(CV-ANUWAR) Page 1 CURRICULUM VITAE PROJECT ENGINEER SAA ENGINEERING & MARINE SDN BHD LOT 19, TINGKAT 1, LOT KEDAI PMINT, BANDAR BARU SERI KERTEH, 24300 KERTEH, KEMAMAN, TERENGGANU DARUL IMAN TEL. NO. : 09-826 1592 FAX NO. : 09-826 1039 BRANCH OFFICE NO.77-1, JLN SUSUR LARKIN PERDANA 1, LARKIN PERDANA, 80350 JOHOR BHARU, JOHOR, MALAYSIA TEL/FAX NO.: 6-07-3883527/2365672 Personal Information Name : Mohd Anuwar Hamzah I/C No. : 820430-11-5355 Date of Birth : 30 th April 1982 Address : 2284, Kampung Sungai Derhaka, 21100 Kuala Terengganu,Terengganu Contact No. : 019-6222544 Status : Married Heir : Nurul Fadiah Bt. Abu Zarin Blood Group : O+ Academic Qualification 2007 Staffordshire University, United Kingdom, England B. Engineering Mechanical Engineering 2004 International University College of Technology Twintech Diploma in Mechanical Engineering 2002 Institut Kemahiran Mara Certificate of Marine 1999 Sekolah Menengah Keb. Tengku Bariah SPM

Upload: dinhdiep

Post on 31-Jan-2018

251 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 1

CURRICULUM VITAE PROJECT ENGINEER

SAA ENGINEERING & MARINE SDN BHD

LOT 19, TINGKAT 1, LOT KEDAI PMINT,

BANDAR BARU SERI KERTEH, 24300

KERTEH, KEMAMAN,

TERENGGANU DARUL IMAN

TEL. NO. : 09-826 1592

FAX NO. : 09-826 1039

BRANCH OFFICE

NO.77-1, JLN SUSUR LARKIN PERDANA 1,

LARKIN PERDANA, 80350 JOHOR BHARU,

JOHOR, MALAYSIA

TEL/FAX NO.: 6-07-3883527/2365672

Personal Information

Name : Mohd Anuwar Hamzah

I/C No. : 820430-11-5355

Date of Birth : 30th

April 1982

Address : 2284, Kampung Sungai Derhaka, 21100 Kuala Terengganu,Terengganu

Contact No. : 019-6222544

Status : Married

Heir : Nurul Fadiah Bt. Abu Zarin

Blood Group : O+

Academic Qualification

2007 Staffordshire University, United Kingdom, England

B. Engineering Mechanical Engineering

2004 International University College of Technology Twintech

Diploma in Mechanical Engineering

2002 Institut Kemahiran Mara

Certificate of Marine

1999 Sekolah Menengah Keb. Tengku Bariah

SPM

Page 2: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 2

Safety Training / Exposure

27–29th

August 2008 Combined Safety Course ( Offshore ) - TSTC

20th

Oct 2008 Niosh Petronas Safety Passport (NPSP)

10th

March 2010 ISO Awareness Training

27th

to 28th

September 2010 Project Planning & Management (PPM)-Concepts

Competency Course / Training

10th

March, 2010 ISO 9001: 2008 Awareness Training

Key Job Description Engineering:-

1. Prepare parts sketches and write work orders and purchase requests to be furnished by outside

contractors.

2. Draft detail drawing or sketch for drafting technician completion or to request parts fabrication by

machine, sheet or wood shops.

3. Review project instructions and blueprints to ascertain test specifications, procedures, and

objectives and test nature of technical problems such as redesign.

4. Review project instructions and specifications to identify, modify and plan requirements

fabrication, assembly and testing.

5. Devise, fabricate and assemble new or modified mechanical components for products, such as

industrial machinery or equipment and measuring instruments.

6. Discuss changes in design, method of manufacture and assembly and drafting techniques and

procedures with staff and coordinate corrections.

7. Set-up and conduct tests of complete units and components under operational conditions to

investigate proposal for improving equipment performance.

8. Inspect lines and figures for clarity and return erroneous drawings to designer for correction.

9. Analyze test results in relation to design or rated specifications and test objectives and modify or

adjust equipment to meet specifications.

10. Evaluate tool drawing designs by measuring drawing dimensions and comparing with original

specifications for form and function, using engineering skills.

11. Confer with technicians and submit reports of test results to engineering department and

recommend design or material changes.

