1 engr. mohammad faizal cv (1) - copy

Click here to load reader

Post on 11-Jan-2017

66 views

Category:

Documents

7 download

Embed Size (px)

TRANSCRIPT

  • ______________________________

    Position Desired: SENIOR SITE

    INSPECTOR CIVIL ENGINEER

    Present Position: ASSISTANT

    RESIDENT ENGINEER (ARE) &

    MEP & INSPECTOR

    _____________________________

    OBJECTIVE:

    To work in a progressive and

    challenging environment that utilizes

    my past experiences, skills and

    educational background in the field

    of Civil Engineering profession.

    _____________________________

    SUMMARY OF QUALIFICATION:

    EDUCATIONAL BACKGROUND:

    Graduate of five (5) years course,

    Bachelor of Science in Civil

    Engineering in April 1987 @

    Mindanao State University (MSU),

    Main Campus, Marawi City,

    Philippines. With 25 years of

    professional experience to civil

    engineering supervised high rise

    building construction and several

    projects, refurbishment building

    residence villas, commercial

    building and maintenance various

    civil engineering works and other

    infrastructure projects, I gained

    competence to general site

    supervision and contract

    management with knowledge in

    materials quality and estimation.

    Obtained a Certificate of Completion

    for Workshop training course of

    AutoCAD 2006 Fundamental and

    Intermediate (2D & 3D) in October

    MOHAMMAD FAIZAL G. MOLOK UPDA CLASSIFIED GRADE A Civil ST. Engineer

    _____________________________________________________

    AL JAZEERA CONSULTING ENGINEERING Doha State of Qatar

    Position: Assistant Resident Engineer & MEP Inspector

    March 18 - 2015 to Date

    Project Handled

    1. Residential Compound ( Unit 106 + Club House + Mosque Al Muaither Date Start November 2015 to Date

    2. QIWF Qatar Iron Welding Factory + Substation + Administration

    Building Industrial Qatar. Date Start : May 2014 to Date

    3. Water, Sewerage and Substation Duhail, Qatar. Date Start April 2015 Handed over

    4. Kharaytiyat Mall B+G+2 Kharaytiyat, Qatar Date Start 2015 To Date

    5. Residential Building B+G+3 Al Hitmi, Bin Omran, Doha Qatar

    Date Start : 2013 Handed Over

    Client : Shiek Hassan Abdullah Al Thani

    Contractor : Al Moez Pearl Contracting Company

    6. Residential Building G+6 Al Saad Client : Al Qahtani

    Contractor : Al Moez Pearl Contracting Company

    _____________________________________________________________

    UNITED CONSULTANTS Doha State of Qatar.

    Structural Civil Engineer.

    January 23, 2014 to March 15, 2015

    Project Handled:

    1. PWA. Car Parking Building B2+G+6+Roof

    Project Cost: 185,000,000.00 QRs. Client: Asghal Main Contractor Al Saad General Contracting Company W.L.L.

    Doha State of Qatar.

    ______________________________________________________________

    GEIC- GULF ENGINEERING & INDUSTRIAL CONSULTANTCY

    Doha, Qatar

    Senior Inspector Civil Engineer

    Dec. 2013 to Dec. 2014

    Projects Handled:

    AFRC - Aquatic Fisheries Research Center

    Alkhor, Ras Al Matbakh, Qatar.

    1) Administration Building 2) Marine Fish Hatchery 3) Shrimp Pond 4) Live Food Facility 5) Shrimp Pond Bloodstock 6) Wet Laboratories

    7) Substation Genset 8) Qtel Room 9) Wastewater Treatment Plant

    8) Quarantine Facility 9) Feed Store 10) Plant Room 11) Guard House

  • 2006 and able to draft Construction

    and As-Built Drawings in the

    Computer. Obtained a Certificate of

    Completion for Construction Safety

    in Oil and Gas Training Course (40

    Hours) in 2012 @ New Safety Index

    International Society (NSIIS)

    Incorporation with New Safety Index

    (NSI)

    _____________________________

    SKILLS:

    Computer: MS Office (word, excel,

    access, and power point), Microsoft

    project 98, AutoCAD 2006/2010 (2D

    and 3D) & STAAD Pro 2005.

    Specification: QCS 2010 Spec.,

    Kahramaa Technical Specification,

    British Standard, ACI Code, ASTM,

    FIDIC, QSMM, ANSI, ARAMCO,

    OSHA, NEBOSH, IOSH, Familiar

    with Ministry of Highways

    Specification Have a knowledge in

    Quantity Surveyor & P6-Primavera

    program, QA/QC, Site Management

    & supervision.

    _____________________________

    AFFILIATED ORGANIZATIONS:

    o Philippines Institute of Civil

    Engineering (PICE), Qatar Chapter,

    Regular Member

    o World Safety Organization Inc.

