THE SECOND PENANG BRIDGE PROJECT Sustainability Consideration in The Construction of Jambatan Kedua Pulau Pinang Presented by : Dato’ Ir. Dr. Ismail Mohamed Taib, Managing Director, Jambatan Kedua Sdn Bhd 22 October 2015 Kuala Lumpur, Malaysia LEMBAGA LEBUHRAYA MALAYSIA JAMBATAN KEDUA SDN. BHD. KERAJAAN MALAYSIA 4 th Construction Industry Research Achievement International Conference Global Sustainable Construction Beyond 2020

Upload: lybao

Post on 02-Jan-2017

258 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CIRARC Kuala Lumpur

THE SECOND PENANG BRIDGE PROJECT

Sustainability Consideration in The Construction of Jambatan Kedua Pulau Pinang

Presented by : Dato’ Ir. Dr. Ismail Mohamed Taib,Managing Director, Jambatan Kedua Sdn Bhd

22 October 2015Kuala Lumpur, Malaysia

LEMBAGA

LEBUHRAYA

MALAYSIA

JAMBATAN KEDUA

SDN. BHD.

KERAJAAN

MALAYSIA

4th Construction Industry Research Achievement International ConferenceGlobal Sustainable Construction Beyond 2020

Page 2: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Photo by Jaafar Abdul Razak© 2014 Jambatan Kedua Sdn Bhd

CONTENT

Project Introduction

Sustainable Development

i. Environmental Responsibility

ii. Social Progress

iii.Economic Activity

Awards

Conclusion

Page 3: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Jambatan Kedua Sdn Bhd (JKSB), a wholly-owned company ofthe Minister of Finance (MoF Inc.) the concessionaire for theSecond Penang Bridge Project (PB2X).

The bridge project which cost RM4.5 billion is the longest inSouth-East Asia with a total length of 16.9 km over water.

The construction of The Second Penang Bridge commenced inNovember, 2008 and open to traffic on 1st March 2014.

The project faces various challenges in applying sustainability toboth design, construction and maintenance.

It is also pioneering in Malaysia tobe fully designed for seismic loadfor a 475 year return periodearthquake and a 2500 yearreturn period earthquake with "nocollapse” criteria.

PROJECT INTRODUCTION

© 2014 Jambatan Kedua Sdn Bhd

Page 4: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The Second Penang Bridge when completed,will improve trade efficiency and enhancelogistics systems by providing betterconnectivity and accessibility to PenangInternational Airport.

The bridge will alleviate the currentoverloaded traffic at the existing bridge andto meet the future traffic demand, apart frombeing one of the key elements in thedevelopment of Penang as logistics andtransportation hub for the northern region ofMalaysia under the Northern CorridorEconomic Region (NCER) programme.

The preliminary Environment Impact Assessment study wasundertaken for the project and approved by the Department ofEnvironment in 2007.

© 2013 Jambatan Kedua Sdn Bhd

Page 5: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

© 2014 Jambatan Kedua Sdn Bhd

Overall View of Jambatan Sultan Abdul Halim Mu’adzam Shah, Malaysia (Second Penang Bridge)

Page 6: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

TN

Synergy

S/B

Pa’ Wan Teh

S/B

HASHIM

DESIGN

SENITAMAN

BUMI INDAH S/B

CONTRACTOR LANDSCAPE FOR 3B & 3C

LANDSCAPE ARCHITECT PACKAGE 3H (LANDSCAPE

FOR 3B & 3C )

ARKITEK

URBANISMA S/B

LANDSCAPE ARCHITECT FOR PACKAGE 3A

SENITAMAN

BUMI INDAH

CONTRACTOR LANDSCAPE FOR 3A

CONSULTANTS FOR PACKAGE 3D

PJSI

CONSULTANT

S/B

PACKAGE 3E

PACKAGE 3F

Organization set-upProject Org. Chart (Construction)

Page 7: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sustainable development is an enduring balanced approach to social progress, economic activity and environmental responsibility.