12. Calculate required capacities for equipment of proposed system to obtain specified performance

and submit data to engineering personnel for approval.

13. Record test procedures and results, numerical and graphical data, and recommendations for

changes in product or test method.

14. Read dials and meters to determine amperage, voltage, electrical output and input at specific

operating temperature to analyze parts performance.

15. Estimate cost factors, including labor and material for purchased and fabricated parts and costs for

assembly, testing and installing.

16. Test equipment, using test devices attached to generator, voltage regulator or other electrical parts,

such as generators or spark plugs.

Page 3: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 3

Job Activities:-

1. Getting Information

Observing, receiving and otherwise obtaining information from all relevant sources.

2. Interacting With Computers

Using computers and computer systems (including hardware and software) to program, write

software, set up functions, enter data or process information.

3. Communicating with Supervisor, Peers or Subordinates

Providing information to supervisors, co-workers and subordinates by telephone, in written form,

e-mail, or in person.

4. Identifying Objects, Actions and Events

Identifying information by categorizing, estimating, recognizing differences or similarities and

detecting changes in circumstances or events.

5. Evaluating Information to Determine Compliance with Standards

Using relevant information and individual judgment to determine whether events or processes

comply with laws, regulations or standards.

6. Establishing and Maintaining Interpersonal Relationship

Developing constructive and cooperative working relationships with others and maintaining them

over time.

7. Making Decisions and Solving Problems

Analyzing information and evaluating results to choose the best solution and solve problems.

8. Drafting, Laying Out and Specifying Technical Devices, Parts and Equipment

Providing documentation, detailed instruction, drawings or specifications to tell others about how

devices, parts, equipments or structures are to be fabricated, constructed, assembled, modified,

maintained or used.

9. Documenting/Recording Information

Entering, transcribing, recording, storing or maintaining information in written or

electronic/magnetic form.

10. Estimating the Quantifiable Characteristic of Products, Events or Information

Estimating sizes, distances and quantities or determining time, costs, resources of materials

needed to perform a work activity.

Page 4: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 4

Working Experiences

Employer : SAA Engineering & Marine Sdn Bhd

Position : Operation Manager

Period/Year : September 2011 to date

Employer : Hamdan Abdullah Sdn Bhd

Position : Project Engineer

Period/Year : August 2008 to September 2011

Project Experience

Client : FPG Oleochemical Sdn.Bhd.

Project : Tank Cleaning During Shutdown 2004

Position : Project Engineer

Date : April 2004

Client : Kerteh Terminal Sdn.Bhd.

Project : : PVRV,PSV and PRV Servicing

Position : Project Engineer

Date : Mei – Jun 2004

Client : Petronas Carigali Sdn.Bhd.

Project : : MISC – FPSO Hose Installation

Position : Project Engineer

Date : Mei – Jun 2004

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose Emergency Repair for FPSO Bunga Kertas

Position : Project Engineer

Date : August 2004 – September 2004

Client : Petronas Carigali Sdn Bhd

Project : Transfer of Marine Cargo Hose from Yard to Warehouse

Position : Project Engineer

Date : September 2004 – October 2004

Client : FPG Oleochemicals Sdn Bhd

Project : Tank Cleaning

Position : Project Engineer

Date : November 2004 - December 2004

Client : Petronas Carigali Sdn Bhd

Project : Offloading Hose Inspection and Testing Warehouse 20, KSB

Position : Project Engineer

Date : November 2004 - December 2004

Page 5: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 5

Client : Petronas Carigali Sdn Bhd

Project : SCPA Structure Deck Extension Platform

Position : Project Engineer

Date : September 2004 – January 2005

Client : Petronas Carigali Sdn Bhd

Project : Fabrication of Riser Guard

Position : Project Engineer

Date : April 2005 – July 2005 (Completed Installation)

Client : FPG Sdn.Bhd.

Project : Tank Cleaning Of RWST

Position : Project Engineer

Date : June 2005 – July 2005

Client : Petronas Carigali Sdn Bhd

Project : Marine Hose And Ancillaries Repair, Maintenance and Disposal

Position : Project Engineer

Date : June 2005

Client : FPG Oleochemicals Sdn Bhd

Project : Tank Internal Cleaning of Rain Water Surge

Position : Project Engineer

Date : June 2005

Client : Petronas Carigali Sdn Bhd

Project : Service Platform Reinstatement at Bekok-A

Position : Project Engineer

Date : October 2005

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose Stringing, Towing and Installation Work for FPSO

Puteri Dulang

Position : Project Engineer

Date : October 2005

Client : Shell Refining Berhad

Project : Upgrading of Berth No.1 at SRC Jetty, Port Dickson ( Installation of

Fenders )

Position : Project Engineer

Date : November 2005

Client : Felda Bulkers Sdn. Bhd.

