3p project

Download 3P PROJECT

Post on 21-Jan-2017

140 views

Category:

Documents

6 download

Embed Size (px)

TRANSCRIPT

  • BAA 4023

    PROJECT FOR PROFESSIONAL

    PRACTICES

    PROPOSAL OF DEVELOPING NEW

    CITYCASA ASTANA RESIDENTAT LOT PT

    93097 LOT PT 93456, SEKTOR IV BANDAR INDERA MAHKOTA, MUKIM KUALA KUANTAN,

    PAHANG DARUL MAKMUR.

    AHLI KUMPULAN NO.ID

    1. SHANMUGAM A/L SUBRAMANIAM AA13022

    2. NUR ATIKAH BINTI MOHAMMAD ZULKIFLI AA12092

    3. NOR HIDAYAH BINTI ISMAIL AA12075

    4. NUR MIZA BINTI MOHAMAD AA12019

    5. NURHIDAYATI BINTI ELFIKRIE AA12039

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 2

    TABLE OF CONTENTS

    NO

    ITEM

    PAGES

    1.

    BACKGROUND COMPANY

    1-3

    2.

    PROJECT DETAILS

    3-9

    3.

    PROJECT PLANNING AND SCHEDULING

    10-11

    4.

    LAND USED RATIO

    12

    5.

    EARTHWORK

    13-16

    6.

    ROAD AND PAVEMENT DESIGN

    17-29

    7.

    DRAINAGE DESIGN

    30-36

    8.

    WATER RETICULATION

    37-65

    9.

    SEWERAGE SYSTEM

    66-89

    10.

    POWER SUB-STATION

    90-95

    11.

    BILL OF QUANTITY

    96-147

    12.

    ESTIMATION

    148-150

    13.

    APPENDIX

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 3

    1.0 COMPANY BACKGROUND

    1.1 CORPORATE INFORMATION

    Registered Name

    Castella Engineers Sdn. Bhd.

    Email

    pie_kl@yahoo.com

    Address

    No. 811 Excella Business Park,

    Jalan Ampang Putra, 68000 Ampang, Kuala Lumpur.

    Tel : (603) 90778898/90778899

    Fax : (603) 90778897

    Structure Of Company :-

    Sendirian Berhad (Sdn. Bhd.)

    100 % Bumiputra

    Registration

    Lembaga Jurutera Malaysia 693 B/C

    Ref No. : 1002 - 0100 - BC 686

    Kementerian Kewangan Malaysia

    Ref. No. : 475-02800108

    Civil Engineering

    Paid-Up Capital

    RM 200,000

    Authorised Capital

    RM 500,000

    mailto:pie_kl@yahoo.com

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 4

    Main consultant :

    CASTELLA CONSULTANCY SDN.BHD.

    Sub-Consultant :

    MITRALAND GROUP SDN.BHD. DIJAYA CORPORATION SDN.BHD.

    MEGA BUILD SDN.BHD.

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 5

    1.2 ORGANIZATION CHART

    PROJECT DIRECTOR

    SHANMUGAM A/L SUBRAMANIAM

    INFRASTRUCTURE ENGINEER

    NUR ATIKAH BINTI MOHAMMAD ZULKIFLI

    CIVIL & STRUCTURAL ENGINEER

    NOR HIDAYAH BINTI ISMAIL

    GEOTECHNICAL ENGINEER

    NUR MIZA BINTI MOHAMAD

    QUANTITY SURVEYOR

    NURHIDAYATI BINTI ELFIKRIE

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 6

    2.0 PROJECT DETAIL

    2.1 INTRODUCTION

    One of the subject call Project for Professional Practice is a compulsory subject that

    required the entire undergraduate student of faculty civil engineering to be taken in

    University Malaysia Pahang. The aims of the course are to developed students

    professionalism and ethical responsibilities skills, effective communication abilities with

    other multidisciplinary professions, effective team working skill, awareness about sustainable

    environment, desires for lifelong learning, utilization of moderns tools and technologies and

    technopreneurship skills using technical knowledge that have been learned to date. This

    subject also helps students to study and more clearly about the concept of managing the

    project that covered the life cycle of the projects, planning and scheduling, monitoring and

    controlling in construction industry.