SUSTAINABLE DEVELOPMENT

SUSTAINABLE

Page 8: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sustainable Development

• JKSB has undertaken the lifecycle management of PB2X wheresustainable develepment and green technology are ke to building thefuture.

• Sustainable development is an enduring balanced approached tosocial progress, economic activities and environmental resposibility.

• The emphesis to the lowest whole life cost is to promote the conceptof design for durability. Durability is influenced by the followingfactors:

Design and detailing Specification of materials used in construction Quality of construction

• In effort to conserve natural resources andprotect the environment, high standards ofenvironment protection were incorporated.

• Marine fauna were closely monitored to avoidchanges to the sensitive marine environment.

Page 9: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Southern Route C

Mid-Channel

Route

Northern Route

Alternative Alignments

Page 10: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Planning Stage

• In the feasibility study, alternative alignments considered were:

i. The Northern Route (highest IRR)

ii. The Mid-Channel Route

iii. The Southern Route

• However, the alignment of the Southern route was chosen as topromote socio-economics development in the south that wouldprovide a balanced development across Penang state.

The Ground Breaking Ceremony byformer Prime Minister, YAB TunAbdullah Haji Ahmad Badawi, 12November 2006

Page 11: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Environmental social activities for community

Presentation of papers which includes environmental issues applied toJKSB during conferences.

Exhibitions to promote JKSB approaches in sustainable bridge construction Adopted School Program (5 schools) Practical training > 100 trainees(from various universities, Universiti

Teknologi Petronas, Universiti Teknologi Mara, University Malaysia Pahang,Universiti Teknologi Malaysia, Universiti Malaya, University of Alabamaetc.)

Visitors (from various private organisations, government bodies anduniversities.)

Environmental Social Responsibility

Page 12: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Investing in Environmental Research & Development andEducation

Socioeconomic impact of Second Penang Bridge Construction Projectundertaken by Malaysian Institute of Economic Research (MIER) . A grantof RM200K was allocated to this research performed in 2013

Socioeconomic Impacts and Ecosystem Health of the Second PenangBridge Construction on Sustainability by USains, an investment arm ofUniversity Sains Malaysia handles the corporate grant for research. Agrant of approximately RM870K was allocated for this research that iscurrently ongoing.

Page 13: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Photo by Rashdan@ 2014 Jambatan Kedua Sdn Bhd

Environmental Responsibility

i. Environmental Monitoring and Auditing

ii. Managing Environmental Issues

iii. Minimal Impact on water flow

iv. Green Building Technology

v. Reducing the Impact of Dredging

vi. Flora and Fauna Monitoring

vii. Habitat Creation

Page 14: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Sampling Points for the Monitoring Study

Location of Ambient Environmental Monitoring

Station

Location of Water Quality Sampling Works

Base line data have been established by the respective Package 1 and 2contractors as referenced data for EMA for dredging and offshore disposalof spoils, piling, construction machineries and equipment during theConstruction Phase of the Penang Second Bridge.

14

i. Environmental Monitoring and Auditing(EMA)

Page 15: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Various environmental consultants were appointed to conduct a comprehensivemonitoring regime through Environmental Impact Assessment (EIA),Environmental Management Plan (EMP) and the Fisheries Impact Assessment(FIA).

CONSESSIONAIRE / PROJECT MANAGER

JAMBATAN KEDUASdn. Bhd.

ERE CONSULTING GROUP Sdn. Bhd.

INDEPENDENT EIA AUDITOR

Package 1, 2 & 3

PACKAGE 1

UEM BuildersBhd.

PACKAGE 2

CHEC Construction (M)Sdn. Bhd.

EIA & EMP

DR. Nik &

Associates Sdn

Bhd.

R-SYNC Tech.

Resources

Sdn. Bhd.

DREDGING AND DISPOSAL OF

SPOIL MATERIAL

Cergas MurniSdn Bhd

PACKAGE 3A PACKAGE 3B PACKAGE 3C

CSK

Murni

Services

Environmental

Science

IJM CorporationBerhad

HRA TeguhSdn Bhd

Design & Build Conventional

YES Enviro

Services

Sdn. Bhd.