Project : Tank Internal Services

Position : Project Engineer

Date : December 2005

Client : MTBE Malaysia Sdn Bhd

Page 6: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 6

Project : Blasting & Painting Work to ½”, ¾”, 1”, 1 ½”, 2”, 4” and 6” pipe

Position : Project Engineer

Date : January 2006

Client : Felda Bulkers Sdn. Bhd.

Project : Tank Internal Services

Position : Project Engineer

Date : February 2006

Client : Kertih Terminals Sdn. Bhd.

Project : VCM Spheres PSV Instrument Service

Position : Project Engineer

Date : February 2006

Client : Petronas Carigali Sdn Bhd

Project : Tank & Vessel Internal Coating at Pulai A Platform

Position : Project Engineer

Date : May 2006

Client : Felda Bulkers Sdn Bhd

Project : Tank Internal Cleaning

Position : Project Engineer

Date : June 2006

Client : Perwaja Steel Sdn Bhd

Project : Vessel Special Coating

Position : Project Engineer

Date : June 2006

Client : Kertih Terminals Sdn Bhd

Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB

Position : Project Engineer

Date : July 2006

Client : Petronas Gas Berhad

Project : Fabrication, Installation and Painting Works of Auto Lubrication for

Fin Fan Cooler

Position : Project Engineer

Date : July 2006

Client : Kerteh Terminals Sdn Bhd

Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB

Position : Project Engineer

Date : July 2006

Client : MTBE Malaysia Sdn Bhd

Project : Supply, Fabrication & Site Installation of Piping System for Spent

Caustic Circulation at PDH

Page 7: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 7

Position : Project Engineer

Date : August 2006

Client : Felda Bulkers Sdn Bhd

Project : Tank Manual Cleaning

Position : Project Engineer

Date : September 2006

Client : Alam Maritim (M) Sdn Bhd

Project : Assembling Hose for Cendor Project

Position : Project Engineer

Date : September 2006

Client : Alam Hidro (M) Sdn Bhd

Project : Installation Hose at FSO Cendor PM304 Project

Position : Project Engineer

Date : October 2006

Client : Petronas Carigali Sdn Bhd

Project : Marine Hose In-Situ Inspection for SBM-5, Miri MCOT Terminal

Position : Project Engineer

Date : October 2006

Client : Lumut Maritime Terminal Sdn Bhd

Project : Fender Replacement

Position : Project Engineer

Date : November 2006

Client : Petronas Carigali Sdn Bhd

Project : Hose Change Out for FSO Puteri Dulang 2007

Position : Project Engineer

Date : March 2007

Client : MTBE Malaysia Sdn Bhd

Project : Supply, Install & Testing of Piping & ITS Auxilliaries for Spent

Caustic Recirculation System at PDH

Position : Project Engineer

Date : March 2007

Client : FPG Oleochemicals Sdn Bhd

Project : Plant Shutdown – Tank Cleaning

Position : Project Engineer

Date : April 2007

Client : Petronas Carigali Sdn Bhd

Project : Fabrication and Installation of Deck Extension for Temporary

Shelter at Sotong-A (STJT-A) Platform

Position : Project Engineer

Page 8: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 8

Date : April 2007

Client : Petronas Carigali Sdn Bhd

Project : Hose Change Out for Subsea Hose at SBM 5, Miri (2 strings)

Position : Project Engineer

Date : April 2007

Client : Petronas Gas Berhad

Project : To Perform Rectification Works of Mechanical Small Bore Item

Turnaround GPP2, Phase 1 and 2

Position : Project Engineer

Date : April to May 2007

Client : Swiber Offshore Construction Pte Ltd

Project : Floating Hose and Hawser Installation at FSO Abu Cluster

Position : Project Engineer

Date : May 2007

Client : Petronas Carigali Sdn Bhd – SKO

Project : Mooring Hawser and Chafing Chain Replacement at SBM 1 Bintulu

Position : Project Engineer

Date : June 2007

Client : Miri Crude Oil Terminal (MCOT)

