W AK TU PELAKSANAAN JM L. H ARGA BOBOT 1 2 3 4 1 2 3 4 D IVISII:UM UM Mobilisasi 5,000,000.00 0.01 0.001 0.001 0.001 0.001 D IVISIII:D RAIN ASE Pasangan Batu D rainase 13,773,583,668.58 15.75 3.937 3.937 3.937 3.937 D IVISIIV :PELEBARAN PERK ERASAN DAN BAH U JALAN LapisPondasi A gregatK elas S 17,500,699,386.66 20.01 10.005 10.005 D IVISIV :PERK ERASAN BERBUTIR Lapispondasi agregatkelasA 12,323,558,699.96 14.09 7.046 7.046 Lapispondasi agregatkelasB 11,422,170,502.73 13.06 6.530 6.530 D IVISIV :PEK ERJAAN ASPAL LapisResap Pengikat-A spal Cair 1,220,377,318.94 1.40 0.698 0.698 LapisPerekat-A spal Cair 262,349,425.60 0.30 0.150 0.150 Laston LapisA us (A C-W C) ( t= 4 cm ) 12,752,406,292.67 14.58 7.291 7.291 Laston LapisA ntara(A C-BC)(t= 6 cm ) 18,195,258,190.09 20.81 10.403 10.403 JU M LA H REAL COST 87,455,403,485.23 100.00 Rencana Kemajuan Pekerjaan M ingguan (% ) 0.00 10.47 17.51 22.08 22.48 17.45 10.01 0.00 Rencana Kemajuan Pekerjaan Komulatif(% ) 0.00 10.47 27.98 50.07 72.55 89.99 100.00 100.00 2 K ET . URAIAN PEKERJAAN 1 TIM E SCH EDULE

Upload: muhammad-setiawan

Post on 17-Aug-2015

224 views

Category:

Documents


0 download

DESCRIPTION

tugas

TRANSCRIPT

Invalid document format