CSK

Murni

Services

FANLI Marine & Consultancy Sdn Bhd

INDEPENDENT FIA CONSULTANT

EIA & EMP EIA & EMP EIA & EMP EIA & EMP

Page 16: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Most of the bridge sections including tubular steel piles, precast spun piles,reinforcement caging, precast shell and Segmental Box Girder are IBScomponents that are prefabricated on land to reduce the amount of timespent at the bridging line and the risk of damaging or polluting the marineenvironment.

Precast Spun Piles

Precast Shell

Segmental Box Girder

Reinforcement Caging

ii. Managing Environmental Issues

Page 17: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

WATER BROWSER REDUCE FLYING DUST

NOISE REDUCTION EXPANTION JOINT

HYDRAULIC PILING HAMMERCONTAINMENT WALL AT DIESEL

STORAGE TANK

MARINE WATER MONITORING RORO BIN FOR SOLID WASTE DISPOSAL

Managing Environmental Issues

Page 18: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

PROPER SCHEDULED WASTE AREA MAINTENANCE OF SILT TRAP GOOD MAINTENANCE OF DETENTION POND

MATERIAL STORAGE AREA WAS STACKED IN ACCORDANCE WITH THE MATERIAL SAFETY DATA SHEET (MSDS) ON SITE

Page 19: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The steel fender system was adopted due to its environmental friendliness, cost saving and shorter construction period.

Total pilecap : 4 nosPilecap size (P25 & P26) : 48.1m x 17.5m x 6mPilecap size (P24 & P27) : 42.7m x 10.6m x 4m

Steel Fender System

MAIN NAVIGATION SPANS

Substructure

iii. Minimal Impact On Water Flow

Page 20: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The design is based on requirements of 80% of IBS and 80% ofGreen Building Index.

• A green building concept is introduced to save water, energy andmaterial.

• The landscaping and the exterior look of the Toll Plaza are designedin such a way that the trespassing light is eliminated by plants andshaded area.

• Rain water from the roof of the building is harvested to supplementthe conventional water supply. The natural light is maximized for theintermediate floors to minimize the usage of electricity. Highefficiency windows and insulation in walls, ceilings and floors areused for the benefit of better temperature control.

Proposed Toll Plaza & Administrative Building Complex

iv. Green Building Technology

Page 21: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Renewable Energy SOLAR THERMAL COOLING& PHOTOVOLTAIC

PHOTOVOLTAIC

S U P E R V I S I O N B U I L D I N G

A D M I N I S T R A T I O N B U I L D I N G

S U R A U

WIND TURBINE AT SURAU

Page 22: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

PB2X Complex© 2014 Jambatan Kedua Sdn Bhd

Page 23: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

© 2014 Jambatan Kedua Sdn Bhd

View of Bandar Cassia Toll Plaza at Night

Page 24: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

PULAUJEREJAK

PULAUAMAN

TRUMPET INTERCHANGEAT Km 154 NSE

PULAUPINANG

NAVIGATIONAL SPAN

BATU MAUNGDIRECTIONAL RAMPS

RSA

PENANG SECOND CROSSING BRIDGETOLL PLAZA PLUS TOLL

PLAZA (EXIT)

9+000.

10+000.

11+000.

12+000. 13+000. 14+000.

15+000.

16+000.

0.

1+000. 2+000.

3+000. 4+000. 5+000. 6+000.

7+000.

8+000.

17+000.

18+000.

19+000.

20+000.

21+000.

22+000.

23+000.

BATU MAUNG TEMPORARY JETTY

PROPOSED

PROPOSED

PROPOSED

PROPOSED

PROPOSED

MAINLAND(BATU KAWAN)

LEGEND

Dredging works for 270m width Temporary Navigational ChannelTotal volume 11 million m³ of Dredged Materials

MATERIAL STORAGE YARD

BATU KAWAN TEMPORARY JTTY

BUKIT TAMBUN TEMPORARY FABRICATION

YARD

Dredged material disposal to Pulau Kendi

v. Reducing The Impact Of Dredging

Dredging Location

The dredging activities have to be carried out due to shallow water conditions at major portions of the bridge alignment which affect the barges movement for piling, pier and launching activities.