Project : Piping Fabrication

Position : Project Engineer

Date : July 2007

Client : Petronas Carigali Sdn Bhd

Project : Supply of Gasket and Bolt & Nuts for SKO Floating Hose

Position : Project Engineer

Date : July 2007

Client : Petronas Carigali Sdn Bhd

Project : Load Cell Inspection and Sea Chest De-Blinding at FSO Puteri

Dulang

Position : Project Engineer

Date : August 2007

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose for Miri SBM (2 strings)

Position : Project Engineer

Date : August 2007

Client : Shell Malaysia Berhad

Project : Replacement of Jetty Fenders to Outer, Inner and Jetty Head

Position : Project Engineer

Date : September 2007

Page 9: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 9

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose In-Service Inspection for FSO Puteri Dulang

Position : Project Engineer

Date : October 2007

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose In-Service Inspection for FSO Abu Cluster

Position : Project Engineer

Date : October 2007

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose In-Service Inspection for FPSO Bunga Kertas

Position : Project Engineer

Date : October 2007

Client : Petronas Carigali Sdn Bhd

Project : Floating Hose In-Service Inspection for FPSO Perintis

Position : Project Engineer

Date : October 2007

Client : Kerteh Terminal Sdn.Bhd

Project : PRV Servicing

Position : Project Engineer

Date : November 2007

Client : Petronas Carigali Sdn Bhd

Project : Fabrication and Installation of Boatlanding at Angsi-E

Position : Project Engineer

Date : November 2007

Client : Petronas Gas Berhad

Project : HDPE Pipeline at GPP4

Position : Project Engineer

Date : March 2008

Client : ENSCO Sdn Bhd

Project : Floating Flare Installation at FSO Abu Field

Position : Project Engineer

Date : March 2008

Client : Petronas Carigali Sdn Bhd

Project : Floating and Subsea Marine Cargo Hose String In-Service

Inspection SBM1, Bintulu

Position : Project Engineer

Date : March 2008

Client : Petronas Carigali Sdn Bhd

Page 10: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 10

Project : Floating Marine Cargo Hose String Disconnection SBM1, Bintulu

Position : Project Engineer

Date : March 2008

Client : Petronas Carigali Sdn Bhd

Project : Installation of Boat Landing Clamp at Angsi C

Position : Project Engineer

Date : May 2008

Client : Nam Fatt Construction Sdn Bhd

Project : Supply Manpower, Tools, Equipment and Mob-Demob for

Installation Temporary Fender

Position : Project Engineer

Date : June 2008

Client : Petronas Carigali Sdn Bhd

Project : Floating Flare Unit Offshore and Hook-up Commissioning at Abu

Field

Position : Project Engieer

Date : June 2008

Client : Petronas Gas Berhad

Project : Replace 1km Pipe for Potable Water Line

Position : Project Engineer

Date : June 2008

Client : Petronas Penapisan (Terengganu) Sdn Bhd

Project : Hose Change Out 2008

Position : Project Engineer

Date : June 2008

Client : Petronas Carigali Sdn Bhd

Project : Underwater Boat Landing Inspection at DDPC

Position : Project Engineer

Date : July 2008

Client : Petronas Carigali Sdn Bhd

Project : Hose Change Out at TCOT

Position : Project Engineer

Date : July 2008

Client : MISC Berhad

Project : Lifting Work at FPSO Abu Cluster

Position : Project Engineer

Date : September 2008

Client : Petronas Dagangan Berhad

Page 11: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 11

Project : Maintenance Works on Tank & Intercopter/Replace Check Valve for

The fire & Replace Bundwall Gate Valve at Kertih Aviation Depot

Position : Project Engineer

Date : September 2008

Client : Petronas Carigali Sdn Bhd

Project : Supply of Material, Design, Fabrication, Painting and Installation of

Cold Vent System

Position : Project Engineer

Date : October 2008

Client : Petronas Carigali Sdn Bhd

Project : Provision of Caisson Inspection, Maintenance & Cleaning Services –

Duyong Field

Position : Project Engineer

Date : November 2008

Client : Petronas Gas Berhad

Project : Replace Platform to Grating Type at GPP1

Position : Project Engineer

Date : February 2009

Client : Petronas Carigali Sdn Bhd

Project : Expansion Joint Replacement In-Service Inspection, Subsea/

Floating Hose and Underwater SBM and PLEM, Mooring Hawser

And Chain Replacement at SBM 5 (Miri)