    (WSO), Qatar Chapter, International,

    Member

    o Safety Ambassador National

    Safety Council (SA-NSC),

    International, Member

    o Qatar Safety Organization (QSO),

    Qatar, Regular Member

    o Asian Society of Safety

    Professional (ASSAP), Qatar,

    International Member

    o New Safety Index International

    Society (NSIIS), Qatar, Active

    Regular Member

    o Philippines Association of Safety

    Engineers (PHASE), Qatar, Regular

    Member

    o Philippines Institute of Civil

    Engineering (PICE)-Lanao Del Sur

    Chapter, Philippines, Lifetime

    Member

    o Maranao Professional Engineers

    Society (MPES), Lanao Del Sur

    Chapter, Philippines, Member

    o Lanao Future Builders

    Association (LFBA), Marawi City

    Chapter, Lanao Del Sur-Philippines,

    Member

    12) Intake Pumping Station 13) Desalination & Pumping Station

    14) Staff Accommodation & Labor Accommodation

    Project Cost : 230,452,499.00 QRs. Client : Ashghal Main Contractor : Consolidated Engineering Construction

    Company W.L.L. Doha State of Qatar

    ______________________________________________________________

    DARA ENGINEERING CONSULTANTS Doha, Qatar

    Position: Site Supervision Civil Engineer

    2009 to 2013

    Projects Handled:

    QIIB Headquarter Commercial Tower(2B+G+M+45)

    Al Daphna Cornice, Qatar

    Project Cost: 300,000,000.00 QRs. Client : Qatar International Islamic Bank Contractor : HBK Contracting Company W.L.L. (Qatar)

    Hotel Building (2B+G+M+&) @ Airport Road

    Project Cost: 100,000,000.00 QRs. Client : Mr. Mohammed Hassan Naqi Contractor : Shannon Contracting Company (Qatar)

    Qatar Power Transmission System Expansion Project (Phase10 & West

    Bay Project)

    Client: KAHRAMAA Qatar General Electricity and Water Corporation

    Project Handled: Qatar Power Transmission System Expansion Project

    (Phase 10 (X)), Stage-1,

    Package: S1 & S2 Substations.

    Position: Assistant Resident Engineer - Civil & Plumbing Inspector

    Project: Construction of 132kV / 11kV Indoor Substations and Cable

    Trenches.

    Main Contractor:

    I. (POWER SUBSTATIONS Package S-1 & S-2)

    1. LARSEN & TOUBRO LIMITED (L & T), (INDIAN)

    A. for Power Substation;

    1) Main Contractor: LARSEN & TOUBRO LIMITED (L & T), (INDIAN)

    Contract No.: GTC/371A/2010

    Location:

    1. Barzan Camp 1 S/S 132KV/11KV, Emiri Guard Compound at Bani Hajir

    2. Barzan Camp 2 S/S 132KV/11KV, Emiri Guard Compound at Bani Hajir

    3. Al Karana S/S 132KV/11KV, Al Karaana

    4. Al Ruwais S/S 132KV/11KV, Al Ruwais, Al Shamal

    DARA ENGINEERING CONSULTANTS (DARA) EPC Contract No.:

    GTC/144C/2006, GTC/144D/2006, GTC/142B/2006, GTC/142D/2006,

    GTC/142E/2006, GTC/142F/2006, GTC/142I/2006, GTC/142J/2006

    Year : July 02, 2009 to Dec 11, 2011

    Position : Assistant Resident Engineer - Civil & Plumbing Inspector

    Client : KAHRAMAA Qatar General Electricity and Water Corp.

    Projects Handled: Qatar Power Transmission System Expansion Project

    Phase VIII (8).

    I. (POWER SUBSTATIONS Package S-3-1 & S-3-2)

    1. LARSEN & TOUBRO LIMITED (L & T), (INDIAN)

    2. HYUNDAI Engineering & Construction Co Ltd., (SOUTH KOREAN)

    II. For POWER CABLES - Extra Heavy Volt (EHV) Package C-3-1, C-3-

  • o Fortified Association of Muslim

    Engineers (FAMEs), MSU-Marawi

    City, Lifetime Member

    o Mindanao State University

    (MSU) Alumni Association, MSU-

    Marawi City, Lifetime Member

    o Ranao Tennis Club (RTC) in

    Doha, State of Qatar, Member

    2, C-3-3, C-3-4, C-3-5, C-4-1& C-4-2)

    1. MARUBENI CORPORATION. (JAPAN)

    2. PRYSMIAN-NEXAN CO. (ITALIAN-FRANCE)

    3.TAIHAN ELECTRIC WIRE CO., LTD. (KOREAN)

    4. ETA STAR INTERNATIONAL L.L.C. (INDIAN)

    5. NEXANS (FRANCE)

    6. SIEMENS (GERMAN)

    A. for Power Substation;

    1) Main Contractor: LARSEN & TOUBRO LIMITED (L & T), (INDIAN)

    Contract No.: GTC/144C/2006

    (SUBSTATIONS Package S-3-1)

    Location: West Bay

    1. 66/11kv EDC-2 S/S

    2. 66/11kv EDC-3 S/S

    3. 66/11kv EDC-4 S/S

    4. 66/11kv EDC-5 S/S

    5. 66/11kv EDC-6 S/S

    6. 66/11kv RO-1 S/S

    2) Main Contractor: HYUNDAI Engineering & Construction Co Ltd

    (SOUTH KOREA)

    Contract No.: GTC/144D/2006

    (SUBSTATIONS Package S-3-2)

    Location; 1. Bani Hajir Super S/S 220KV/132KV/66KV/11KV

    2. Al-Sowaidi S/S (Existing) 132KV/66KV/11KV

    3. Gharafa Izagwa S/S 66/11KV

    4. Bani Hajir North S/S 66/11KV

    5. Rayyan West S/S 66/11KV

    6. Al-Wajbah Local S/S 66/11KV

    7. Al-Soudan S/S 66/11KV

    B.for under Ground Power Cables (