    Students can learn how to establish the amount of money the owner will spend to obtain

    the project and the amount of money that the design and construction organization will be

    compensated for performing the work. The students are grouped into a team and that group

    will assigned to do a completed project planning and design of a civil engineering project

    report that, including the entire step regarding how to develop a project from start to the end

    progress of projects. Students must prepare a completed project planning of civil engineering

    works. A Project Director will supervise the students until the completion of the project

    proposed. Scope of works that involved in the project is all of the civil works such as site

    investigation, earthworks, water supply, drainage and sewerage system, road access,

    environmental assessment and the estimation of work.

    2.2 PROBLEM STATEMENT

    Since the area proposed is located nearby the Bandar Indera Mahkota and becoming

    the developed are, the population of residents are inclined. It will cause the demand of

    residential and facility also will be increases. In order to overcome this problem, we planned

    to propose a suitable nature park city to that are to fulfill the demand.

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 7

    2.3 TITLE OF THE PROJECT

    Proposed Of Developing New City Casa Astana at Lot Pt 93097-Lot Pt 93456,

    Sektor IV Bandar Indera Mahkota,Mukim Kuala Kuantan, Pahang Darul Makmur.

    2.4 OBJECTIVES

    To develop the remote area with 60.91 acres.

    To build 81 units Terrace House (Single Storey), 57 units Terrace House (Double

    Storey), 122 units Semi-Detached House (Double storey), 49 units Bungalow

    (Double Storey), 188 units Cluster House (Double Storey), 7 units shoplot

    (Double storey)

    Provide the others facility like Petrol Station, Sewerage Treatment Plant,

    Community Centre, Surau, Recreation Park, Playground, TNB.

    To provide the infrastructures such as road, drainage, sewerage, and water

    reticulation system within the whole area.

    2.5 JUSTIFICATIONS

    The proposed location of the Casa Astana is located near with the existing main roads

    which provide quick and convenient access to important destinations in Kuantan. The

    strategic location where is surrounded by institutional, residential, tourism, commercial area

    and recreational park. The proposed of development of nature park city are:

    To provide a safe environment.

    To provide the Eco-tourism, this is close to nature and truly represents an ideal

    getaway from the tribulations of city life.

    To provide the residential area with the distinctiveness that sets apart from the

    others.

    To provide a peaceful place of study for that area.

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 8

    2.6 PROJECT LOCATION

    Site is located at Bandar Indera Mahkota,Mukim Kuala Kuantan,Pahang Darul Makmur.

    About 15 minutes drive from the city center

    Figure 2.1 Location of Pahang

    Figure 2.2 Location of Bandar Indera Mahkota

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 9

    Figure 2.3: Key Plan Casa Astana Resident Site

    Figure 2.4: Location Plan of Casa Astana Resident Site

  • PROPOSAL OF DEVELOPING NEW CITYCASA ASTANA RESIDENTAT LOT PT 93097 LOT PT 93456, SEKTOR IV

    BANDARINDERA MAHKOTA, MUKIM KUALA KUANTAN, PAHANG DARUL MAKMUR.

    Castella Consultancy Sdn. Bhd. Page 10

    2.7 LANDSCAPE

    For this project landscape works, we will pass to landscape architect to design and

    hire another subcontractor that full with experience to complete this work. For the paz

    garden will be take more time to be construct due to this garden is mainly to be eco-

    friendly and truly environment. While for others area that with empty spaces without

    construct any building or civil work, will be construct as a field. The work of landscape will

    be consists of plantation of trees and flowers, gazebos and pedestrian.

    2.8 ENVIRONMENT

    An environmental assessment is a study required to establish all the impacts either

    positive or negative about one particular project. It will consist of technical evaluation,

    economic impact and social results that the project will bring. The environmental assessment

    will have to:

    i) Identify possible environmental effects.

    ii) Propose measurements to mitigate adverse effects.

    The site clearing will involve felling trees but after the c