Position : Project Engineer

Date : April 2009

Client : Petronas Carigali Sdn Bhd

Project : Expansion Joint Replacement

Replacement Subsea/Floating Hose Change Out at SBM 1

(Bintulu)

Position : Project Engineer

Date : May 2009

Client : Petronas Carigali Sdn Bhd

Project : Hose Change Out for FSO Puteri Dulang

Position : Project Engineer

Date : July 2009

Client : Petronas Carigali Sdn Bhd

Project : Refit Boatlanding Clamp at Duyong Drilling Platform C (DDPC)

Position : Project Engineer

Date : July 2009

Client : MLNG Sdn Bhd

Page 12: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 12

Project : Sea Cooling Water Intake Station (SCWIS) Inspection and

Cleaning During Module 1 DOSH Shutdown 2009

Position : Project Engineer

Date : July 2009

Client : Petronas Carigali Sdn Bhd

Project : Expansion Joint Replacement In-Service Inspection, Subsea/

Floating Hose and Underwater SBM and PLEM, Mooring Hawser

And Chain Replacement at SBM 5 (Miri)

Position : Project Engineer

Date : August 2009

Client : Petronas Carigali Sdn Bhd

Project : Fabrication & Installation of Boatlanding Fender System at Malong A

Platform

Position : Project Engineer

Date : August 2009

Client : Petronas Gas Berhad

Project : Small and Big Bores Piping Inspection Program at Plant Operation

Division, PGB for a Period of Two (2) years with an option to extend

For another two (2) years on annually basis

Position : Project Engineer

Date : December 2008 – December 2010

Client : Petronas Carigali Sdn Bhd

Project : Provision of Grating Replacement at ANDR-A and ANDP-B

Position : Project Engineer

Date : October 2009

Client : Kertih Port Sdn Bhd

Project : Provision for Fender Replacement at Berth 4 & 5, KPSB Jetty

Position : Project Engineer

Date : October 2009

Client : Petronas Penapisan (Terengganu) Sdn Bhd

Project : Provision of SBM Underwater Barnacle Cleaning, Kerteh

Position : Project Engineer

Date : November 2009

Client : Petronas Carigali Sdn Bhd

Project : Mooring Hawser, Chafing Chain, Support Buoy Chain and Picking-

up Rope Replacement for SBM 1 (Bintulu)

Position : Project Engineer

Date : November 2009

Client : Petronas Penapisan (Terengganu) Sdn Bhd

Page 13: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 13

Project : Provision for Emergency Floating Hose Replacement For SBM

Kerteh

Position : Project Engineer

Date : November 2009

Client : Petronas Carigali Sdn Bhd

Project : Provision Underwater Welding and Rectification SBM Kerteh

Position : Project Engineer

Date : December 2009 - January 2010

Client : Petronas Carigali Sdn Bhd

Project : Mooring Hawser Replacement for SBM 2, Bintulu

Position : Project Engineer

Date : January, 2010

Client : Petronas Carigali Sdn Bhd

Project : SBM 5 Mooring Hawser, Chafing Chain and Support Chain

Replacement and Spool Installation

Position : Project Engineer

Date : February, 2010

Client : Petronas Carigali Sdn Bhd

Project : Provision of Grating Replacement at ANDR – A and ANDP-B

Position : Project Engineer

Date : October 2009 – February, 2010

Client : Petronas Carigali Sdn Bhd

Project : SBM 5 Mooring Hawser, Chafing Chain and Support Chain

Replacement and Spool Installation, Miri

Position : Project Engineer

Date : March, 2010

Client : Petronas Carigali Sdn Bhd

Project : Fabrication & Installation of Boatlanding Fender System at Malong A

Platform

Position : Project Engineer

Date : September, 2009 - March, 2010

Client : Kertih Port Sdn Bhd

Project : Provision of Fender Replacement at Berth 4 & 5, KPSB Jetty

Position : Project Engineer

Date : October 2009 - April, 2010

Client : Petronas Penapisan (Terengganu) Sdn Bhd

Project : Provision of Manpower, Equipment, Tools, Material & etc for SBM

Shutdown

Position : Project Engineer

Date : April, 2010

Page 14: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 14

Client : FPSO Venture Sdn Bhd

Project : Recovering of Starboard and Port Mooring Chain and Reinstatement of

Port and Starboard Mooring Buoy Offshore Location at FSO South

Angsi

Position : Project Engineer

Date : April, 2010

Client : Kertih Port Sdn Bhd

Project : Fabrication Fender Frontal Frame

Position : Project Engineer

Date : April, 2010

Client : Kertih Port Sdn Bhd

Project : Provision of Scaffolding

Position : Project Engineer

Date : April, 2010

Client : Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE)