Page 25: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• In total, 11 million m³ of material was dredged from the seabed in the Penang Strait. Dredging was done carefully and spillage was minimised to avoid suspended sediment that could shade and potentially endanger the marine life.

• Disposal barge are monitor through: GPS Depth monitor Discharge opening sensor

Silt curtain was erected and maintained properly

Dredging Work

cont’d

Page 26: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Package 1 : Location of Water Quality Sampling by R-Sync Sdn Bhd

cont’d

Water Quality sampling location at disposal route

Disposal Area

Page 27: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

vi. Flora & Fauna Monitoring

• Marine flora and fauna are monitored throughout the construction phase toreduce demands and complaints from fishermen and fish farmers whoostensibly incurred losses as a result of the bridge construction.

• To ensure the aquatic life is not effected by the construction of SecondPenang Bridge, Fanli Marine & Consultancy Ptd. Ltd. (Fanli) is appointed byJKSB as an Independent Consultant to monitor the Fisheries ImpactAssessment (FIA) for this project. Fanli had earlier completed the base linestudy in 2007 for the Fisheries Department.

Overview Fisheries Industry in Penang

There are 17 fishing villages on the island and 14 fishing landing point on the main land.

In 2007, marine fisheries catch in Penang amounted to 37,774 tonnes worth RM 218.9 million.

The industry provides livelihood to nearly 3,193 fulltime fishermen.

Page 28: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Fisheries LocationLocation of Fisheries Landing Points

Location of Cage Culture Farms

Location of Cockle Farms

cont’d

Page 29: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

vii. Habitat Creation

Research by Lund University in Sweden hasdiscovered that the Oresund Bridge connectingDenmark and Sweden has improved the MarineEnvironment in 10 years since it was built.

In the Second Penang Bridge, aquatic life such asalgae, oysters, fishes are found abundantly aroundthe newly driven piles.

They become food for fish like the LongfinBannerfish (Heniochus acumiratus), Rock Grouper(Epinephelus fasciatomaculosus) and WhiteCheeked Monocle Bream (Scolopsis vosmeri) andthe local “udang lipan” (Stomatopod Crustacean).

It has been recorded that towards the end of theproject, the number of fish and invertebratespecies also found to increased from 9 to 23 and 4to 12 respectively for four years of monitoring. Assuch, it has been proven that the construction ofSecond Penang Bridge does not affect the marineenvironment of the surrounding area.

Page 30: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

© 2014 Jambatan Kedua Sdn Bhd

Social Progress

i. Stakeholder communication and involvement

ii. Occupational Safety

iii. Public Road Safety

iv. Operation and Maintenance

v. Bridge Optimization

vi. Bridge Durability

vii. Learning From Good Practice

Page 31: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Monthly Coordination meetings are held regularly with MHA and government agencies to solve project issues and to ensure compliance with regulatory bodies requirements.

• The public, factory owners, marine department and other local authorities are informed well in advance of any disruptions caused by construction activities through meetings and correspondences.

• I-supervision was implemented to monitor the construction progress at site and for public to view via JKSB website.

i. Stakeholder Communication and

Involvement

I-Supervision

• Ministry of Finance, Unit Kerjasama Awam Swasta (UKAS), Ministry of Works (JKR) and Malaysian Highway Authority (MHA) are advised on the status of the project on regular basis.

Page 32: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

ii. Occupational Safety

• Safety measures are implemented whichinclude detailed planning of constructionactivities, safety training and education,inspections by safety officers and healthchecks.

• A well balanced training/ penalty/ awardsystem is utilized to keep all managementstaff and workers up to date with the latestHSE standards and to ensure theircompliance.

