUN 09’ 99.83% 96.63% 0.01%
MECHANICAL PLANNED
ACTUAL
AIR COND 90.95% 100.00%
FIRE FIGHTING 57.40% 72.89%
KITCHEN EQUIP. 65.55% 69.00%
LPG INSTALL. 40.84% 48.50%
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 98.00%
DB 100.00% 95.00%
LUMINAIRE 100.00% 80.00%
MAIN S/BOARD 100.00% 90.00%
LPS 100.00% 97.32%
PA 56.87% 73.23%
SMATV 92.47% 90.79%
CCTV NA NA
ICT 100.00% 75.35%
DEWAN MAKAN
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 98.70% 99.43% 0.73%
JUN 09’ 99.39% 99.55% 0.16%
MECHANICAL PLANNED
ACTUAL
AIR COND 89.66% 100.00%
FIRE FIGHTING 39.31% 84.41%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & BBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 99.33% 100.00%
SUBMAIN CABLE 94.80% 97.00%
DB 100.00% 90.00%
LUMINAIRE 100.00% 95.00%
MAIN S/BOARD 100.00% 90.00%
LPS 98.56% 97.48%
PA 64.19% 76.16%
SMATV 72.72% 89.94%
CCTV 79.47% 92.93%
ICT 97.72% 92.43%
ASRAMA LELAKI A & B
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 98.95% 99.37% 0.52%
JUN 09’ 99.44% 99.50% 0.06%
MECHANICAL PLANNED
ACTUAL
AIR COND 76.12% 100.00%
FIRE FIGHTING 81.16% 85.89%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & DBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 99.23`% 100.00%
SUBMAIN CABLE 98.85% 97.00%
DB 94.81% 90.00%
LUMINAIRE 92.21% 95.00%
MAIN S/BOARD 100.00% 90.00%
LPS 100.00% 97.64%
PA 60.31% 74.66%
SMATV 72.35% 89.94%
CCTV 84.84% 92.62%
ICT 99.49% 91.62%
ASRAMA PEREMPUAN C & D
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 95.20% 92.10% 0.69%
JUN 09’ 96.94% 96.63% -0.31%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING 100.00% 75.00%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - SURAU
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 76.89% 100.00%
MAIN S/BOARD 85.00% 95.00%
LPS 91.35% 96.24%
PA 30.52% 64.71%
SMATV NA NA
CCTV NA NA
ICT NA NA
SURAU
MONTH PLANNED ACTUAL AHEAD / DELAY
MEI 09’ 99.80% 99.83% 0.04%
JUN 09’ 99.99% 99.83% -0.16%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING 100.00% 75.00%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - ASTAKA
BANGUNAN SOKONGAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 100.00%
SUBMAIN CABLE 100.00% 100.00%
DB 100.00% 100.00%
LUMINAIRE 100.00% 100.00%
MAIN S/BOARD 100.00% 90.00%
LPS 97.85% 93.89%
PA 38.16% 67.38%
SMATV NA NA
CCTV NA NA
ICT NA NA
BANGUNAN SOKONGAN
ASTAKA
MONTH PLANNED ACTUAL AHEAD / DELAY
JUN 09’ 100.00% 100.00% 0.00%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 99.53%
FIRE FIGHTING 32.54% 90.34%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM
BANGUNAN SOKONGAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 97.00%
SUBMAIN CABLE 100.00% 90.00%
DB 100.00% 0.00%
LUMINAIRE 92.72% 90.00%
MAIN S/BOARD 54.00% 100.00%
LPS NA NA
PA NA NA
SMATV NA NA
CCTV NA NA
ICT NA NA
BANGUNAN SOKONGAN
M&E PLANT ROOM – PUSAT SUMBER
BANGUNAN SOKONGAN
M&E PLANT ROOM - BENGKEL
DECORATIVE FENCE
BANGUNAN SOKONGAN
GARAJ KENDERAAN
ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK
RUMAH SAMPAH
LALUAN BERBUMBUNG
OPEN PLAZA
KERJA INFRA – JALAN UTAMA
GELANGGANG PERMAINAN
GELANGGANG PERMAINAN
GELANGGANG PERMAINAN
BENGKEL MIKRO - CLEANROON
M&E : FIRE FIGHTING
STAGE : DEWAN KULIAH
BENGKEL JAMINAN KULITI
KITCHEN HOOD : CAFETERIA
M&E
• SEKIAN TERIMA KASIH