Project : Provision to Fabricate and Install of Fuel Gas Line for Gas Engine

Generator & Remaining Work at FSO Abu Offshore

Position : Project Engineer

Date : September, 2010

Client : FPSO Ventures Sdn Bhd

Project : Supply, Fabricate and Install of Emergency Repair Crude Oil

Washing Line at FSO Abu (Fieldweld)

Position : Project Engineer

Date : October, 2010

Client : FPSO Ventures Sdn Bhd

Project : Additional for Supply, Fabricate and Install of Emergency Repair

Crude Oil Washing Line at FSO Abu (Fieldweld)

Position : Project Engineer

Date : October, 2010

Client : Petronas Penapisan Melaka Sdn Bhd

Project : Repair and Maintenance Work (SPM F123 & F028)

Position : Project Engineer

Date : October, 2010

Client : Petronas Penapisan (Terengganu) Sdn Bhd

Project : Provision for SBM Underwater Barnacle Cleaning

Position : Project Engineer

Date : November, 2010

Client : FPSO Ventures Sdn Bhd

Page 15: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 15

Project : Provide Manpower, Tools and Equipment for Hydrostatic Test for

1 String Hose at FSO Angsi

Position : Project Engineer

Date : October 2010

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Material, Equipments, Tools and Consumables

To Perform Survey, Replace and Repair Aft Ballast Tanks Ladder and

Securing Arrangement

Position : Project Engineer

Date : November 2010

Client : FPSO Ventures Sdn Bhd

Project : Supply, Fabricate and install of Emergency Repair Crude Oil Washing

Line at FSO Abu (Fieldweld)

Position : Project Engineer

Date : November 2010

Client : FPSO Ventures Sdn Bhd

Project : Supply, Fabricate and install of Emergency Repair Crude Oil Washing

Line at FSO Abu (Fieldweld)

Position : Project Engineer

Date : November 2010

Client : FPSO Ventures Sdn Bhd

Project : Sea Cooling Water Intake Station (SCWIS) Inspection and Cleaning

During Module 2 Dosh TA 2010

Position : Project Engineer

Date : November 2010

Client : Petronas Carigali Sdn Bhd

Project : Term contract for Maintenance & Repair of Offshore Facilities

(Upgrading of Boat Landing Fender at Penara)

Position : Project Engineer

Date : November 2010 – June 2011

Client : Petronas Carigali Sdn Bhd

Project : Term contract for Maintenance & Repair of Offshore Facilities

(Upgrading of Boat Landing Fender at North Lukut)

Position : Project Engineer

Date : November 2010 – June 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision to Supply Manpower, Material (Belzona), Tool and

Consumable to Repair of Barbell Marine Cargo Floating Hose

Position : Project Engineer

Date : December 2010

Page 16: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 16

Client : Petronas Gas Berhad

Project : Recertification of Lifting & Rigging Equipment

Position : Project Engineer

Date : December 2010

Client : FPSO Ventures Sdn. Bhd

Project : Provision of Manpower, Materials, Equipment, Tools and Consumables

For Replacement of Corroded Piping in Engine Room onboard FPSO

Bunga Kertas

Position : Project Engineer

Date : December 2010

Client : FPG Oleochemicals Sdn Bhd

Project : Tank Cleaning for S901 & 902

Position : Project Engineer

Date : January 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to

Fabricate, Dismantle and Install of Steam Turbine Generator (STG)

Lube Oil (LO) Cooler Sea Water Pipeline onboard FSO Abu

Position : Project Engineer

Date : January 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Materials, Equipments, Tools and