• Safety features during construction is of prime concern, the recorded LostTime Accident Rate (LTAR) at Second Penang Bridge is 8.98Nos./million.Hr on the entire project.

• By comparison, one of Europe safest record is accorded to the 12kmOresund Crossing (connecting Sweden & Denmark) recording 11Nos/million.Hr with 1 death case.

(Case study 49; Aspect of Sustainability, Oresund Bridge, Sweden & Denmark; January 2009 49cs:V1 )

Page 33: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Standard Guardrails with level TL3 is upgraded to level TL4 at strategic locations to ensure that in the event of an accident, heavy vehicles are contained.

• Motorcycle lane is separated from the main lane by NJB to protect vulnerable motorcyclist.

iii. Public Road Safety

NJB

Accident involving police car on the Second Penang Bridge

Page 34: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

iv. Operation and Maintenance

• All systems are integrated with synergy between Asset Management (ISO 55000), Risk (ISO 31000), Quality (ISO 9000), Environmental (ISO 14000) and Safety (ISO 18000) Systems.

Page 35: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Integrated Asset Management System

Definitions

“Coordinated activity of an organization to realize value from assets” (ISO55000:2014 – Asset Management)

“the combination of management, financial, engineering, economic and other practices applied to physical assets with the objective of

providing the required level of service in the most effective manner” (AS/ISO 55000)

Page 36: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Integrated Module Overview

Page 37: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Performance Based Contract

A type of contract in which payment for the deliverable isexplicitly linked to the contractor successfully meeting orexceeding certain clearly defined performance indicators

World Bank Transport Note

Definition:

Maintenance contractors appointed based onPerformance Based Contract divided into fourpackages:

• Mainline• Building and Toll Plaza Complex• Mechanical and Electrical Installation• Turfed and Landscape Areas

Page 38: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

a) 2.0m dia. Bored pile for cable-stayed bridge Easily adapted to the various load and soil

requirements due to large variety in dia. andconstruction techniques

Enable the immediate in-situ evaluation of drilledsoil layers to revise foundation length due tochanged soil conditions

Achieved required capacity of 25 Meganewton (MN)at 120m depth (8m socketed into bedrock)

b) 1.5m dia. Steel pile for approach bridge Have high load-carrying capacity for a given weight

of pile, which can reduce driving costs Driven to 80m length and cause little ground

displacement Easy to splice

c) 1m dia. Spun pile for low-level bridge Faster, prefabrication allows 65m length with no

site jointing. Efficient mass to strength ratio Piles can withstand high tension forces

Advantages of different types of foundation

v. Bridge Optimization

Page 39: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Precast Concrete Shells are used as aformwork for the second layer casting andpermanently incorporated into the pilecap

6 pieces of Precast Concrete Shells arerequired for each pilecap

Pilecap Construction

Total of 3,468 nos of Precast Concrete Shell are used

Precast Concrete Shells are adopted for:

• Minimisation of temporary works (no cofferdams).

• Minimisation of insitu works

• Speed of construction

• Better surface finishing work

Page 40: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Pile caps, Columns and Crossheads are designed as reinforced concrete structures

• Total no of Piers – 289 nos at Approach Spans

• The sections and shapes of the pile caps,columns and crossheads are designed toenhance constructability, optimise costand still aesthetically pleasing.

• The low piers are cast in one completeoperation using reusable steel formwork

Substructure at the Approach Span – Pilecap, Columns and Crossheads

Page 41: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The precast segmental box girder is designed as acontinuous single twin box of 14.08m width, 4.0mlength and 3.20m depth structure with match castjoints, multiple shear keys and pre-stressingtendons.

• The design has been highly optimized to minimizeweight such that it does not require special heavylifting equipment. Segments weight between 69 to100 ton.

• Hybrid pre-stressing encompassing both externaland internal pre-stressing for design economy.

• The design of the segments is identicalwhich allows the same formwork to berepeatedly used.

• The depth is maintained constant topresent aesthetically consistent soffitline.

