amali part time 4wd shaft
DESCRIPTION
KERTAS KERJA MTA501TRANSCRIPT
KOLEJ VOKASIONAL MIRILORONG 10, JALAN JEE FOH, KROKOP
98000 MIRI, SARAWAK.
KERTAS KERJA
PROGRAM TEKNOLOGI AUTOMOTIF
KOD MODUL MAT 501
TAJUK MODUL 4 WHEEL DRIVE TRAIN SYSTEM
TAHUN / SEMESTER TAHUN 1 SEMESTER 5 DIPLOMA VOKASIONAL MALAYSIA
JAM KREDIT 3.0
JUMLAH JAM
KELAS/KULIAH
5.0 JAM / SEMINGGU
KOMPETENSI 1. OVERHAUL FOUR-WHEEL DRIVE TRANSFER CASE
STANDARD
PEMBELAJARAN
1.1 IDENTIFY FOUR-WHEEL DRIVE TRANSFER CASE’S LOCATION
1.2 REMOVE FOUR-WHEEL DRIVE TRANSFER CASE1.3 DISMANTLE FOUR-WHEEL DRIVE TRANSFER CASE1.4 ASSEMBLE FOUR-WHEEL TRANSFER CASE1.5 INSTALL FOUR-WHEEL DRIVE TRANSFER CASE
NAMA PELAJAR: TARIKH:
TAJUK : PART TIME 4WD TRANSFER CASE SHAFT DISASSEMBLY AND ASSEMBLY
OBJEKTIF :
Selepas aktiviti ini pelajar-pelajar mesti boleh :
1. Membuka dan memasang rear output shaft dengan teknik yang betul
2. Membuka dan memasang front output shaft dengan teknik yang betul
Page | 1
ARAHAN AM :
Anda dikehendaki membuka dan memasang part time 4 wheel drive rear outputshaft, membuka dan
memasang front output shaft menggunakan teknik yang betul. Masa yang diberikan adalah selama 2
jam. Sila patuhi langkah-langkah keselamatan semasa melaksanakan tugas dan pastikan tempat
kerja sentiasa kemas dan bersih semasa atau selepas menjalankan tugas.
PERALATAN/PERKAKASAN/BAHAN :
BIL ITEM Bil/Unit
1. 4 wheel drive transfer case 1 unit2. Service manual 1 unit3. Peralatan tangan 1 set 7. Oil Seal 1 set8. Takungan (tray) 2 unit
ARAHAN KERJA :
1. Sediakan bahan, peralatan dan kelengkapan yang sesuai.
2. Sangga kenderaan dan julang ia setinggi mengikut kesesuaian kerja
3. Membuka dan memasang rear output shaft dengan teknik yang betul
4. Membuka dan memasang front output shaft dengan teknik yang betul
Page | 2
GAMBAR RAJAH : REAR OUTPUT SHAFT (PART TIME 4WD)
Page | 3
LANGKAH KERJA BUTIRAN KERJA
1. Clutch Hub Removal
2. Jam Nut Removal
3. Radial Ball Bearing
Removal
1.1 Use special tool to support the low speed gear.
1.2 Use a press to push at the front end of the rear output shaft and then
remove the hub and gear.
NOTE: The clutch hub may fit loosely on the shaft, so that
removal is possible without using a press.
2.1 Remove the staked nut from the shaft.
2.2 Hold the drive sprocket in a soft-jaw vise.
2.3 Shift the clutch sleeve to the drive sprocket side.
2.4 Use special tool to remove the jam nut
3.1 Use special tool to support the ball bearing.
3.2 Use a press to push at a rear end of the rear output shaft,and then
remove the radial ball bearing.
NOTE: The bearing may fit loosely on the shaft, so that removal is
possible without using a press.
Page | 4
LANGKAH KERJA BUTIRAN KERJA
4. Clutch Hub Removal
5. Ball Bearing/Stopper
Plate Installation
6. Clutch Hub
Installation
4.1 Place special tool so that the load is applied at the bearing
4.2 Use a press to push at the rear end of the rear output shaft,
and then remove the clutch hub and ball bearing
5.1 Use special tool to the rear output shaft
5.2 After installing the ball bearing, fit the stopper plate onto the rear
output shaft
5.3 Use special tools to press in the ball bearing
6.1 Use special tool to the rear output shaft.
6.2 Confirm the clutch hub installation direction, and fit onto the rear
output shaft.
6.3 Use special tools to press in the clutch hub.
NOTE: The clutch hub may fit loosely on the shaft, so that installation
is possible without using a press.