Consumables to Perform Repair, Inspect and Load Test for Provision

Crane onboard FPSO Bunga Kertas

Position : Project Engineer

Date : January 2011

Client : FPG Oleochemicals Sdn Bhd

Project : Major Tank Cleaning 2011

Position : Project Engineer

Date : January 2011

Client : Petronas Gas Bhd

Project : Maintenance of Plug Valve and Grease Nip at GPPB

Position : Project Engineer

Date : January 2011

Client : Petronas Gas Bhd

Project : Provision of Manpower, Supervision, Tools, Materials and

Consumables to Perform Fabrication of IETS Aeractor Structure,

GPPA

Position : Project Engineer

Date : February 2011

Page 17: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 17

Client : FPG Oleochemicals Sdn Bhd

Project : Tank Cleaning S-804

Position : Project Engineer

Date : March 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables for the

Renewal of Lifeboat Davit Structure onboard FSO Cendor

Position : Project Engineer

Date : April 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to Survey

And Service Pump Room Stripping Pump onboard FSO Abu

Position : Project Engineer

Date : April 2011

Client : Petronas Carigali Sdn Bhd

Project : Provision of Manpower, Supervision, Tools, Materials and

Consumables for Hose Change Out FPSO Bunga Kertas

Position : Project Engineer

Date : April 2011

Client : Petronas Carigali Sdn Bhd

Project : Mooring Hawser Change Out for FPSO Bunga Kertas

Position : Project Engineer

Date : April 2011

Client : Petronas Carigali Sdn Bhd

Project : Provision of Manpower, Supervision, Tools, Materials and

Consumables for Hose Change Out Abu Cluster

Position : Project Engineer

Date : April 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables for

Retrievel, Transportation, Cleaning, Repair and Storage of A Mid

Water Arch (MWA) Buoy for FSO Abu

Position : Project Engineer

Date : April 2011

Client : Newfield Peninsula Malaysia Inc.

Project : Provision of Conversation, Supply, Fabrication, Installation &

Commissioning of Floating Flare Unit

Position : Project Engineer

Date : April 2011

Client : Petronas Gas Bhd

Page 18: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 18

Project : Provision for Scaffolding, Insulation and Painting Services for Small

And Big Bores Piping Inspection Program at GPPA, GPPB, Export

Terminal and Kertih Shared Marine Facility, Plant Operation Division,

For A period of Two (2) years with an option to extend for another one

(1) Year (2 + 1)

Position : Project Engineer

Date : April – December 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to Repair

Underwater Sea Chest Suction Grating Cleaning onboard FSO Abu

Position : Project Engineer

Date : April 2011

Client : Kertih Port Sdn Bhd

Project : Provision of Manpower, Supervision, Tools, Materials and

Consumable to Replace Fender 4 units at Jetty KPSB Berth 1 by

Workboat

Position : Project Engineer

Date : May 2011

Client : Kertih Terminals Sdn Bhd

Project : Supply of Manpower, Equipment, Tools and Consumables and

Transportation for Hose Hydrotest

Position : Project Engineer

Date : June 2011

Client : Petronas Maritime (M) Sdn Bhd

Project : Mooring Hawser Replacement Works at SUPSB

Position : Project Engineer

Date : June 2011

Client : Petronas Maritime (M) Sdn Bhd

Project : Manhole Opening, Cleaning and Drying Inside Compartment and

Closing back at SUPSB

Position : Project Engineer

Date : June 2011

Client : Petronas Maritime (M) Sdn Bhd

Project : Flushing of Greaser and Re-grease to SPM at SUPSB

Position : Project Engineer

Date : June 2011

Client : Kertih Terminals Sdn Bhd

Project : Painting Works at Ammonia Loading Arm and Associated Area at

Jetty B5 and B6

Position : Project Engineer

Date : May - July 2011

Page 19: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 19

Client : Petronas Carigali Sdn Bhd

Project : Provision for Manpower, Equipment, Tools, Materials and

Consumables Supply for Tie-in Works for TCOT Zero Flaring Project

Position : Project Engineer

Date : July 2011

Client : Petronas Gas Berhad

Project : Provision of Manpower, Supervision, Tools, Materials and

Consumable to Perform NSR Rectification during GPP1 Turnaround,

Gas Processing Plant Complex A

Position : Project Engineer

Date : May - July 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Repair and Life Extension (RLE) Work Phase 1 onboard