Superstructure at the Approach Span – Segmental Box Girder

Page 42: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

View of Completed Piers View of Completed SBG

• Cathodic protection system and special coating are applied to the tubular steelpiles for protection against corrosion.

• High strength concrete with Ground Granular Blastfurnace Slag (GGBS) andPulverised Fuel Ash (PFA) are used for the pilecap, pier column, crosshead andSBG. This will prevent sulphate and chloride attack that can cause corrosion tothe reinforcement bar.

• Concrete cover was designed to latest Eurocode: pilecap (75 mm), pier column(65mm), crosshead (60 mm) to protect the reinforcement bar against corrosion.

vi. Bridge Durability

The Second Penang Bridge is designed to have an operational lifespan of 120 years.For this project,

Tubular Steel Piles

Page 43: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Stay Cables

The stay cable will be provided with protection against corrosion by means of 3 barriers:

i) The first barrier is hot dip galvanising that covers the full length of the individualsteel wires.

ii) The second barrier (internal barrier) consists of High Density Polyethylene (HDPE)sheaths around the individual strands and that the intermediate medium wax fillsthe space between the individual sheath and the galvanized strand.

iii) The third barrier (external barrier) is the outer casing which consist of HDPE sheatharound the group of strands.

The stay cables consists of the Parallel Strand System (PSS) made up of parallel individually polyethylene coated seven-wire strands, placed inside an external polyethylene stay pipe.

First Barrier

Second BarrierThird Barrier

Typical PSS cables

Page 44: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

•Design life of stay cables is 60 years and designed to be replaceable. For non-replacement components (such as cable saddle) the design life is 125 years.

• For the anchorage components which are accessible for maintenance operationin-situ, the corrosion protection system have a design life of 25 years. After thisperiod of 25 years, if necessary, the protection system will be renewed in-situ atregular intervals of 15 years corresponding to the maintenance operations.

Stay Cables – cont’d

Cable SaddleAnchorage

THIRD GENERATION CABLE SADDLES FOR

CABLE STAY

Page 45: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• The Employer’s Requirement (ER) requires nodamage criteria for a 500 years return period.In addition to this, a requirement of ‘nocollapse’ criteria for the most credibleearthquake (2500 years return period) wasalso introduced.

• Detail design checking by IndependentChecking Engineer (ICE) indicated that spunpiles at the approach bridge of Package 1 couldonly cater for the 500 years return periodearthquake. No plastic hinge forms as requiredfor ‘no collapse’ criteria of 2500 years returnperiod.

High Damping Rubber Bearing (HDRB)

HDRB –Section

Page 46: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

• Considering the current progress of works, it was decided that achange of bridge bearing system shall be the best solution. Theoriginal Pot Bearing system has to be replaced with High DampingRubber Bearing to provide an effective seismic isolation system.

• Elastomeric bearing have a low embodied energy per m² of the bridge deck.

High Damping Rubber Bearing (HDRB) – cont’d

Page 47: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

vii. Learning From Good Practice

Contractor / Consultant

Role Signature Project

CHEC Construction (M) Sdn Bhd- subsidiary of China

HarbourEngineering Company Ltd (CHEC)

Main contractor for Main Navigation span and substructure for approach span.

• The Donghai Bridge, China 25.5km length over water cable-stayed bridge, the second longest cross sea bridge in the world.

• The Sutong Bridge, China Cable stayed bridge with the longest main span (1088m) in the world.

Highway Planning & Design Institute, China

Designer for CHEC Construction (M) Sdn Bhd

• The Sutong Bridge, China• The Hangzhou Gulf Bridge, China

The world’s longest sea-crossing bridge (36km)• The Xihoumen Bridge, China

The world’s second largest span suspension bridge (1650m)

MMSB- Technical support

from AECOMMalaysia and AECOM Hong Kong

Submitting engineer for CHECConstruction

• Padma Multipurpose Bridge, Bangladesh

A 6.15 km long two-level steel-truss road and

rail bridge (AECOM)

Page 48: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Contractor / Consultant