Page | 5
LANGKAH KERJA BUTIRAN KERJA
7. Ball Bearing
Installation
8. Jam Nut Installation
7.1 Use special tool to support the rear output shaft.
7.2 Use special tools to install the radial ball bearing.
NOTE: The ball bearing may be fitted loosely on the shaft, so
that installation is possible without using a press.
8.1 Hold the drive sprocket in a soft-jaws vise
8.2 Shift the clutch sleeve to the drive sprocket side
8.3 Using special tool MB991013, tighten the jam nut to the specified
torque
8.4 Stake the two places of the jam nut as shown in illustration.
Page | 6
LANGKAH KERJA BUTIRAN KERJA
9. Clutch Hub
Installation
10.Snap Ring
Installation
9.1 Use special tool to support the drive sprocket.
9.2 Confirm the clutch hub installation direction, and fit onto the rear
output shaft.
9.3 Use special tools to press in the clutch hub.
10.1 Install the thickest snap ring that can be fitted in the snap
ring groove of the rear output shaft.
10.2 Make sure that the clutch hub end play meets the standard value.
Standard value: 0 − 0.08 mm (0 − 0.003 inch)
Page | 7
GAMBAR RAJAH : FRONT OUTPUT SHAFT (PART TIME 4 WD)
LANGKAH KERJA BUTIRAN KERJA
1. Ball Bearing Removal
2. Ball Bearing
Installation
1.1 Use special tool to support the ball bearing
2.1 Use special tool to support the front output shaft
2.2 Use special tools to install the ball bearing
Page | 8
LANGKAH KERJA BUTIRAN KERJA
3. Ball Bearing
Installation
3.1 Use special tool to support the front output shaft.
3.2 Use special tools to install the ball bearing.
Page | 9
PERATURAN PEMARKAHAN AMALI
PROGRAM DIPLOMA VOKASIONAL MALAYSIA
MTA 501: 4 WHEEL DRIVE TRAIN SYSTEM
1. Skala Markah:
0- Tidak menjalankan tugasan.
1- Menjalankan tugasan dan tidak mengikut kriteria yang ditetapkan.(1%-49%)
2- Menjalankan tugasan dan mengikut sebahagian kriteria yang ditetapkan.(50%-74%)
3- Menjalankan tugasan dan mengikut kriteria yang ditetapkan.(75%-100%)
2. Wajaran:
1- Perkara yang penting/ Tidak memerlukan kemahiran tinggi.
2- Perkara penting/ Perlu kemahiran tinggi.
3- Perkara sangat penting/ Mempengaruhi kefungsian.
3. Tandakan (√) di ruang markah yang disediakan
SKALA MARKAH:
Skala 0 = Calon tidak melakukan tugasan/ tidak mengikut kriteria yang ditetapkan
Skala 1 = Calon mengikut sebahagian daripada kriteria yang ditetapkan
Skala 2 = Calon mengikut kriteria ditetapkan
Skala 3 = Calon mengikut dan melebihi kriteria ditetapkan
BIL ASPEK DINILAI
MARKAH DIBERI WAJARAN
(1 – 3)
MARKAH DIPEROLE
HI
PERATUS MARKAH
DIPEROLEHI0 1 2 3
1. PROSES KERJA -40%
/ 9 x 40
Menyediakan peralatan dan bahan kerja 2
Melaksanakan kerja dengan tempoh yang telah ditetapkan.
1
JUMLAH 3
Page | 10
2. HASIL KERJA-40%
/ 27 x 40
Membuka dan memasang rear output shaft dengan teknik yang betul
3
Membuka dan memasang komponen front output shaft dengan teknik betul
3
Tiada kerosakan pada ceraian komponen
3
JUMLAH 9
3. FAKTOR KRITIKAL -10%
/ 9x 10
Proses membuka, pemeriksaan dan pemasangan ke atas komponen menggunakan kaedah yang betul mengikut manual servis pengeluar.
3
JUMLAH 3
4. KESELAMATAN DAN NILAI - 10%
/ 42 x 10
Sentiasa menjaga kebersihan tempat kerja
2
Semua peralatan di simpan / di jaga dengan baik
2
Sentiasa mengamalkan langkah-keselamatan semasa melakukan kerja.
2
Persediaan diri 2
Berhemah dan berdisplin 2
Etika 2
Profesionalisma 2
JUMLAH 14
JUMLAH MARKAH KESELURUHAN
TANDA TANGAN PEMERIKSA
NAMA PEMERIKSA
TARIKH
TERAMPIL / TIDAK TERAMPIL
NAMA PENGESAHTANDA TANGAN PENGESAH
Page | 11