FSO Cendor

Position : Project Engineer

Date : July 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to

Replace The Sea Chest Valves in Engine Room onboard FSO Cendor

Position : Project Engineer

Date : July 2011

Client : FPSO Ventures Sdn Bhd

Project : To Crop and Replace Boundry Plate Between Sea Chest No.3 and

No.4 for FSO Puteri Dulang

Position : Project Engineer

Date : July 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to Dismantle

Fabricate and Replace Marine Gas Oil (MGO) 6” Main Pipe Line in engine

Room onboard FSO Abu

Position : Project Engineer

Date : July 2011

Client : Petronas Carigali Sdn Bhd

Project : Provision for Supply Manpower, Material, Consumables and Equipment

for Maintenance Painting at Tiong B

Position : Project Engineer

Date : July to November 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Materials, Equipment, Tools and Consumables to

Remove and Install New Gas Extractor (GE) Collecting Tank at 4” GE

Page 20: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 20

Piping in AFT Pump Room

Position : Project Engineer

Date : July to September 2011

Client : FPSO Ventures Sdn Bhd

Project : Provision of Manpower, Equipment, Tools and Consumables to Replace

Worn Seat Rings for Cargo Valve COT 2C, 3C, 5C and one by pass Valve

Onboard FSO Puteri Dulang

Position : Project Engineer

Date : July to September 2011

Client : Sungai Udang Port Sdn Bhd

Project : Sand Removal at SPM Plem

Position : Project Engineer

Date : July 2011

Client : FPSO Venture Sdn Bhd

Project : Hydrotest Hose Location at FSO South Angsi, Talisman

Position : Project Engineer

Date : July 2011

Client : PMSSB, Kerteh Port (TCOT-Descaling)

Project : Effluent Water Discharge Line Terengganu Crude Oil Terminal

Connect and Disconnection of Hose for Scale Recovery

Position : Project Engineer

Date : August 2011

Client : PMSSB, Kerteh Port (TCOT)

Project : Provision of Manpower, Equipment, Material, Tools and

Consumables for CBM SALM 1 & SALM 2

Position : Project Engineer

Date : August-October 2011

Client : Kertih Terminal Sdn Bhd

Project : Provision of Manpower, Tools, Materials, Consumables, Equipment

And Mob Demob for Piping Work at Jetty B5

Position : Project Engineer

Date : August 2011

Client : PMSSB, Kerteh Port (TCOT)

Project : Cleaning and Gauge Pig Retrieval from SALM 1 Pig Receive

Module for SALM 1, TCOT, Kerteh

Position : Project Engineer

Date : September 2011

Page 21: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 21

Client : Sungai Udang Port Sdn Bhd

Project : Rectification Work to SPM Melaka Sub Sea Floaters & Spreader Bar

Position : Project Engineer

Date : September 2011

Client : Sungai Udang Port Sdn Bhd

Project : Underwater Inspection and Maintenance Services Surface and Underwater

Inspection SPM Melaka (Quartely Inspection)

Position : Project Engineer

Date : October 2011

Client : Petronas Carigali Sdn Bhd

Project : Manpower Supply for GEG Commissioning Work at FSO Abu Cluster

Position : Project Engineer

Date : November 2011

Client : Petronas Carigali Sdn Bhd

Project : To Supply Manpower, Tools, Equipment to Repair 3 unit Ball Valve

Position : Project Engineer

Date : December 2011

Client : Iskandar Malaysia, Johor Darul Takzim

Project : Jointing & Launching of Marine Outfall for Medini Development

Position : Project Engineer

Date : March 2012 – June 2012

Client : Ardent Sea Tramp Sdn Bhd

Project : ROV Sea Fastening Ondeck MV Setia Nurani

Position : Project Engineer

Date : May 2012

Client : FPSO Ventures Sdn Bhd

Project : Repair and Life Extension (RLE) Work Phase IV (A) onboard FSO Cendor

Position : Project Engineer

Date : June 2012

Client : MISC Berhad

Project : Rehabilitation of Existing Forward Deck Tensioning Winch

Position : Project Engineer

Date : June 2012

Client : Petronas Carigali Sdn Bhd

Project : Flexible Piping System at Bekok-C MOPU

Position : Project Engineer

Date : June 2012

Page 22: CURRICULUM VITAE - avhm.com.my · PDF file27th to 28th September 2010 Project Planning & Management ... Kertih Terminals Sdn. Bhd. Project : VCM Spheres PSV Instrument Service

(CV-ANUWAR) Page 22

Client : Petronas Carigali Sdn Bhd

Project : Well Desander Installation at Duyung Platform

Position : Project Engineer

Date : June 2012

Client : Petronas Carigali Sdn Bhd

Project : Inspection and Testing of Export Hose for FSO Cendor

Position : Project Engineer

Date : June 2012