Role Signature Project

ARUP JururundingSdn Bhd- Technical support

from ARUP Hong Kong

• Independent Checking Engineer for Package 1& 2

• Supervision Consultant for Package 3

• Stonecutter Bridge, Hong KongCable stayed bridge with the second longest main span (1018m) in the world

• Forth Replacement Crossing, Scotland, UKA 2.7 km cable-stayed bridge with three single column towers, wind shielding and a single deck carrying two general lanes of traffic and hard shoulders in each direction

MINCO IndependentChecking Engineer for Package 3

• Experience in 23 countries on the design of highways and infrastructures.

• Arch-Bridge crossing Wetland Lake, Putrajaya• Jalan Duta Interchange, Kuala Lumpur• New Klang Valley Tolled Expressway, Kuala Lumpur –

Tanjung Malim Expressway

cont’d

Page 49: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Photo by Leong Cheon Khan© 2014 Jambatan Kedua Sdn Bhd

Economic Activity

i. Local construction employment

ii. Usage of Local Materials

iii. Training And Communication

iv. Vocational Training

v. Regional Economic Development

Page 50: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Package % of Works

Package 2 30%

Package 3A 60%

Package 3B 30%

Package 3C 60%

• Conventional Form of Contract is adopted for Package 3 (LandExpressway Portion), to give the opportunity for local / ‘Bumiputera’Contractor / Consultant to participate in such prestigious project andto expose them in managing and executing mega project.

• To promote Bumiputera Contractors participation in the project,certain percentage of works has been allocated:

i. Local Construction Employment

Page 51: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

ii. Usage of Local Material

• The use of HDRB for the bridge bearing system promotes naturalrubber; abundantly produced in Malaysia.

• Except for the cable-stayed saddle and anchorage, and steelfender, all other construction materials are obtained locally.

• The usage of local materials provides great advantage to theproject in terms of supplier availability and cost as well aseconomic contribution to the nation.

Page 52: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

iii. Training And Communication

Environmental Related Training

2011 Introduction to ISO 14001:2004 and OHSAS

18001:2007 Towards ISO 14001:2004 and OHSAS 18001:2007 for

Health, Safety and Environmental Management System; Introduction and Awareness

Towards ISO 14001:2004 and OHSAS 18001:2007 for Environmental Management System (EMS) Pre-assessment Compliance Audit (Stage 2) and Workshop

Brainstorming; Towards OHSAS 18001:2007 and ISO 14001:2004

Internal Audit Training for Quality, Environmental, Safety and Health (QESH)

HIRADC and Environmental Aspect establishment workshop

2012 Decoding & Applying the Malaysian Environmental

Laws Emergency Response Plan (ERP) Training OSH and Environmental Management Program

2013 Environmental Aspect Impact Revision Workshop Environmental Audit and Standards – ENSEARCH Scheduled Waste Management - Neville Clarke Seminar buangan terjadual anjuran KASPEN, JAS

Pulau PinangCertified Erosion, Sediment and Storm Water

Inspector (CESSWI) Sustainability & Environmental Management

Conference and Exhibition 2013QHSE Management System Introduction and

Process Based Internal Auditor training

2014 In House – Brainstorming QHSE Management

System (Operation & Maintenance) at Bukit Merah Laketown Resort

Page 53: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Communication of Environmental Related Information

Internal communication Health, Safety and Environment Committee Meeting (Quarterly) Communication through any means (memo, letter, report, notice etc.)

External communication ISO 14001:2004 and OHSAS 18001:2007 Manual & Procedures Communicates all related Health & Safety Hazard and Environmental Aspect

with contractors/consultants/visitors Communication through any means accepted (telephone & recorded, fax,

e-mail, newspaper, DOSH/DOE log book, Monthly site meeting, Environmental Management Report (EMR), Fanli Marine report etc.)

Documentary (National Geographic, JSAHMS Technical Book) Visitors (Government officers, teachers & student) Practical trainee (IPTA, PHD candidates & lecturer) Seminars (International Seminar on Design & Construction (ISDC) organized

by JKSB) Attended conferences

Page 54: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

iv. Vocational Training

• To promote transfer of technology, anemployment programme is initiated totrain local people in order to meet theskill level requirement of the project.This include employing local engineers,technicians, consultants andconstruction workers.

• Weekly educational visits byGovernment authorities, privatesectors and universities as part of theprogramme to expose them in theconstruction aspects of the megaproject.

Site visit by University Students

• Young Engineers Scheme (YES) programme is introduced in Package 2Contract to give opportunity to young engineers to get exposure in themega-scale construction project.

Page 55: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

v. Regional Economic Development

The bridge has reduce traffic volume on theFirst Penang Bridge by 8%

The bridge is a catalyst for development atthe northern corridor and also position thestate as a transportation hub for the northernregion.

Spur the economic growth at Batu Kawan andsurrounding area.

The route will become major passagefor the movement of goods to Penangports and the international airport inwhich will facilitate economic activityand also promote regional tourismindustry.

It will also contribute to accelerateeconomic transformation under theIndonesia, Malaysia & ThailandGrowth Triangle programme (IMTGT).

Page 56: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The International Green Apple Awards; forthe BuiltEnvironment & Architectural Heritage 2013– 24 June 2013

The award is giving by The Green Organizationwhich recognize and reward those who are making apositive contribution to their built environment andarchitectural heritage. JKSB also became the GreenWorld Ambassador for year 2014.

Platinum Building Award (DesignAssessment) – Green Building Index (GBI)– 27 February 2014

The benefits of GBI are; Save energy and resources,minimize the emission of toxic substancesthroughout its life cycle, harmony with the localclimate, traditions, culture and the surroundingenvironment and increase workplace activities.

AWARDS

Page 57: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Geneva International Star Award for Quality (ISAQ) 2014 -International Star Quality Convention in Geneva, 2014– 21 September 2014

The objective of the International Star Award for Quality (ISAQ) is to recognize thecommitment to quality in the top areas of business, services and industry fromdiverse sectors all around the world.

Jambatan Kedua Sdn Bhd (JKSB), the concessionaire for the Sultan Abdul HalimMu’adzam Shah Bridge or Penang Second Bridge, won a gold award at theInternational Star Award for Quality (ISAQ) during the International QualityConvention in Geneva.

Page 58: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

Road Engineering Excellence Award 2014 -Road Engineering Association Of Malaysia(REAM)– 10 November 2014

This award was introduced to confer recognition tothe most outstanding road engineering project builtwithin Malaysia.

Special Project Award (Silver Awardee) -Prime Minister’s Hibiscus Award 2014/2015

Prime Minister’s Award 2014/2015 presents anopportunity for public recognition of business,industry’s environmental accomplishment, leadershipand serves to create environmental awarenessamongst enterprises. JKSB was the first constructioncompany/concessionaire to participate and achievethe Special Project Award.

Page 59: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

The Brunel Medal Awards 2015 - ICE (Institution of Civil Engineers), UK– 9 October 2015

ICE's Annual Awards are designed to recognize both outstanding civil engineeringachievements and contribution to the profession and the institution. The Brunel Medalis awarded to a project or individual that represents excellence within civil engineering.

Jambatan Kedua Sdn Bhd (JKSB), has carved Malaysia name on the 'Civil EngineeringWall of Fame' after being the first Southeast Asian country and the third countryoutside the United Kingdom to be honoured with the prestigious Brunel Medal award.

The ICE Awards Ceremony was held at ICE Headquarters, One Great George Street,Westminster, London.

Page 60: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated

CONCLUSION

Despite its implementation in a fast track manner, theJambatan Sultan Abdul Halim Mu’adzam Shah project wasconstructed to the highest quality, considering health, safety,cost, sustainability and environmental conservation.

Page 61: CIRARC Kuala Lumpur

JAMBATAN KEDUA SDN. BHD. (824573-U)

Wholly owned by Minister of Finance, Incorporated